Results of BOD meeting including financial statements for the 1st QTR of 2019 ARTC
Document 135 pages, a scan, not read yetThis file at DFM
Page 1
Arabtec Holding PJSC and its subsidiaries
Condensed consolidated interim financial information for the three-month period ended 31 March 2019 (Unaudited)
Page 2
Arabtec Holding PJSC and its subsidiaries
Condensed consolidated interim financial information for the three-month period ended 31 March 2019
Pages
Report on review of condensed consolidated interim financial information 1-2
Condensed consolidated interim statement of financial position 3Condensed consolidated interim income statement 4Condensed consolidated interim statement of comprehensive income 5Condensed consolidated interim statement of changes in equity 6Condensed consolidated interim statement of cash flows 7-8
Notes to the condensed consolidated interim financial information 9-33
Page 3
No text on this page.
Page 4
No text on this page.
Page 5
No text on this page.
Page 6
Arabtec Holding PJSC and its subsidiaries
The notes on pages 9 to 33 form an integral part of this condensed consolidated interim financial information (4)
Condensed consolidated interim income statementThree-month period ended 31 March
Note20192018
UnauditedUnaudited
AED’000AED’000
Revenue2,027,3422,420,357
Direct costs(1,891,937)(2,256,340)
Gross profit135,405164,017
Investment income1,0532,437
General and administrative expenses(114,138)(81,855)
Other income48,1799,236
Finance costs - net(32,079)(26,000)
Share of (loss)/profit from investment in an associate22(7,803)1,752
Profit before tax30,61769,587
Income tax expense12(435)(3,740)
Profit after tax for the period30,18265,847
Attributable to:
Owners of the Parent31,81363,636
Non-controlling interests(1,631)2,211
30,18265,847
Earnings per share
Basic and diluted (AED)140.0210.042
Page 7
Arabtec Holding PJSC and its subsidiaries
The notes on pages 9 to 33 form an integral part of this condensed consolidated interim financial information (5)
Condensed consolidated interim statement of comprehensive incomeThree-month period ended 31 March
20192018
UnauditedUnaudited
AED’000AED’000
Profit for the period30,18265,847
Other comprehensive loss
Items that will be reclassified subsequently to profit or loss
Net change in foreign currency translation reserve(3,668)(4,545)
Other comprehensive loss for the period(3,668)(4,545)
Total comprehensive income for the period26,51461,302
Attributable to:
Owners of the Parent29,30860,164
Non-controlling interests(2,794)1,138
26,51461,302
Page 8
Arabtec Holding PJSC and its subsidiaries
The notes on pages 9 to 33 form an integral part of this condensed consolidated interim financial information (6)
Condensed consolidated interim statement of changes in equityAttributable to owners of the ParentSharecapitalStatutoryreserveForeigncurrencytranslationreserveOtherreservesRetainedearnings TotalNon-controllinginterestsTotalequity
AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000
Balance at 31 December 2018 (Audited)1,500,000155,90927,603(212,648)189,7931,660,657(258,399)1,402,258
Impact of changes in accounting policies
(Note16)----(47,489)(47,489)-(47,489)
Balance at 1 January 2019 (Unaudited)1,500,000155,90927,603(212,648)142,3041,613,168(258,399)1,354,769
Profit for the period----31,81331,813(1,631)30,182
Other comprehensive loss for the period--(2,505)--(2,505)(1,163)(3,668)
Total comprehensive income for the
period(2,505)31,81329,308(2,794)26,514
Balance at 31 March 2019 (Unaudited)1,500,000155,90925,098(212,648)174,1171,642,476(261,193)1,381,283
Attributable to owners of the Parent Share
capitalStatutoryreserveForeigncurrencytranslationreserveOtherreservesRetainedearnings TotalNon-controllinginterestsTotalequity
AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000
Balance at 31 December 2017 (Audited)1,500,000130,27933,498(199,063)120,1521,584,866(244,368)1,340,498
Impact of changes in accounting policies
(Note16)----(101,397)(101,397)(11,282)(112,679)
Balance at 1 January 2018 (Audited)1,500,000130,27933,498(199,063)18,7551,483,469(255,650)1,227,819
Profit for the period----63,63663,6362,21165,847
Other comprehensive loss for the period--(3,472)--(3,472)(1,073)(4,545)
Total comprehensive income for the
period--(3,472)-63,63660,1641,13861,302
Balance at 31 March 2018 (Unaudited)1,500,000130,27930,026(199,063)82,3911,543,633(254,512)1,289,121
