Arabtec Holding PJSCFY 2018 AUDITED EARNINGS RELEASEPage | 1Highlights
Net profit attributable to Parent for FY18 was AED 256 million compared to AED 123 million in FY17 up
108% y-o-y. In 4Q18, net profit to parent was up 58.6% q-o-q at AED 76 million compared to AED 48
million for 4Q17
The Board of Directors proposes a cash dividend of 5.0 fils per share (AED 75 million) for FY18 compared to 2.05 fils per share for FY17 up 144% y-o-y, payable 30 days after the Annual General Assembly
Meeting
Revenue increased to AED 9.9 billion in FY18 compared to AED 9.1 billion for FY17 up 7.8% y-o-y.
Backlog was AED 15.6 billion as at 31Dec 2018 supported by a solid
pipeline of tender opportunities in infrastructure and industrial sectors
EBIT in FY18 was AED 364 millionup from AED 212 million in FY17
Dubai, UAE – 13th Feb 2019: Arabtec Holding PJSC (“Arabtec” or “Group”), a leading contractor for social and economic infrastructure, today announced its audited financial results for the 12 months ending 31 December 2018. The Group recorded a revenue of AED 9.9 billion for the full year and AED 2.7 billion for 4Q18. Net profit to parent reached AED 256 million for FY18 and AED 76 million for 4Q18. The Group’s backlog remained strong at AED 15.6 billion.
Furthermore, the Board of Directors is recommending the distribution of a final cash dividend of 5.0 fils per share (Total: AED 75 million) for FY18 for shareholder approval at the Annual General Assembly Meeting.
In 4Q18, debtor days reduced by a further 11 days to 155 days contributing to a positive net cash from operating activities of AED 924 million. The increase in operating cash reflects the Group’s ongoing focus on shortening payment cycles and cash collection from legacy projects. Consistent with the Group’s strategic priority to strengthen the balance sheet, net debt to equity ratio improved to 0.56 compared to 1.07 at 30 September 2018. Arabtec is progressing its refinancing of the Group’s existing term debt which will provide a sustainable platform for the future.
Arabtec is proud to be delivering the UAE Pavilion and Public Realm in Concourses and Arrivals Plazas for Expo2020 and has strengthened longstanding client relationships winning further work with Dubai Municipality in the economic infrastructure sector and with ADNOC Group in the industrial sector.
In 2019, Arabtec continues to take a selective approach to new work, particularly in the building sector. The Group will strengthen its regional footprint taking advantage of the growing market opportunities in the UAE, KSA, Egypt, Bahrain and Kuwait further diversifying its backlog of AED 15.6 billion, capitalising on a strong AED 48 billion pipeline of addressable opportunities.
Group Chief Executive Officer Hamish Tyrwhitt comments: ‘I am pleased to report that revenue increased to AED 9.9 billion in FY18 compared to AED 9.1 billion for FY17, up 7.8% year-on-year. Net profit attributable to parent for FY18 was AED 256 million compared to AED 123 million for FY17, up 108% year-on-year. The Group has now achieved eight consecutive quarters of profitability supported by positive cash from operating activities and a reduction in net debt.
In line with our Strategic Roadmap, our objective in 2018 was to rebase the business through a range of initiatives focused on productivity, efficiency, innovation and strengthening the balance sheet and we have delivered on our objective. Operational productivity and efficiency remain a strategic objective and will be a key driver in positioning Arabtec as a competitive and sustainable business. We continue to simplify the business through standardised processes enabling tools and the removal of duplicated functions and activities through Shared Services and outsourcing.’
