ASHUMGulf news and Dubai stocks, live

Financial statements for the first half of 2026 ALEC

ALEC Holdings PJSC Half-year results 46 pages

Document46 pages, text from the file; its scanned pages read by AshumOpen DFM’s file

Page 1

ALEC Holdings PJSC and its subsidiaries

Condensed consolidated interim financial information for the six-month period ended 30 June 2026 (Unaudited)

Page 2

ALEC Holdings PJSC and its subsidiariesTable of contents Pages

Report of the Directors1-2

Report on review of condensed consolidated interim financial information 3

Condensed consolidated interim statement of financial position4-5

Condensed consolidated interim statement of profit or loss 6Condensed consolidated interim statement of comprehensive income 7Condensed consolidated interim statement of changes in equity 8

Condensed consolidated interim statement of cash flows9-10

Notes to the condensed consolidated interim financial information11-44

Page 3

ALEC Holdings PJSC and its subsidiariesReport of the Directorsfor the six-month period ended 30 June 2026

The Directors have the pleasure of submitting their report, together with the reviewed condensed consolidated interim financial information of the Group for the six-month period ended 30 June 2026.

Principal activities

The principal activities of the Group include engineering, and construction contracting related to building construction and infrastructure developments, earth and civil works and industrial process plants. The Group undertakes general contracting works in civil, mechanical, electrical, and marine engineering as well as structural steelwork and process piping, shutdown and turnaround and services for all types of process plants and building maintenance. The Group engages in both onshore and offshore industrial and oil and gas projects, as well as commercial developments and in investment, establishment, and management of industrial projects.

Results and movement in retained earnings

Revenue for the six-month period ended 30 June 2026 is AED 8,990 million as compared to AED 5,362 million for the preceding period. Total comprehensive income attributable to Owners of the Company for the six-month period ended 30 June 2026 is AED 214 million as compared to AED 238 million for the six-month period ended 30 June 2025.

Movement in retained earnings:Six-month period ended30 June

20262025

AED’000AED’000

(Unaudited)(Unaudited)

Retained earnings at the beginning of the period1,320,607913,066

Total profit attributable to the Owners of the Company214,276237,805

Dividends declared / paid to shareholders (Note7)(250,000)(265,000)

Acquisition of non-controlling interest in a subsidiary (Note1)-(13,539)


Retained earnings at the end of the period1,284,883872,332


Impact of regional conflict

The ongoing regional conflict which started in late February 2026 has had a major impact on the operations and outcomes of the Group and that impact is still being felt as the situation continues.

Whilst there are no areas of the business which have not been impacted by slowdown in deliveries or a slowdown in the market, some areas of the Group’s business are more exposed than others to the supply chain disruptions and / or the direct impact of the conflict.

Management has conducted a detailed review of the extent and ongoing impact of the conflict on each of the Group’s projects to understand the expected cost and delivery impact. Based on the information available, we have recognised the full impact of these in the Group’s project estimates used to produce these results for the quarter leading to the reported loss for the period.

Page 4

ALEC Holdings PJSC and its subsidiaries

Report of the Directorsfor the six-month period ended 30 June 2026 (continued)

Impact of regional conflict (continued)

Caution has been taken in estimation of the variable revenue to be taken against the increased estimated costs. At this stage, we continue ongoing positive negotiations with the Group's major clients to understand what support can be expected through this period and, whilst it is clear that they recognise the need to ensure that the impact on the contracting community is mitigated, it is not yet clear to what extent their financial compensation and support will be forthcoming.

In addition, where contracts allow, claims due to contract variations, project delays, and cost variations are being evaluated and management has been careful to ensure that these are recognised only where management feel confident that they will not be reversed in future accounting periods.

Following the signing of the Interim Memorandum of Understanding between the United States of America and Iran, there has been some alleviation in the impact of the conflict, though it remains unclear as to whether the situation will continue to improve and thus management have been careful to take a position which reflects the best understanding of the potential of the likely outcomes of the current situation without being overly positive about the potential upsides.

All awarded projects continue to be delivered to timelines agreed with customers and now that the worst of situation is known and has been recognised, the current challenges have been planned for and overcome.

Whilst there may be a slowdown in the market in relation to project awards, there are no pipeline projects which have been cancelled.

On behalf of the Board

His Excellency Hussain Nasser LootahChairman

Barry Roy LewisChief Executive Officer

Page 5

Deloitte & Touche (M.E.)Building 2, Level 3Emaar SquareDowntown DubaiP.O. Box 4254DubaiUnited Arab EmiratesTel: +971 (0) 4 376 8888Fax:+971 (0) 4 376 8899www.deloitte.comAugust 17th, 2016REPORT ON REVIEW OF CONDENSED CONSOLIDATED INTERIM FINANCIALINFORMATIONThe ShareholdersALEC Holdings PJSCDubaiUnited Arab EmiratesIntroduction

We have reviewed the accompanying condensed consolidated interim statement of financial position of ALEC Holdings PJSC (the “Company”) and its subsidiaries (the “Group”) as of 30 June 2026, and the related condensed consolidated interim statement of profit or loss, condensed consolidated interim statement of comprehensive income, condensed consolidated interim statement of changes in equity and condensed consolidated interim statement of cash flows for the six month period then ended, and material accounting policy information and other explanatory notes. Management is responsible for the preparation and presentation of this condensed consolidated interim financial information in accordance with International Accounting Standard 34 Interim Financial Reporting (“IAS 34”). Our responsibility is to express a conclusion on this condensed consolidated interim financial information based on our review.

Scope of Review

We conducted our review in accordance with International Standard on Review Engagements 2410 Review of Interim Financial Information Performed by the Independent Auditor of the Entity. A review of interim financial information consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

Conclusion

Based on our review, nothing has come to our attention that causes us to believe that the accompanying condensed consolidated interim financial information has not been prepared, in all material respects, in accordance with IAS 34.