Page 9
Arabtec Holding PJSC and its subsidiaries
The notes on pages 9 to 33 form an integral part of this condensed consolidated interim financial information (7)
Condensed consolidated interim statement of cash flowsThree-month period ended 31 March
Note20192018
UnauditedUnaudited
AED'000AED'000
Operating activities
Profit before tax30,61769,587
Adjustments for:
Gain on sale of property, plant and equipment(46,729)(209)
Gain on disposal of investment properties(408)-
Investment income(1,053)(2,437)
Depreciation on property, plant and equipment757,70845,879
Depreciation on investment properties2781
Amortisation of intangible assets9250250
Provision for employees' end of service benefits16,87420,729
Provision for impairment of receivables - net65,000-
Interest expense33,69225,512
Net interest expense on non-current receivables and
payables(1,613)488
Share of loss/(profit) from investment in associate7,803(1,752)
Operating cash flow before changes in working capital, payment of employees’ end of service
benefits and income tax162,168158,128
Changes in working capital:
Trade and other receivables44,513(269,538)
Advances paid to suppliers and sub-contractors(123,595)(26,443)
Due from related parties18,795(4,163)
Inventories(10,862)(5,869)
Other current assets81,0692,769
Trade and other payables(9,341)12,746
Advances received from customers for contract work(265,708)(62,077)
Due to related parties19,25925,935
Retention payable90,8462,854
Cash generated from/(used in) operating activities7,144(165,658)
Employees' end of service benefits paid(13,915)(25,050)
Income tax paid(680)(7,252)
Net cash used in operating activities(7,451)(197,960)
Balance carried forward(7,451)(197,960)
Page 10
Arabtec Holding PJSC and its subsidiaries
The notes on pages 9 to 33 form an integral part of this condensed consolidated interim financial information (8)
Condensed consolidated interim statement of cash flows (continued)Three-month period ended 31 March
20192018
UnauditedUnaudited
NoteAED'000AED'000
Balance brought forward(7,451)(197,960)
Investing activities
Investment income received1,0532,437
Purchase of property, plant and equipment7(16,495)(24,897)
Proceeds from disposal of property, plant and equipment11,6816,224
Proceeds from disposal of investment properties2,120-
Net movement in other financial assets49,288(25,836)
Net cash generated from/(used in) investing activities47,647(42,072)
Financing activities
Repayments of borrowings, net(179,889)(116,836)
Repayment of lease liabilities(19,989)-
Interest paid(27,231)(25,512)
Net cash used in financing activities(227,109)(142,348)
Net decrease in cash and cash equivalents(186,913)(382,380)
Cash and cash equivalents at the beginning of the period874,898500,749
Net foreign currency translation difference(3,668)(4,545)
Cash and cash equivalents at the end of the period11684,317113,824
Page 11
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019
(9)1 General information
Arabtec Holding PJSC (the “Company”) is a Public Joint Stock Company established under the laws of the United Arab Emirates (UAE) pursuant to the resolution of the Department of Economic Development, Dubai, number 71 dated 2 July 2004. The Company commenced operations on 20
September 2004. The Company's shares are listed on the Dubai Financial Market (“DFM”). The registered office of the Company is P.O. Box 3399, Dubai, UAE.
The Group’s major shareholder is Aabar Investment PJS whose parent company is International Petroleum Investment Company (“IPIC”). IPIC is part of the Mubadala Investment Company PJSC
– group wholly owned by the Government of the Emirate of Abu Dhabi.
Arabtec Holding PJSC and its subsidiaries (the “Group”) are primarily engaged in construction of high-rise towers, buildings and residential villas, in addition to the execution of related services such as drainage, electrical and mechanical works, provision of ready mix concrete and construction equipment supply and rental.
The Group also operates in the oil and gas, infrastructure and power sector, facilities management and property development.
The condensed consolidated interim financial information of the Group for the three-month period ended 31 March 2019 was authorised for issue in accordance with a resolution of the Board of Directors on 14 May 2019.
The condensed consolidated interim financial information is reviewed, not audited.