Page 2
89%UAE BahrainKazakhstan Others50%15%19%15%Arabtec Holding PJSC(DFM: ARTC)13 February 2019, Dubai, UAEFY 2018 Audited Earnings ReleasePage | 2Financial Performance ReviewImportant Disclaimer
Certain statements contained in this document constitute forward-looking statements relating to the Company, its business, markets, industry, financial condition, results of operations, business strategies, operating efficiencies, competitive position, growth opportunities, plans and objectives of management and other matters. These forward-looking statements are not guarantees of future performance. Rather, they are based on current plans, views, estimates, assumptions and projections and involve known and unknown risks, uncertainties and other factors, many of which are outside of Arabtec's control and are difficult to predict, that may cause actual results, performance or developments to differ materially from any future results, performance or developments expressed or implied from the forward-looking statements. Arabtec does not make any representation or warranty as to the accuracy of the assumptions underlying any of the statements contained herein. The information contained herein is expressed as of the date hereof and may be subject to change. Neither Arabtec nor any of its controlling shareholders, directors or executive officers or anyone else has any duty or obligation to supplement, amend, update or revise any of the forward-looking statements contained in this market release, whether as a result of new information, future events or otherwise, except as required by applicable laws and regulations or by any appropriate regulatory authority.
Backlog and new contract awards are non-IFRS metrics based on management’s estimates of awarded, signed and ongoing contracts which have not yet been completed, and serve as an indication of total size of contracts to be executed. These figures and classifications are unaudited, have not been verified by a third party, and are based solely on management's estimates.
About Arabtec Holding Investor Relations Contact
A leading engineering and construction Group specializing in projects in the
Middle East and North Africa. Through its operating companies and investments, the Group delivers construction and infrastructure projects, including commercial, residential, social, industrial and economic infrastructure in UAE and other selected countries in the region. The UAE-based group’s list of completed projects includes iconic buildings such as the world’s tallest building, the Burj Khalifa in Dubai, Abu Dhabi landmark, the Emirates Palace Hotel and Louvre Abu Dhabi Museum; as well as other technically challenging work on airports and related infrastructure. In 2005, Arabtec became the first construction company to be listed on the Dubai Financial Market. Today, Arabtec Holding consists of operating companies which span all segments of the construction cycle. The group is currently working on some of the most prestigious projects in the Middle East, such as the UAE Pavilion and the Midfield Terminal Building in Abu Dhabi.
Investor Relations✉ ir@arabtecholding.com☎ +971 (0) 2 333 7798
For more information, please visit www.arabtecholding.com
AED (million) Q1’18 Q2’18 Q3’18 4Q’1820182017
Revenue2,4202,3912,3402,7019,8539,141
EBIT96839293364212
EBIT Margin (%)4.0%3.5%3.9%2.5%3.7%2.3%
Net Profit for the period6649677425797
Margin (%)2.7%2.1%2.9%2.7%2.6%1.1%
Net Profit attributable to the
owners of the parent64496776256123
Margin (%)2.6%2.1%2.9%2.8%2.6%1.3%
BySectorByGeographySectors:Building
• Residential Villas
• Residential
Towers
• Mixed use
Developments
• Hospitality
• Retail
EconomicInfrastructure
• Airports
• Roads and Bridges
• Railway & Metros
• Marine Works
SocialInfrastructure
• Healthcare
• Museums
• Education
• Defense
• Community
Buildings
• Sports &
RecreationIndustrial
• Oil and Gas
• Light & Heavy
Industry
• Waste Disposal
• Environment
Plants
• Utilities
Concessions,PPPs andDevelopmentsBacklog89%UAE BahrainKazakhstan OthersUAE BahrainKazakhstan OthersUAE BahrainKazakhstan Others89%UAE BahrainKazakhstan Others
Document 216 pages, a scan, not read yetThis file at DFM
Page 1
FY 2018 Investor PresentationFebruary 2019
Page 2
2
This document has been provided to you for information purposes only. This document does not constitute an offer of, or an invitation to invest or deal in, the securities of Arabtec Holding PJSC (the “Company”). The information set out in this document shall not form the basis of any contract and should not be relied upon in relation to any contract or commitment.
The issue of this document shall not be taken as any form of commitment on the part of the Company to proceed with any negotiation or transaction.
Certain statements contained in this document constitute forward-looking statements relating to the Company, its business, markets, industry, financial condition, results of operations, business strategies, operating efficiencies, competitive position, growth opportunities, plans and objectives of management and other matters. These forward-looking statements are not guarantees of future performance. Rather, they are based on current plans, views, estimates, assumptions and projections and involve known and unknown risks, uncertainties and other factors, many of which are outside of the Company's control and are difficult to predict, that may cause actual results, performance or developments to differ materially from any future results, performance or developments expressed or implied from the forward-looking statements.
