ASHUMGulf news and Dubai stocks, live

Financial statements for the 3rd QTR of 2024 AMLAK

Amlak Finance PJSC Nine-month results 28 pages

Document28 pages, text from the fileOpen DFM’s file

Page 1

Amlak Finance PJSC and its Subsidiaries

REVIEW REPORT AND CONDENSED CONSOLIDATEDINTERIM FINANCIAL INFORMATIONFOR THE NINE MONTH PERIOD ENDED30 SEPTEMBER 2024 (UNAUDITED)

Page 2

Amlak Finance PJSC and its Subsidiaries

Table of contents Pages

Report on review of condensed consolidated interim financial information 1

Condensed consolidated interim statement of income (Unaudited) 2

Condensed consolidated interim statement of comprehensive income (Unaudited) 3

Condensed consolidated interim statement of financial position 4

Condensed consolidated interim statement of cash flows (Unaudited) 5

Condensed consolidated interim statement of changes in equity (Unaudited) 6 - 7

Notes to the condensed consolidated interim financial information 8 - 26

Page 3

Akbar Ahmad (1141), Cynthia Corby (995), Faeza Sohawon (5508), Firas Anabtawi (5482), Georges Najem (809), Jazala Hamad (1267), Mohammad Jallad (1164), Mohammad Khamees Al Tah (717), Musa Ramahi (872), Mutasem M. Dajani (726), Nurani Subramanian Sundar (5540), Obada Alkowatly (1056), and Rama Padmanabha Acharya (701) are registered practicing auditors with the UAE Ministry of Economy.

Deloitte & Touche (M.E.)Building 2, Level 3Emaar SquareDowntown DubaiP.O. Box 4254DubaiUnited Arab Emirates

Tel: +971 (0) 4 376 8888Fax:+971 (0) 4 376 8899www.deloitte.com

August 17th, 2016

REPORT ON REVIEW OF CONDENSED CONSOLIDATEDINTERIM FINANCIAL INFORMATION

The Board of DirectorsAmlak Finance PJSCDubaiUnited Arab Emirates

Introduction

We have reviewed the accompanying condensed consolidated interim statement of financial position of Amlak PJSC, Dubai, United Arab Emirates (the “Company”) and its Subsidiaries (together referred to as the “Group”) as at 30 September 2024, and the related condensed consolidated interim statements of income, comprehensive income, changes in equity and cash flows for the nine month period then ended.

Management is responsible for the preparation and fair presentation of this interim financial information in accordance with International Accounting Standard 34: Interim Financial Reporting (“IAS 34”). Our responsibility is to express a conclusion on this interim financial information based on our review.

Scope of review

We conducted our review in accordance with International Standard on Review Engagements 2410, “Review of Interim Financial Information Performed by the Independent Auditor of the Entity”. A review of interim financial information consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

Conclusion

Based on our review, nothing has come to our attention tha t causes us to believe that the accompanying condensed consolidated interim financial information is not prepared, in all material respects, in accordance with IAS 34.

Deloitte & Touche (M.E.)

Mohammad JalladRegistration No.: 11645 November 2024DubaiUnited Arab Emirates

Page 4

Amlak Finance PJSC and its SubsidiariesCONDENSED CONSOLIDATED INTERIM STATEMENT OF INCOMEFor the nine month period ended 30 September 2024 (Unaudited)

The attached notes 1 to 18 form part of these condensed consolidated interim financial information.

2

Three months Nine months

ended 30 Septemberended 30 September


2024202320242023

NotesAED’000AED’000AED’000AED’000

Income from Islamic financing

and investing assets35,94329,466100,21588,151

Fee and commission income1,3155052,9161,984

Income from investment properties, net438,06946,009104,551103,053

Gain on debt settlement, net-19,698-173,939

Share of results of an associate102,1384195,4663,562

Other income59,3863,21117,4379,007


86,85199,308230,585379,696

Reversal of impairment/(impairment), net5,00378,129(7,622)49,557

Amortisation of initial fair value gain on

investment deposits11(7,883)(8,551)(23,907)(30,804)

Operating expenses(23,692)(21,977)(71,638)(67,523)


PROFIT BEFORE DISTRIBUTION

TO FINANCIERS / INVESTORS60,279146,909127,418330,926

Distribution to financiers / investors(21,644)(15,308)(54,925)(45,203)


PROFIT FOR THE PERIOD BEFORE

INCOME TAX38,635131,60172,493285,723

Income tax expense12(15,410)(632)(19,271)(17,041)


NET PROFIT FOR THE PERIOD23,225130,96953,222268,682


Profit per share attributable to:

Equity holders:

Basic profit per share (AED)30.0150.0860.0350.178

Diluted profit per share (AED)30.0100.0590.0250.122


Page 5

Amlak Finance PJSC and its SubsidiariesCONDENSED CONSOLIDATED INTERIM STATEMENT OF COMPREHENSIVEINCOMEFor the nine month period ended 30 September 2024 (Unaudited)

The attached notes 1 to 18 form part of these condensed consolidated interim financial information.

3

Three months Nine months

ended 30 Septemberended 30 September


2024202320242023

AED’000AED’000AED’000AED’000

Profit for the period23,225130,96953,222268,682

Other comprehensive income

Items that will be reclassified subsequently to profit or loss:

Exchange differences on translation of

foreign operations(1,829)(809)(60,674)(35,156)

Share of other comprehensive (loss)/income

in an associate(218)1,074(3,301)1,074


Other comprehensive (loss)/income

for the period(2,047)265(63,975)(34,082)


Total comprehensive income/ (loss) for the period21,178131,234(10,753)234,600


Page 6

Amlak Finance PJSC and its SubsidiariesCONDENSED CONSOLIDATED INTERIM STATEMENT OF FINANCIAL POSITIONAs at 30 September 2024

The attached notes 1 to 18 form part of these condensed consolidated interim financial information.

