ASHUMGulf news and Dubai stocks, live

Integrated report for the year 2025 ALEC

ALEC Holdings PJSC 186 pages

Document186 pages, text from the file; its scanned pages read by AshumOpen DFM’s file

Page 1

ALECHOLDINGS

Integrated Annual Report 2025

Page 2

1 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSWHEREEXPERIENCEBECOMESLEGACY

Our first annual report reflects years of visionary construction and engineering excellence, which have changed city skylines, delivered meaningful social and economic impact through the realisation of industry-firsts and iconic complex structures and developments.

OUR VISION

To be the leading innovative construction group.

OUR PURPOSE

Transform construction towards an efficient and sustainable future.

OUR VALUES

COURAGE – We strive forward with bold action INTEGRITY – We are transparent and

accountable in our actions

RELIABILITY – We deliver on our commitments INNOVATION – We make ideas happen

VALUE OUR PEOPLE – We empower and invest in our people

WELCOMEMARINA GATE TOWERS

Page 3

2 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTS

Through the integration of groundbreaking technologies, including robotics and advanced automation, ALEC Holdings strives to be at the forefront of next-generation construction and engineering operating models. We aim to increasingly automate more of our building and construction activities through advanced robotic solutions by 2030, while our suite of specialised related businesses pushes the boundaries of design and modularity in cultural, hospitality, and leisure developments. As a publicly listed entity on the Dubai Financial Market (DFM) and as part of the Investment Corporation of Dubai (ICD), ALEC Holdings is at the forefront of the UAE’s strategic vision for economic diversification and sustainable development.

ABOUT UStomorrowWe build for

Page 4

3 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTS

We deliver complex, multibillion- Dirham projects with complete

visibility from concept tocommissioning through an

integrated platform that unites the Group’s Portfolio Businesses across Building & Construction, Energy Solutions, MEP, Fit-Out, Data Centres, Façades, Modular Solutions, and Equipment Rental.

Each part of this ecosystem

contributes expert capabilities at precisely the right moment: whether executing iconic

developments like One Za’abeel or technically demanding offshore energy infrastructure.

From massivescale…

Page 5

4 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTS

The Group provides end-to-end management and disciplined cost controls, quality, design, and build services. We focus on precision fit-out works and meticulous execution from thousands of workers and across years of construction. This integration enables visibility across macro-level programme management

and micro-level execution quality. Shared digital building information modelling, risk-governance frameworks, and real-time optimisation tools ensure that these projects never lose sight of the millimetre-level tolerances and system-integration challenges that define how we build for tomorrow.

BVLGARI RESORT HOTELAND MARINA VILLAGEsmallest…to thedetail

Page 6

5 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSWelcome 1About Us 2Strategic ReportHighlights 6Awards and Recognition 9Built on Innovation 10Our Sectors of Expertise 14Landmark Projects 16Chairman’s Message 29CEO Statement 31CFO Statement 34Our Business Model 37Market Overview 41Our Strategy 45Operational Review 46Stakeholder Propositions 58ESG Summary 60Corporate GovernanceChairman’s Introduction 78Governance at a Glance 79Governance Initiatives 2025 80Governance Challenges Overview 81Corporate Governance Report 83Governance Framework 83Board Composition 84Board Members Share Ownership 87Board Oversight of Culture atALEC HOLDINGS (PJSC) 89Stakeholder and RelatedParty Transactions 95Delegation of Responsibilities 95Board Evaluation 95Group Structure andExecutive Management 96External Auditor 100Internal Control System 101Violations in 2025 113Community andEnvironmental Contributions 113General information 115Financial StatementsReport of the Directors 119Independent Auditor’s Report 120Consolidated Financial Statements 124Notes to the ConsolidatedFinancial Statements 128ESG Appendices 170Read more aboutALEC Holdings: alec.aeWelcome to ourIntegrated Annual ReportCONTENTSMOBILITY PAVILION

Page 7

6 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTS633836

1,3232025

2024

20236.3

8.1

12.62025

2024202322.127.5

30.22025

2024

2023-17

660

8132025

2024

2023100

243

2652025

20242023427630

1,1062025

20242023ALEC Holdings delivered an

exceptional financial performance in 2025, achieving record revenue of AED 12.6 billion: a remarkable 56% year-on-year growth, alongside AED 1.1 billion EBITDA and a

commanding AED 30.2 billion

backlog. Strong cash generation, expanding margins, and

AED 335 million in shareholder dividends demonstrated disciplined growth and operational excellence.

ALEC Holdings achieved record revenue growth in 2025, driven by robust backlog conversion across Building & Construction (AED 6.8 billion, 47.1% of Group revenue) and Energy Solutions (AED 4.6 billion, 31.9% of Group revenue), supported by steady contributions from higher-margin Related Businesses.

Year-end backlog of AED 30.2 billion provides exceptional forward visibility, with 89% concentrated in the UAE and 11% in Saudi Arabia. The backlog is well diversified across data centres, energy and offshore, hospitality, leisure, and complex residential sectors.

Strong gross profit performanceunderscores the Group’s ability to

select high-value projects and execute them efficiently.

Strong cash generation was maintained despite increased capital expenditure of AED 387 million (3.1% of revenue), deployed primarily to enhance energy segment capabilities and support data centre growth.

EBITDA performance reflected enhanced operational efficiency, disciplined cost control, and a strategic focus on complex, high-value projects across data centres, energy infrastructure, and mission-critical facilities.

Total 2025 dividends represent ALEC Holdings’ commitment to a minimum 50% payout ratio of net profit, balancing shareholder returns with growth investment.