Subsidiaries, associates and joint operations:Name of subsidiary and domicile% Holding (includingindirect holding)Principal activities31 March201931December2018Arabtec Construction LLC – Dubai,
UAE100%100%
Civil construction and related works
Arabtec Construction Syria LLC,
Syrian Arab Republic100%100%
Civil construction and related works
Arabtec Pakistan (Pvt.) Limited,
Pakistan60%60%
Civil construction and related works
Arabtec Egypt for Construction SAE,
Arab Republic of Egypt55%55%
Civil construction and related works
Arabtec Construction LLC (Foreign
Company), State of Palestine100%100%
Civil construction and related works
Arabtec - Musawa W.L.L., Kingdom of
Bahrain100%100%
Civil construction and related works
Arabtec Construction LLC (Jordan foreign working entity), Jordan
100%100%
Civil construction and
electrical, mechanical plumbing contracting and related works
Page 12
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(10)1 General information (continued)
Subsidiaries, associates and joint operations (continued):
Name of subsidiary and domicile% Holding (includingindirect holding)Principal activities31 March201931December2018Arabtec International Company,
Limited, Republic of Mauritius100%100%
Civil construction and related works
Arabtec Construction India (Pvt)
Limited, India63%63%
Civil construction and related works
Arabtec Constructions LLC - Abu
Dhabi, UAE100%100%
Civil construction and related works
Arabtec Precast LLC, UAE100%100%
Manufacturing of precastpanelsArabtec Minority Holdings Limited,
JAFZA, UAE100%100%
Investment holding companyArabtec Building Equipment LLC,
UAE70%70%
Trading and leasing ofconstruction and buildingequipmentArabtec Engineering Services LLC,
UAE80%80%
Infrastructure constructionworksArabtec-Envirogreen Facility
Management Services LLC, UAE100%100%
Building maintenance andcleaning services, facilitiesmanagement and securityservicesArabtec Property Development LLC –
Abu Dhabi, UAE100%100%
Real estate, investment,development andmanagementArabtec Property Development LLC -
Dubai, UAE100%100%
Real estate developmentArabtec Property Management LLC -
Dubai, UAE100%100%
Leasing and management ofthird party propertyArabtec Real Estate LLC - Abu Dhabi,
UAE100%100%
Real estate leasing andmanagement services
Arabtec Real Estate LLC - Dubai, UAE100%100%
Buying and selling of realestateArabtec Living For Construction LLC,
UAE100%100%
Civil construction and related works
Page 13
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(11)1 General information (continued)
Subsidiaries, associates and joint operations (continued):
Name of subsidiary and domicile% Holding (includingindirect holding)Principal activities31 March201931December2018
Arabtec Limited, JAFZA, UAE100%100%
General trading; commercialand real estate investments
Arabtec Trading Limited, JAFZA, UAE100%100%
General trading; commercialand real estate investmentsArabtec Consolidated Contractors
Limited, JAFZA, UAE*50%50%
International business,general trading, andinvestmentsAustrian Arabian Ready Mix Concrete
Co. LLC - Dubai, UAE100%100%
Ready mixed concretemanufacturingEmirates Falcon Electromechanical
Co. (EFECO) LLC - Dubai, UAE100%100%
Electrical, mechanical andplumbing contracting
EFECO Qatar W.L.L, Qatar*49%49%
Electrical, mechanical andplumbing contracting
EFECO LLC, State of Palestine100%100%
Electrical, mechanical andplumbing contractingEmirates Falcon Electromechanical Co.
(EFECO) LLC - Abu Dhabi, UAE100%100%
Electrical, mechanical andplumbing contracting
Gulf Steel Industries FZE, UAE100%100%
Fabrication of steel structure and profiles
GSI Steel Construction Contracting
LLC, UAE100%100%
Fabrication of steel structure and profiles
Idrotec Srl, Italy96%96%
Civil construction and related works
Nasser Bin Khaled Factory Ready Mix
Concrete Co. LLC, Qatar*49%49%
Manufacturing andtransportation of readymix concrete products
Saudi Target Engineering Construction Company LLC, Kingdom of Saudi
Arabia65%65%
Civil construction and related works
Target Engineering Construction
Company LLC, UAE100%100%
Civil construction and related works
Target Steel Industries LLC, UAE97%97%
Fabrication of steel structure and profiles
Target Engineering Construction Company L.L.C, (Foreign Company)
Jordan100%100%
Civil construction and related works
Page 14
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for three-month period ended 31 March 2019 (continued)
(12)1 General information (continued)Subsidiaries, associates and joint operations (continued):
* Although the Group holds 50% or less of the share capital, it exercises control over these subsidiaries.
The Company and its subsidiaries have the following branches:
Arabtec Holding PJSC – Abu Dhabi branch Arabtec Construction LLC, St Petersburg, Russia Arabtec Construction LLC, Riyadh, Kingdom of Saudi Arabia Arabtec Construction LLC, Fujairah branch Arabtec Construction LLC, Bahrain branch Arabtec Construction LLC, Sharjah Branch Idrotec SRL - Abu Dhabi ACC Arabtec JV SAL - Syrian Arab Republic branch Target Engineering Construction Company – Dubai branch Target Engineering Construction Company – Sharjah branch Target Engineering Construction Company – Fujairah branch Target Engineering Construction Company WLL – Qatar branch Arabtec Construction LLC – branch, Abu Dhabi
GSI Steel Construction Contracting LLC – Abu Dhabi branch Gulf Steel Industries FZE – Jordan branch
Arabtec Construction LLC – Egypt branch
Arabtec Consolidated Contractors Limited – Astana City Branch, Kazakhstan
Arabtec Engineering Services LLC, Abu Dhabi branch Austrian Arabian Ready-Mix Co LLC – Abu Dhabi branch EFECO – Riyadh, Kingdom of Saudi Arabia
Joint operations of the Group are disclosed in Note 17.
