ASHUMGulf news and Dubai stocks, live

Financial statements for the 2nd QTR of 2019 ARTC

Arabtec Holding PJSC Half-year results 40 pages

Document40 pages, a scan, not read yetOpen DFM’s file

Page 1

Arabtec Holding PJSC and its subsidiaries

Condensed consolidated interim financial information for the six-month period ended 30 June 2019 (Unaudited)

Page 2

Arabtec Holding PJSC and its subsidiariesPages

Report on review of condensed consolidated interim financial information1-3

Condensed consolidated interim statement of financial position 4Condensed consolidated interim statement of profit or loss 5Condensed consolidated interim statement of comprehensive income 6Condensed consolidated interim statement of changes in equity 7

Condensed consolidated interim statement of cash flows8-9

Notes to the condensed consolidated interim financial information10-38

Page 3

Akbar Ahmad (1141), Anis Sadek (521), Cynthia Corby (995), Georges Najem (809), Mohammad Jallad (1164), Mohammad Khamees Al Tah (717), Musa Ramahi (872), Mutasem M. Dajani (726), Obada Alkowatly (1056), Rama Padmanabha Acharya (701) and Samir Madbak (386) are registered practicing auditors with the UAE Ministry of Economy.

Deloitte & Touche (M.E.)Building 3, Level 6Emaar SquareDowntown DubaiP.O. Box 4254DubaiUnited Arab EmiratesTel: +971 (0) 4 376 8888Fax:+971 (0) 4 376 8899www.deloitte.comAugust 17th, 2016REPORT ON REVIEW OF CONDENSED CONSOLIDATED INTERIM FINANCIALINFORMATIONThe Board of DirectorsArabtec Holding PJSC and its subsidiariesDubaiUnited Arab EmiratesIntroduction

We have reviewed the accompanying condensed consolidated interim statement of financial position of Arabtec Holding PJSC (the “Company”) and its subsidiaries (collectively referred to as the “Group”) as at 30 June 2019 and the related condensed consolidated interim statements of profit or loss, comprehensive income, changes in equity and cash flows for the six-month period then ended, including a summary of significant accounting policies and other explanatory information. Management is responsible for the preparation and presentation of this condensed consolidated interim financial information in accordance with International Accounting Standard (IAS) 34 Interim Financial Reporting. Our responsibility is to express a conclusion on this condensed consolidated interim financial information based on our review.

Scope of Review

Except as explained in the following paragraphs, we conducted our review in accordance with International Standard on Review Engagements 2410 Review of Interim Financial Information Performed by the Auditor of the Entity. A review of interim financial information consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

Basis for Qualified Conclusions

a) The Group’s investment properties include a property comprising a plot of land and associated development costs (the “Property”) which is carried at AED 568 million on the condensed consolidated interim statement of financial position as at 30 June 2019 (31 December 2018: AED 568 million). Based on information provided to us by management, the recoverable amount of this property has not been determined, which constitutes a departure from International Accounting Standard (IAS) 36, Impairment of assets and consequently we were unable to complete our review of the Property included in the condensed consolidated interim financial information. Had we been able to complete our review of the Property, matters might have come to our attention indicating that adjustments might be necessary to the condensed consolidated interim financial information.

Cont’d…

Page 4

REPORT ON REVIEW OF CONDENSED CONSOLIDATED INTERIM FINANCIALINFORMATION (continued)Basis for Qualified Conclusions (continued)

b) The Group has “due from customers on construction contracts” which is carried at AED 2.7 billion on the condensed consolidated interim statement of financial position as at 30 June 2019 (31 December 2018: AED 2.6 billion). Based on information provided to us by management, certain claims included in the above have been accounted for as variable consideration in the transaction price of its construction contracts. International Financial Reporting Standard 15 Revenue from Contracts with Customers requires that variable consideration shall be included in the transaction price only to the extent that it is highly probable that a significant reversal in the amount of cumulative revenue recognised will not occur when the uncertainty associated with the variable consideration is subsequently resolved. This information indicates that, had management constrained the inclusion of these claims in the transaction price to the extent that it meets the above criteria, due from customers from construction contracts would have been decreased by AED 222.4 million and opening retained earnings would have been decreased by AED 87.1 million as at 30 June 2019. Accordingly, contract revenue and profit would have been decreased by AED 135.3 million and earnings per share would have been reduced by AED 0.09 per share for the six-month period ended 30 June 2019.

Qualified Conclusion

Based on our review, with the exception of matter a) described in the preceding paragraph and except for the adjustments to the condensed consolidated interim financial information that we might have become aware of had it not been for the situation described in matter b) above, based on our review, nothing has come to our attention that causes us to believe that the accompanying condensed consolidated interim financial information does not present fairly, in all material respects, the financial position of the Group as at 30 June 2019 and of its financial performance and cash flows for the six-month period then ended in accordance with IAS 34 Interim Financial Reporting.

Emphasis of MattersWe draw attention to:

a) Note 24 to the condensed consolidated interim financial information, which describes that the various contractual disputes relating to projects are currently subject to legal and / or dispute resolution proceedings and where applicable, amicable settlement negotiations, with the respective employers.

The probable outcome of these contractual disputes cannot be determined with reasonable certainty, as these legal/dispute resolution proceedings and where applicable, amicable settlement negotiations, are ongoing.

b) Note 25 to the condensed consolidated interim financial information, which describes that the outcome of the dispute and claim filed by a non-controlling shareholder of Arabtec Construction W.L.L. Qatar, a subsidiary of the Group, cannot be determined with reasonable certainty as at the date of this report.

Our conclusion is not modified in respect of these matters.Other Matters

The condensed consolidated interim financial information of the Group for the period ended 31 March 2019, was reviewed by another auditor who expressed a modified conclusion on those condensed consolidated interim financial information on 14 May 2019. The consolidated financial statements of the Group for the year ended 31 December 2018, was audited by another auditor who expressed a modified opinion on those consolidated financial statements on 12 February 2019.