HIGHLIGHTSAL JANOUB BEACH CLUB,ONE&ONLY ROYAL MIRAGEBACKLOGAED 30.2bn+2.4x revenue coverageREVENUEAED 12.6bn+56% YoYGROSS PROFITAED 1,323mn+ 10.5% MarginEBITDAAED 1,106mn+8.8% MarginFREE CASH FLOWAED 813mn+23.2%DIVIDENDSAED 335mnAED 250mn April 2026 +AED 85mn interim August 20252025 FINANCIAL OVERVIEW

Page 8

7 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTS027.530.2 20252024HIGHLIGHTS CONTINUEDDEVELOPMENT OVERVIEW

ALEC Holdings secured AED 12.4 billion in projects, including Lower Zakum field works and the Stargate Data Centre. Successful execution on major projects like Wynn Al Marjan Island and Energy infrastructure, along with notable completions and industry awards, confirmed the Group’s regional leadership and technical expertise.

ALEC Holdings increased its contracted

work backlog from AED 27.5 billion at the end of 2024 to AED 30.2 billion by December 2025, driven by winning key projects in the UAE through its selective tendering process and strong client relationships.

BACKLOG GROWTHAED 30.2bn10.0% YoYSTARGATE DATA CENTRE WYNN AL MARJAN ISLANDNATURAL HISTORYMUSEUM ABU DHABINEWLY AWARDEDPROJECTSLower Zakum, Stargate, BorougePE4 and PE5 Expansion

In 2025, ALEC Holdings won some of its largest and most important contracts to date. Success in competitive tenders and negotiations highlighted the Group’s technical expertise and strong market position in energy, data centres, and infrastructure projects. 52% of new awards in 2025 came through direct, bilaterally negotiated awards.

ONGOING PROJECTSWynn Al Marjan Island, StargateData Centre, ADNOC projects,Qiddiya Speed ParkIn 2025, ALEC Holdings continued

delivering several major regional projects, including resorts, data centres, energy infrastructure, and giga-projects in Saudi Arabia. The Group is using strict programme management, digital controls, business integration, and early-warning systems to consistently meet schedules, budgets, and quality standards on demanding ongoing assignments.

PROJECT COMPLETIONSteamLab Phenomena Abu Dhabi,

Yas Waterworld Expansion, Natural History Museum Abu Dhabi and

ADNOC Offshore upgrade workson Das Island

In 2025, the Group completed several major projects, showcasing its expertise in delivering complex, high-standard facilities. These achievements strengthened its reputation for excellence in themed entertainment, immersive experiences, and mission-critical systems.

Page 9

8 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTS

ALEC Holdings demonstrated strong ESG leadership in 2025, earning two LEED office certifications, including Platinum, operating 5.5 MWp of solar capacity across its assets, and training nearly 8,000 workers.

With 100% of senior executive management completing ESG training, and external recognition from EcoVadis, sustainability excellence is embedded across every operation.

ENVIRONMENTAL HIGHLIGHTS:

• 2 offices LEED certified (Platinum, gold)

• ISO 14001:2015 covering 100% of businesses

• 5.5 MWp cumulative solar capacity installed across assets

• 70% waste diversion from landfill

• 158 tonnes of gypsum waste recycled

SOCIAL HIGHLIGHTS:

• 0.097 Lost Time Injury Frequency Rate per million man-hours in 2025

• ISO 45001:2018 Covering 100% of businesses

• 99% close-out rate on worker welfare issues recorded in 2025

• Over 8,000 workers trained, 250 workers

promoted to staff

• Over 11,000 beneficiaries of Community Impact projects

• 100% senior executive management completed ESG 101 training

• New Mother’s Rooms established across 4 offices

HIGHLIGHTS CONTINUEDSUSTAINABILITY OVERVIEWGOVERNANCE HIGHLIGHTS:

• United Nations Global Compact signatory and participant since 2023

• ISO 9001:2015 covering 100% of businesses

• 100% of cases reported through ALEC ALERT whistleblowing platform resolved

• 65%* staff completed Ethics training completion

• 3,132 vendors formally certified compliance with Code of Conduct

* Majority of those who haven’t completed Ethics training are new hires who joined in Q4

Page 10

9 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSThe Group’s operationalexcellence, safetyleadership, and projectexecution capabilitieswere recognisedexternally throughmultiple industry awardsin 2025. These accoladesvalidate its strategic focuson complex, high-valueprojects, disciplined riskmanagement, and world-class health, safety, andquality performanceacross its UAEand KSA operations.AWARDS AND RECOGNITIONGROUP AWARDS:INNOVATION AWARDS:WORKER WELFAREAND ESG AWARDS:Largest Contractor of theYearBig Project ME Awards (2025)Contractor of the YearCIA MENA Awards (2025)#3Oil and Gas Middle East’s Top25 EPC Contractors (2025)Business Excellence –ConstructionWestford Awards (2025)Digital Team of the YearME Digital ConstructionAwards (2025)Digital Contractor ofthe YearME Digital ConstructionAwards (2025)Best WelfareCompanyDubai Holding (2025)First Place for LabourAccommodation(companies withfewer than 10,000workers)UAE Ministry (2025)CommittedBadgeEcovadisESG Label (AdvancedMaturity Level)Dubai Chamber ofCommerce

Best Contractor of Innovation in Construction Techniques, LINQ

Construction KSA Innovation Awards (2025)FEB 2025

Page 11

ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 10 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSINNOVATION FUELSEVERY ADVANTAGEBUILT ON INNOVATION

Innovation at ALEC Holdings is structured, measured, and scaled to sharpen competitive advantage, from

robotics to digital platforms and newrevenue streams across the portfolio.