Deloitte & Touche (M.E.)Cynthia CorbyRegistration No.: 99513 August 2026DubaiUnited Arab Emirates

Page 6

ALEC Holdings PJSC and its subsidiaries 4

Condensed consolidated interim statement of financial position as at 30 June 2026

The accompanying notes form an integral part of these condensed consolidated interim financial information.

30 June 31 December

Notes20262025

AED’000AED’000

(Unaudited) (Audited)ASSETSNon-current assets

Property, plant and equipment41,302,2511,267,604

Intangible assets588,32294,447

Goodwill23,05523,055

Gross amounts due from customers on construction

contracts1027,43827,438

Retention receivables9222,700187,349

Deferred tax assets2222,950-

Advances to suppliers and subcontractors190,835260,350


Total non-current assets1,877,5511,860,243


Current assets

Inventories1175,72553,761

Investment in financial assets2677,185-

Contract and other receivables83,797,2603,303,749

Gross amounts due from customers on construction

contracts103,979,3363,786,095

Prepayments53,99943,308

Cash and bank balances202,386,3001,574,529


Total current assets10,369,8058,761,442


Total assets12,247,35610,621,685


Page 7

5

ALEC Holdings PJSC and its subsidiaries

Condensed consolidated interim statement of financial position as at 30 June 2026 (continued)

Notes30 June31 December
20262025
AED'000AED'000
(Unaudited)(Audited)
EQUITY AND LIABILITIES
Equity
Share capital1250,00050,000
Statutory reserve1393,09993,099
General reserve14409409
Retained earnings1,284,8831,320,607
Foreign currency translation reserve(117)(208)
Remeasurement loss on employees' defined
benefit obligations15(69,797)(69,797)
Equity attributable to Owners of the Company1,358,4771,394,110
Non-controlling interests(714)(284)
Total equity1,357,7631,393,826
Non-current liabilities
Provision for employees' end-of-service benefits16433,775402,315
Retention payables17175,737167,119
Advances from customers17923,7441,328,632
Borrowings24632,548250,000
Lease liabilities19185,529225,218
Long term incentive provision25,07214,614
Asset retirement obligation193,0003,000
Total non-current liabilities2,379,4052,390,898
Current liabilities
Contract and other payables177,460,0246,217,707
Gross amounts due to customers on construction
contracts25342,241263,656
Current tax liability22144,03198,747
Borrowings24488,526179,284
Lease liabilities1975,36677,567
Total current liabilities8,510,1886,836,961
Total liabilities10,889,5939,227,859
Total equity and liabilities12,247,35610,621,685

To the best of our knowledge, and in accordance with the applicable reporting principles for interim financial reporting, the condensed consolidated interim financial information presents fairly in all material respects the financial position, financial performance and cash flows of the Group.

His Excellency Hussain Nasser LootahChairman

Barry Roy LewisChief Executive Officer

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Page 8

ALEC Holdings PJSC and its subsidiaries 6

Condensed consolidated interim statement of profit or loss for the six-month period ended 30 June 2026

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Three-month period ended30 JuneSix-month period ended30 June

2026202520262025

NotesAED’000AED’000AED’000AED’000

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

Contract revenue214,380,3572,894,9398,989,8285,362,334

Contract costs(4,277,090)(2,618,326)(8,476,766)(4,825,831)


Gross profit103,267276,613513,062536,503

Administrative expenses(115,200)(113,260)(236,725)(225,869)

Share of results of joint ventures6(5)(12)(22)(19)


(Loss) / profit from operations(11,938)163,341276,315310,615

Reversal of / (provision for)expected credit loss allowance on

financial assets and contract assets7,422-5,296(1,296)

Finance costs - net18(26,356)(31,457)(56,407)(53,766)

Finance income7,6435,64013,5168,624

Other income - net4,6805667,1922,474


(Loss) / profit before tax(18,549)138,090245,912266,651

Income tax benefit / (expense)221,931(13,558)(32,066)(27,623)


(Loss) / profit for the period(16,618)124,532213,846239,028


Attributable to:

Owners of the Company(16,338)122,928214,276237,805

Non-controlling interests(280)1,604(430)1,223


(16,618)124,532213,846239,028


(Loss) / earnings per share

Basic and diluted (AED)23(0.003)0.0250.0430.048


Page 9

ALEC Holdings PJSC and its subsidiaries 7

Condensed consolidated interim statement of comprehensive income for the six-month period ended 30 June 2026

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Three-month period ended30 JuneSix-month period ended30 June

2026202520262025

AED’000AED’000AED’000AED’000

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

(Loss) / profit for the period(16,618)124,532213,846239,028

Other comprehensive income / (loss) Item that may be reclassified

subsequently to profit or loss Net change in foreign currency

translation reserve44(3)9145


Total comprehensive (loss) / income

for the period(16,574)124,529213,937239,073


Attributable to:

Owners of the Company(16,294)122,925214,367237,850

Non-controlling interests(280)1,604(430)1,223


(16,574)124,529213,937239,073


Page 10

ALEC Holdings PJSC and its subsidiaries 8

Condensed consolidated interim statement of changes in equity for the six-month period ended 30 June 2026

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Share Statutory General RetainedForeigncurrencytranslationRemeasure-ment loss onemployees’definedbenefitEquityattributableto ownersof theNon-controlling

capital reserve reserve earnings reserve obligations Company interests Total

AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000

Balance at 1 January

2025 (Audited)50,00092,977409913,066(420)(23,602)1,032,4308901,033,320

Profit for the period---237,805--237,8051,223239,028

Other comprehensive

income for the period----45-45-45


Total comprehensive

income for the period---237,80545-237,8501,223239,073

Acquisition of non-controlling interestin a subsidiary

(Note1)---(13,539)--(13,539)(2,061)(15,600)

Dividends declared /paid to

shareholders (Note7)---(265,000)--(265,000)-(265,000)