Name of subsidiary and domicile% Holding (includingindirect holding)Principal activities31 March201931December2018Arabtec Egypt for Property
Development, Egypt100%100%
Real Estate, investment,development, and management
Arabtec Gulf for Property Investment LLC, UAE
100%100%
Buying and selling of real estate as well as holding activities
Arabtec Construction W.L.L., Qatar*49%49%
Civil construction and related works
Page 15
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(13)1 General information (continued)Subsidiaries, associates and joint operations (continued):
The Group has the following associate over which it exercises significant influence:
2 Basis of preparation and accounting policies
2.1 Basis of preparation
This condensed consolidated interim financial information for the period ended 31 March 2019 has been prepared in accordance with IAS 34, ‘Interim Financial Reporting’.
The condensed consolidated interim financial information has been presented in United Arab Emirates Dirhams (“AED”) being the functional currency of the Company and presentation currency of the Group. All numbers are rounded off to the nearest thousand except otherwise stated.
The condensed consolidated interim financial information should be read in conjunction with the annual consolidated financial statements for the year ended 31 December 2018, which have been prepared in accordance with International Financial Reporting Standards.
2.2 Significant accounting policies
The accounting policies applied in the preparation of the condensed consolidated interim financial information are consistent with those followed in the preparation of the Group’s annual consolidated financial statements for the year ended 31 December 2018 except as stated in Note 2.3.
2.3 Changes in accounting policies
(a) New and amended standards adopted by the Group
The following new standard became applicable for the current reporting period and the Group had to change its accounting policies and make appropriate adjustments as a result of adopting the standard:
IFRS 16, 'Leases' (effective from 1 January 2019)
The impact of the adoption of IFRS 16 and the new accounting policies are disclosed in Note 16.
% Holding (includingindirect holding)
Principal activities Name of associate and domicile 31 March
201931December2018Depa Plc, Dubai, UAE (“DEPA”)(formerly Depa Limited) 24% 24%
Luxury fit-out of five star hotels, yachts and facilities and related services
Page 16
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(14)2 Basis of preparation and accounting policies (continued)
2.3 Changes in accounting policies (continued)
(b) New standards and amendments not early adopted by the Group
There are no IFRSs or IFRIC interpretations that are not yet effective that would be expected to have a material impact on the Group’s condensed consolidated interim financial information.
2.4 Basis of consolidation
The condensed consolidated interim financial information as at, and for the period ended 31 March 2019 comprises results of the Company and its subsidiaries. The condensed consolidated interim financial information of the subsidiaries is prepared for the same reporting period as that of the Company, using consistent accounting policies. All inter-company transactions, profits and balances are eliminated on consolidation.
Subsidiaries are fully consolidated from the date on which control is transferred to the Group and cease to be consolidated from the date on which control is transferred out of the Group.
3 Critical accounting estimates and judgements
The preparation of condensed consolidated interim financial information requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, income and expenses. Actual results may differ from these estimates.
In preparing this condensed consolidated interim financial information, the significant judgements made by the management in applying the Group’s accounting policies and the key sources of estimation uncertainty were the same as those that applied in the consolidated financial statements for the year ended 31 December 2018 except as follows:
Critical judgements in determining the lease term:
In determining the lease term, management considers all facts and circumstances that create an economic incentive to exercise an extension option, or not exercise a termination option. Extension options (or periods after termination options) are only included in the lease term if the lease is reasonably certain to be extended (or not terminated). The assessment is reviewed if a significant event or a significant change in circumstances occurs which affects this assessment and that is within the control of the Group. Furthermore, with respect to the lease for one of the labour camps, potential future cash outflows of AED 572 million have not been included in the lease liability because the Group is not reasonably certain that the leased premises will be utilized to full capacity.
Page 17
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(15)4 Financial risk management and financial instruments
4.1 Financial risk factors
The Group’s activities expose it to a variety of financial risks: market risk (including currency risk, fair value interest rate risk, cash flow interest rate risk and price risk), credit risk and liquidity risk.
The condensed consolidated interim financial information does not include all financial risk management information and disclosures required in the annual consolidated financial statements; therefore, it should be read in conjunction with the Group’s annual consolidated financial statements as of 31 December 2018. The Group’s financial risk management objectives and policies are consistent with those disclosed in the annual consolidated financial statements as of and for the year ended 31 December 2018.
There have been no changes in the risk management department or in any risk management policies since the year end.
The Group monitors its risk of a possible shortage of funds using cash flow forecasts. These forecasts consider the maturity of both its financial investments and financial assets (e.g. accounts receivable, other financial assets) and projected cash flows from operations.