ALEC Holdings treats innovation as a core corporate value, owned by every business unit and supported by a central Innovation Department. A formal framework covers five domains: People, Organisation and Culture; Continuous Improvement; Health, Safety and Environment; Technology and Automation; and New Business Opportunities.

Bright Ideas, the Group’s digital innovation platform, tracks live initiatives and in 2025 generated over 1,204 ideas, with 170 implemented. Ideas are assessed, executed, and then recorded for future use. Every employee has an innovation target, supported by training and knowledge sharing programmes with contributions tracked via dashboards reviewed by business unit leaders.

Our engagement model with startupsbrings innovative ideas and practical

solutions to the construction industry.

We actively seek collaboration to drive technological advancements and improve project outcomes.

IDEAS GENERATEDIN 20251,204IDEAS IMPLEMENTEDIN 2025170

Page 12

11 ALEC HOLDINGS ANNUAL REPORT AND ACCOUNTS 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSEMBRACINGROBOTICSIn November 2024, ALEC Holdings

launched its robotics strategy to automate 5% of activities by 2030.

Key construction tasks include concrete levelling, robotic block handling (MULE), logistics, pipe welding, and rebar tying.

MULE technology, developed with

Construction Robotics, increases block work productivity by 50–75% and reduced manual handling risks, allowing operators to focus on higher-value work.

This illustrates how in 2025, the focus shifted to converting momentum into

measurable traction, with pilots delivering results and laying foundations for wider adoption across projects. Concrete levelling and pipe-welding solutions are currently being piloted and evaluated before

wider adoption.

Evidence shows that ALEMCO’s modular operations delivered measurable MEP productivity and commissioning gains in 2025 offsite manufacture accelerated delivery timelines, improved programme certainty, and mitigated delivery risks.

The controlled factory environment

strengthened labour efficiency and quality, with the approach now positioned for scaling across multiple fabrication hubs.

WE PAY FOR GREATIDEAS

Innovation is incentivised through a transparent points system that converts impact into recognition and rewards.

Engagements are scored on desirability, feasibility, and business value, reaching 100 points unlocks a cash bonus.

High performers are also profiled across the Group, rewarding incredible ideas with peer recognition as well as hard cash.

We work diligently to ensure that the ideas we adopt are of meaningful, scalable value. Annual culture surveys, CSAT scores for major initiatives and industry benchmarking ensure that innovation activity is judged on measurable value, not volume of ideas.

TOTAL CASH BONUSES AWARDEDDURING 2025 (AED)495,000AVERAGE BLOCKWORKPRODUCTIVITY GAINS50-75%BUILT ON INNOVATION CONTINUED

Page 13

ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 12 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR DOOR ISOPEN

Innovation in ALEC Holdings is deliberately open: universities, startups, digital firms, and mature suppliers are integrated into the innovation ecosystem.

By 2025, the Group had engaged 56 new partners of which 21 are startups and completed 28 pilots with different partners. These figures represent the cumulative partners and solutions progressed through the innovation funnel to date.

Tahadiy II, the Group’s flagship challenge programme, concluded in February 2025

after converting real business problems into tested solutions.

The programme marked a shift from standalone piloting toward embedding proven initiatives into repeatable operational practices, while building innovation capability across teams.

Partnerships have already created new revenue lines, most notably Battery Energy Storage Systems deployed with AJI Rentals and ALEC Energy, and ALEC Data Center Solutions hyperscale offering.

A total of 40 battery boxes were deployed in 2025, proving the business case for sustainable, generator-free site power and opening a new commercial opportunity.

Loadgate, ALEC Holdings’ internally developed logistics platform, has achieved around 20% asset utilisation gains and more than 50% effort savings on crane and delivery management. The solution is now positioned as a product in its own right, demonstrating how internal innovation can evolve into a scalable service.

STARTUPS ENGAGED IN 202521 PILOTS COMPLETED28REDUCTION IN HUMAN ERROR90%AS SAFE ASHOUSES

Digital construction underpins ALEC Holdings’ innovation edge, anchored by ISO 19650-aligned BIM processes and BSI BIM Kitemark certification for design, construction, and commissioning.

This positions the Group as a leader in information management on complex schemes such as Wynn Al

Marjan and Stargate Data Centre. Integrated platforms like Autodesk Construction Cloud, Revizto, Morta, and Oracle Primavera P6 allow multidisciplinary teams and over 70 subcontractors to coordinate design, clashes, and changes instantly. On major projects, human error has dropped by up to 90%, with 7-15% efficiency improvement across all stages of construction through the use of different tools.

BUILT ON INNOVATION CONTINUED

Page 14

13 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSTHE FUTURE IS OURS

The future can be owned by anybody, but with an unparalleled internal and external innovation ecosystem, the future is already in our grasp.

BUILT ON INNOVATION CONTINUEDFive innovation themes guidepriorities for 2026

1. Digital transformation

2. Data and AI

3. Subcontractor innovation challenges and mini challenges

4. Robotics in construction

5. Monetising new revenue streams

Each theme has a defined owner, KPIs and links to business unit plans across Construction, Energy and Related Businesses.

Taken together, the Bright Ideas engine, incentives, robotics roadmap, digital construction leadership and partner ecosystem position ALEC Holdings to be the region’s leading innovative construction group. At ALEC Holdings, absolutely anything can be achieved – we have the resources, the scale, the strategy, the brains, and the will to guarantee that nothing is impossible.