Balance at 30 June

2025 (Unaudited)50,00092,977409872,332(375)(23,602)991,74152991,793


Balance at 1 January

2026 (Audited)50,00093,0994091,320,607(208)(69,797)1,394,110(284)1,393,826

Profit / (loss) for the

period---214,276--214,276(430)213,846

Other comprehensive

income for the period----91-91-91


Total comprehensiveincome / (loss)

for the period---214,27691-214,367(430)213,937

Dividends declared /paid to

shareholders (Note7)---(250,000)--(250,000)-(250,000)


Balance at 30 June

2026 (Unaudited)50,00093,0994091,284,883(117)(69,797)1,358,477(714)1,357,763


Page 11

ALEC Holdings PJSC and its subsidiaries 9

Condensed consolidated interim statement of cash flows for the six-month period ended 30 June 2026

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Six-month period ended30 June

Notes20262025

AED’000AED’000

(Unaudited)(Unaudited)

Operating activities

Profit before tax245,912266,651

Adjustments for:Depreciation of property, plant and equipment and amortisation of

right-of-use assets4143,980109,953

Provision for employees’ end-of-service benefits1641,02859,927

Finance costs – net1856,40753,766

Finance income(13,516)(8,624)

Amortization of intangible assets57,6226,875

Reversal of / (provision for) expected credit loss allowance on financial assets and contract assets

contract assets

(5,296)1,296

Bad debts written-off2,733-

Gain on disposal of property, plant and equipment and

gain arising from cancellation of lease(393)(858)

Share of results of joint ventures62219


Cash from operating activities before movements in working

capital478,499489,005

Increase in inventories(21,964)(39,164)

Increase in contract and other receivables, including non-current retention receivables and advances to suppliers and

subcontractors(477,258)(283,029)

Increase in gross amount due from customers on construction

contracts(184,089)(871,651)

Increase in prepayments(10,691)(14,843)

Decrease in margin deposits under lien41746,980

Increase in contract and other payables, including non-current portion of retention payables and advances from customer and

long-term provisions860,7121,501,562

Increase / (decrease) in gross amounts due to customer on

construction contracts78,585(158,209)


Cash generated from operations724,211670,651

Employees’ end-of-service benefits paid16(19,914)(17,510)

Income tax paid(9,732)(7,437)


Net cash generated from operating activities694,565645,704


Page 12

ALEC Holdings PJSC and its subsidiaries 10

Condensed consolidated interim statement of cash flows for the six-month period ended 30 June 2026 (continued)

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Six-month period ended30 June

Notes20262025

AED’000AED’000

(Unaudited)(Unaudited)

Investing activities

Payments for purchase of property, plant and equipment4(170,863)(166,721)

Payments for purchase of intangible assets5(1,497)(1,717)

Proceeds from disposal of property, plant and equipment1,226838

Finance income received13,5168,624

Payments for short-term investments(77,185)-

Payment for purchase of non-controlling interest in a subsidiary

-(10,000)


Net cash used in investing activities(234,803)(168,976)


Financing activities

Proceeds from bank borrowings845,9251,049,806

Repayment of bank borrowings(154,135)(1,266,253)

Dividends paid to shareholder7(250,000)(180,000)

Repayment of principal portion of lease liabilities19(50,487)(37,446)

Finance costs paid18(38,968)(44,838)


Net cash generated from / (used in) financing activities352,335(478,731)


Net increase / (decrease) in cash and cash equivalents812,097(2,003)

Cash and cash equivalents at the beginning of the period201,537,5511,164,823

Add: Effect of foreign exchange rate changes9145


Cash and cash equivalents at the end of the period2,349,7391,162,865

Less: Expected credit loss allowance on cash and cash equivalents(205)(133)


Cash and cash equivalents at the end of the period,

net of expected credit loss202,349,5341,162,732


Non-cash transactions:Purchase of property, plant and equipment relating to

right-of-use asset with corresponding lease liability 4 and19(8,597)(140,355)


Reallocation of share of loss in excess of investment in

joint venture to due from related parties6(22)(19)


Dividends declared to shareholders not yet paid7-(85,000)


Contingent consideration on acquisition of non-controlling interest

in a subsidiary1-(5,600)


Cancellation and disposal of right of use asset with corresponding

lease liability 4 and1973411,452


Page 13

ALEC Holdings PJSC and its subsidiaries 11Notes to the condensed consolidated interim financial informationfor the six-month period ended 30 June 2026

1. General information

ALEC Holdings PJSC (the “Company”) is a Public Joint Stock Company (PJSC) operating in the United Arab Emirates under a trade licence issued in Dubai, United Arab Emirates on 3 March 2010. The Company also has operations in State of Qatar, Sultanate of Oman, Kingdom of Saudi Arabia, Ethiopia, and Egypt through its subsidiaries, joint operations, joint ventures and branches.

The principal activities of the Company and its subsidiaries and branches (together referred to as “the Group”) include engineering and construction contracting related to building construction and infrastructure developments, earth and civil works and industrial process plants. The Group undertakes general contracting works in civil, mechanical, electrical, and marine engineering as well as structural steelwork and process piping, shutdown and turnaround and services for all types of process plants and building maintenance. The Group engages in both onshore and offshore industrial and oil and gas projects, as well as commercial developments and in investment, establishment, and management of industrial projects.

The Company is a subsidiary of Investment Corporation of Dubai (the “Immediate Parent Company”), which is ultimately owned by the Government of Dubai (the “Ultimate Parent Company”).

On 24 January 2025, the Immediate Parent Company approved the conversion of the Company from limited liability company – single owner to public joint stock company and offer part of the Company’s capital to the public.

On 19 September 2025, the Articles of Association of the Company were approved and notarized and the Company was converted into a Public Joint Stock Company.