The Company does not make any representation or warranty as to the accuracy of the assumptions underlying any of the statements contained herein. The information contained herein is expressed as of the date hereof and may be subject to change. Neither the Company nor any of its controlling shareholders, directors or executive officers or anyone else has any duty or obligation to supplement, amend, update or revise any of the forward looking statements contained in this document, whether as a result of new information, future events or otherwise, except as required by applicable laws and regulations or by any appropriate regulatory authority.
Backlog and new contract awards are non-IFRS metrics based on management’s estimates of awarded, signed and ongoing contracts which have not yet been completed, and serve as an indication of total size of contracts to be executed.
These figures and classifications are unaudited, have not been verified by a third party, and are based solely on management's estimates.
Disclaimer
Page 3
3
212364
2.3%3.7%
-10.0%-8.0%-6.0%-4.0%-2.0%0.0%2.0%4.0%05010015020025030035040045050012M 2017 12M 2018EBITEBIT margin
9,1419,853
12M 2017 12M 2018Performance Highlights
Robust revenue growth and operational efficiency driving profitability 12M 2018 vs 12M 2017
RevenueAED 9,853 mn+7.8% y-o-ycompared to AED9,141 mn in 12M’17
1. Net profit attributable to parent EBIT
AED 364 mn+72.1% y-o-ycompared to AED 212mn in 12M’17Margin improved from2.3% to 3.7%Net Profit1AED 256 mn+108.3% y-o-ycompared to AED 123mn in 12M’17Margin improved from1.3% to 2.6%BacklogAED 15.6 bnSolid pipeline oftender opportunities ofAED 48 bnG&A Expenses3.0%G&A expenses as apercentage of revenueimproved from 3.5% in12M’17 to 3.0%Revenue (AED mn)Growth of 7.8%EBIT (AED mn)
Page 4
42018 Key Project Awards
Leveraging strength in core sectors and diversifying into infrastructure projects Gas Development Expansion
(ADNOC LNG)AED 3.2 billionSewerage Infrastructure(Dubai Municipality)AED 588 millionMEP for Bu Hasa Oil Project(Tecnicas Reunidas)AED 521 millionUptown Cairo(Emaar Misr)AED 157 millionLuxury Villas at AKOYA Oxygen(DAMAC Properties)AED 992 millionLuxury Residential Towers(DAMAC Properties)AED 353 millionMEP for Opera District(TAV Tepe Akfen)AED 250 millionVillas at Villanova, Dubai(Dubai Properties)AED 521 millionPublic Realm in Concourses(Expo 2020)AED 311 millionCreekside Horizon(Emaar Properties)AED 117 million
Page 5
5Strategic Roadmap
Key focus on strategic alignment of the Group to its vision, mission and values
• Implementing the
Recapitalisation Programme
• Establishing Arabtec Holding as a strategic management
company
• Building and implementing a
strong risk managementapproach
• Stabilising the Group’s
organisation structure and role
• Embedding a performance-
based culture
• Resolving legacy project claims, receivables and WIP
• Disposal of non-core assets
• Consistently secure annual
backlog of new projects of at
least AED 8-9 billion at Group level
• Maintain leaner organisation with G&A expenses at target
benchmark level
• Ensure on-time and on-budget delivery of projects
• Risk management framework
• Remuneration framework
• Capital recycling
• Consistent growth in net profit and improved cash flow
generation
• Attract, retain, and develop appropriate resources to deliver growth
• Continue to improve project
gross margins and ensure on-time delivery
• Grow capabilities in MEP, EPCM, Infrastructure and Special
Construction
• Grow from existing capital base 2017
Phase – 1: Stabilise2018Phase – 2: Prepare2019+Phase – 3: GrowSuccessfully implemented Successfully implemented Progressing
Page 6
6Strategic RoadmapSuccessfully executed phase 2 of the Strategic Roadmap