Page 15

14 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR PROJECTSOUR SECTORS OF EXPERTISEAIRPORTSALEC Construction,ALEMCO, ALEC FITOUTand AJI Rentals coordinate

airside and landside delivery, integrating complex MEP,

security, theming andlogistics to keep live hubsoperational while expandingcapacity and enhancingpassenger experienceat scale.DATA CENTRES

An integrated platform spanning ALEC Data Center Solutions,

ALEMCO, ALEC Technologies,ALEC Energy and ALEC

Construction delivers end-to-end, product-agnostic data centres, combining prefabrication, ELV, MEP and renewable power to

meet hyperscale, AI and uptimerequirements seamlessly.ENERGY SOLUTIONS

Target Engineering’s EPC expertise in offshore and onshore oil and gas is reinforced by marine yards and specialist services, enabling complex brownfield tie-ins, marine works, and fabrication to be executed under one disciplined governance and risk framework.

HOSPITALITY

From core-and-shell construction to luxury fit-out, and MEP, ALEC Construction, ALEC FITOUT and ALEMCO deliver 5-star hospitality assets as fully coordinated programmes, aligning interfaces, quality and brand standards while compressing schedules on flagship resorts.

DUBAI AIRPORT CONCOURSE DALEC TECHNOLOGIESOIL AND GASJUMEIRAH MARSA AL ARAB

Page 16

15 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSDUBAI HILLS MALLCOMMERCIAL

For headquarters and office towers, ALEC integrates core construction, high-spec MEP, ELV, modular solutions and interior fit-out, optimising floorplates, flexibility and building performance while managing costs and programme through one coordinated delivery team.

RETAILEnd-to-end capabilityacross malls and lifestyledestinations combinesstructural works, fast-track interior packages,specialist MEP and tenantcoordination, enablingphased openings,high footfall resilienceand consistent brandenvironments for leadingregional developers.LEISURE

Across theme parks and entertainment destinations, ALEC Holdings combines complex structural delivery, specialist MEP, theming, AV and show systems through ALEC FITOUT, ALEMCO and ALEC Technologies, creating immersive visitor environments with single-point accountability for performance and safety.

COMPLEX RESIDENTIALHigh-rise and branded residencesbenefit from ALEC’s experience in vertical

developments, integrated with ALEMCO, ALEC FITOUT and ALEC Solutions for façades and modular elements, delivering premium living environments with rigorous

cost, quality and programme control.MUSEUMS AND PAVILIONS

The Group unites precision construction, exhibition fit-out, environmental controls and digital experiences, leveraging ALEC FITOUT, ALEMCO and ALEC Technologies to meet stringent curatorial, acoustic and climate requirements on nationally significant cultural landmarks.

ONE ZA’ABEELUAE PAVILIONSEAWORLD ABU DHABIYAS LINKS CLUBHOUSEOUR SECTORS OF EXPERTISE CONTINUED

Page 17

16 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR APPROACHConstruct, Conserve and Protect

ALEC Holdings’ integrated delivery for the Natural History Museum Abu Dhabi combined advanced environmental systems, heritage-sensitive construction, and specialised exhibition infrastructure. ALEC Construction led project coordination, while ALEMCO provided precise climate control, fire suppression, and building automation, all geared to stringent conservation standards.

ALEC FITOUT enhanced galleries and visitor experience, and ALEC Technologies installed security and environmental monitoring systems.

The project also demanded collaboration with museum specialists and heritage consultants, ensuring every element, from HVAC to lighting, prioritised collection protection and respected conservation requirements.

The 30-month timeline required careful

coordination between design development, heritage protocol establishment, procurement of specialised systems, and construction execution – all conducted with meticulous attention to quality and conservation standards.

Natural HistoryMuseum Abu Dhabi

The Natural History Museum Abu Dhabi represents a landmark cultural project on Saadiyat Island, Abu Dhabi’s premier cultural district. This world-class museum combines advanced architectural design with sophisticated heritage preservation systems,

creating a facility capable of housing and displayingsignificant natural history collections.

The museum features many exhibition galleries, research areas, climate-controlled storage, and visitor facilities. Advanced environmental systems ensure stable temperature and humidity to protect valuable natural history specimens. Interior design balanced architectural goals, heritage conservation, and visitor experience requirements.

OverviewClientMiralBuilt-up Area36,700m²Contract Period30 monthsPurposeWorld-class museum,advanced heritagepreservation.DeliveryPrecision climate control,heritage-sensitiveconstruction, advancedexhibition systems.OutcomeEstablished ALEC’s expertisein cultural institutions,delivered to stringentconservation standards.LANDMARK PROJECTSMUSEUMS AND PAVILIONSALEC units involved

Page 18

17 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR APPROACHRapid Mobilisation for a StandoutArchitectural Triumph

The UAE Pavilion at EXPO 2020, delivered by ALEC Holdings, exemplifies the company’s skill in managing complex projects quickly. Given the BUA of 19,200m², ALEC Construction led fast-track site logistics and assembly. ALMECO also implemented modular MEP systems for efficient off-site fabrication and seamless integration of critical services.

ALEC Lite and ALEC Technologies ensured a high-quality visitor experience through advanced ICT and AV installations, including security and live media capabilities. This coordinated, modular approach enabled ALEC Holdings to exceed expectations, making the pavilion a standout architectural achievement and demonstrating its expertise in delivering ambitious national projects under tight deadlines.