The Group’s objective is to maintain a balance between continuity of funding and flexibility through the use of bank facilities. The Group manages liquidity risk by maintaining adequate bank balances and credit facilities, by continuously monitoring forecasted and actual cash flows and matching the maturity profiles of financial assets and liabilities.
Compared to year ended 31 December 2018, there was no material change in the contractual undiscounted cash out flows for financial liabilities.
Financial instruments comprise financial assets and financial liabilities.
Financial assets consist of bank balances and cash, trade and other receivables, other financial assets, other current assets excluding prepayments and advances, and due from related parties.
Financial liabilities consist of bank borrowings, trade and other payables, retentions payable and due to related parties.
At the period end, the fair values of financial instruments are not materially different from their carrying values. The fair value of the financial assets and liabilities are considered at the amount at which the instrument could be exchanged in a current transaction between willing parties, other than in a forced or liquidation sale. The following methods and assumptions were used to estimate the fair values:
Bank balances and cash, trade receivables, other financial assets, other current assets, due from related parties, bank borrowings, trade and other payables, due to related parties approximate their carrying amounts, largely due to the short-term maturities of these instruments.
Page 18
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(16)4 Financial risk management and financial instruments (continued)
4.1 Financial risk factors (continued)
Long term receivables are evaluated by the Group based on parameters such as interest rates, specific country risk factors, and individual credit worthiness of the customer and the risk characteristics of the financed project. Based on this evaluation, provisions are taken to account for the expected losses of these receivables. As at 31 March 2019, the carrying amounts of such receivables, net of provisions, are not materially different from their fair values.
4.2 Fair value estimation
The Group classifies its valuations of financial instruments carried at fair value and investment properties for which fair value is disclosed in the following levels of fair value hierarchy:
Quoted prices (unadjusted) in active markets for identical assets or liabilities (Level 1).
Inputs other than quoted prices included within level 1 that are observable for the asset or liability, either directly (that is, as prices) or indirectly (that is, derived from prices) (Level 2).
Inputs for the asset or liability that are not based on observable market data (that is, unobservable inputs) (Level 3).
5 Seasonality of operations
The results for the period ended 31 March 2019 reflect the results of the Group's continuing projects and new projects commenced during the period and are not significantly affected by any seasonal or cyclical operations.
Management has concluded that this does not constitute “highly seasonal” as considered by IAS 34 Interim Financial Reporting. Notwithstanding, the results for the three-month period ended 31
March 2019 are not necessarily indicative of the results that might be expected for the year ending 31 December 2018.
6 Segment reporting
Information regarding the Group’s operating segments is set out below in accordance with IFRS 8 “Operating Segments”. IFRS 8 requires operating segments to be identified on the basis of internal reports about components of the Group that are regularly reviewed by the “Executive management” who are the Chief Operating decision-makers in order to allocate resources to the segment and to assess its performance. The Group CEO is identified as a chief operating decision maker for the Group.
.
Page 19
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(17)6 Segment reporting
The management of the Group assessed the Group into four key business units; Building, Economic and Social Infrastructure, Industrial and Other. These businesses are the basis on which the Group reports its primary segment information to the chief operating decision maker for the purpose of resource allocation and assessment of segment performance.
The building segment primarily engages in the construction of high-rise towers, commercial and residential buildings and residential villas including execution of drainage, electrical and mechanical works. The Economic and Social Infrastructure segment is related to construction of airports, hospitals, museums and other activities which contributes to the social and economic development and industrial segment is involved in the all works related to, intended to be used for, and/or for clients in the industries of oil and gas. The Other segment is involved in all other wok that does not fall into the previous three segments in addition to the headquarters.
The above segments are the basis on which the Group reports its segment information. Transactions between segments are conducted at estimated market rates on an arm’s length basis and eliminated on consolidation.