430 September 31 December

20242023

NotesAED’000AED’000

(Unaudited) (Audited)ASSETS

Cash and balances with banks6351,820222,126

Islamic financing and investing assets71,169,9391,318,764

Investment securities8382597

Investment properties91,279,7691,376,047

Investment in an associate10218,786216,617

Other assets159,253100,117

Furniture, fixtures and office equipment9,0479,809


TOTAL ASSETS3,188,9963,244,077


LIABILITIES AND EQUITYLiabilities

Investment deposits and other Islamic financing111,183,8491,229,168

Term Islamic financing170,862201,253

Employees’ end of service benefits5,4844,845

Other liabilities217,245185,102


Total liabilities1,577,4401,620,368


Equity

Share capital1,500,0001,500,000

Statutory reserve302,155302,155

Special reserve99,26599,265

Mudaraba Instrument1382,87282,872

Mudaraba Instrument reserve13311,565311,565

Cumulative changes in fair value9214,222

Foreign currency translation reserve(479,148)(418,474)

Accumulated losses(206,074)(257,896)


Total equity1,611,5561,623,709


TOTAL LIABILITIES AND EQUITY3,188,9963,244,077


To the best of our knowledge, and in accordance with the applicable reporting principles for interim financial reporting, the condensed consolidated interim financial information present fairly in all material respects the financial position, financial performance and cash flows of the Group as of, and for the periods presented therein.

The interim condensed consolidated financial statements were authorised for issue by the Board of Directors and signed on their behalf by:


Director Chief Executive Officer

Page 7

Amlak Finance PJSC and its SubsidiariesCONDENSED CONSOLIDATED INTERIM STATEMENT OF CASH FLOWSFor the nine month period ended 30 September 2024 (Unaudited)

The attached notes 1 to 18 form part of these condensed consolidated interim financial information.

5

Nine months ended 30 September


20242023

AED’000AED’000

OPERATING ACTIVITIES

Profit for the period before income tax expense72,493285,723

Adjustments for:

Depreciation8231,156

Share of results of an associate(5,466)(3,562)

Impairment of financing

and investing assets7,8222,469

Reversal of impairment of other assets(374)(2,151)

Reversal of provision on settlement of advance of investment properties-(50,000)

Fair value gain on investment properties(56,092)(46,792)

Impairment on investment property175125

Amortisation of fair value gain on investment deposits23,90730,804

Gain on debt settlement-(173,939)

Distribution to financiers / investors54,92545,203

Income on deposits(9,949)(4,804)

Other income(7,488)(4,202)

Gain realised on sale of investment properties(30,838)(53,641)

Provision for employees’ end of service benefit650853


Operating profit before changes in operating assets and liabilities:50,58827,242

Islamic financing and investing assets170,807241,061

Other assets(59,470)17,971

Other liabilities29,55023,233


Cash generated from operations191,475309,507

Employees’ end of service benefit paid(12)(523)

Income tax paid(12,853)(1,334)


Net cash generated from operating activities178,610307,650


INVESTING ACTIVITIES

Dividend from an associate-12,637

Proceeds from sale of available-for-sale investments4,3031,540

Proceeds on sale of investment properties111,773183,656

Movement in restricted cash(51,422)(11,731)

Proceeds from wakala deposits3,495,5612,718,425

Placement of wakala deposits(3,561,721)(2,824,052)

Purchase of furniture, fixtures and office equipment(269)(328)

Income on deposits9,9494,804


Net cash generated from investing activities8,17484,951


FINANCING ACTIVITIES

Receipt of term Islamic financing70,15850,244

Repayment of term Islamic financing(27,896)(25,723)

Investment deposits and other Islamic financing(88,699)(370,934)

Redemption of Mudaraba instrument-(62,230)

Director’s fee paid(1,400)(1,400)


Net cash used in financing activities(47,837)(410,043)


INCREASE /(DECREASE) IN CASH AND CASH EQUIVALENTS138,947(17,442)

Foreign currency translation reserve(60,674)(35,156)

Cash and cash equivalents at the beginning of the period91,431143,136


CASH AND CASH EQUIVALENTS AT THE END OF THE PERIOD169,70490,538


Page 8

Amlak Finance PJSC and its SubsidiariesCONDENSED CONSOLIDATED INTERIM STATEMENT OF CHANGES IN EQUITYFor the nine month period ended 30 September 2024 (Unaudited)

The attached notes 1 to 18 form part of these condensed consolidated interim financial information.

6

Share Statutory Special MudarabaMudarabainstrumentCumulativechanges inForeigncurrencytranslation Accumulated

capital reserve reserve instrument reserve fair value reserve losses Total

AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000

At 1 January20241,500,000302,15599,26582,872311,5654,222(418,474)(257,896)1,623,709

Profit for the period-------53,22253,222

Other comprehensive

loss for the period-----(3,301)(60,674)-(63,975)


Total comprehensive

(loss)/income for the period-----(3,301)(60,674)53,222(10,753)


Director's fee paid (Note16)-------(1,400)(1,400)


At 30 September20241,500,000302,15599,26582,872311,565921(479,148)(206,074)1,611,556


Page 9

Amlak Finance PJSC and its SubsidiariesCONDENSED CONSOLIDATED INTERIM STATEMENT OF CHANGES IN EQUITYFor the nine month period ended 30 September 2023 (Unaudited)

The attached notes 1 to 18 form part of these condensed consolidated interim financial information.

7

ForeignMudaraba Cumulative currency

Share Statutory General Special Mudaraba Instrument changes in translation Accumulated capital reserve reserve reserve Instrument reserve fair value reserve losses Total

AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000

At 1 January20231,500,000276,229276,22999,265107,624404,6274,213(384,703)(822,721)1,460,763

Profit for the period--------268,682268,682

Other comprehensive

income/(loss) for the period------1,074(35,156)-(34,082)


Total comprehensiveincome/(loss) for the period -


-


1,074(35,156)268,682234,600


Transfer from general reserves--(276,229)-----276,229-

Debt settlement

adjustment----(24,753)(93,065)---(117,818)

Gain on debt settlement

through equity--------55,58555,585

Director's fee paid (note16)--------(1,400)(1,400)


At 30 September20231,500,000276,229-99,26582,871311,5625,287(419,859)(223,625)1,631,730


Page 10

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATIONFor the nine month period ended 30 September 2024 (Unaudited)

81 ACTIVITIES

Amlak Finance PJSC (the ‘Company’) was incorporated in Dubai, United Arab Emirates, on 11 November 2000 as a private shareholding company in accordance with UAE Federal Law No (8) of 1984, as amended by the Federal Law No. 2 of 2015 and by Law No. 32 of 2021 on Commercial Companies (the “New Companies Law”).