On 15 October 2025, the Company completed its initial public offering (“IPO”) on the Dubai Financial Market. As part of the IPO, the Immediate Parent Company sold 20% of its shareholding to the public while retaining 80% ownership and control. The Company is now listed on the Dubai Financial Market (TICKER: ALEC).

Group reorganisation and business combinations under common control

At 31 December 2024, as part of its policy choice, management previously opted to apply the pooling of interest method with the net amount presented within merger reserve within other equity. As at 1 January 2025, the Group has changed this accounting policy and now recognizes the net amount resulting from applying the pooling of interest method directly in retained earnings.

This has been reflected in these condensed consolidated interim financial information retrospectively as follows:

Retained earnings as at 1 January 2025 have been restated as a result of the change in accounting policy to net off the merger reserve, previously known as other reserves, against Retained earnings. As such retained earnings at 1 January 2025 is restated from AED 937,766 thousand to AED 913,066 thousand.

Page 14

ALEC Holdings PJSC and its subsidiaries 12Notes to the condensed consolidated interim financial informationfor the six-month period ended 30 June 2026 (continued)

1. General information (continued)

The condensed consolidated interim financial information includes the results of operations and financial position of the Group. The principal activity, country of incorporation and operation and ownership interest of the Company in the subsidiaries and branches are set out below:

Name of subsidiaryPrincipalactivityCountry ofincorporationand operationProportion ofownershipinterest (%)Proportion ofbeneficialinterest (%)

2026202520262025

ALEC Engineering andContracting LLC -S.P.C.ConstructionactivitiesUnited ArabEmirates

100%100%100%100%

ALEC L.E.G.T.Contracting WLL (1)Constructionactivities

State of Qatar--100%100%

ALEC Engineering andContracting Oman LLCConstructionactivitiesSultanate ofOman

70%70%100%100%

ALEMCOElectromechanicalContracting LLC - S.P.C.ConstructionactivitiesUnited ArabEmirates

100%100%100%100%

AJI Heavy EquipmentRental LLCRental of heavyand light machinesand equipmentUnited ArabEmirates

100%100%100%100%

ALEC Saudi ArabiaEngineering andContracting One PersonCompanyConstructionactivitiesKingdom ofSaudi Arabia

100%100%100%100%

L I N Q Modular LLC Modular fabrication and assembly

United ArabEmirates

100%100%100%100%

Emisha TechnologiesFZ-LLCSoftwareconsultancy,developer, serviceproviderUnited ArabEmirates

100%100%100%100%

AES Building MaterialsTrading LLC (5)Building andconstructionmaterials tradingUnited ArabEmirates

100%100%100%100%

ALEC Engineering andContracting Egypt LLCConstructionactivities

Egypt100%100%100%100%

ALEC EPC Holding LLC

– S.O.

Investment activities United Arab Emirates

100%100%100%100%

Page 15

ALEC Holdings PJSC and its subsidiaries 13

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 1. General information (continued)

Name of subsidiaryPrincipalactivityCountry ofincorporationand operationProportion ofownershipinterest (%)Proportion ofbeneficialinterest (%)

2026202520262025

ALEMCO ContractingCompanyElectromechanicalworks, projectscontracting, sub-sewage networksconnections andhomes connectionscontracting and mainwater networkscontracting worksKingdom ofSaudi Arabia

100%100%100%100%

AJI Equipment RentalCompanyRenting andoperational leasingof machine tools,engines and turbines,cranes and lorries,scaffold and workplatforms, withouterection anddismantling andrenting of craneswith operatorsKingdom ofSaudi Arabia

100%100%100%100%

TargetEngineeringConstruction Company

– Sole Proprietorship

L.L.C.General contractingworks for civil,mechanical,electrical andmarine, onshore andoffshore industrial,oil and gas,commercial projects,scaffold installationworks, buildingmaintenance,investment andestablishing andmanaging industrialprojects in the UAEUnited ArabEmirates

100%100%100%100%

Target GeneralConstructionWLL (2)Construction ofbuildings, civil andcontracting works

State of Qatar49%49%49%49%

Target SaudiConstruction CompanyLLCConstruction ofbuildings, civil andcontracting worksKingdom ofSaudi Arabia

90%90%90%90%

Target Steel Industries –Sole ProprietorshipLLCSteel fabricationworksUnited ArabEmirates

100%100%100%100%

Page 16

ALEC Holdings PJSC and its subsidiaries 14

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 1. General information (continued)

Name of subsidiaryPrincipalactivityCountry ofincorporationand operationProportion ofownershipinterest (%)Proportion ofbeneficialinterest (%)

2026202520262025

ALEC Interior DecorationOne Person CompanyManufacture ofcarpentry productsand crafts needed forconstruction workers,construction ofbuilding and otherrelated constructionactivitiesKingdom ofSaudi Arabia

100%100%100%100%

AES Aluminium and GlassWorks LLCAluminiuminstallation works,machining andforming of metalsand glass platesinstallation works.United ArabEmirates

100%100%100%100%

Infrastructure ProtectiveServices InproservMiddle East L.L.C (3)Corrosion andoxidation resistantservices, fireresistant paintingworks and removingcorrosion of metalsUnited ArabEmirates

50%50%50%50%

ALEC Engineering andContracting RAK LLC -OPCMetal prefabricatedbuildingsmanufacturing,alternative energyequipmentinstallation andmaintenance andconstruction.United ArabEmirates

100%100%100%100%

ALEC Industries LLC Centralairconditioningrequisitesmanufacturing,ventilationequipmentmanufacturing andcentralairconditioningequipmentmanufacturing.United ArabEmirates

100%100%100%100%

Idrotec MarineConsultancy LLC – SPCCivil engineeringconsultancy,onshore andoffshore oil and gasfields and facilitiesservicesUnited ArabEmirates

100%100%100%100%

Page 17

ALEC Holdings PJSC and its subsidiaries 15

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 1. General information (continued)