Page 20
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued) (18)
6 Segment reporting (continued)BuildingEconomic andsocialinfrastructure Industrial Others Eliminations Total
AED '000AED '000AED '000AED '000AED '000AED '000
Three months period ended 31 March2019 (Unaudited)
Revenue1,536,913413,727186,89655,638(165,832)2,027,342
Direct costs(1,432,553)(401,403)(174,568)(49,245)165,832(1,891,937)
Gross profit104,36012,32412,3286,393-135,405
Other income and other expenses, net40,7648616965,858-48,179
General and administrative expenses(89,768)(3,063)(3,869)(17,438)-(114,138)
Finance costs(24,253)-(1,383)(5,390)-(31,026)
Share of loss from associate---(7,803)-(7,803)
Income tax expense(435)----(435)
Net segment results30,66810,1227,772(18,380)-30,182
Three months period ended 31 March2018 (Unaudited)
Revenue1,726,065511,863306,41796,272(220,260)2,420,357
Direct costs(1,637,437)(489,923)(282,422)(66,818)220,260(2,256,340)
Gross profit88,62821,94023,99529,454-164,017
Other income and other expenses, net1,09712620212,000-13,425
General and administrative expenses(37,907)(14,864)(6,084)(23,000)-(81,855)
Finance costs(12,746)(4,274)(2,815)(6,165)-(26,000)
Income tax expense(2,799)(941)---(3,740)
Net segment results36,2731,98715,29812,289-65,847
Page 21
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued) (19)
6 Segment reporting (continued)BuildingEconomic andsocialinfrastructure Industrial Others Eliminations Total
AED '000AED '000AED '000AED '000AED '000AED '000
As at 31 March 2019 (Unaudited)
Segment assets6,704,2862,677,468723,6632,905,040(2,008,127)11,002,330
Segment liabilities(7,030,364)(2,483,224)(648,334)(1,472,108)2,012,983(9,621,047)
As at 31 December 2018 (Audited)
Segment assets6,511,3832,743,526846,8162,902,369(1,968,987)11,035,107
Segment liabilities(6,795,731)(2,544,399)(758,473)(1,470,667)1,936,421(9,632,849)
Page 22
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(20)7 Property, plant and equipment
During the three-month period ended 31 March 2019, the Group acquired various types of property, plant and equipment with a cost of AED 16,495 thousand (period ended 31 March 2018: AED 24,897 thousand). Assets with a net book value of AED 10,952 thousand were disposed off by the Group during the period (period ended 31 March 2018: AED 6,015 thousand). Depreciation expense for the period was AED 57,708 thousand (period ended 31 March 2018: AED 45,879 thousand).
8 Investment properties
Investment properties included a land in Dubai, UAE amounting to AED 568 million (31 December 2018: AED 568 million). The carrying value of the land includes incurred development costs of AED 88 million.
At 31 March 2019, management is working with an external party on the development plan of the property. No impairment provision was recorded as management is confident that the recoverable amount of the property will be higher than its carrying amount based on its value-in-use. This land is pledged against the borrowing from Mashreq Bank amounting to AED 242.8 million (31 December 2018: AED 250 million).
Villas in Abu Dhabi, UAE with a carrying value of AED 2 million (31 December 2018: AED 2 million), the fair value of these investment properties based on market prices approximates AED 2 million at 31 March 2019 (31 December 2018: AED 2 million). The villas are designated for rental activities and accordingly, classified as investment properties.
Land in Al Ain, UAE amounting to AED 25 million (31 December 2018: AED 25 million), management has classified this land as investment property and is currently held for appreciation in the value. The fair value of the land is not expected to be materially different from the carrying value as at 31 March 2019.
During the year, there is no rental income (period ended 31 March 2018: Nil) related to investment properties and the depreciation charge in the condensed consolidated interim income statement amounted to AED 27 thousand (period ended 31 March 2018: AED 81 thousand).
9 Other intangible assets
During the period, the amortisation of other intangible assets amounts to AED 250 thousand (period ended 31 March 2018: AED 250 thousand). There were no additions during the period (period ended 31 March 2018: Nil).
Page 23
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(21)10 Related parties
The following table provides details of the total amount of transactions that have been entered into with related parties during three-month periods ended 31 March 2019 and 2018, as well as balances with related parties as of 31 March 2019 and 31 December 2018:
Three months ended 31March 2019 (Unaudited)As at 31 March 2019(Unaudited)RevenueOtherexpenses andsub-contractcostsAmountdue toAmountdue from
AED’000AED’000AED’000AED’000
Joint operations16,645-411,502548,678
Shareholder4,648-5,226-
Associate--53,579-
Other related parties8,232-35,9818,687
27,525-506,288557,365
Three months ended 31 March2018 (Unaudited)As at 31 December 2018(Audited)RevenueOtherExpensesand sub-contractcostsAmountdue toAmountdue from
AED’000AED’000AED’000AED’000
Joint operations32,685-390,369561,231
Shareholder5,038-7,048-
Associate-4,31750,855-
Other related parties3,768-38,75714,929
41,4914,317487,029576,160
Compensation of key management personnel
The remunerations of directors and other key members of management of the Group during the period were as follows:
Three months ended 31 March
20192018
UnauditedUnaudited
AED’000AED’000
Short term benefits3,3523,685
Employees’ benefits183315
Bonus-9,218
3,53513,218
Page 24
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(22)10 Related parties (continued)
The Group, in the ordinary course of business, enters into various transactions including borrowings and bank deposits with financial institutions which may be majority-owned by the Government of the Emirate of Abu Dhabi. The effect of these transactions is included in the condensed consolidated interim financial information. These transactions are made at terms equivalent to those that prevail in arm’s length transactions.