At the constituent shareholders meeting held on 9 March 2004, a resolution was passed to convert the Company to a Public Joint Stock Company.

The Company is licensed by the UAE Central Bank as a finance company and is primarily engaged in financing and investing activities based on structures such as Ijara, Murabaha, Mudaraba, Wakala and Musharaka. The activities of the Company are conducted in accordance with Islamic Sharia’a, which prohibits usury, and are within the provisions of its Articles and Memorandum of Association.

The registered address of the Company is P.O. Box 2441, Dubai, United Arab Emirates.

The condensed consolidated interim financial information comprises of the financial information of Amlak Finance PJSC and its subsidiaries (the “Group”). The principal activities of the subsidiaries are the same as those of the parent company. The extent of the Group’s shareholding in the subsidiaries is as follows:

CompanyBasis forconsolidationCountry of

incorporation Percentage of shareholding 30 September

202431 December2023

Amlak Finance Egypt Company (S.A.E.) Subsidiary Egypt100%100%

Amlak Sky Gardens LLC Subsidiary UAE100%100%

Amlak Holding Limited Subsidiary UAE100%100%

Warqa Heights LLC Subsidiary UAE100%100%

Amlak Capital LLC Subsidiary UAE100%100%

Amlak Property Investment LLC Subsidiary UAE100%100%

Amlak Limited Subsidiary UAE100%100%

Amlak Nasr City Real Estate Investment LLC Subsidiary Egypt100%100%

The interim condensed consolidated financial statements were authorized for issue on 5 November 2024.

2 ACCOUNTING POLICIES

2.1 ASSESSMENT OF GOING CONCERN ASSUMPTION

For the period ended 30 September 2024 the Group has generated a profit of AED 53 million (30 September 2023: AED 269 million) and operating cash flows of AED 179 million (30 September 2023: AED 308 million).

The Group has reported a decline in financing income year on year due to the shrinking of the financing assets portfolio in UAE which poses a future risk to generate sufficient cashflow to meet the repaymen t obligation of financiers. With the passage of time and given the changes in market dynamics and macro -economic factors the restructured Common Term Agreement (CTA) to be less viable and detrimental to the long -term prospects of the Group.

The Group’s management and Board of Directors have developed a new business plan where management as a first step has commenced negotiations to exit the Common Term Agreement (CTA) signed in 2014 and amended in 2016 and 2020. The Group has a total outstanding of AED 1.63 billion due to its financiers at 30 September 2024, including equity instruments.

Based on the proposed terms:

a. 39% of the total outstanding will potentially settle their outstanding exposure at a discount and b. the remaining 61% are expected to receive 30% of the outstanding amount as an upfront settlement and 70% will be restructured for a period of 8 years.

Accordingly, the Group needs to generate significant cashflows to fulfill the above commitments during 2024. Although this event indicates that a material uncertainty exists, that may cast a significant doubt on the Group’s ability to continue as a going concern, the management and Board of Directors believe that the new business plan will ensure the going concern of the Group. As a part of the process, the Group will seek all formal and necessary approvals to formally execute the plan.

Page 11

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

92 ACCOUNTING POLICIES (continued)

2.1 ASSESSMENT OF GOING CONCERN ASSUMPTION (continued)

The Group’s management and Board of Directors are considering several steps, as part of new business plan, to address the above situation including the following:

a. Redeeming the Wakala Deposits.b. Selling the real estate and financing assets; andc. Selling the equity investments.

The Management and the Board of Dire ctors have determined that the above actions will be sufficient to mitigate the uncertainty and have therefore prepared these condensed consolidated interim financial information on a going concern basis.

2.2 BASIS OF PREPARATION

The condensed consolidated interim financial information of Amlak Finance PJSC and its subsidiaries ( the “Group”) are prepared in accordance with International Accounting Standard IAS 34, Interim Financial Reporting. The accounting policies used in the preparation of th e interim condensed consolidated financial information are consistent with those used in the preparation of the financial statements for the year ended 31 December 2023 except as described below.

Income tax expense for the period

Income tax expense is recognised at an amount determined by multiplying the profit before tax for the interim reporting period by management's best estimate of the weighted -average annual income tax rate expected for the full financial year, adjusted for the tax effect of certain items recognised in full in the interim period. As such, the effective tax rate in the interim financial statements may differ from management's estimate of the effective tax rate for the annual financial statements.

The change of the accounting policy will also be reflected in the Group's consolidated financial statements as at and for the year ending 31 December 2024.

The condensed consolidated interim financial information does not include all the information or disclosures require d in the annual consolidated financial statements, and should be read in conjunction with the Group’s annual consolidated financial statements as at 31 December 2023. In addition, results for the nine month period ended 30 September 2024 are not necessarily indicative of the results that may be expected for the financial year ending 31 December 2024.

The condensed consolidated interim financial information is prepared under the historical cost convention modified to include the measurement at fair value of investments at FVOCI and investment properties.

The condensed consolidated interim financial information has been presented in UAE Dirhams (AED) and all values are rounded to the nearest thousand (AED’000) except when otherwise indicated.

No income of seasonal nature was recorded in the condensed consolidated interim statement of income for nine month periods ended 30 September 2024 and 30 September 2023.

Page 12

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

102 ACCOUNTING POLICIES (continued)

2.3 CHANGES IN ACCOUNTING POLICIES, ESTIMATES AND JUDGEMENTS

2.3.1 New and amended IFRS Standards that are effective for the current period.

In the current period, the Group has applied a number of amendments to IFRS Standards and Interpretations issued by the International Accounting Standards Board (IASB) that are effective for an annual period that begins on or after 1

January 2024.

The following new and revised IFRSs, which became effective for annual periods beginning on or after 1 January 2024, have been adopted in these condensed consolidated interim financial information. Their adoption has not had any material impact on the disclosure s or on the amounts reported in these condensed consolidated interim financial information.