Name of subsidiary Principal activityCountry ofincorporationand operationProportion ofownershipinterest (%)Proportion ofbeneficialinterest (%)

2026202520262025

Altrons IntegratedSecurity EquipmentInstallation LLCMeasuring and controlsystem installation,security equipmentinstallation andmaintenance, wired andwirelesscommunication systemsinstallation, securitysystems and equipmenttrading, radio, T.V.station, cinema theatreequipment installationand maintenance, andinternal communicationnetwork installationand maintenance.United ArabEmirates

100%100%100%100%

Alentra Machines andEquipment Rentals -L.L.C - S.P.C (4)Heavy machines,equipment renting,lifting and loadingmachinesUnited ArabEmirates

100%-100%-

AJI Machines andEquipment RentingL.L.C - S.P.C (4)Onshore and offshoreoil and gas fields andfacilities services,heavy machinesequipment renting,lifting and loadingmachinesUnited ArabEmirates

100%-100%-

Name of branch Principal activities Country of

incorporation andoperation

ALEC Engineering and Contracting LLC - Dubai Branch

Construction activities United Arab Emirates ALEC Engineering and Contracting LLC – O.P.C. - RAK Branch

Construction activities United Arab Emirates ALEC Engineering and Contracting LLC (Branch) - RAKEZ Branch

Construction activities United Arab EmiratesALEMCO Electromechanical Contracting LLC - DubaiBranchConstruction activities United Arab EmiratesALEMCO Electromechanical Contracting LLC - RAKBranchConstruction activities United Arab Emirates

Page 18

ALEC Holdings PJSC and its subsidiaries 16

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 1. General information (continued)

Name of branch Principal activitiesCountry ofincorporation andoperation

Infrastructure Protective Services Inproserv Middle East L.L.C – Dubai Branch

Corrosion and oxidationresistant services, fireresistant painting works andremoving corrosion ofmetalsUnited Arab Emirates

Infrastructure Protective Services Inproserv Middle East L.L.C – RAK Branch

Corrosion and oxidationresistant services, fireresistant painting works andremoving corrosion ofmetalsUnited Arab EmiratesALEC Engineering and Contracting LLC Construction activities EthiopiaTarget Engineering Construction Company LLC - DubaiBranchConstruction activities United Arab EmiratesTarget Engineering Construction Company LLC - QatarBranchConstruction activities United Arab EmiratesAltrons Integrated Security Equipment InstallationL.L.C. – Branch of Abu DhabiMeasuring and control systeminstallation, securityequipment installation andmaintenance, wired andwireless communication

systems installation, security systems and equipment

trading, radio, T.V. station,cinema theatre equipmentinstallation and maintenance,and internal communicationnetwork installation andmaintenance.United Arab Emirates

Altrons Integrated Security Equipment Installation L.L.C. OPC - RAK Branch

Measuring and control systeminstallation, securityequipment installation andmaintenance, wired andwireless communication

systems installation, security systems and equipment

trading, radio, T.V. station,cinema theatre equipmentinstallation and maintenance,and internal communicationnetwork installation andmaintenance.United Arab Emirates

Page 19

ALEC Holdings PJSC and its subsidiaries 17Notes to the condensed consolidated interim financial informationfor the six-month period ended 30 June 2026 (continued)

1. General information (continued)

(1) ALEC L.E.G.T. Contracting WLL is legally owned by International Company for Project Development, State of Qatar and LEGT Construction Company Limited, Jersey. By virtue of the shareholders’ agreement between ALEC Engineering and Contracting LLC - SPC and the shareholders of ALEC L.E.G.T. Contracting WLL, all the shareholdings in ALEC L.E.G.T. Contracting WLL are effectively owned by ALEC Engineering and Contracting LLC - SPC.

(2) Target Engineering Construction Company – Sole Proprietorship L.L.C. (Target), a subsidiary, owns 49% of the shareholding in Target General Construction WLL and Target is exercising control over this subsidiary.

(3) The Company owns 50% of the shareholding of Infrastructure Protective Services Inproserv Middle East L.L.C. and the Company is exercising control over this subsidiary.

(4) During the current period, the Company has invested in two newly incorporated entities in the United Arab Emirates.

(5) On 17 June 2025, by the virtue of share transfer agreement, ALEC Engineering and Contracting LLC

– S.P.C. acquired the remaining 20% equity interest in AES Building Materials Trading LLC, from Bashar Kayali for a total consideration of AED 15,600 thousand, of which AED 5,600 is payable subject to meeting a certain condition. The transaction was accounted for as an equity transaction in accordance with IFRS 10 Consolidated Financial Statements, as control had already been established.

The difference between the acquisition consideration and the carrying value of the non-controlling interest acquired, amounting to AED 13,539 thousand, was recognised directly in equity and attributed to the Owners of the Parent Company. No goodwill or gain / loss was recognised in the condensed consolidated interim statement of profit or loss as a result of this transaction.

2. Basis of preparation, material accounting policy information and critical accounting judgements

2.1 Basis of preparation

This condensed consolidated interim financial information for the six-month period ended 30 June 2026 has been prepared in accordance with IAS 34 Interim Financial Reporting. The condensed consolidated interim financial information does not include all information and disclosures required in the annual consolidated financial statements and should be read in conjunction with the Group’s annual audited consolidated financial statements for the year ended 31 December 2025.

2.2 Functional and presentation currency

This condensed consolidated interim financial information is presented in UAE Dirhams (AED), which is the functional and presentation currency of the Group and all values are rounded to the nearest thousand (AED’000) except when otherwise indicated.

2.3 Basis of consolidation

The condensed consolidated interim financial information as at and for the six-month period ended 30 June 2026 comprises results of the Company and its subsidiaries and branches. The condensed consolidated interim financial information of the subsidiaries and branches is prepared for the same reporting period as that of the Company, using consistent material accounting policy information. All inter-company transactions, profits and balances are eliminated on consolidation. Subsidiaries are fully consolidated from the date on which control is transferred to the Group and cease to be consolidated from the date on which control is transferred out of the Group.