Consistently secured annual backlog of new projects of at least AED 8-9 billion at Group level
Maintained leaner organisation with G&A expenses at target benchmark level
Ensured on-time and on-budget delivery of projectsRisk management frameworkCapital recyclingRemuneration framework1✓ Co✓ Co✓ Co Ong
✓ Completed Progressing
23456 Ong✓ Co
Page 7
7Performance Highlights
Achieve strategic priorities for the year Contract
Wins
Gas Development Expansion (ADNOC LNG), Villas at AKOYA Oxygen
(DAMAC properties), Sewerage
Infrastructure (Dubai Municipality), MEP for Bu Hasa Oil Project
(Tecnicas Reunidas)MarketPresence
Strengthening regional footprint on selected countries including UAE, KSA, Egypt & Bahrain as well as
building presence in the infrastructure space
Productivity
G&A has seen a consistent reduction to reach 3.0% of revenue compared to 3.5% in 12M 2017
Emiritisation
Awarded in three categories and honored by H.E. Nasser Thani Al Hameli, the Minister of Human
Resources in the EmiratisationGovernment Accelerator ProgramReceivables
Improved receivables collection and debtor days reduced by 31 days from 186 days in Q4 2017 to 155 in Q4 2018
Cashflow
Net cash from operating activities improved to AED 924 mn in 12M 2018 compared to negative cash from operating activities in 12M 2017 of AED 1,337 mn
BalanceSheet
Net debt decreased by AED 702 mn from AED 1,490 mn in Q4 2017 to AED 787 mn in Q4 2018. Net debt to equity ratio decreased from 1.11x in Q4 2017 to 0.56x in Q4 2018
Page 8
8Strategic Priorities 2019
Rebasing the business through a range of initiatives Productivity
• Measures to increase workforce productivity
• Implement group level solution for manpower planning
• Increase internal subcontracting of workforce Efficiency
• Remove duplicated functions and activities through shared services and outsourcing
• Simplify and closely integrate the Group’s operating structure
• Support international OPCOs through single support center Innovation
• Implementation of innovative methods for construction
• Improve cost savings and benefits through integrated supply chain management
• Integrate of BIM and 3D modelling into new projects
• Explore opportunities to reduce waste through the modularisation of building design
Sustainability
• Improve net debt to equity ratio
• Continue to divest or develop non-core assets and investments
• Create paperless work environment
Responsible Supply Chain
• Procurement of raw materials using Group’s strategic procurement platform
• Develop approved supplier list by evaluating existing and new suppliers
• Improve debtor days and creditors days
Culture
• Improve safety measure
• Improve communication across stakeholders
• Focus on increasing UAE nationals in workforce Market and Growth
• Achieve target work winning rate
• Pursue opportunities in the infra sector
• Diversify revenue through international projects
• Develop framework & competency to offer other funding solutions for Government projects
Governance
• Complete roll-out of Business Standards across the Group
• Roll-out of policies and procedures to support business standards
• Continue harmonisation of internal control systems
• Establish risk management processes
• Establish group-wide compliance framework
• Implement Oracle Fusion across the group
Page 9
9AED (mn) Q4 2018 Q4 2017 Variance 12M 2018 12M 2017 Variance
Revenue 2,701 2,796 (3.4)%9,8539,1417.8%
EBIT938213.9%36421272.1%
Margin (%)3.5%2.9%3.7%2.3%
Net Profit for the period744565.5%25797164.8%
Margin (%)2.7%1.6%2.6%1.1%
Net Profit to Parent764858.6%256123108.3%
Net Profit to Parent Margin2.8%1.7%2.6%1.3%
Income Statement
Revenue growth coupled with consistent G&A improvement and margin enhancement 12M 2018
• G&A ratio improved from 3.5% in 2017 to 3.0%