New and revised IFRS SummaryIFRS S1 General Requirements for Disclosureof Sustainability-related Financial Information

IFRS S1 sets out overall requirements for sustainability -related financial disclosures with the objective to require an entity to disclose information about its sustainability-related risks and opportunities that is useful to primary users of general -purpose financial reports in making decisions relating to providing resources to the entity.

IFRS S2 Climate-related Disclosures IFRS S2 sets out the requirements for identifying, measuring and disclosing information about climate -related risks and opportunities that is useful to primary users of general -purpose financial reports in making decisions relating to providing resources to the entity.

Amendments to IFRS 16 Leases relating toLease Liability in a Sale and Leaseback

The amendment clarifies how a seller -lessee subsequently measures sale and leaseback transactions that satisfy the requirements in IFRS 15 to be accounted for as a sale.

Amendments to IAS 1 Presentation of FinancialStatements relating to Classification ofLiabilities as Current or Non-Current

The amendments aim to promote consistency in applying the requirements by helping companies determine whether, in the statement of financial position, debt and other liabilities with an uncertain settlement date should be classified as current (due or potentially due to be settled within one year) or non-current.

The amendments also defer the effective date of the January 2020 amendments by one year, so that entities would be req uired to apply the amendment for annual periods beginning on or after 1 January 2024.

Amendments to IAS 1 Presentation of FinancialStatements relating to Non -current Liabilitieswith Covenants

The amendment clarifies how conditions with which an entity must comply within twelve months after the reporting period affect the classification of a liability.

Amendments to IAS 7 Statement of Cash Flowsand IFRS 7 Financial Instruments: Disclosuresrelating to Supplier Finance Arrangements

The amendments add disclosure requirements, and ‘signposts’ within existing disclosure requirements, that ask entities to provide qualitative and quantitative information about supplier finance arrangements.

Other than the above, there are no other significant IFRSs and amendments that were effective for the first time for the financial year beginning on or after 1 January 2024.

Page 13

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

112 ACCOUNTING POLICIES (continued)

2.3 CHANGES IN ACCOUNTING POLICIES, ESTIMATES AND JUDGEMENTS (continued)

2.3.2 New and revised IFRS in issue but not yet effective and not early adopted

At the date of authorisation of these condensed consolidated interim financial information, the Group has not applied the following new and revised IFRS Standards that have been issued but are not yet effective:

New and revised IFRSEffective forannual periodsbeginning on or after

Amendments to IAS 21 The Effects of Changes in Foreign Exchange Rates relating to Lack of Exchangeability

The amendments contain guidance to specify when a currency is exchangeable and how to determine the exchange rate when it is not.

1 January 2025

Amendments to the SASB (Sustainability Accounting Standards Board) standards to enhance their international applicability

The amendments remove and replace jurisdiction -specific references and definitions in the SASB standards, without substantially altering industries, topics or metrics.

1 January 2025

Amendments to IFRS 9 Financial Instruments and IFRS 7 Financial Instruments:

Disclosures regarding the classification and measurement of financial instruments The amendments address matters identified du ring the post -implementation review of the classification and measurement requirements of IFRS 9.

1 January 2026

IFRS 18 Presentation and Disclosures in Financial Statements

IFRS 18 includes requirements for all entities applying IFRS for the presentation and disclosure of information in financial statements to help ensure they provide relevant information that faithfully represents an entity’s assets, liabilities, equity, inc ome and expenses.

1 January 2027

IFRS 19 Subsidiaries without Public Accountability: Disclosures

IFRS 19 specifies the disclosure requirements an eligible subsidiary is permitted to apply instead of the disclosure requirements in other IFRS Accounting Standards.

1 January 2027

Amendments to IFRS 10 Consolidated Financial Statements and IAS 28 Investments in Associates and Joint Ventures (2011)

The amendments relate to the treatment of the sale or contribution of assets from an investor to its associate or joint venture

Effective date deferredindefinitely. Adoptionis still permitted.

The Group anticipates that these new standards, interpretations and amendments will be adopted in the Group’s condensed consolidated interim fi nancial information as and when they are applicable and adoption of these new standards, interpretations and amendments may have no material impact on the condensed consolidated interim financial information of Group in the period of initial application.

2.4 RISK MANAGEMENT

The Group’s financial risk management objectives and policies are consistent with those disclosed in the consolidated financial statements as at and for the year ended 31 December 2023.

Page 14

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

123 BASIC AND DILUTED PROFIT PER SHARE

Three months Nine months

ended 30 Septemberended 30 September


2024202320242023

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

Profit for the period attributable to equity holders of the parent net of Directors’

fee (AED’000)21,825129,56951,822267,282


Weighted average number of shares for basic

EPS (in thousands) *1,500,0001,500,0001,500,0001,500,000

Effect of dilution:

Mudaraba Instrument581,467686,414581,467686,414


Weighted average number of ordinary

shares adjusted for the effect of dilution2,081,4672,186,4142,081,4672,186,414


Attributable to equity holders of the Parent:

Basic profit per share (AED)0.0150.0860.0350.178

Diluted profit per share (AED)0.0100.0590.0250.122


4 INCOME FROM INVESTMENT PROPERTIES, NET

30 September30 September

20242023

AED’000AED’000

(Unaudited)(Unaudited)

Rental income17,62113,096

Gain on sale of investment properties9,72840,802

Gain on sale of investment properties in joint operation-net (note9)21,1102,363

Fair value gain on investment properties (Note9)56,09246,792


104,551103,053


5 OTHER INCOME

30 September30 September

20242023

AED’000AED’000

(Unaudited)(Unaudited)

Income on deposits and saving accounts9,9494,804

Gain on initial recognition of repossessed properties8102,826

Reversal of liabilities no longer payable3,309326

Others3,3691,051


17,4379,007


Page 15

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

136 CASH AND BALANCES WITH BANKS30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

Cash on hand4858

Balances with banks (Note6.3)169,65691,374

Deposits with banks182,116130,694


Cash and balances with banks351,820222,126

Less: Restricted cash and deposits

Regulatory deposit with no maturity (Note6.1)(35,000)(35,000)

Restricted cash Note6.2)(147,116)(95,695)


Cash and cash equivalents169,70491,431


6.1 Represents deposits with a local bank under lien to the Central Bank of UAE in accordance with Central Bank regulations for licensing.