Page 20

ALEC Holdings PJSC and its subsidiaries 18

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued)

2. Basis of preparation, material accounting policy information and critical accounting judgements (continued)

2.4 Material accounting policy information

The material accounting policy information applied in the preparation of the condensed consolidated interim financial information is consistent with that applied by the Group in the preparation of the Group’s annual audited consolidated financial statements for the year ended 31 December 2025.

2.5 Critical accounting judgements

In preparing this condensed consolidated interim financial information, the significant judgments made by management in applying the Group’s accounting policies and the key sources of estimation uncertainty are consistent with that applied in the consolidated financial statements for the year ended 31 December 2025, except for the below:

During the current period, the ongoing geopolitical developments in the region have resulted in increased uncertainty across the Group’s operating environment, including disruptions to supply chains, volatility in key input costs, constraints in logistics and resource availability, and delays in project execution.

The Group’s revenue is recognized over time based on the projects’ stage of completion, requiring significant judgement in estimating total contract costs and project timelines. Management operate a robust process for the ongoing reassessment of expected completion costs and project schedules and estimated variable revenue associated with changes, prolongation, disruption and escalation and has continued to apply that in this period. The estimable impact of these developments has been reflected in the determination of the estimated completion schedule, contract costs, variable contract revenues, and the consequential project margins for the period.

The Group has implemented mitigation measures, including supply chain reconfiguration, optimized resource deployment, and close coordination with employers and authorities to manage schedules.

Contractual and insurance positions are also under review to manage risk exposure. The Group is also currently evaluating and discussing potential claims on its projects arising from the consequential project delays and the direct impact on estimated costs as a result of these delays as well as costs escalations The Group maintains strong operational resilience and remains committed to safeguarding its workforce and protecting long-term shareholder value.

While management has incorporated the impact of conditions existing at the reporting date into its forecast project cost and revenue estimates, there remains a degree of uncertainty in relation to future cost changes, market conditions and project execution risks. It is not currently practicable to reliably quantify the full financial effect of all such potential impacts. Management continue to monitor the situation closely and update its forecast project costs and revenue as and when facts and circumstances changes. .

3. Segment reporting

Information regarding the Group’s operating segments is set out below in accordance with IFRS 8

Operating Segments. IFRS 8 requires operating segments to be identified based on internal reports about components of the Group that are regularly reviewed by the “Executive management” who are the Chief Operating Decision Makers (CODM) in order to allocate resources to the segment and to assess its performance. The Board of Directors is identified as CODM for the Group. The management of the Group assess the Group into four key business units: Building and Infrastructure Construction Services, Energy, Related Businesses and Corporate Activities.

Page 21

ALEC Holdings PJSC and its subsidiaries 19Notes to the condensed consolidated interim financial informationfor the six-month period ended 30 June 2026 (continued)

3. Segment reporting (continued)

These businesses are the basis on which the Group reports its primary segment information to CODM for the purpose of resource allocation and assessment of segment performance. Transactions between segments are conducted at estimated market rates on an arm’s length basis and eliminated on consolidation.

Segment assets and liabilities are not disclosed in the segment reporting as these are not regularly provided to the CODM. Only the total assets and liabilities of the Group are reported to the CODM.

Building andinfrastructureconstructionservices EnergyRelatedbusinessesCorporateactivities Eliminations Total

AED’000AED’000AED’000AED’000AED’000AED’000

Six-month period ended30 June 2026 (Unaudited)

Contract revenue5,836,9622,754,3682,586,404-(2,187,906)8,989,828

Contract costs(5,428,671)(2,911,841)(2,265,928)-2,129,674(8,476,766)










---------- Gross profit / (loss)408,291(157,473)320,476-(58,232)513,062

Administrative expenses(63,287)(54,569)(81,903)(36,966)-(236,725)

Share of results of joint ventures--(22)--(22)

Reversal of / (provision for)expected credit loss allowanceon financial assets and contract

assets17,148(8,057)(3,795)--5,296

Finance costs - net1,762(43,525)(7,895)(15,846)9,097(56,407)

Finance income4321,32243019,619(8,287)13,516

Other income - net5864,2368331,537-7,192










---------- Net segment results – profit /

(loss) before tax364,932(258,066)228,124(31,656)(57,422)245,912


=


=== Three-month period ended30 June 2026 (Unaudited)

Contract revenue2,962,2551,255,2481,289,547-(1,126,693)4,380,357

Contract costs(2,750,519)(1,456,745)(1,133,658)-1,063,832(4,277,090)










---------- Gross profit / (loss)211,736(201,497)155,889-(62,861)103,267

Administrative expenses(32,176)(23,942)(37,574)(21,508)-(115,200)

Share of results of joint ventures--(5)--(5)

Reversal of / (provision for)

expected credit loss allowance on financial assets and contract

assets16,839(3,370)(6,047)--7,422

Finance costs - net(1,933)(18,075)(2,190)(10,051)5,893(26,356)

Finance income2361,20111011,989(5,893)7,643

Other income- net3542,0679501,309-4,680










---------- Net segment results – profit /

(loss) before tax195,056(243,616)111,133(18,261)(62,861)(18,549)


=


Page 22

ALEC Holdings PJSC and its subsidiaries 20

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 3. Segment reporting (continued)

Building andinfrastructureconstructionservices EnergyRelatedbusinessesCorporateactivities Eliminations Total

AED’000AED’000AED’000AED’000AED’000AED’000

Six-month period ended30 June 2025 (Unaudited)

Contract revenue2,839,5302,012,1221,156,182-(645,500)5,362,334

Contract costs(2,654,237)(1,822,695)(1,022,201)-673,302(4,825,831)










----------- Gross profit185,293189,427133,981-27,802536,503

Administrative expenses(35,386)(52,779)(67,740)(69,964)-(225,869)