Cash and cash equivalents and borrowings include AED 134,580 thousand (2018: AED 224,121 thousand) and AED 572,363 thousand (2018: AED 461,211 thousand) respectively, with/from entities in which the Government of the Emirate of Abu Dhabi has an equity stake. Finance cost include AED 8,378 thousand (2018: AED 5,188 thousand) relating to balances with these entities.
Certain contracting customers of the Group are entities controlled by the Government of the Emirate of Abu Dhabi, The Group enters into transactions with such entities in the normal course of business (providing construction services). The significant transactions lead to a revenue of AED 644,939 thousand (31 March 2018: AED 1,172,051 thousand), receivable balances of AED 334,358 thousand (31 December 2018: AED 403,944 thousand) and advances of AED 496,433 thousand (31 December 2018: AED 523,185 thousand). Below here is list of all balances relating to such projects:
(Unaudited) RevenueAmounts dueonconstructionworksAccountsreceivableRetentionsreceivableAdvancesreceivedAED’ 000 AED’ 000 AED’ 000 AED’ 000 AED’ 000Period ended 31March 2019 644,939 948,687 334,358 328,053 496,433Period ended 31March 2018 /December 2018 1,172,051 991,466 403,944 382,918 523,185
Page 25
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued) (23)
11 Cash and cash equivalents31 March201931 December2018Unaudited Audited
AED’000AED’000
Cash and bank balances682,982898,728
Short term bank deposits327,379370,847
Cash and bank balances1,010,3611,269,575
Cash and cash equivalents comprise bank balances and cash net of bank overdrafts. The details are as follows:
31 March201931 March2018UnauditedAED’000UnauditedAED’000
Cash and bank balances1,010,361633,023
Less: Deposits with maturity of more than 3 months(40,912)(40,000)
Less: Bank overdraft(285,132)(479,199)
Cash and cash equivalents for the purpose of statement of
cash flows684,317113,824
Page 26
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(24)12 Income tax expense
The Group is subject to taxation on its operations except in the United Arab Emirates and Bahrain.
Income in countries of operations is subject to tax at rates ranging between 5% and 34%.
The major components of income tax expense in the condensed consolidated interim income statement are:
Three months ended 31 March
20192018
UnauditedUnaudited
AED’000AED’000
Income taxes
Current tax expense1,9114,531
Deferred tax income relating to the origination of temporary differences
(1,476)(791)
Total income tax expense4353,740
The total charge for the period can be reconciled to the accounting profit for entities subject to taxation as follows:
Three months ended 31 March
20192018
UnauditedUnaudited
AED’000AED’000
Income before tax30,61769,587
Income tax expense(435)(3,740)
The income tax expense in the condensed consolidated income statement is at the applicable tax rate of the respective subsidiaries in the condensed consolidated interim financial information.
13 Share capital31 March 201931 December2018Unaudited Audited
AED’000AED’000
Authorised, issued and fully paid up:
1,500,000 thousand shares of AED 1 each (31 December
2018 AED 1,500,000 thousand shares of AED 1 each)1,500,0001,500,000
Page 27
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(25)14 Earnings per share
Earnings per share is calculated by dividing the profit attributable to the owners of the Parent for the three-month period ended 31 March 2019, amounting to AED 31,813 thousand (three-month period ended 31 March 2018: profit of AED 63,636 thousand) by the weighted average number of shares outstanding during the period of 1,500,000 (2018: 1,500,000 thousand).
Three months ended 31 March2019 2018Unaudited UnauditedAED’000 AED’000Basic and diluted earnings per share 0.021 0.04215 Other matters
(a) At 31 March 2019, the Group has net receivable exposures amounting to AED 153 million (31 December 2018: AED 153m) after considering outstanding advances and other receivables from the customer and direct payments made to the Group’s suppliers by the customer. Negotiations with the customers for recovery of the amounts are in progress.
Based on the contracts and communications with the customers, management is of the opinion that the Group is entitled under the contracts to recover the full amounts and accordingly, no provision for impairment has been made against these balances.
(b) The Group has a total exposure of AED 428 million as at 31 December 2018 (2017: AED 428 million) relating to receivables against a previous project in Dubai, UAE. As the client disputed the payment of receivables, the Board of Directors of the Group resolved to initiate arbitration proceedings against the customer.
(c) The Group has a total exposure of AED 203 million as at December 2018 (2017: AED 203 million) relating to receivables against two projects in Dubai, UAE, for the same client.
During the last quarter of 2017, the Group received a court judgment in its favour in respect of one project, which the Group is taking steps to enforce. During the previous year, the Group received an arbitral award for the second project in its favour and the Group is taking steps to enforce its rights.