6.2 At period ended 30 September 2024, the Group reported AED 147 million (31 December 2023: AED 96 million) of restricted cash. This represents the Group’s share of the cash held and controlled by a joint venture (Note 9).

6.3 Includes AED 52 million (31 December 2023, AED 15 million) balance with banks in subsidiaries outside UAE.

7 ISLAMIC FINANCING AND INVESTING ASSETS

30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)Financing assets:

Ijarah752,215927,562

Forward Ijarah39,08442,241

Shirkatul Milk3221,484

Real estate Murabaha8,6747,335

Others27,92623,665


828,2211,002,287

Allowance for impairment(176,165)(187,065)


Total financing assets652,056815,222


Investing assets:

Wakala517,883503,542


Total investing assets517,883503,542


1,169,9391,318,764


The movement in the allowance for impairment is as follows:

Page 16

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

147 ISLAMIC FINANCING AND INVESTING ASSETS (continued)

Islamic Financing and investing assets and undrawn irrevocable commitments.

30 September 31 December

20242023

AED’000AED’000

ECLECL

(Unaudited) (Audited)

Balance at 1 January187,065404,176

Impairment / (reversal) for impairment for the period / year22,500(17,975)

Write back / recoveries made during the period / year(6,402)(5,738)


16,098(23,713)


Amounts written off during the period / year(32,862)(195,179)

Exchange and other adjustments5,8641,781


Closing balance176,165187,065


7.1 Carrying value of exposures by stage.

30 September 2024 (Unaudited)Stage 1 Stage 2 Stage 3 Total

AED’000AED’000AED’000AED’000

Gross Exposure446,773244,577136,871828,221

Expected Credit Losses(5,233)(48,101)(122,832)(176,165)


441,540196,47614,039652,056


31 December 2023 (Audited)

Stage 1 Stage 2 Stage 3 Total

AED’000AED’000AED’000AED’000

Gross Exposure540,970293,183168,1341,002,287

Expected Credit Losses(9,931)(37,493)(139,641)(187,065)


531,039255,69028,493815,222


8 INVESTMENT SECURITIES

30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

Equities (FVOCI)382597


Page 17

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

158 INVESTMENT SECURITIES (continued)

30 September 2024 (Unaudited)

Investments carried at fair value Total Level 1 Level 2 Level 3

AED’000AED’000AED’000AED’000

Equities (FVOCI)382--382


31 December 2023 (Audited)

Investments carried at fair value Total Level 1 Level 2 Level 3

AED’000AED’000AED’000AED’000

Equities (FVOCI)597--597


There were no transfers of securities between the Level 1 and Level 2 categories of the fair value hierarchy in the current and prior periods.

The following shows reconciliation from the opening balances to the closing balances for level 3 fair values:

30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

Balance at 1 January5977,397

Disposal during the period / year-(6,652)

Foreign currency exchange movement(215)(148)


382597


9 INVESTMENT PROPERTIES30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

At 1 January1,376,0471,347,043

Additions during the period/year31,61339,808

Disposals during the period/year(183,800)(71,590)

Fair value gain on investment properties during the period / year56,09260,286

(Charge) / reversal of provision on foreclosed properties during the period / year(175)500

Foreign currency exchange fluctuation(8)-


At period/year end1,279,7691,376,047


Investment properties consist of land, villas and units in buildings held for lease or sale. In accordance with its accounting policy, the Group carries investment properties at fair value.

The fair values of the properties are based on valuations performed at quarter end by independent professionally qualified valuers who hold a recognised relevant professional qualification and have relevant experience in the locations and segments of the investment properties valued. The valuation model used is in accordance with that recommended by the Royal Institute of Chartered Surveyors.

Page 18

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

169 INVESTMENT PROPERTIES (continued)

All investment properties are located within the UAE. Except for investment properties in a joint venture, investment properties are categorized as Level 3 for fair value measurement as they have been derived using the comparable price approach based on co mparable transactions for similar properties. Sales prices of comparable properties in proximity are adjusted for differences in the key attributes such as property size and location. The most significant input into this valuation approach is the estimated price per square foot for each given location. There were no transfers into or out of the Level 3 category during the year.

Valuation technique used for investment properties in the joint venture -Warqa Garden Project – has been derived using the comparable price approach based on comparable transactions for similar properties. Inputs used by valuator include sale price range from AED 80 to AED 110 per sq ft for GFA for mixed use plots, it has been adopted a rate of AED107 per sq ft of GFA for the mixed use and residential plots for Warqa Garden Project, For the School and Showroom plots, it has been adopted a premium rate of AED265 and AED325 per sq ft, respectively.

As at 30 September 2024, investment properties having fair value of AED 478 million (31 December 2023: AED 542 million) are mortgaged / assigned in favor of the security agent as part of the restructuring.

30 September30 September

20242023

AED’000AED’000

(Unaudited)(Unaudited)

Rental income derived from investment properties17,62113,096

Direct operating expenses (including repairs and maintenance)

generating rental income(9,147)(7,198)


Profit rising from investment properties carried at fair value8,4745,898


On 1 October 2014, the Group entered into a joint venture agreement with another party to develop a jointly owned plot of land in Nad Al Hammar. Amlak Finance PJSC acquired a 50% interest in Al Warqa Gardens LLC, a jointly controlled entity to develop a jo intly owned plot of land in Nad Al Hammar. The Group has a 50% share in the assets, liabilities, revenue and expenses of the joint venture and accordingly under IFRS 11 it is deemed to be a jointly controlled operation.

As the land is under development with a view to disposal in the market, it has been treated as property under development with an initial cost equal to its fair value at the time of transfer from investment property portfolio for AED 330 million.

Subsequent expenditure to develop the land for resale is included in the cost of the property. The cash held by the joint venture is restricted, given that it is contractually committed to the development of the land under the joint venture agreement. The Group’s share of this restricted cash balan ce at 30 September 2024 is AED 147million (31 December 2023: AED 96 million) (Note 6).