Page 5

REPORT ON REVIEW OF CONDENSED CONSOLIDATED INTERIM FINANCIALINFORMATION (continued)Other Matters (continued)

The reasons for modification of the review conclusion and audit opinion were as follows:

a) The Group's investment properties include a property comprising of a plot of land and associated development costs (the property) with a carrying amount of AED 568 million (31 December 2018:

AED 568 million). Management has not carried out a detailed impairment review to assess the recoverable amount of the property, which is calculated on the higher of its value-in-use and fair value less cost to sell in accordance with IAS 36 Impairment of assets. The predecessor auditor was unable to perform the review procedures they considered necessary to satisfy themselves as to the carrying amount of the property as at 31 March 2019 and 31 December 2018 and was not able to determine whether any impairment should have been recorded.

b) The balance of trade and other receivables include net exposures of AED 153 million at 31 March 2019 (31 December 2018: AED 153 million) relating to amounts due from customers that have not been certified by the customers and which are subject to negotiations and discussions. The predecessor auditor was unable to perform the review procedures they considered necessary to satisfy themselves as to the extent and timing of the recoverability of these amounts and was not able to determine whether any impairment adjustments relating to these amounts was necessary.

As part of our review of the condensed consolidated interim financial information for the six-month period ended 30 June 2019, we also reviewed the adjustments described in Note 26 that were applied to restate amounts reported as at 31 March 2019. In our opinion, such adjustments are appropriate and have been properly applied. We were not engaged to audit, review, or apply any procedures to the Group’s condensed consolidated interim financial information for the three-month period ended 31 March 2019 other than with respect to the adjustments and, accordingly, we do not express an opinion or any other form of assurance on the Group’s condensed consolidated interim financial information for the three-month period ended 31 March 2019 taken as a whole.

Deloitte & Touche (M.E.)Cynthia CorbyRegistration No. 9958 August 2019DubaiUnited Arab Emirates

Page 6

No text on this page.

Page 7

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Arabtec Holding PJSC and its subsidiaries 5

Condensed consolidated interim statement of profit or loss (Unaudited) for the six-month period ended 30 June 2019

Three-month period ended30 JuneSix-month period ended30 JuneNotes 2019AED’0002018AED’0002019AED’0002018AED’000

Revenue172,185,7852,391,4944,213,1274,811,851

Direct costs(2,049,836)(2,231,192)(3,947,045)(4,487,532)


Gross profit135,949160,302266,082324,319

Investment income/(loss)2,017(992)3,0701,445

General and administrative expenses(91,956)(78,844)(206,094)(160,699)

Other income/(expense)148(3,161)48,3276,075

Finance costs - net(27,144)(33,574)(53,951)(59,574)

Share of (loss)/profit of an associate-5,745(7,803)7,497


Profit before tax19,01449,47649,631119,063

Income tax expense14(244)(111)(679)(3,851)


Profit after tax for the period18,77049,36548,952115,212


Attributable to

Owners of the Parent26,05949,40957,872113,045

Non-controlling interests(7,289)(44)(8,920)2,167


18,77049,36548,952115,212


Earnings per share

Basic and diluted (AED)180.020.030.040.08


Page 8

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Arabtec Holding PJSC and its subsidiaries 6

Condensed consolidated interim statement of comprehensive income (Unaudited) for the six-month period ended 30 June 2019

Three-month period ended30 JuneSix-month period ended30 June2019AED’0002018AED’0002019AED’0002018AED’000

Profit for the period18,77049,36548,952115,212

Other comprehensive loss:

Items that may be reclassified subsequently to profit or loss

Net change in foreign currency translation

reserve(10,073)(1,445)(13,741)(5,990)

Total comprehensive income for the period8,69747,92035,211109,222

Attributable to:

Owners of the Parent19,77748,72149,085108,885

Non-controlling interests(11,080)(801)(13,874)337

8,69747,92035,211109,222

Page 9

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Arabtec Holding PJSC and its subsidiaries 7

Condensed consolidated interim statement of changes in equity for the six-month period ended 30 June 2019

Attributable to owners of the ParentShare StatutoryForeigncurrencytranslation Other RetainedNon-controlling Totalcapital reserve reserve reserves earnings Total interests equity

AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000

Balance at 31 December 2018 (Audited)1,500,000155,90927,603(212,648)189,7931,660,657(258,399)1,402,258

Profit/(loss) for the period----57,87257,872(8,920)48,952

Other comprehensive loss for the period--(8,787)--(8,787)(4,954)(13,741)

Total comprehensive income/(loss) for the period--(8,787)-57,87249,085(13,874)35,211

Dividends declared and paid to shareholders (Note27)----(75,000)(75,000)-(75,000)

Dividends declared and paid to non-controlling interest------(2,000)(2,000)

Balance at 30 June 2019 (Unaudited)1,500,000155,90918,816(212,648)172,6651,634,742(274,273)1,360,469

Balance at 31 December 2017 (Audited)1,500,000130,27933,498(199,063)120,1521,584,866(244,368)1,340,498

Impact of changes in accounting policies----(101,397)(101,397)(11,282)(112,679)

Balance at 1 January 2018 - restated1,500,000130,27933,498(199,063)18,7551,483,469(255,650)1,227,819

Profit for the period----113,045113,0452,167115,212

Other comprehensive loss for the period--(4,160)--(4,160)(1,830)(5,990)

Total comprehensive (loss)/income for the period--(4,160)-113,045108,885337109,222

Dividends declared and paid to shareholders (Note27)----(30,750)(30,750)-(30,750)

Dividends declared and paid to non-controlling interest------(6,013)(6,013)

Remuneration to directors----(9,200)(9,200)-(9,200)

Balance at 30 June 2018 (Unaudited)1,500,000130,27929,338(199,063)91,8501,552,404(261,326)1,291,078

Page 10

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Arabtec Holding PJSC and its subsidiaries 8

Condensed consolidated interim statement of cash flows (Unaudited) for the six-month period ended 30 June 2019

Six-month period ended30 June

20192018

NotesAED’000AED’000

Cash flows from operating activities

Profit before tax49,631119,063

Adjustments for:

Depreciation on property, plant and equipment573,86671,225

Gain on sale of property, plant and equipment(54,586)(175)

Interest expense56,42050,260

Provision for employees' end of service benefits27,25518,191

Investment income(3,070)(1,445)

Amortisation of right-of-use of asset5,550-

Amortisation of intangible assets7522500

Loss on disposal of an investment property408-

Depreciation on investment properties27163

Net fair value change in non-current receivables and payables(1,737)9,314

Share in loss/(profit) of an associate7,803(7,497)

Operating cash flows before changes in operating162,089259,599

assets and liabilitiesDecrease/(increase) in trade and other receivables, including

due from customers on construction contracts11,968(33,341)

Decrease in advances paid to suppliers and sub-contractors201,521271,652

Decrease in due from related parties2,6699,850

Increase in inventories(7,851)(27,489)

Increase in other current assets(36,342)(25,277)

Decrease in trade and other payables, including due to

customers on construction contracts(28,068)(443,179)

Decrease in advances received from customers(322,973)(135,492)

Increase in due to related parties10,88499,120

Increase in retention payables86,65467,044

Cash generated from operating activities80,55142,487

Employees' end of service benefits paid(19,673)(21,813)

Income tax paid(2,274)(12,565)

Net cash generated from operating activities58,6048,109

Page 11

The accompanying notes form an integral part of these condensed consolidated interim financial information.