• EBIT margin improved from 2.3% in 2017 to 3.7%
• Net profit margin improved from 1.1% in 2017 to 2.6%
• Net profit to parent margin improved from 1.3% in 2017 to 2.6%
Page 10
10
Net debt decreased by AED 702 mn in 2018 Balance Sheet
Balance Sheet (AE mn)2018201720182017
ASSETS EQUITY AND LIABILITIESNon-current assets Equity
Property, plant and equipment 639 754 Share capital1,5001,500
Goodwill 249 249 Other reserves(30)(49)
Investment properties 595 596 Retained earnings (accumulated losses)190132
Trade and other receivables 520 750 Equity att. to equity holders of the
Parent1,6601,583
Advances paid to suppliers and subcon. 268 291 Non-controlling interests(257)(243)
Investment in associates 209 224 Total equity1,4021,340
Other non-current assets 68 38 Non-current liabilities
Total non-current assets 2,548 2,902 Bank borrowings621790
Provision for employees' end of service
indemnity216201
Current assets Retention payable528433
Trade and other receivables 5,038 5,290 Total non-current liabilities1,3651,424
Advances paid to suppliers andsubcontractors 978 1,258 Current liabilities
Other financial assets 206 182 Bank borrowings1,4361,843
Due from related parties 576 736 Trade and other payables4,7414,830
Other current assets 420 452 Advances received from customers for
contract work1,5911,963
Cash and bank balances 1,270 1,144 Due to related parties487553
Total current assets 8,487 9,062 Income tax payable1310
Total current liabilities8,2689,199
Total liabilities9,63310,624
TOTAL ASSETS 11,035 11,964 TOTAL EQUITY AND LIABILITIES11,03511,964
Page 11
11Receivables Analysis
Continued emphasis on cash collection and gradual improvement in debtor days Notes:
1. Revenue certified and payable by clients
2. Work completed including a. billed but not certified and b. unbilled Current Receivables (AED mn) 2018 2017 Change
Contract receivables(1)1,8311,876(45)
Amounts due from customers for
contract work(2)2,6422,981(339)
Trade and other receivables5557(1)
Provision for doubtful debts(335)(264)(71)
Total (excluding retentions)4,1944,650(457)
Retentions receivable844640204
Trade & other receivables -
Current5,0385,290(252)
Advances paid to suppliers
and sub contractors9781,258(280)
Current Receivables (AED mn)
* Calculated based on rolling 12 months actual revenue and excluding retentions Debtor Days*
4,6214,822
5,1105,2905,485
5,2235,2645,038
Q1FY17 Q2FY17 Q3FY17 Q4FY17 Q1FY18 Q2FY18 Q3FY18 Q4FY18 178
191198
186186
168166
155Q1FY17 Q2FY17 Q3FY17 Q4FY17 Q1FY18 Q2FY18 Q3FY18 Q4FY18
Page 12
12Cashflow Statement
Efficient working capital management driving improvement in cashflow generation
Cashflow Summary (AED mn)2018201720182017
OPERATING ACTIVITIES INVESTING ACTIVITIES
Profit before tax 261 113 Purchase of PP&E(60)(115)
Adjustment for: Proceeds from disposal of PP&E825
Depreciation of PP&E 169 175 Net movement in other financial assets(23)(67)
Provision for EOS 56 61 Movement in deposits maturing after 3
months0(40)
Finance costs 111 93 Other investing activities2717
Other non-cash items (21) (73) Cash flows from investing activities(48)(181)
576369
Working capital change: FINANCING ACTIVITIESTrade and other receivables 378 (1,157) Proceeds / (repayments) of
borrowings, net(327)259
Advances paid to subcontractors 302 (394) Dividends(40)0
Due from related parties 138 (408) Interest paid(111)(93)
Trade and other payables (74) (80) Additional share capital issued net of
transaction cost01,100
Advances received (420) 176 Loan from a related party0222
Due to related parties (49) 170 Other financing activities(13)(9)
Retentions payable 142 2 Cash flows from financing activities(492)1,479
Other working capital367
Cash from operating activities 996 (1,255) Increase (decrease) in cash384(38)