The UAE Pavilion’s successful delivery – and its subsequent recognition as one of EXPO 2020’s architectural highlights – validated ALEC Holdings’ capacity to execute landmark national projects within extraordinary time constraints while maintaining design integrity and client satisfaction.

UAE Pavilion –EXPO 2020 DubaiThe UAE Pavilion atEXPO 2020 Dubairepresented nationalpride and innovation,aiming to inform visitorsabout the Nation’sachievements, values,and vision.

As the host country’s pavilion, it was a project of special importance, demanding top architectural

standards and smooth collaboration with the government and

international exhibition authorities.

The pavilion’s design, with unique features and 1,800 tonnes of steel, demanded close coordination

across design, permits, fabrication, and assembly.

LANDMARK PROJECTSMUSEUMS AND PAVILIONSOverviewClientMinistry of PresidentialAffairsBuilt-up Area19,200m²PurposeSymbol of national pride,immersive culturalexperience, and setnew benchmarks forexhibition architecture.DeliveryFast-track, modularMEP, advanced ICT/AV, parallel off-site andon- site execution.OutcomeRecognised as anarchitectural highlight,delivered under extremetime constraints.1,800TONNES OF STEELALEC units involved

Page 19

18 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR APPROACHSeamlessly Engineered Thematic Architecture

The Mobility Pavilion has served as a prime example of ALEC Holdings’ integrated delivery strategy, with ALEC Construction managing complex structural forms, ALEMCO providing exhibition-specific MEP systems, and ALEC FITOUT transforming interiors into immersive environments. ALEC Technologies delivered advanced ELV, AV, and security infrastructure, while AJI Rentals supported construction with specialised equipment.

This coordinated delivery model enabled seamless coordination of engineering, theming, and technology, with each portfolio company adding domain expertise to enhance the guest experience. The project highlighted ALEC Holdings’ capability to deliver large-scale thematic pavilions through deep specialisation and value chain integration.

The pavilion’s success depended on seamless integration between the architectural vision, structural systems, MEP infrastructure, and exhibition fit-out. ALEC Holdings’ integrated model enabled single-point accountability while deploying deep specialisation across disciplines.

Mobility Pavilion –EXPO 2020 Dubai

The Mobility Pavilion at EXPO 2020 Dubai was a major temporary exhibition focused on the future of transportation, featuring innovations in autonomous vehicles, sustainable transit, and advanced mobility systems. Its architecture embodied movement, connectivity, and modern design.

The pavilion’s design used advanced

engineering to create column-free spaces for moving vehicle displays and interactive zones. It included 9,000 tonnes of steel and required innovative temporary works.

The interior featured 9 exhibition zones, each with unique environmental, lighting, and safety needs, demanding precise MEP coordination for both exhibition and building systems.

LANDMARK PROJECTS CONTINUEDMUSEUMS AND PAVILIONSOverviewClientEMAARBuilt-up Area23,439m²Contract Period22 monthsPurposeExplore global mobility,deliver state-of-the-artexhibition infrastructure.DeliveryColumn-free interiors,advanced MEP, integratedfit-out and technology.OutcomeSignature EXPO venue,seamless integration ofarchitecture, engineering,and visitor experience.ALEC units involved

Page 20

19 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSThe KSA Pavilion at EXPO2020 Dubai showcasedSaudi Arabia’s vision andculture, acting as a temporarycultural ambassador.

The pavilion’s design focused on providing an immersive experience for visitors over a period of six months, with an emphasis on architectural quality and operational efficiency.

The pavilion’s design emphasised the interplay between traditional Saudi aesthetics and contemporary construction methodologies. The structure incorporated a substantial quantity of steel framework and utilised advanced temporary works engineering to achieve the ambitious architectural vision while meeting EXPO’s stringent safety and accessibility requirements.

LANDMARK PROJECTS CONTINUEDMUSEUMS AND PAVILIONSKSA Pavilion –EXPO 2020 Dubai

Page 21

20 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR APPROACHBalancing Function, Geometric Complexity,and Heavy Materials

ALEC Construction used a design-and-build approach for the construction of the KSA Pavilion, coordinating closely with stakeholders to deliver an efficient and visually impressive pavilion on schedule, supporting Saudi Arabia’s Vision 2030.

ALEC built a modular steel structure using fast assembly methods, achieving complex geometry quickly while maintaining quality and aesthetics. The Group also integrated its design, procurement, and construction processes to optimise cost and schedule and ensure consistent standards throughout the project.

The accelerated 19-month timeline required innovative project scheduling and mobilisation strategies. ALEC’s approach enabled parallel execution of design refinements and site preparation, compressing critical path activities.

The pavilion’s successful delivery within budget and schedule solidifies the Group’s extensive capabilities in delivering on international exhibition projects and its ability to coordinate multiple specialised disciplines under complex operational constraints.

ALEC units involvedLANDMARK PROJECTS CONTINUEDMUSEUMS AND PAVILIONS – KSA PAVILION CONTINUEDOverviewClientSaudi AramcoBuilt-up Area7,070m²Contract Period19 monthsPurposeShowcase Saudi Vision2030, deliver a world-class,temporary structure withhigh visitor capacity.DeliveryModular steel structure,rapid assembly, integrateddesign and construction,completed on time andon budget.OutcomeIconic pavilion, seamlessstakeholder coordination,affirmed ALEC’s credentialsin international exhibitions.