Arabtec Holding PJSC and its subsidiaries 9

Condensed consolidated interim statement of cash flows (Unaudited) for the six-month period ended 30 June 2019 (continued) Six-month period ended

30 June

20192018

NotesAED’000AED’000

Cash flows from investing activities

Proceeds from disposal of property, plant and equipment81,78012,419

Purchase of property, plant and equipment5(21,268)(31,335)

Decrease/(increase) in other financial assets49,742(20,251)

Proceeds from disposal of investment property1,304-

Purchase of intangible assets(44)-

Dividend received from an associate-19,442

Investment income received3,0701,445

Increase in short term deposits-(450)

Net cash generated from/(used in) investing activities114,584(18,730)

Cash flows from financing activities

Repayment of borrowings, net(229,247)(155,634)

Repayment of lease liabilities(6,736)-

Interest paid(53,951)(50,260)

Dividends paid to shareholders(75,000)(30,750)

Dividends paid to non-controlling interests(2,000)(6,013)

Remuneration paid to directors-(9,200)

Net cash used in financing activities(366,934)(251,857)

Net decrease in cash and cash equivalents(193,746)(262,478)

Cash and cash equivalents at the beginning of the period/year874,898500,749

Net foreign currency translation difference(13,741)(5,990)

Cash and cash equivalents at the end of the period/year11667,411232,281

Non-cash transaction:

IFRS 9 and 15 opening adjustments-112,679

Page 12

Arabtec Holding PJSC and its subsidiaries 10Notes to the condensed consolidated interim financial informationfor the six-month period ended 30 June 2019

1. General information

Arabtec Holding PJSC (the “Company”) is a Public Joint Stock Company established under the laws of the United Arab Emirates (UAE) pursuant to the resolution of the Department of Economic Development, Dubai, number 71 dated 2 July 2004. The Company commenced operations on 20 September 2004. The Company's shares are listed on the Dubai Financial Market (“DFM”). The registered office of the Company is P.O. Box 3399, Dubai, UAE.

The Group’s major shareholder is Aabar Investment PJS whose parent company is International Petroleum Investment Company (“IPIC”). IPIC is part of the Mubadala Investment Company PJSC - group wholly owned by the Government of the Emirate of Abu Dhabi.

Arabtec Holding PJSC and its subsidiaries (the “Group”) are primarily engaged in construction of high-rise towers, buildings and residential villas, in addition to the execution of related services such as drainage, electrical and mechanical works, provision of ready mix concrete and construction equipment supply and rental.

The Group also operates in the oil and gas, infrastructure and power sector, facilities management and property development.

The condensed consolidated interim financial information is reviewed, not audited.

Subsidiaries, associates and joint operations:% Holding (includingindirect holding)30 June 31 DecemberName of subsidiary and domicile 2019 2018 Principal activities

Arabtec Construction LLC - Dubai, UAE 100% 100% Civil construction and related works Arabtec Construction Syria LLC,

Syrian Arab Republic100% 100% Civil construction and related works

Arabtec Pakistan (Pvt.) Limited, Pakistan 60% 60% Civil construction and related works Arabtec Egypt for Construction SAE,

Arab Republic of Egypt

55% 55% Civil construction and related works Arabtec Construction LLC

(Foreign Company), State of Palestine 100% 100% Civil construction and related works Arabtec - Musawa W.L.L.,

Kingdom of Bahrain

100% 100% Civil construction and related works Arabtec Construction LLC

(Jordan foreign working entity), Jordan 100% 100% Civil construction and electrical, mechanical plumbing contracting

and related works

Page 13

Arabtec Holding PJSC and its subsidiaries 11

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 1. General information (continued)

Subsidiaries, associates and joint operations: (continued) % Holding (including

indirect holding)30 June 31 December

Name of subsidiary and domicile 2019 2018 Principal activities Arabtec International Company,

Limited, Republic of Mauritius

100% 100% Civil construction and related works Arabtec Construction India (Pvt) Limited, India

63% 63% Civil construction and related works Arabtec Constructions LLC - Abu Dhabi, UAE

60% 60% Civil construction and related works

Arabtec Precast LLC, UAE 100% 100% Manufacturing of precast panels Arabtec Minority Holding Limited, JAFZA,

UAE100% 100% Investment holding company

Arabtec Building Equipment LLC, UAE 70% 70% Trading and leasing of construction and building equipment

Arabtec Engineering Services LLC, UAE 80% 80% Infrastructure construction works Arabtec-Envirogreen Facility

Management Services LLC, UAE

100% 100% Building maintenance and cleaning services, facilities

management and security services Arabtec Property Development LLC - Abu Dhabi, UAE

100% 100% Real estate, investment, development and management

Arabtec Property Development LLC - Dubai, UAE

100% 100% Real estate development Arabtec Property Management LLC - Dubai, UAE

100% 100% Leasing and management ofthird party property

Arabtec Real Estate LLC - Abu Dhabi, UAE 100% 100% Real estate leasing and management services

Arabtec Real Estate LLC - Dubai, UAE 100% 100% Buying and selling of real estate Arabtec Living For Construction LLC, UAE 100% 100% Civil construction and related works Arabtec Limited, JAFZA, UAE 100% 100% General trading; commercial and real estate investments

Arabtec Trading Limited, JAFZA, UAE 100% 100% General trading; commercial and real estate investments

