ASHUMGulf news and Dubai stocks, live

Press release regarding financial results for the first half of 2020 ARTC

Arabtec Holding PJSC 2 pages Arabic record

Document2 pages, text from the fileOpen DFM’s file

Page 1

Page | 1Dubai, UAE – 15 August 2020:

Arabtec Holding PJSC (“Arabtec” or “Group”), a leading contractor for social and economic infrastructure, today reported its half year financial results for six months ended June 30, 2020.

Arabtec reported a net loss to parent of AED 794 million in 1HY 2020, which was attributable to the construction business (Arabtec Construction). Other core businesses including Target (Industrial), Arabtec Engineering Services (Infrastructure) and EFECO (MEP) traded profitably and remain well-positioned within their respective sectors.

The first half year loss is primarily attributable to:

• Limited liquidity in the real estate and construction sector, impacting progress and forecast costs on projects.

• Limited settlement and recoverability of contractual claims.

• The effect of COVID 19, resulting in reduced progress on projects and additional costs.

• Slowing real estate sector has resulted in limited new awards.

The Board, having considered the current challenging business and economic environment as well as the accumulated losses as a percentage of shareholders equity, together with the increased future funding requirements of the Group, will call for an Extraordinary General Assembly meeting to discuss and determine the future options for the Group.

The Group is negotiating and will soon engage with an advisory firm to assist management in a capital and debt restructuring exercise. Viable options will be shared with shareholders in the upcoming General Assembly to be held within the next 30 days as required by the UAE Federal Law No (2) of 2015; and based on the options presented, the Shareholders will then be required to vote on dissolving the company or determine the most appropriate restructuring plan.

The board and management will work collaboratively with all regulatory bodies during this process.

Financial Performance SummaryAED (million) 6M 2020 6M 2019 Variance

Revenue3,0264213(1187)

Net (Loss)/Profit for the period(794)49(843)

Net Margin (%)-26.2%1.1%-

Net (Loss)/Profit attributable to the owners of the parent(794)58(846)

Net Margin attributable to the owners of the parent (%)-26%1.3-

Earnings per share(0.526)0.04-

Arabtec Holding PJSC1HY 2020 UNAUDITED EARNINGS RELEASE

Page 2

Page | 2ENDS

For further information, please contact: ir@arabtecholding.com

+971 (0) 2 333 7798About Arabtec Holding

A leading engineering and construction Group specialising in projects in the Middle East and North Africa. Through its operating companies and investments, the Group delivers construction and infrastructure projects, including commercial, residential, social, industrial and economic infrastructure in UAE and other selected countries in the region. The UAE-based group’s list of completed projects includes iconic buildings such as the world’s tallest building, the Burj Khalifa in Dubai, Abu Dhabi landmark, the Emirates Palace Hotel and Louvre Abu Dhabi Museum; as well as other technically challenging work on airports and related infrastructure.

In 2005, Arabtec became the first construction company to be listed on the Dubai Financial Market. Today, Arabtec Holding consists of operating companies which span all segments of the construction cycle. The group is currently working on some of the most prestigious projects in the Middle East, such as the UAE Pavilion and the Midfield Terminal Building in Abu Dhabi.

For more information on Arabtec Holding please visit www.arabtecholding.com

Important Disclaimer

Certain statements contained in this document constitute forward-looking statements relating to the Company, its business, markets, industry, financial condition, results of operations, business strategies, operating efficiencies, competitive position, growth opportunities, plans and objectives of management and other matters. These forward-looking statements are not a guarantee of future performance. Rather, they are based on current plans, views, estimates, assumptions and projections and involve known and unknown risks, uncertainties and other factors, many of which are outside of Arabtec's control and are difficult to predict, that may cause actual results, performance or developments to differ materially from any future results, performance or developments expressed or implied from the forward-looking statements. Arabtec does not make any representation or warranty as to the accuracy of the assumptions underlying any of the statements contained herein. The information contained herein is expressed as of the date hereof and may be subject to change. Neither Arabtec nor any of its controlling shareholders, directors or executive officers or anyone else has any duty or obligation to supplement, amend, update or revise any of the forward-looking statements contained in this market release, whether as a result of new information, future events or otherwise, except as required by applicable laws and regulations or by any appropriate regulatory authority. Backlog and new contract awards are non-IFRS metrics based on management’s estimates of awarded, signed and ongoing contracts which have not yet been completed, and serve as an indication of total size of contracts to be executed. These figures and classifications are unaudited, have not been verified by a third party, and are based solely on management's estimates.