Page 22

21 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSALEC units involvedOUR APPROACH360 Visibility on HighlyComplex Construction andLogistics Coordination

One Za’abeel highlights ALEC Holdings’ ability to manage complex, multi-disciplinary projects, integrating advanced engineering and technology. ALEC Construction led the towers and a record-setting strand-jacking of the cantilever bridge, with support from other ALEC divisions.

The project marked a global first in large-scale strand-jacking, requiring close coordination with Dubai authorities. It set new benchmarks for construction innovation, sustainability, and quality in luxury mixed-use developments.

The vertical integration of the development

– with the main towers rising while construction proceeded in overlapping phases – required extraordinary logistics planning and coordination to manage material flows, personnel movements, and equipment deployment.

One Za’abeel’s successful delivery and its subsequent recognition as a landmark architectural and engineering achievement represent just one of ALEC Holdings’ unique landmark developments and its role in constructing some of the world’s most iconic, most complex, and ambitious projects.

One Za’abeel – Dubai

One Za’abeel is a flagship mixed-use development in Dubai,

featuring two main towerslinked by the world’s largestsuspended link bridge above a

highway, considered a significant engineering achievement.

The project integrates luxury

hospitality, upscale residences, and commercial spaces in one

urban location. ALEC Construction led the construction of the towers and a record-setting strand-jacking of the suspended link bridge, with

support from other ALEC divisionsThe primary engineering achievement

was the cantilever bridge, a record-setting structure installed using large-scale strand-jacking and incorporating a long unsupported span that required precise design and construction coordination.

The development includes ultra-luxury hotels such as One&Only and SIRO, upscale residences, premium dining options, a 82-metre rooftop infinity pool, and streamlined operations for various amenities.

LANDMARK PROJECTS CONTINUEDCOMPLEX RESIDENTIALOverviewClientIthra DubaiBuilt-up Area530,000m²Contract Period39 monthsPurposeIconic mixed-usedevelopment, redefineDubai’s skyline.DeliveryTwin towers, world’s largestcantilever bridge, luxuryfit-out, advanced MEP, andtechnology.OutcomeLandmark engineeringachievement, recognised forinnovation and complexity.

Page 23

22 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR APPROACHPrecision Engineering andSafety-first Accountability

The design and construction of the Aquarabia Qiddiya City required a comprehensive, end-to-end development approach that combined construction, fit-out, MEP systems, theming, and operational technology under one

accountable team.Coordination and Collaboration

ALEC Saudi Arabia and El Seif jointly managed site development, structural and temporary works, and overall coordination, while ALEC FITOUT managed theming, finishes, F&B, and retail fit-out, and guest amenities.

The Aquarabia Qiddiya City is a major attraction featuring 11 themed zones with a variety of slides, pools, and rivers. Signature rock elements define the park’s distinctive skyline. The design prioritises innovation, guest comfort, and sustainability through advanced water and climate systems.

As a flagship leisure destination, the park supports Qiddiya’s vision for cultural and economic growth and strengthens Saudi Arabia’s global tourism ambitions by offering memorable experiences for visitors and residents.

AquarabiaQiddiya CityAquarabia Qiddiya Citynear Riyadh, developed bya joint venture betweenALEC Saudi ArabiaEngineering and Contractingand El Seif EngineeringContracting for QiddiyaInvestment Company, will

offer water attractions, dining, hotels, shops, and connections

to Qiddiya’s infrastructure.Design and Technical Highlights

The park will feature 11 themed zones with slides, pools, rivers, and adventure spaces alongside extensive theming, including the 82-metre Camel Rock spanning 94,000m².

Advanced water systems and climate-adapted HVAC will meet global standards.

LANDMARK PROJECTS CONTINUEDLEISUREOverviewClientQiddiya Investment CompanyBuilt-up Area~250,000m²Contract Period47 monthsPurpose

Flagship leisure destination aligned with Qiddiya’s master plan and Vision 2030.

Delivery

End-to-end construction, fit-out, MEP, theming and operational technology under single JV accountability.

Outcome

Region’s largest themed water park, 11 zones, 82-metre Camel Rock; positions JV for future

Qiddiya projects.ALEC units involved

Page 24

23 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSLANDMARK PROJECTS CONTINUEDLEISURE

teamLab Phenomena Abu Dhabi on Saadiyat Island, delivered by ALEC Construction for Miral, is a purpose-built immersive digital art venue combining projection, interactive sensors, architectural design, and visitor-responsive technology.

Design and Technical HighlightsSpaces were engineered to optimise

projection sightlines and immersive effects, with tailored architectural, lighting, AV, and sensor requirements. Precise climate control, high-density power distribution, and integrated building automation protect sensitive equipment and enable continuous interactive operation.

teamLabPhenomenaAbu Dhabi

Page 25

24 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSALEC units involvedOUR APPROACHImmersive Digital Architecture andTechnical Coordination

ALEC Construction combined structural works, specialist fit-out, MEP, and extra low voltage (ELV) and audiovisual (AV) coordination to meet teamLab’s artistic and technical brief, providing single-point delivery and close collaboration with the artist technologists.

Contractor Roles

From start to finish, the Group and its Portfolio Companies managed site development, structural and fit-out works and coordinated specialist MEP/ AV suppliers. MEP systems delivered precise HVAC, power distribution, and automation. Furthermore, the Group’s ELV/AV teams integrated projection, sound, and sensor networks; fit out delivered specialist mounts, finishes and visitor amenities.

Project Outcome

teamLab Phenomena Abu Dhabi is a complete, purpose-built immersive venue on Saadiyat Island that demonstrates ALEC’s ability to deliver complex digital culture projects through tight technical coordination and iterative testing, enabling responsive, high-impact visitor experiences.