Arabtec Consolidated Contractors Limited,JAFZA, UAE*

50% 50% International business, general trading, and investments

Austrian Arabian Ready Mix Concrete Co. LLC - Dubai, UAE

100% 100% Ready mixed concretemanufacturing

Emirates Falcon Electromechanical Co. (EFECO) LLC - Dubai, UAE

100% 100% Electrical, mechanical andplumbing contracting

EFECO Qatar W.L.L, Qatar* 49% 49% Electrical, mechanical and plumbing contracting

EFECO LLC, State of Palestine 100% 100% Electrical, mechanical and plumbing contracting

Emirates Falcon Electromechanical Co.(EFECO) LLC - Abu Dhabi, UAE100% 100% Electrical, mechanical andplumbing contracting

Gulf Steel Industries FZE, UAE 100% 100% Fabrication of steel structure and profiles

Page 14

Arabtec Holding PJSC and its subsidiaries 12

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 1. General information (continued)

Subsidiaries, associates and joint operations: (continued) % Holding (including

indirect holding)30 June 31 December

Name of subsidiary and domicile 2019 2018 Principal activities GSI Steel Construction Contracting LLC,

UAE100% 100% Fabrication of steel structure andprofiles

Idrotec Srl, Italy 96% 96% Civil construction and related works Nasser Bin Khaled Factory Ready Mix

Concrete Co. LLC, Qatar*

49% 49% Manufacturing and transportation of ready mix concrete products

Saudi Target Engineering Construction Company LLC, Kingdom of Saudi Arabia 65% 65% Civil construction and related works Target Engineering Construction Company LLC, UAE

100% 100% Civil construction and related works

Target Steel Industries LLC, UAE 97% 97% Fabrication of steel structure and profiles

Target Engineering Construction Company L.L.C, (Foreign Company) Jordan

100% 100% Civil construction and related works Arabtec Egypt for Property Development, Egypt

100% 100% Real Estate, investment,development and management

Arabtec Gulf for Property Investment LLC, UAE

100% 100% Buying and selling of real estateas well as holding activities

Arabtec Construction W.L.L., Qatar* 49% 49% Civil construction and related works

* Although the Group holds 50% or less of the share capital, it exercises control over these subsidiaries.

The Company and its subsidiaries have the following branches: Arabtec Holding PJSC - Abu Dhabi Branch Arabtec Construction LLC, St Petersburg, Russia

 Arabtec Construction LLC, Riyadh, Kingdom of Saudi Arabia  Arabtec Construction LLC, Fujairah Branch

 Arabtec Construction LLC, Bahrain Branch Arabtec Construction LLC, Sharjah Branch Idrotec SRL - Abu Dhabi ACC Arabtec JV SAL - Syrian Arab Republic Branch Target Engineering Construction Company - Dubai Branch Target Engineering Construction Company - Sharjah Branch Target Engineering Construction Company - Fujairah Branch Target Engineering Construction Company WLL - Qatar Branch Arabtec Construction LLC - branch, Abu Dhabi

 GSI Steel Construction Contracting LLC - Abu Dhabi Branch  Gulf Steel Industries FZE - Jordan Branch

 Arabtec Construction LLC - Egypt Branch

 Arabtec Consolidated Contractors Limited - Astana City Branch, Kazakhstan

 Arabtec Engineering Services LLC, Abu Dhabi Branch Austrian Arabian Ready-Mix Co LLC - Abu Dhabi Branch EFECO - Riyadh, Kingdom of Saudi Arabia

Joint operations of the Group are disclosed in Note 19.

Page 15

Arabtec Holding PJSC and its subsidiaries 13

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 1. General information (continued)

Subsidiaries, associates and joint operations (continued):

The Group has the following associate over which it exercises significant influence:

% Holding (includingindirect holding)30 June 31 December

Name of associate and domicile 2019 2018 Principal activities Depa Plc, Dubai, UAE (“DEPA”)

(formerly Depa Limited)

24.329% 24.329% Luxury fit-out of five star hotels, yachts and facilities and related

services

2. Basis of preparation and accounting policies

2.1 Basis of preparation

This condensed consolidated interim financial information for the period ended 30 June 2019 has been prepared in accordance with IAS 34, ‘Interim Financial Reporting’.

The condensed consolidated interim financial information has been presented in United Arab Emirates Dirhams (“AED”) being the functional currency of the Company and presentation currency of the Group.

All numbers are rounded off to the nearest thousand except otherwise stated.

The condensed consolidated interim financial information does not include all information and disclosures required in the annual financial statements and should be read in conjunction with the Company’s annual financial statements for the year ended 31 December 2018.

2.2 Significant accounting policies

The accounting policies applied in the preparation of the condensed consolidated interim financial information are consistent with those followed in the preparation of the Group’s annual consolidated financial statements for the year ended 31 December 2018 and the notes attached thereto except as stated in Note 2.3.

2.3 Changes in accounting policies

(i) New and amended standards adopted by the Group

The following new standard became applicable for the current reporting period and the Group had to change its accounting policies and make appropriate adjustments as a result of adopting the standard:

The Group adopted IFRS 16 ‘Leases’ the standard replaces the existing guidance on leases, including IAS 17 ‘Leases”, IFRIC 4 ‘Determining whether an Arrangement contains a Lease”, SIC 15 “Operating Leases

– Incentives” and SIC 27 “Evaluating the Substance of Transactions in the Legal Form of a Lease”.

Page 16

Arabtec Holding PJSC and its subsidiaries 14

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 2. Basis of preparation and accounting policies (continued)

2.3 Changes in accounting policies (continued)

(i) New and amended standards adopted by the Group (continued)

IFRS 16 was issued in January 2016 and is effective for annual periods commencing on or after 1 January 2019. IFRS 16 stipulates that all leases and the associated contractual rights and obligations should generally be recognize in the Group’s financial Position, unless the term is 12 months or less or the lease for low value asset. Thus, the classification required under IAS 17 “Leases” into operating or finance leases is eliminated for Lessees. For each lease, the lessee recognizes a liability for the lease obligations incurred in the future. Correspondingly, a right to use the leased asset is capitalized, which is generally equivalent to the present value of the future lease payments plus directly attributable costs and which is amortized over the useful life.

The Group has opted for the modified retrospective application permitted by IFRS 16 upon adoption of the new standard. During the first time application of IFRS 16 to operating leases, the right to use the leased assets was generally measured at the amount of lease liability, using the interest rate at the time of first time application. IFRS 16 transition disclosures also requires the Group to present the reconciliation. The off-balance sheet lease obligations as of 31 December 2018 are reconciled as follows to the recognized the lease liabilities as of 1 January 2019.