The following items represent the Group’s interest in the assets, liabilities, revenue and expenses of the joint operation after elimination of intercompany transactions:

30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

Investment properties152,500225,128

Cash and balances with banks (Note6)147,11695,694

Other assets – receivables133,25147,859

Deferred income and other liabilities(92,870)(41,807)


Net Assets339,997326,874


Page 19

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

179 INVESTMENT PROPERTIES (continued)

30 September30 September

20242023

AED’000AED’000

(Unaudited)(Unaudited)

Gain on sale of investment properties in joint operation-net of cost21,1102,363

Operating expenses(19,072)(2,034)

Income on deposits3,7182,134

Other income1,160-


Profit for the period6,9162,463


10 INVESTMENT IN AN ASSOCIATE

Amlak International Finance Company , Saudi Arabia is Saudi joint stock company established to provide real estate finance under Saudi Central Bank (SAMA) regulations.

.30 September 31 December

20242023

Percentage holdingAED’000AED’000

2024 2023 (Unaudited) (Audited) Amlak International Finance Company,

Saudi Arabia18.35%18.35%218,786216,617


30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

Assets4,071,1483,564,467

Liabilities(2,878,769)(2,386,044)


Equity1,192,3791,178,423


Group’s carrying amount of the investment218,786216,617


30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

Revenue308,362300,369


Profit for the period / year29,79138,496


Group’s share of profit for the period / year5,4667,064


Page 20

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

1811 INVESTMENT DEPOSITS AND OTHER ISLAMIC FINANCING

Frequency of Final instalment 30 September 31 December

instalments date Profit rate20242023

AED’000AED’000

(Unaudited) (Audited)

Purchase price payable Monthly 25 October20262%1,236,1551,305,381


1,236,1551,305,381

Unamortised fair value adjustment (Note11.1)(52,306)(76,213)


1,183,8491,229,168


Investments deposits and other Islamic financing are secured against assignment and mortgages over the Group’s investment properties located in UAE (note 9), assignment of insurance, pledge over bank accounts (note 6), assignment of rights to receive payments in connection with the Islamic financing and investing assets portfolio and corporate guarantees of the Group’s subsidiaries. Securities offered would be held by a security agent on behalf of financiers.

11.1 Unamortised fair value adjustment

30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

At 1 January76,213144,449

Amortisation charged for the period / year - regular(23,907)(38,946)

Amortisation charged for the period / year - debt settlement-(29,290)


52,30676,213


The nature of the Company’s deposits was significantly changed due to the restructuring undertaken in 2014, resulting in a fixed obligation to be paid to the Commercial Financiers and Liquidity Support Providers. In accordance with IFRS, due to the substantial changes in the terms of the investment deposits through the restructuring, a fair valuation assessment of the restructured obligations was performed based on the net present value of the contracted cash flows.

As at 25 November 2014, the restructured obligations were initially recognised at fair value in the statement of financial position giving rise to AED 911 million of fair value gain which was recorded in the consolidated statement of income.

In September 2020, the Company again undertook restructuring of deposits of Commercial financiers; the face value of the restructured fixed obligations at period end is AED 4,219 million. Upon revised restructuring, repayment behaviour was significantly changed resulting into scheduled and non -scheduled instalment payments linked to sale of certain investment properties.

The fair value adjustment is calculated using the original effective profit rate of 4.89%. The cumulative value of f air value gain amortised till 30 September 2020 was AED 627 million (31 December 2019: AED 584 million) giving a residual fair value gain of AED 284 million as at 30 September 2020 (31 December 2019: AED 328 million). However, upon restructuring in 2020, t his residual fair value gain as at 30 September 2020 was increased to AED 497 million which will be fully reversed out over the repayment period till October 2026, with a resulting charge to the consolidated statement of income each year.

The obligations are subsequently to be measured at amortised cost using the effective finance rate method.

Restructured investment deposits and other Islamic financing are secured against assignment and mortgage over the Group’s investment properties located in UAE (note 9), assignment of insurances, pledge over bank accounts (note 6), assignment of rights to r eceive payments in connection with the Islamic financing and investing assets portfolio and corporate guarantees of the Group’s subsidiaries. Securities offered would be held by a security agent on behalf of the financiers.

Page 21

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

1912 TAXATION

On 9 December 2023, the United Arab Emirates (UAE) Ministry of Finance (“MOF”) released Federal Decree-Law No 47 of 2022 on the Taxation of Corporations and Businesses, Corporate Tax Law (“CT Law”) to enact a new CT regime in the UAE. The new CT regime has become effective for accounting periods beginning on or after 1 June 2023. The CT Law confirms the rate of 9% to be applied to taxable income exceeding a specified threshold.

As the Group’s accounting year ends on 31 December, accordingly the effective implementation date for the Group will start from 1 January 2024 to 31 December 2024, with the first return to be filed on or before 30 September 2025.

It is not currently foreseen that the Group’s UAE operations will be subject to the application of the G lobal Minimum Tax rate of 15% in financial year 2024.

The new CT Law provides certain transitional rules and gives choices for irrevocable elections regarding the treatment to be followed for calculation of taxable income.

The Group's consolidated effective tax rate in respect of continuing operations for the nine months ended 30

September 2024 was 26.53% percent (nine months ended 30 September 2023: Nil percent) since the new corporate tax CT regime has become effective for accounting periods beginning on or after 1 June 2023.

12.1 Income tax expense

Nine month ended30 September


20242023

(Unaudited)(Unaudited)

Current Tax17,16717,041

Deferred Tax2,104-


Balance19,27117,041


12.2 Provision for taxation

30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

Balance at 1 January20,3351,493

Addition during the period / year.17,16720,109

Paid during the period / year.(12,853)(1,334)

Foreign exchange effect(8,710)67


Closing Balance15,93920,335


12.3 Deferred tax assets / (liability)

30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

Balance at 1 January3(1)

Movement during the period / year.(2,104)4


Closing balance(2,101)3


Page 22

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

2013 MUDARABA INSTRUMENT

30 September 31 December

20242023

AED’000AED’000

(Unaudited) (Audited)

Mudaraba Instrument (nominal value)394,437394,437

Mudaraba Instrument Reserve(311,565)(311,565)


Mudaraba Instrument (carrying value)82,87282,872


On 25 November 2014, a Mudaraba Instrument of AED 1,300 million with a maturity in November 2026 was issued through a special purpose vehicle owned by the Group. On maturity, the Mudaraba Instrument to the extent it is not redeemed, will mandatorily convert into ordinary shares of the Company with the face value of AED 1 each.