Overview

• Deliver a world-class

immersive digitalart museum usingadvanced projection andinteractive systems.

• Provide exhibition

infrastructure forprojection, sensors,AV, and responsiveinstallations.

• Showcase ALEC’s

capability to delivertechnically demandingcultural venues inthe region.

• Support flexible, evolving

installations that changewith each visit.ClientMiralBuilt-up area17,000m²StatusCompleted in February 2025ScopePurpose-built exhibitionspaces, mechanical,electrical, and plumbing(MEP); audiovisual (AV),and fit-out.OutcomeA multi-award-winningimmersive digital artdestination that elevatesvisitor engagement andstrengthens the client’scultural brand.

• MEP ME Awards: Smart

Project of the YearLANDMARK PROJECTS CONTINUEDLEISURE – TEAMLAB PHENOMENA ABU DHABI CONTINUED

Page 26

25 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR APPROACHCritical StakeholdersEngagement and ComplexAquatic Engineering

As a highly specialised facility combining architectural innovation, sophisticated mechanical systems, visitor experience design, and advanced operational technologies, SeaWorld Abu Dhabi is as exciting as it is challenging in its complexity and need for a unique architectural design and precision engineering.

ALEC Holdings orchestrated the delivery of SeaWorld Abu Dhabi, with ALEC Construction managing structural systems for vast aquarium loads, while ALEMCO implemented advanced life support and water treatment, and ALEC FITOUT delivered high-quality hospitality and visitor amenities.

ALEC Technologies provided

sophisticated monitoring and safety systems, with ALEC Energy installing solar PV for sustainability and AJI Rentals supplying bespoke access solutions.

This unified expertise enabled seamless integration of mechanical, structural, and operational systems, ensuring marine welfare and visitor experience.

The 42-month schedule allowed

for thorough design, testing, and improvement with marine biology experts, ensuring a well-developed facility. ALEC Holdings brought together the critical needs for animal welfare, visitor safety, and operational standards to ensure the highest possible welfare and safety across the SeaWorld experience.

SeaWorld Abu Dhabi stands as the world’s largest indoor marine theme park and represents a transformational leisure project for Abu Dhabi’s tourism ecosystem. Encompassing state-of-the-art marine habitats, interactive animal experiences, world-class dining, and adventure attractions, the facility combines zoological excellence with

entertainment infrastructure on anunprecedented scale.

The facility hosts the world’s largest aquarium with around 25 million gallons of saltwater in 8 habitat zones. Spanning 5 levels and 1.8 kilometres of pathways, it meets international animal care standards and offers restaurants, shops, meeting spaces, as well as advanced water treatment and life-support systems.

OverviewClientMiralBuilt-up Area256,000m²Contract Period42 monthsPurposeWorld’s largest indoormarine theme park,innovative habitatengineering.DeliveryAdvanced life support,water treatment, integratedguest experience, andsustainability features.OutcomeBenchmark for marineparks, unified biological,visitor, and infrastructureexcellence.LANDMARK PROJECTS CONTINUEDLEISUREALEC units involvedSeaWorldAbu Dhabi

Page 27

26 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSLANDMARK PROJECTS CONTINUEDDATA CENTRE

Once complete, Stargate Data Centre will serve as a reference point for the region’s rapidly expanding artificial intelligence and hyperscale data centre sector. This landmark 200 MW Phase 1 facility – currently under construction – will sit within a 1GW campus concept, and is

being developed in partnership withG42 and OpenAI.

As such, it represents the first international deployment of OpenAI’s advanced AI infrastructure platform in the Middle East and anchors Abu Dhabi’s ambitions to become a global AI hub.

The data centre’s design emphasises rapid deployment, modular scalability, and operational efficiency. The facility is incorporating 200 MW electrical capacity, sophisticated cooling systems to dissipate 200 megawatts of heat, and infrastructure redundancy ensuring continuous operational availability. The 200 MW first phase is designed to integrate seamlessly with planned subsequent phases, creating the full 1GW campus.

Stargate Data Centre

– Abu Dhabi

Page 28

27 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR APPROACHPhased Commissioning, ModularConstruction and Advanced Cooling

ALEC Construction is managing structural works, while ALEC Data Center Solutions oversees design, modular manufacturing, and fast deployment for hyperscale data centres. ALMECO is providing advanced MEP systems, including immersion cooling, reliable power, and automation to ensure continuous operation. LINQ’s modular assembly is accelerating construction, and ALEC Technologies is delivering ELV, security, and management platforms for round-the-clock control and reliability.

Stargate’s 19-month delivery timeline – which is extraordinarily aggressive for a hyperscale facility – requires highly innovative, disruptive approaches that include:

• Modular prefabrication enables parallel off-site

manufacturing and on-site assembly, compressing theconstruction critical path

• Standardised design modules reduce on-site complexity and enable rapid deployment of capacity increments

• Advanced cooling technologies, including liquid cooling and immersion approaches, optimise power efficiency and deployment speed

• Phased commissioning enables partial facility operation during construction

The 19-month schedule requires tight coordination among design, manufacturing, and assembly teams.

ALEC Holdings’ integrated and innovation-led approach is allowing for flexible delivery, adjusting to changing technical demands and client needs as AI infrastructure evolves in real-time.