AED’000(Unaudited)Operating lease commitments disclosed as of 31 December 2018 528,988

Less: Short term leases recognised on a straight line basis as expense (149,137) Net adjustments due to discounting and different treatments of extension and termination options (266,758)

Net present value of lease liabilities 113,093Less: Prepayments as at the date of initial application (34,946)

Lease liabilities recognised as at 1 January 2019 – as restated 78,147

Of which are:

- Current lease liabilities 6,800

- Non-current lease liabilities 71,347

78,147

The right-of use assets were measured at the amount equal to the lease liability, adjusted by the amount of any prepaid or accrued lease payments relating to that lease recognised in the consolidated statement of financial position as at 31 December 2018. There were no onerous lease contracts that would have required an adjustment to the right-of-use assets at the date of initial application.

The change in accounting policy affected the following items in the statement of financial position of the Group as at 1 January 2019 (as restated):

 prepayment - decrease by AED 34.9 million right-of-use assets - increase by AED 113.1 million

 lease liabilities - increase by AED 78.1 million There is no impact on retained earnings on 1 January 2019.

Page 17

Arabtec Holding PJSC and its subsidiaries 15

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 2. Basis of preparation and accounting policies (continued) 2.3 Changes in accounting policies (continued)

(i) New and amended standards adopted by the Group (continued) The recognised right-of-use assets relate to the following types of assets:

30 June2019AED’0001 January2019AED’000(Unaudited) (As restated)

Land99,356102,298

Buildings7,7649,396

Labor camps20,2511,399

127,371113,093

The additions during the period for right-of-use assets amounted to AED 19.8 million.

Lease liabilities recognized and maturity analysis:

30 June2019AED’0001 January2019AED’000(Unaudited) (As restated)Amount due for settlement within 12 months

Not later than 1 year (shown under current liabilities)10,1596,800

Amount due for settlement after 12 months

Later than 1 year and not later than 5 years53,41741,215

Later than 5 years30,13230,132

93,70878,147

Impact on segment disclosures and earnings per share

The change in accounting policy increased segment assets and liabilities as at 30 June 2019 and reduced net results for the period then ended. Lease liabilities are now included in segment liabilities, whereas finance lease liabilities were previously excluded from segment liabilities.

The following segments were affected by the change in policy:Net resultsSegmentassetsSegmentliabilities

AED’000AED’000AED’000

Building(2,469)59,00228,822

Economic and social infrastructure(2,402)36,43534,876

Industrial(3,148)31,93430,010

(8,019)127,37193,708

Page 18

Arabtec Holding PJSC and its subsidiaries 16

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 2. Basis of preparation and accounting policies (continued) 2.3 Changes in accounting policies (continued)

(i) New and amended standards adopted by the Group (continued)

The Group’s leasing activities and how these are accounted for:

The Group leases various properties, equipment and cars. Rental contracts are typically made for fixed periods of 1 to 50 years but may have extension options. Lease terms are negotiated on an individual basis and contain a wide range of different terms and conditions. The lease agreements do not impose any covenants, but leased assets may not be used as security for borrowing purposes.

From 1 January 2019, Leases are recognised as a right-of-use asset and a corresponding liability at the date at which the leased asset is available for use by the Group. Each lease payment is allocated between the liability and finance cost. The finance cost is charged to profit or loss over the lease period so as to produce a constant periodic rate of interest on the remaining balance of the liability for each period. The right-of-use asset is depreciated over the shorter of the asset's useful life and the lease term on a straight-line basis.

Assets and liabilities arising from a lease are initially measured on a present value basis. Lease liabilities include the net present value of the following lease payments:

 fixed payments (including in-substance fixed payments), less any lease incentives receivable;

 variable lease payment that are based on an index or a rate;

 amounts expected to be payable by the lessee under residual value guarantees;

 the exercise price of a purchase option if the lessee is reasonably certain to exercise that option; and  payments of penalties for terminating the lease, if the lease term reflects the lessee exercising that option.

The lease payments are discounted using the interest rate implicit in the lease. If that rate cannot be determined, the lessee’s incremental borrowing rate is used, being the rate that the lessee would have to pay to borrow the funds necessary to obtain an asset of similar value in a similar economic environment with similar terms and conditions.

Right-of-use assets are measured at cost comprising the following: the amount of the initial measurement of lease liability

 any lease payments made at or before the commencement date less any lease incentives received  any initial direct costs, and

 restoration costs.

Payments associated with short-term leases and leases of low-value assets are recognised on a straight-line basis as an expense in profit or loss. Short-term leases are leases with a lease term of 12 months or less.

Low-value assets comprise IT-equipment and small items of office furniture.

Practical expedient

In applying IFRS 16 for the first time, the Group has used the following practical expedients permitted by the standard:

 the use of a single discount rate to a portfolio of leases with reasonably similar characteristics;

 reliance on previous assessments on whether leases are onerous;

 the accounting for operating leases with a remaining lease term of less than 12 months as at 1 January 2019 as short-term leases;

Page 19

Arabtec Holding PJSC and its subsidiaries 17

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 2. Basis of preparation and accounting policies (continued) 2.3 Changes in accounting policies (continued)

(i) New and amended standards adopted by the Group (continued)

Practical expedient (continued)

 the exclusion of initial direct costs for the measurement of the right-of-use asset at the date of initial application, and

 the use of hindsight in determining the lease term where the contract contains options to extend or terminate the lease.

The Group has also elected not to reassess whether a contract is, or contains a lease at the date of initial application. Instead, for contracts entered into before the transition date the Group relied on its assessment made applying IAS 17 and IFRIC 4 Determining whether an Arrangement contains a Lease.

(ii) Revised standards

Effective for annual periods beginning on or after 1 January 2019:

 Amendments to IFRS 9 Prepayment Features with Negative Compensation and Modification of financial liabilities

 Amendments to IAS 28 Investment in Associates and Joint Ventures: Relating to long-term interests in associates and joint ventures.