The Mudaraba Instrument at the time of issue comprised:

1. Face Value of AED 1,300 million.

2. An expected profit rate of 1% per annum on the outstanding balance each year, payable as profit in kind (“PIK”) which the Company can elect to make distributions in cash or in the form of shares.

3. A contingent issuance of upto 500 million shares applicable only to the extent the Mudaraba Instrument remains outstanding at maturity. Th e number of contingent shares to be issued is prorated with the amount of Mudaraba Instrument remaining outstanding.

As the Mudaraba Instrument is redeemed, there will be a proportionate reduction in the contingent share issuance due.

The Mudaraba Inst rument was recorded at fair value at the time of issuance. The difference between the fair value of the Mudaraba Instrument and the carrying value of the deposits it replaced of AED 1,027 million was recorded as a gain in the 2014 income statement as required by IFRS. Subsequent to initial recognition, the carrying value of the Mudaraba Instrument will not be re -measured. The fair value gain of AED 1,027 million on initial recognition of the Mudaraba Instrument was transferred from accumulated losses to the Mudaraba Instrument reserve. This reserve will be utilized in the event of any repayment of the Mudaraba Instrument or on issue of shares in the Company on maturity of the Mudaraba Instrument. Any difference between the par value of shares issued on conve rsion and the carrying value of the Mudaraba Instrument and Mudaraba Instrument reserve will be posted to retained earnings / accumulated losses.

The fair value of the Mudaraba Instrument was determined based on management’s best estimate of the expected cash flows that will arise, discounted at the Company’s cost of equity. For this purpose, management assumed that the Mudaraba Instrument will be redeemed, in full, in year 12 and the PIK charge for the 12-year period will be settled on the same date.

The fair value of the Mudaraba Instrument was calculated using a cost of equity of 14.96% calculated under the Capital Assets Pricing Model wherein the risk free return was based on UAE Government’s long term bond; levered beta was based on comparable company’s beta within similar businesses and a market risk premium was based on current market conditions which reflects the additional expected return over a risk free investment.

On 12 August 2015, the Board of Directors of the Company voluntarily opted to red eem AED 200 million against the Mudaraba Instrument which has reduced the Mudaraba Instrument and Mudaraba Instrument reserve by AED 42 million and 158 million respectively. The Company also paid AED 9 million in 2015, in respect of PIK charge falling due as a consequence of the repayment of the Mudaraba Instrument with the amount being 1% of the outstanding Mudaraba Instrument from the date of restructuring to the date of redemption. This charge was recorded in accumulated losses in equity.

On 23 November 2017, the Board of Directors of the Company voluntarily opted to redeem AED 75 million against the Mudaraba Instrument which has reduced the Mudaraba Instrument and Mudaraba Instrument reserve by AED 16 million and AED 59 million respectivel y. The Company also paid AED 25 million in 2017, in respect of PIK (profit) as a consequence of the redemption of the capital under the Mudaraba Instrument with the amount being 1% of the outstanding Mudaraba Instrument from the 1 st redemption date to the 2nd redemption date. This charge was recorded in accumulated losses in equity.

Page 23

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

2113 MUDARABA INSTRUMENT (continued)

During the period ended 30 September 2024 the Group redeemed Mudaraba instrument in the value of AED Nil million (year ended 31 December 2023: AED 118 million) through the debt settlement mechanism.

At 30 September 2024, the maximum number of shares which may convert under the instrument are 581 million (31 December 2023: 581 million).

14 SEGMENTAL INFORMATION

For management purposes, the Group is organised into three business segments, real estate finance (comprising of financing and investing activities), real estate investment (comprising of property transactions), corporate finance investment (comprising of corporate finance investment).

Management monitors the operating results of its business units for the purpose of making decisions about resource allocation and assessment of performance.

Operating segments:

The Group’s revenues and expenses for each segment for the nine-month period ended 30 September are as follows:

30 September 2024 (Unaudited):

Real Estate Real Estate Corporate Finance Finance Investment Investment Total

AED’000AED’000AED’000AED’000

Operating income65,561113,01652,008230,585

Allowances for impairment(7,637)-15(7,622)

Amortisation of initial fair value gain on deposits(11,993)(8,775)(3,139)(23,907)

Expenses (including allocated expenses)(21,538)(44,426)(5,674)(71,638)

Distribution to financiers/investors(9,721)(7,112)(38,092)(54,925)

Income tax expense(2,593)(15,290)(1,388)(19,271)


Profit for the period12,07937,4133,73053,222


30 September 2023 (Unaudited):

Real Estate Real Estate Corporate Finance Finance Investment Investment Total

AED’000AED’000AED’000AED’000

Operating income240,149107,97231,575379,696

Allowances for impairment(1,707)51,03123349,557

Amortisation of initial fair value gain on deposits(17,108)(9,850)(3,846)(30,804)

Expenses (including allocated expenses)(35,319)(23,381)(8,823)(67,523)

Distribution to financiers/investors(13,918)(8,013)(23,272)(45,203)

Income tax expense-(16,208)(833)(17,041)


Profit/ (loss) for the period172,097101,551(4,966)268,682


Page 24

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

2214 SEGMENTAL INFORMATION (continued)

Segment assets and liabilities:

The following table presents segment assets and liabilities of the Group as at 30 September 2024 and 31 December 2023:

30 September 2024 (Unaudited):

Real Estate Real Estate Corporate Finance Finance Investment Investment Total

AED’000AED’000AED’000AED’000

Segment assets1,126,0161,633,287429,6933,188,996


Segment liabilities1,276,542110,779190,1191,577,440


31 December 2023 (Audited):

Real Estate Real Estate Corporate Finance Finance Investment Investment Total

AED’000AED’000AED’000AED’000

Segment assets1,206,0101,573,901464,1663,244,077


Segment liabilities1,331,98474,340214,0441,620,368


15 RELATED PARTY TRANSACTIONS

Related parties represent associated companies, major shareholders, directors and key management personnel of the Group, and entities controlled, jointly controlled or significantly influenced by such parties. The pricing policies and terms of these transa ctions are approved by the Group’s management. Transactions with such related parties are made on substantially the same terms, as those prevailing at the same time for comparable transactions with external customers and parties:

Balances with related parties included in the consolidated statement of financial position are as follows:

30 September 2024 (Unaudited):OtherMajor relatedshareholders parties Total

AED’000AED’000AED’000

Financing and investing assets-868868

Investment deposits44,66356,331100,995

Other liabilities151934

Mudaraba instrument14,24017,97532,215


31 December 2023 (Audited):

OtherMajor relatedshareholders parties Total

AED’000AED’000AED’000

Investment deposits47,16459,486106,650

Other liabilities182341

Mudaraba instrument14,24017,97532,215


Page 25

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

2315 RELATED PARTY TRANSACTIONS (continued)

Transactions with related parties included in the statement of income are as follows:

30 September 2024 (Unaudited)Directors OtherMajor and senior relatedshareholders management parties Total

AED’000AED’000AED’000AED’000

Income from Islamic financing

and investing assets--1010

Distribution to financiers / investors700-8831,583

30 September 2023 (Unaudited)Directors OtherMajor and senior relatedshareholders management parties Total

AED’000AED’000AED’000AED’000

Income from Islamic financing

and investing assets-1-1

Distribution to financiers / investors755-1,2081,963

Compensation of key management personnel

The compensation paid to key management personnel of the Group is as follows:

30 September30 September

20242023

AED’000AED’000

(Unaudited)(Unaudited)

Salaries and other benefits12,18411,358

Employee termination benefits-43


12,18411,401


16 COMMITMENTS AND CONTINGENCIES

Commitments30 September 31 December

20242023

AED’000AED’000

Notes (Unaudited) (Audited)

Irrevocable commitments to advance financing16.1-2,000

16.1 Credit-related commitments include commitments to extend facilities designed to meet the requirements of the Group’s customers. Commitments generally have fixed expiration dates, or other termination clauses, and normally require the payment of a fee. Since commitments may expire without being drawn upon, the total contract amounts do not necessarily represent future cash requirements.

Contingencies

The Group is engaged in certain litigation proceedings in the United Arab Emirates, involving claims by and against it, mainly in respect of certain sale and financing transactions. The Group is defending these cases and, based on legal counsel advice received, believes it is less than probable that such actions taken by counter parties would succeed, a provision of AED 0.56 million ( 2023: AED 0.95 million) that has been made. The group had paid the Director’s remuneration of AED 1.4 million (2023: AED 1.4 million).

Page 26

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

2417 MATURITY ANALYSIS OF ASSETS AND LIABILITIES

The maturity analysis of assets, liabilities and off balance sheet items is analysed according to when they are expected to be recovered, settled or sold. The values presented in this table include the impact of fair value adjustment as per the statement of financial position and excludes profit not yet due at the period end.

At 30 September 2024 (Unaudited) Up to 1 year──────────────────────── TotalLess than 3 months 6 months up to 1 year to Over Items with

3 months to 6 months to 1 year 1 year 5 years 5 years no maturity Total

AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000

Assets

Cash and balances with banks279,129--279,12937,691-35,000351,820

Islamic financing and investing assets485,49934,94062,393582,832236,314350,793-1,169,939

Investment securities--382382---382

Investment properties15,50017,160153,613186,2731,093,496--1,279,769

Investments in an associate----218,786--218,786

Other assets15,31312,83019,72247,865111,388--159,253

Furniture, fixture, and office equipment------9,0479,047


Total assets795,44164,930236,1101,096,4811,697,675350,79344,0473,188,996


Liabilities

Investment deposits and other Islamic financing22,09922,09944,19888,3961,095,453--1,183,849

Term Islamic financing8,4398,43915,99532,873108,02929,960-170,862

Employees’ end of service benefits------5,4845,484

Other liabilities32,71026,403140,810199,92317,322--217,245


Total liabilities63,24856,941201,003321,1921,220,80429,9605,4841,577,440


Commitments--------


Net liquidity gap732,1937,98935,107775,289476,871320,83338,5631,611,556


Cumulative net liquidity gap732,193740,182775,289775,2891,252,1601,572,9931,611,5561,611,556


Page 27

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

2517 MATURITY ANALYSIS OF ASSETS AND LIABILITIES (continued)

At 31 December 2023 (audited) Up to 1 year──────────────────────── Total

Less than 3 months 6 months up to 1 year to Over Items with 3 months to 6 months to 1 year 1 year 5 years 5 years no maturity Total

AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000

Assets

Cash and balances with banks91,432--91,43295,694-35,000222,126

Islamic financing and investing assets503,11627,42348,581579,120327,533412,111-1,318,764

Investment securities--597597---597

Investment properties8,1018,07587,469103,6451,272,402--1,376,047

Investment in an associate----216,617--216,617

Other assets9,09816,20137,14262,44137,676--100,117

Furniture, fixture and office equipment------9,8099,809


Total assets611,74751,699173,789837,2351,949,922412,11144,8093,244,077


Liabilities

Investment deposits and other Islamic financing300,72821,72843,457365,913863,255--1,229,168

Term Islamic financing12,0779,11520,60241,794132,64226,817-201,253

Employees’ end of service benefits------4,8454,845

Other liabilities52,74716,148113,549182,4442,658--185,102


Total liabilities365,55246,991177,608590,151998,55526,8174,8451,620,368


Commitments2,000--2,000---2,000


Net liquidity gap244,1954,708(3,819)245,084951,367385,29439,9641,621,709


Cumulative net liquidity gap244,195248,903245,084245,0841,196,4511,581,7451,621,7091,621,709


Page 28

Amlak Finance PJSC and its SubsidiariesNOTES TO THE CONDENSED CONSOLIDATED INTERIM FINANCIAL INFORMATION

For the nine month period ended 30 September 2024 (Unaudited) (continued)

2618 COMPARATIVE INFORMATION

Certain comparative amounts in the condensed consolidated interim financial information and notes to the condense d consolidated interim financial information have been adjusted to conform with the current period presentation.