EOS paid (60) (59) Cash at the beginning of the period501543
Income tax paid (13) (23) Net foreign exchange difference(9)(4)
Cash flows from operating activities 924 (1,337) CASH AT PERIOD END876501
Page 13
13
Strong backlog supported by high profile project wins Backlog
13Project Name. Value(AED mn)From Description
Gas Development* 3,160 ADNOC LNG Expansion of Phase II AKOYA Oxygen 992 DAMAC
Properties Construction & MEP of villasInfrastructure
Project 588 Dubai Municipality Industrial sewerage system Bu Hasa Project 521 Tecnicas
ReunidasMEP for ADNOC’s oilproject
Public Realm 311 Expo 2020 Concourses & arrival plazas Residential Towers 353 DAMAC
Properties Construction of two towersOpera District 250 TAV Tepe Akfen MEP for two towersVillanova 222 Dubai Properties Construction of villasUptown Cairo 157 Emaar Misr Construction of Phase 3 & 4Creekside Horizon 117 Emaar properties MEPBacklog (AED mn) Major Wins (2018)
* Group share is 40-50%
17,168 16,220 16,105 16,361 15,648
Q4FY17 Q1FY18 Q2FY18 Q3FY18 Q4FY18 69%
24%3%5%ArabtecConstructionTargetEFECOOthersBySubsidiary 50%15%19%15%BuildingEconomicInfrastructureSocialInfrastructureIndustrialBySector89%5%3%4%UAEBahrainKazakhstanOthersByGeography
Page 14
14Integrated Capabilities
Delivering a competitive advantage to the group Core Competencies
EconomicInfrastructure Social Infrastructure Hospitality Residential Commercial Industrial
100%80%
100%24%
100%100%
TargetEngineeringDepaAustria ArabianReady Mix ArabtecEngineeringArabtecConstructionEFECO
Page 15
15
155169179190202216
9.9%9.2%
5.5%6.2%6.4%6.7%
-30.0%-25.0%-20.0%-15.0%-10.0%-5.0%0.0 %5.0 %
10. 0%
15. 0%
-501001502002502018f 2019f 2020f 2021f 2022f 2023f
• Within the MENA region, UAE and KSA are the largest construction markets, and are set to register the highest growth and offer maximum opportunities in the coming years. Egypt is showing huge potential underpinned by political stability and population growth
• The majority of the opportunities in GCC have been in ‘Building’ and ‘Industrial’ segments
o Building Sector: accounts to 42% of the addressable market with the mixed use projects contributing to 78% of the sector o Economic Infrastructure Sector: accounts 24% of the addressable market with Rail & Metro projects contributing 45% of the sector followed by Roads & Bridges contributing 29% o Industrial Sector: accounts 32% of the addressable market with healthcare projects contributing 39% of the sector followed by sports & recreation contributing 35%.
Market Outlook
The UAE construction market is estimated to grow at 6.8% CAGR (2019-23) Source: Industry articles,MEED, BMI
MENA Construction Awards(avg. 2013-17, AED Bn)UAE Contract Awards(AED)
• The UAE construction market is estimated at AED 169 bn in 2019 and expected to grow at a CAGR of 6.8% over the coming 5 years
• Growth in the UAE construction market is driven by a number of factors including rising oil prices, a growing economy, and Expo 2020.
• Key drivers include:
o Infrastructure investments in relation to Ghadan 21 stimulus plan, Abu Dhabi vision 2030 and UAE Vision 2021
o Efforts for economic diversification and focus on non oil sectors like tourism & finance
o Government-supported infrastructure projects in transport & utilities.
o The UAE is becoming a hub for renewables and green technologies, with Masdar spearheading new ventures.
165269
13297
26UAE KSA Egypt Kuwait BahrainMENA Pre-execution Pipeline(AED bn)1,1173,693
789585148
UAE KSA Egypt Kuwait Bahrain
Page 16
Commitment | Integrity | Team Spirit | Professionalism | AccountabilityArabtec Holding PJSC
1st Floor Low Rise IPIC Building, Sultan Bin Zayed the First Street (Al Muroor Road),
Tel : +971 2 333 7777Fax : +971 2 333 7711www.arabtecholding.com