 Annual Improvements to IFRSs 2015 - 2017 Cycle Amendments to IFRS 3 Business Combinations, IFRS 11 Joint Arrangements, IAS 12 Income Taxes and IAS 23 Borrowing Costs  Amendments to IAS 19 Employee Benefits Plan Amendment, Curtailment or Settlement  IFRIC 23 Uncertainty over Income Tax Treatments

(iii) New and revised standards and interpretations but not yet effective Effective for annual periods beginning after 1 January 2020:

 Amendments regarding the definition of material Amendments to clarify the definition of a business IFRS 17: Insurance Contracts

 Amendments to IFRS 10 Consolidated Financial Statements and IAS 28 Investments in Associates and Joint Ventures (2011) relating to the treatment of the sale or contribution of assets from and investor to its associate or joint venture.

 Amendments to IFRS 2, IFRS 3, IFRS 6, IFRS 14, IAS 1, IAS 8, IAS 34, IAS 37, IAS 38, IFRIC 12, IFRIC 19, IFRIC 20, IFRIC 22, and SIC-32 to update those pronouncements with regard to references to and quotes from the framework or to indicate where they refer to a different version of the Conceptual Framework.

2.4 Basis of consolidation

The condensed consolidated interim financial information as at, and for the period ended 30 June 2019 comprises results of the Company and its subsidiaries. The condensed consolidated interim financial information of the subsidiaries is prepared for the same reporting period as that of the Company, using consistent accounting policies. All inter-company transactions, profits and balances are eliminated on consolidation. Subsidiaries are fully consolidated from the date on which control is transferred to the Group and cease to be consolidated from the date on which control is transferred out of the Group.

Page 20

Arabtec Holding PJSC and its subsidiaries 18

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued)

3. Critical judgments and key sources of estimation uncertainty

Changes in judgments and estimation uncertainty

The critical judgements and estimates used in the preparation of these condensed consolidated interim financial information are consistent with those used in the preparation of the Group’s consolidated financial statements for the year ended 31 December 2018 except as follows:

Determining the lease term

In determining the lease term, management considers all facts and circumstances that create an economic incentive to exercise an extension option, or not exercise a termination option. Extension options (or periods after termination options) are only included in the lease term if the lease is reasonably certain to be extended (or not terminated).

Discounting of lease payments

The lease payments are discounted using the Group’s incremental borrowing rate (“IBR”), which ranges from 6.24% to 6.5%, due to the absence of implicit rates in the lease contracts.

Management has applied judgments and estimates to determine the IBR at the commencement of lease, using borrowing rates that certain financial institutions would charge the Group against financing the different types of assets it leases over different terms and different ranges of values. Majority of the leases are present in the UAE and accordingly no adjustment for the economic environment was deemed required.

Recoverable amount of Investment in Depa PLC

The Group maintains its significant influence over Depa PLC’s operating and financial policies. As a result, Management continues to account for its investment in Depa PLC as at 30 June 2019 under the equity method. Since the investee has not declared its results at the date of approval of this condensed consolidated interim financial information, Management has assessed the recoverable amount of the investment using value in use calculation, based on available market information and reasonable assumptions; such as cashflow forecast, growth rate, discount rate, and terminal growth rate.

Management considers that for the recoverable amount to fall below the carrying value, there would have to be unreasonable changes to key assumptions. Management considers the likelihood of these changes occurring as unlikely.

Impairment assessment of Goodwill

Management tests annually for impairment of goodwill as required by IAS 36 Impairment of Assets or more frequently when there is an indication that goodwill may be impaired at another reporting date, in accordance with the requirements of IAS 36. The recoverable amount of the cash-generating units have been determined based on value-in-use calculations. The cash flow forecast used in the calculations are consistent with the most up-to-date budgets and plans aligned with the Group’s business strategy and are based on reasonable and supportable assumptions. The discount rate used represents the rate that the market would expect on an investments of equivalent risk.

A change in the assumptions used by management, in particular the discount rate and growth rate assumptions used in the cash flow projections, could significantly affect the Group’s impairment evaluation.

Page 21

Arabtec Holding PJSC and its subsidiaries 19

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued)

3. Critical judgments and key sources of estimation uncertainty (continued)

Changes in judgments and estimation uncertainty (continued)Contract claims

A claim is an amount that the contractor seeks to collect from the customer or another party as reimbursements for costs not included in the contract price. A claim may arise from, for example, customer caused delays, prolongation cost, cost of acceleration of project, program errors in specifications or design, and disputed variations in contract work. The measurement of the amounts of revenue arising from claims is subject to a high level of uncertainty and often depends on the outcome of negotiations. Therefore, claims are only included in contract revenue when the amount has been accepted by the customer or the customer’s representative and or negotiations have reached a stage that it is highly probably that a significant reversal of revenue will not occur.

Labor camp option

As described in Note 26 (b), the Group is currently in the process of finalizing the terms of the Labour Camp option for the renegotiated lease. The Group has made a judgement, based on current discussions and a draft term sheet, that the lease option agreement will be finalized based on the high level terms set out in Note 26 (b). Given payment of AED 100 million for this option has been made in advance, the Group has classified this balance as such in the condensed consolidated interim statement of financial position as at 30 June 2019.

4. Segment reporting

Information regarding the Group’s operating segments is set out below in accordance with IFRS 8 “Operating Segments”. IFRS 8 requires operating segments to be identified on the basis of internal reports about components of the Group that are regularly reviewed by the “Executive management” who are the Chief Operating decision-makers in order to allocate resources to the segment and to assess its performance. The Group CEO is identified as a chief operating decision maker for the Group.

The management of the Group assessed the Group into four key business units; Building, Economic and Social Infrastructure, Industrial and Other. These businesses are the basis on which the Group reports its primary segment information to the chief operating decision maker for the purpose of resource allocation and assessment of segment performance.

The building segment primarily engages in the construction of high-rise towers, commercial and residential buildings and residential villas including execution of drainage, electrical and mechanical works. The Economic and Social Infrastructure segment is related to construction of airports, hospitals, museums and other activities which contributes to the social and economic development and industrial segment is involved in all works related to, intended to be used for, and/or for clients in the industries of oil and gas.

The Other segment is involved in all other work that does not fall into the previous three segments in addition to the Company.

The above segments are the basis on which the Group reports its segment information. Transactions between segments are conducted at estimated market rates on an arm’s length basis and eliminated on consolidation.