OverviewClientKhaznaBuilt-up Area250,000m²(Phase 1: 200MW)Contract Period19 months for theinitial phasePurposeHyperscale AI data centre,rapid deployment forglobal AI hub.DeliveryModular construction,advanced cooling, phasedcommissioning, 24/7operational infrastructure.OutcomePositioned ALEC as aregional leader in datacentre construction.LANDMARK PROJECTS CONTINUEDDATA CENTRE CONTINUEDALEC units involved

Page 29

28 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSOUR APPROACHAn Extraordinary Attentionto Detail across the EntireValue Chain

Wynn Al Marjan Island requires a truly unified, 360-degree approach to major luxury hospitality development, combining structural construction, sophisticated MEP systems, ultra-premium fit-out, and advanced operational technologies. This is where ALEC Holdings and its Portfolio Companies are truly coming into their own.

ALEC Holdings is serving as the lead contractor for the project, managing structures, site development, and infrastructure for the development.

Drawing on past hospitality experience, ALEC Construction is coordinating the project with ALEMCO, delivering custom MEP solutions such as

advanced HVAC, plumbing, electrical, and automation to ensure operational excellence throughout all areas. ALEC FITOUT is creating high-end interiors for suites, residences, restaurants, retail, spa, and conference spaces, and ALEC Technologies is tasked with installing modern guest management, entertainment, security, AV, and automation systems. On the logistics front, AJI Rentals is supporting the construction with specialist equipment.

The 41-month timeline requires

the careful orchestration of design development, the procurement of luxury finishes and systems, construction sequencing, and fit-out execution.

ALEC Holdings’ end-to-end approach is enabling flexible project delivery while maintaining rigorous quality standards essential to luxury hospitality.

Wynn Al MarjanIsland – Ras AlKhaimah

Wynn Al Marjan Island represents ALEC Holdings’ landmark entry into luxury resort development in the Emirate of Ras Al Khaimah, delivering one of the region’s most ambitious hospitality complexes. When complete, this project will combine a world-class hotel, upscale retail, premium dining, and leisure

facilities into a singular iconic destination redefining Ras Al Khaimah’s position as a premier hospitality market.

The development includes a luxury hotel, branded

residences, upscale retail and dining, conference facilities, and leisure amenities such as beachfront clubs and entertainment venues. The project requires careful coordination among hospitality, design, engineering, and technology to deliver a comprehensive resort experience.

OverviewClientWynn ResortsBuilt-up Area508,000m²Contract Period41 monthsPurposeLuxury integrated resort,redefining hospitality inthe UAE.DeliveryMulti-component complex,luxury fit-out, advancedMEP and technology, valuechain integration.OutcomeThe Island will set newstandards for luxuryresorts and function as abenchmark for the seamlessdelivery of complex projectsacross disciplines.LANDMARK PROJECTS CONTINUEDHOSPITALITYALEC units involved

Page 30

29 ALEC HOLDINGS INTEGRATED ANNUAL REPORT 2025 STRATEGIC REPORT ESG GOVERNANCE FINANCIAL STATEMENTSCHAIRMAN’S MESSAGEBuilding tomorrow’s landmarks todayWe concluded the year with recordrevenue growth and robust backlog of

AED 30.2 billion, providing exceptional visibility over our future earnings trajectory.

This performance reflects our unwavering commitment to operational excellence, disciplined project selection, and the execution of some of the region’s most iconic developments.

Strategic Alignment withRegional Ambitions

Our track record in winning strategically vital assignments across the Gulf underscores the confidence placed in us by governments and leading institutions.

We are directly engaged in the realisation of the UAE’s D33 economic blueprint and the Kingdom of Saudi Arabia’s Vision 2030 transformation agenda.

Across both markets, these strategic frameworks are driving economic

diversification, building world-class infrastructure, and shaping the region into global hubs for technology, tourism, and sustainable development.

From the Stargate Data Centre complex supporting the UAE’s AI ambitions to the Qiddiya Speed Park project and major offshore energy infrastructure, our work contributes directly to economic priorities and nation-building objectives.

We are proud to participate in landmark projects of genuine national significance – such as the pioneering Wynn Al Marjan Island in Ras al Khaimah and cultural institutions like the Natural History Museum Abu Dhabi.

Our Integrated Platform CreatesReal Value

Our ability to deliver on projects of such monumental significance rests upon the inherent value in our integrated platform, which delivers tangible results in real project execution. When our construction, energy, fit-out, MEP, and specialist teams work as a single unit, we achieve historic outcomes that our competitors simply cannot match. We maintain full visibility and control over costs, quality, and supply chains. Importantly, we also deliver as one point of contact for our clients, rather than coordinating multiple contractors, allowing us to sequence our services in ways that compress timelines and reduce risk.

The evidence for this is everywhere: at SeaWorld Abu Dhabi, where our MEP

specialists developed advanced life-support systems for various marine animals. At One Za’abeel, the scale and technical complexity of the world’s longest cantilever, the largest strand-jacking operation in the region, and the luxury fit-out of 500 rooms required flawless integration across every business unit. These technical achievements speak to the inherent value and strength of the Group’s integrated approach.

It is an approach that has earned us a win rate of approximately 46% on focused tenders, affirming our position as the first-choice contractor for the region’s most sophisticated clients. It has enabled deep, recurring relationships with ADNOC, major master developers, and government-related entities across both markets.

H.E. HUSSAIN LOOTAHChairman of the Board of DirectorsALEC Holdings PJSCDear Stakeholders,

On behalf of the Board of Directors, I am pleased to present ALEC Holdings’ 2025 Annual Report, marking a landmark year in which we completed our initial public offering and delivered exceptional performance that establishes our standing as the region’s preferred partner for iconic, mission-critical developments.

Show all 186 pages