Share of results of joint ventures--(19)--(19)

Provision for expected credit loss allowance on financial assets and

contract assets-(1,296)---(1,296)

Finance costs - net3,632(35,471)(4,093)(18,349)515(53,766)

Finance income-1,5729406,627(515)8,624

Other income - net9351,323259(43)-2,474










----------- Net segment results – profit /

(loss) before tax154,474102,77663,328(81,729)27,802266,651












======= Three-month period ended30 June 2025 (Unaudited)

Contract revenue1,504,4661,152,214648,610-(410,351)2,894,939

Contract costs(1,409,088)(1,047,579)(575,669)-414,010(2,618,326)










----------- Gross profit95,378104,63572,941-3,659276,613

Administrative expenses(16,615)(29,313)(32,977)(34,355)-(113,260)

Share of results of joint ventures--(12)--(12)

Finance costs - net2,380(19,341)(2,391)(12,543)438(31,457)

Finance income-1,4406623,976(438)5,640

Other income- net575(651)255387-566










----------- Net segment results – profit /

(loss) before tax81,71856,77038,478(42,535)3,659138,090













Page 23

ALEC Holdings PJSC and its subsidiaries 21

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 4. Property, plant and equipment

30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)

Balance at the beginning of the period / year1,267,604929,244

Additions during the period / year179,460601,416

Depreciation and amortization charge for the period / year(143,980)(250,582)

Disposals / write off during the period / year(833)(1,403)

Disposal arising from lease cancellation during the period / year-(11,071)


Balance at the end of the period / year1,302,2511,267,604


Property, plant and equipment includes right-of-use assets which include land, building and machinery and equipment, and which is summarised below:

30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)

Balance at the beginning of the period / year338,692181,680

Additions during the period / year (Note19)8,597214,728

Amortization for the period / year(34,163)(46,263)

Disposals during the period / year(734)(382)

Reversal arising from lease cancellation during the period / year-(11,071)


Balance at the end of the period / year312,392338,692


5. Intangible assets

30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)

Balance at the beginning of the period / year94,447104,075

Additions during the period / year1,4976,039

Amortization for the period / year(7,622)(15,667)


Balance at the end of the period / year88,32294,447


Page 24

ALEC Holdings PJSC and its subsidiaries 22

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 6. Investments in joint ventures

Details of the Group’s joint ventures at the end of the reporting period are as follows:

Name ofjoint venture Principal activityPlace ofincorporationProportionof ownershipinterest held bythe Group legallyBeneficial interestheld by theGroup

2026202520262025

Service and Trade andAl Jaber L.E.G.T.Company LLCConstruction of JabalAl Akhdar AnantaraResort Hotel and SpaSultanate ofOman

50%50%50%50%

ALEMCO ZawawiLLCElectromechanicalcontracting servicesSultanate ofOman

70%70%70%70%

Expo ContractingDWC LLCCommercial enterprisesand managementUnited ArabEmirates

50%50%50%50%

The above joint ventures are accounted for in the condensed consolidated interim financial information using the equity method in accordance with IAS 28 Investments in Associates and Joint Ventures.

A joint venture of the Group has assets and liabilities which offset each other through a pass-through arrangement, and should there be a shortfall between these, the difference is guaranteed by the Dubai Department of Finance. The exposure of the joint venture's shareholders is therefore limited to the share capital of the joint venture.

Movement in investments in joint ventures:30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)Balance at the beginning of the period / year - -

Share of results(22)(1,816)

Reallocation / write-off *221,816


Balance at the end of the period / year - -


* Total share of results from the Group’s joint ventures for the six-month period ended 30 June 2026 is a loss of AED 22 thousand (six-month period ended 30 June 2025: AED 19 thousand). Out of the total, the loss attributable to two of the Group’s joint ventures has exceeded the original investment. In accordance with IAS 28 Investments in Associates and Joint Ventures, when the Group’s share of losses of a joint venture exceeds the Group’s interest in that joint venture, the Group discontinues recognizing its share of further losses and any additional losses are recognized only to the extent that the Group has incurred legal or constructive obligations on behalf of the joint venture.

Page 25

ALEC Holdings PJSC and its subsidiaries 23Notes to the condensed consolidated interim financial informationfor the six-month period ended 30 June 2026 (continued)

7. Related party balances and transactions

The Group enters into transactions with companies and entities that fall within the definition of a related party as contained in International Accounting Standard 24 Related Party Disclosures. Related parties comprise companies and entities under common ownership and/or common management and control, shareholders and key management personnel. The terms and conditions of such transactions are decided by management.

Transactions with related parties

The following transactions during the period arose from the normal operations of the Group:

Three-month period ended30 JuneSix-month period ended30 June

2026202520262025

AED’000AED’000AED’000AED’000

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

Purchase of materials and services

Companies under common control27,02923,18145,88533,808


Three-month period ended30 JuneSix-month period ended30 June

2026202520262025

AED’000AED’000AED’000AED’000

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

Revenue from relatedparties (Note 21)

Companies under common control1,8225,5604,30622,291


Compensation of key management personnel Three-month period ended

30 JuneSix-month period ended30 June

2026202520262025

AED’000AED’000AED’000AED’000

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

Short-term benefits1,9391,5334,6186,316

Long-term benefits10876191151


2,0471,6094,8096,467


Three-month period ended30 JuneSix-month period ended30 June

2026202520262025

AED’000AED’000AED’000AED’000

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

Directors’ fees9251,0981,9901,570


Page 26

ALEC Holdings PJSC and its subsidiaries 24

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 7. Related party balances and transactions (continued) Dividends

30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)

Dividends paid to shareholders250,000265,000


On 24 March 2026, by virtue of a shareholders resolution, the shareholders approved and declared a cash dividend of AED 0.05 per share amounting to AED 250,000 thousand, which was paid on 24 April 2026.