Page 22

Arabtec Holding PJSC and its subsidiaries 20

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 4. Segment reporting (continued)

BuildingEconomicand socialinfrastructure Industrial Others Eliminations Total

AED’000AED’000AED’000AED’000AED’000AED’000

Six-month period ended 30 June 2019 (Unaudited)

Revenue3,261,202791,118329,158135,068(303,419)4,213,127

Direct costs(3,077,402)(757,681)(307,734)(107,647)303,419(3,947,045)

Gross profit183,80033,43721,42427,421-266,082

Other income and other expenses, net54,1295061,281(2,321)(10,000)43,595

General and administrative expenses(165,458)(4,895)(7,058)(30,683)2,000(206,094)

Finance costs - net(39,300)(33)(3,164)(11,455)-(53,952)

Income tax expense(679)----(679)

Net segment results32,49229,01512,483(17,038)(8,000)48,952

Three-month period ended 30 June 2019 (Unaudited)

Revenue1,724,289377,391142,26279,430(137,587)2,185,785

Direct costs(1,639,577)(356,278)(133,166)(58,402)137,587(2,049,836)

Gross profit84,71221,1139,09621,028-135,949

Other income and other expenses, net13,365(355)585(376)(10,000)3,219

General and administrative expenses(75,690)(1,832)(3,189)(13,245)2,000(91,956)

Finance costs - net(20,319)(33)(1,781)(6,065)-(28,198)

Income tax expense(244)----(244)

Net segment results1,82418,8934,7111,342(8,000)18,770

Page 23

Arabtec Holding PJSC and its subsidiaries 21

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 4. Segment reporting (continued)

BuildingEconomicand socialinfrastructure Industrial Others Eliminations Total

AED’000AED’000AED’000AED’000AED’000AED’000

Six-month period ended 30 June 2018 (Unaudited)

Revenue3,504,8321,093,735478,696147,238(412,650)4,811,851

Direct costs(3,300,636)(1,049,110)(442,044)(108,392)412,650(4,487,532)

Gross profit204,19644,62536,65238,846-324,319

Other income and other expenses, net1,22793247112,387-15,017

General and administrative expenses(81,105)(32,265)(10,679)(36,650)-(160,699)

Finance costs - net(32,018)(10,712)(4,268)(12,576)-(59,574)

Income tax expense(2,842)(1,009)---(3,851)

Net segment results89,4581,57122,1762,007-115,212

Three-month period ended 30 June 2018 (Unaudited)

Revenue1,778,767581,872172,27950,966(192,390)2,391,494

Direct costs(1,663,199)(559,187)(159,622)(41,574)192,390(2,231,192)

Gross profit115,56822,68512,6579,392-160,302

Other income and other expenses, net130806269387-1,592

General and administrative expenses(43,198)(17,401)(4,595)(13,650)-(78,844)

Finance costs - net(19,272)(6,438)(1,453)(6,411)-(33,574)

Income tax expense(43)(68)---(111)

Net segment results53,185(416)6,878(10,282)-49,365

Page 24

Arabtec Holding PJSC and its subsidiaries 22

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 4. Segment reporting (continued)

BuildingEconomicand socialinfrastructure Industrial Others Eliminations Total

AED’000AED’000AED’000AED’000AED’000AED’000

As at 30 June 2019 (Unaudited)

Segment assets6,689,5712,155,927663,2522,738,373(1,782,479)10,464,644

Segment liabilities(6,727,095)(2,246,675)(482,557)(1,403,506)1,755,658(9,104,175)

As at 31 December 2018 (Audited)

Segment assets6,511,3832,743,526846,8162,902,369(1,968,987)11,035,107

Segment liabilities(6,795,731)(2,544,399)(758,473)(1,470,667)1,936,421(9,632,849)

Page 25

Arabtec Holding PJSC and its subsidiaries 23

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 5. Property, plant and equipment

LandLeaseholdlandPlant,machineryand officeequipment VehiclesLabourcamps andbuildings FurnitureScaffolding,cabins andtunnel formsPropertiesunderconstruction Total

AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000

At 31 December 2018 (audited)

Cost or fair value53,4276,3021,118,467186,047602,544147,351165,63611,9372,291,711

Accumulated depreciation-(2,205)(900,661)(155,982)(364,704)(128,590)(100,695)-(1,652,837)

Net book value53,4274,097217,80630,065237,84018,76164,94111,937638,874

Six-month period ended30 June 2019 (Unaudited)

Opening net book value53,4274,097217,80630,065237,84018,76164,94111,937638,874

Depreciation charge-(80)(46,611)(6,766)(6,254)(6,862)(7,293)-(73,866)

Additions-59213,9908516551,2922913,59721,268

Disposals--(287)(3,617)(22,967)(155)(168)-(27,194)

Transfers-(84)35426-34284(614)-

Closing net book value53,4274,525185,25220,559209,27413,07058,05514,920559,082

At 30 June 2019 (Unaudited)

Cost or fair value53,4276,8101,132,524183,307580,232148,522166,04314,9202,285,785

Accumulated depreciation-(2,285)(947,272)(162,748)(370,958)(135,452)(107,988)-(1,726,703)

Net book value53,4274,525185,25220,559209,27413,07058,05514,920559,082

Page 26

Arabtec Holding PJSC and its subsidiaries 24

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 6. Investment properties

30 June2019AED’00031 December2018AED’000(Unaudited) (Audited)

Net book value at the beginning of the period/year595,320595,647

Disposal during the period/year(1,712)-

Depreciation for the period/year(27)(327)

Net book value at the end of the period/year593,581595,320

a) Investment properties include a plot of land in Dubai, UAE amounting to AED 568 million (31 December 2018: AED 568 million). The carrying value of the land includes development costs incurred of AED 88 million.

At 30 June 2019, management is working with an external party on the development plan of the property. No impairment provision was recorded as management is confident that the recoverable amount of the property will be higher than its carrying amount based on its value-in-use. This land is pledged against the borrowing from a financial institution amounting to AED 242.8 million as at 30 June 2019 (31 December 2018: AED 250 million).

b) Land in Al Ain, UAE amounting to AED 25 million (31 December 2018: AED 25 million), Management has classified this land as investment property and is currently held for appreciation in the value. The fair value of the land is not expected to be materially different from the carrying value as at 30 June 2019.

During the period, there is no rental income (period ended 30 June 2018: Nil) related to investment properties and the depreciation charge in the condensed consolidated interim statement of profit or loss amounted to AED 0.03 million (period ended 30 June 2018: AED 0.16 million).

7. Other intangible assets

30 June2019AED’00031 December2018AED’000(Unaudited) (Audited)

Net book value at the beginning of the period/year16,00017,000

Additions during the period/year44-

Amortisation for the period/year(522)(1,000)

Net book value at the end of the period/year15,52216,000

The net book value of other intangible assets comprise the “Arabtec brand name”.

Page 27

Arabtec Holding PJSC and its subsidiaries 25

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 8. Investment in an associate

a) Details of the Group’s associate at 30 June 2019 and 31 December 2018 is as follows:

Place ofProportionProportion

incorporation of ownership of voting

Name of the Associate and operation interest power held Principal activity Depa PLC Dubai, U.A.E. 24.329% 24.329% Construction activities

b) The above investment has been accounted for under the equity method as follows:

30 June2019AED’00031 December2018AED’000(Unaudited) (Audited)

At the beginning of the period/year209,328205,248

Share of (loss)/profit for the period/year(7,803)4,080

At the end of the period/year201,525209,328

On 21 November 2012, the Group acquired shares in Depa PLC (“DEPA”) for AED 241.7 million representing a 24.329% interest in DEPA’s share capital upon acquisition. The investment in DEPA was classified as an associate as the Group obtained significant influence over the operating and financial policies of DEPA.

DEPA operates in the luxury fit-out sector, focusing primarily on hospitality, commercial and residential property developments through a combination of multiple subsidiaries, joint ventures and associates across a number of countries and market segments. DEPA operates in the Middle East, North Africa, Europe and Asia regions. DEPA is listed in the Dubai International Financial Center (DIFC) on NASDAQ Dubai.

Summarised financial information of DEPA as of 30 June 2019 is not available as DEPA has not declared its results at the date of approval of this condensed consolidated interim financial information.

Subsequent to the date of issuance of the consolidated financial statements of the Group for the year ended 31 December 2018, DEPA published its financial statements for the same period that showed an additional share of loss attributable to the Group of AED 7.8 million excluding losses amounting to AED 129.6 million from impairment of goodwill in the books of DEPA relating to acquisition made by DEPA, prior to it becoming associate of the Group. The loss has been recognised by the Group during the six-month period ended 30 June 2019.

Furthermore, the Group’s share in the results of DEPA for the six-month period ended 30 June 2019 has not been accounted for due to the fact that the financial information of DEPA as of 30 June 2019 has not been published as of date.

Page 28

Arabtec Holding PJSC and its subsidiaries 26

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 9. Due from/(to) customers on construction contracts 30 June

2019AED’00031 December2018AED’000(Unaudited) (Audited)Contract costs incurred plus recognised profits

less recognised losses on contracts in progress41,400,09241,344,875

Less: progress billings(38,713,538)(38,769,402)

2,686,5542,575,473

30 June2019AED’00031 December2018AED’000VarianceAED’000(Unaudited) (Audited)Gross amounts of due from customers on

construction contracts2,727,0312,641,92885,103

Gross amounts of due to customers on

construction contracts(40,477)(66,455)25,978

2,686,5542,575,473111,081

30 June2019AED’000(Unaudited)

Conversion to certified receivables (4,102,046) Revenue recognition 4,213,127

111,081

10. Related party transactions

The following table provides details of the total amount of transactions that have been entered into with related parties, as defined in International Accounting Standard 24: Related Party Disclosures, during the six-month periods ended 30 June 2019 and 2018, as well as balances with related parties as of 30 June 2019 and 31 December 2018:

Page 29

Arabtec Holding PJSC and its subsidiaries 27

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 10. Related party transactions (continued)

Six-month period ended30 June 2019As at30 June 2019RevenueOtherexpenses andsub-contractcostsAmountdue toAmountdue from

AED’000AED’000AED’000AED’000

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

Joint operations21,212-412,665536,260

Shareholders11,204-5,961-

Associate--34,9401,968

Other related parties16,892-44,34735,263

49,308-497,913573,491

Six-month period ended30 June 2018As at31 December 2018RevenueOtherexpenses andsub-contractcostsAmountdue toAmountdue from

AED’000AED’000AED’000AED’000

(Unaudited) (Unaudited)(Audited)(Audited)

Joint operations64,116-390,369561,231

Shareholders9,998-7,048-

Associate-6,07550,855-

Other related parties6,90848038,75714,929

81,0226,555487,029576,160

Page 30

Arabtec Holding PJSC and its subsidiaries 28

Notes to the condensed consolidated interim financial information for the six-month period ended 30 June 2019 (continued) 10. Related party transactions (continued)

Compensation of key management personnel

The remunerations of directors and other key members of management of the Group during the period were as follows:

Three-month period ended30 JuneSix-month period ended30 June

2019201820192018

AED’000AED’000AED’000AED’000

(Unaudited)(Unaudited)(Unaudited)(Unaudited)

Short term benefits2,9123,1976,2646,882

Employees’ benefits84120267436

Bonus9,135-9,1359,218

Remuneration to board of

directors-9,200-9,200

The Group, in the ordinary course of business, enters into various transactions including borrowings and bank deposits with financial institutions, which may be majority-owned by the Government of the Emirate of Abu Dhabi. The effect of these transactions is included in the condensed consolidated interim financial information. These transactions are made at terms equivalent to those that prevail in arm’s length transactions.

As at 30 June 2019, cash and cash equivalents and borrowings include AED 167.7 million (31 December 2018: AED 224.1 million) and AED 462.2 million (31 December 2018: AED 461.2 million) respectively, with/from entities in which the Government of the Emirate of Abu Dhabi has an equity stake. Finance costs include AED 13.9 million for the six-month period ended 30 June 2019 (for the six-month period ended 30 June 2018: AED 13.9 million) relating to balances with these entities.

Certain contracting customers of the Group are entities controlled by the Government of the Emirate of Abu Dhabi. The Group enters into transactions with such entities in the normal course of business (providing construction services). The impact of these transactions have been summarized as follows:

Due fromcustomers onconstructioncontractsCertifiedreceivablesRetentionreceivablesAdvancesreceived Revenue

AED’000AED’000AED’000AED’000AED’000

As at 30 June 2019 andfor the period then

ended (Unaudited)889,839389,096335,627440,3601,435,524

As at 31 December 2018(Audited)/for the periodended 30 June 2018

(Unaudited)991,466403,944382,918523,1852,319,156

Show all 40 pages