On 30 June 2025, by virtue of a shareholders resolution, the shareholders approved and declared a cash dividend of AED 1,700 per share amounting to AED 85,000 thousand, which was paid on 25 August 2025.

On 20 March 2025, by virtue of a shareholders resolution, the shareholders approved and declared a cash dividend of AED 3,600 per share amounting to AED 180,000 thousand, which was paid on 19 June 2025.

Balances and transactions with affiliated entities under the Immediate Parent Company The following balances and transactions during the period / year arose from the normal operations of the Group:

30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)

Cash and cash equivalents held at related party banks (Note20)463,308376,748


Borrowings from related party banks (Note24)437,780300,000


Three-month period ended30 JuneSix-month period ended30 June

2026202520262025

AED’000AED’000AED’000AED’000

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

Finance cost and commission expense charged by related party banks

(Note18)14,9268,75021,14217,954


Page 27

ALEC Holdings PJSC and its subsidiaries 25

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 7. Related party balances and transactions (continued) Balances with related parties

The following are the outstanding balances with related parties arising from the normal operations of the Group:

30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)Due from related parties (Note 8)

Immediate Parent Company300300

Joint ventures9,22811,793

Joint operations6,1062,494

Other affiliated entities46,75915,093


62,39329,680

Less: Expected credit loss allowance(9,223)(12,101)


53,17017,579


The following table shows the movement in Lifetime ECL that has been recognised for amounts due from related parties in accordance with the simplified approach set out in IFRS 9.

30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)

Balance at the beginning of the period / year12,10110,307

Change in loss allowance(2,878)1,794


Balance at the end of the period / year9,22312,101


30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)Due to related parties (Note 17)

Joint operations94,89739,761

Other affiliated entities18,05711,705


112,95451,466


Page 28

ALEC Holdings PJSC and its subsidiaries 26

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 7. Related party balances and transactions (continued) Balances with related parties (continued)

30 June 31 December

20262025

AED’000AED’000

(Unaudited) (Audited)

Retention receivables - net (Note9)80,057107,867


Retention payables (Note17)9911,002


Advances from customers (Note17)39,14739,147


Gross amounts due from customers on construction contracts -

net (Note10)32,175231,791


Gross amounts due to customers on construction contracts

(Note25)651384


8. Contract and other receivables

30 June202631 December2025

AED’000AED’000

(Unaudited) (Audited)

Contract receivables1,643,7191,401,729

Less: Expected credit loss allowance(76,030)(69,082)


1,567,6891,332,647

Due from related parties - net (Note7)53,17017,579

Retention receivables - net (Note9)825,187824,267

Advances to suppliers and subcontractors1,217,8591,037,575

Other receivables133,35591,681


3,797,2603,303,749


The average credit period on sale of goods or services is 90 days (31 December 2025: 90 days). No interest is charged on past due contract receivables.

Page 29

ALEC Holdings PJSC and its subsidiaries 27Notes to the condensed consolidated interim financial informationfor the six-month period ended 30 June 2026 (continued)

8. Contract and other receivables (continued)

Before accepting any new customers, the Group assesses the potential credit quality of the customer.

Out of the contract receivables balance as at 30 June 2026, an amount of AED 715,736 thousand (31 December 2025: AED 255,599 thousand) is due from three major customers (31 December 2025: two major customers). There are no other customers whose balance exceeds more than 10% of the contract receivables as at end of the reporting period.

Included in the Group’s contract receivables balance as at 30 June 2026 are debtors with a carrying amount of AED 316,194 thousand (31 December 2025: AED 396,570 thousand) which are past due at the end of the reporting period. The Group does not hold any collateral over these balances.

Ageing of past due contract receivables:30 June202631 December2025

AED’000AED’000

(Unaudited) (Audited)

Past due for 90 to 120 days32,48741,766

Past due for 121 to 180 days42,677105,527

Past due for more than 180 days241,030249,277


316,194396,570


The Group always measures the loss allowance for contract receivables at an amount equal to Lifetime ECL using the simplified approach, taking into account the historical default experience and the future prospects of the construction industry. There has been no change in the estimation techniques or significant assumptions made during the current reporting period in assessing the loss allowance for contract receivables.

The following table shows the movement in Lifetime ECL that has been recognised for contract receivables in accordance with the simplified approach set out in IFRS 9:

30 June202631 December2025

AED’000AED’000

(Unaudited) (Audited)

Balance at the beginning of the period / year69,08270,585

Change in loss allowance6,948(1,473)

Write-off of loss allowance-(30)


Balance at the end of the period / year76,03069,082


Page 30

ALEC Holdings PJSC and its subsidiaries 28

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2026 (continued) 9. Retention receivables

30 June202631 December2025

AED’000AED’000

(Unaudited) (Audited)

Current portion, net of expected credit losses (Note8)825,187824,267

Non-current portion, net of expected credit loss allowance and

fair value adjustment222,700187,349


1,047,8871,011,616


Non-current portion of retention receivables represents retention receivables that become due in a period exceeding one year from the end of the reporting period.

Retention receivables are classified as follows:30 June202631 December2025

AED’000AED’000

(Unaudited) (Audited)

Related parties, net of expected credit losses (Note7)80,057107,867

Third parties, net of expected credit losses967,830903,749


1,047,8871,011,616


The management always measure the loss allowance on retention receivables at an amount equal to Lifetime ECL using the simplified approach, taking into account the historical default experience and the future prospects of the construction industry. There has been no change in the estimation techniques or significant assumptions made during the current reporting period in assessing the loss allowance for retention receivables.

The following table shows the movement in Lifetime ECL that has been recognised for retention receivables in accordance with the simplified approach set out in IFRS 9:

30 June202631 December2025

AED’000AED’000

(Unaudited) (Audited)

Balance at the beginning of the period / year14,28713,496

Change in loss allowance(214)791


Balance at the end of the period / year14,07314,287


Show all 46 pages