(d) During 2016, the non-controlling shareholder of the Group's subsidiary in Qatar (Arabtec Construction W.L.L. Qatar) issued a letter indicating their non-approval or non-authorisation to issue the financial statements of the subsidiary, on the grounds that they accepted no responsibility for the financial position and performance and management of the subsidiary. The Group has obtained legal advice and strongly believes that the non-controlling shareholder is responsible for their share of the subsidiary's operations based on the Qatari Commercial Companies Law, and that both shareholders of the entity are jointly liable for the liabilities of the subsidiary. During the year ended 31 December 2017, the shareholder filed a claim against the Group related to the above mentioned matter.
Management believes that the outcome of such a dispute would have no impact on the condensed consolidated interim results of the Group as a whole or on its total equity.
(e) The amount of claim recognised as part of the revenue for the three-month period ended is AED 67 million (31 December 2018: AED 381 million).
Page 28
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(26)16 Changes in accounting policies
This note explains the impact of the adoption of IFRS 16 “Leases” on the Group’s condensed consolidated interim financial information and also discloses the new accounting policies that have been applied from 1 January 2019, where they are different to those applied in prior periods.
As a result of the changes in the Group’s accounting policies, opening retained earnings in the condensed consolidated interim financial information have been adjusted. IFRS 16 was adopted without restating comparative information. The reclassifications and the adjustments arising from the new standard are therefore not reflected in the condensed consolidated interim statement of financial position as at 31 December 2018, but are recognised in the opening retained earnings on 1 January 2019. The adjustments are explained in more detail below:
16.1 Impact of adoption
As indicated in Note 2.3, the Group has adopted IFRS 16 Leases retrospectively from 1 January 2019.
In accordance with the transition provisions in IFRS 16 the new rules have been adopted retrospectively with the cumulative effect of initially applying the new standard recognised on 1
January 2019. Comparatives for the 2018 financial year have not been restated.
On adoption of IFRS 16, the Group recognised lease liabilities in relation to leases which had previously been classified as ‘operating leases’ under the principles of IAS 17 Leases. These liabilities were measured at the present value of the remaining lease payments, discounted using the lessee’s incremental borrowing rate as of 1 January 2019. The weighted average incremental borrowing rate applied to the lease liabilities on 1 January 2019 was 6.31%.
The associated right-of-use assets for one of the leases relating to a labour camp was measured on a retrospective basis as if the new rules had always been applied. Other right-of use assets were measured at the amount equal to the lease liability, adjusted by the amount of any prepaid or accrued lease payments relating to that lease recognised in the consolidated statement of financial position as at 31 December 2018. The net impact on retained earnings on 1 January 2019 was AED 47,489 thousand.
Page 29
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(27)16 Changes in accounting policies (continued)
16.1 Impact of adoption (continued)
In applying IFRS 16 for the first time, the Group has used the following practical expedients permitted by the standard:
the use of a single discount rate to a portfolio of leases with reasonably similar characteristics;
the accounting for operating leases with a remaining lease term of less than 12 months as at 1 January 2019 as short-term leases;
the use of hindsight in determining the lease term where the contract contains options to extend or terminate the lease.
The Group has also elected not to apply IFRS 16 to contracts that were not identified as containing a lease under IAS 17 and IFRIC 4 Determining whether an Arrangement contains a Lease.
16.2 IFRS 16 Accounting policies
(i) Amount recognised in the condensed consolidated interim statement of financial position:
The condensed consolidated interim statement of financial position shows the following amounts relating to leases:
20192018
UnauditedUnaudited
AED’000AED’000
Right of use asset659,918-
20192018
UnauditedUnaudited
AED’000AED’000
Lease liabilities
Current65,390-
Non-current360,069-
425,459-
Additions to right of use asset during the three-month period ended 31 March 2019 were nil.
Page 30
Arabtec Holding PJSC and its subsidiaries
Notes to the condensed consolidated interim financial information for the three-month period ended 31 March 2019 (continued)
(28)16 Changes in accounting policies (continued)
16.2 IFRS 16 Accounting policies (continued)
(ii) Amount recognised in the condensed consolidated interim income statement:
The condensed consolidated interim income statement shows the following amounts relating to leases:
20192018
UnauditedUnaudited
AED’000AED’000
Depreciation charge of right of use assets26,526-
Interest expense6,461-
Expense relating to short-term leases8,334-
The total cash outflow for leases during the three-month period ended 31 March 2019 was AED 19,989 thousand (period ended 31 march 2018: nil).
(iii) The Group’s leasing activities and how these are accounted for
The Group leases various properties, equipment and cars. Rental contracts are typically made for fixed periods of 1 to 50 years but may have extension options. Lease terms are negotiated on an individual basis and contain a wide range of different terms and conditions. The lease agreements do not impose any covenants, but leased assets may not be used as security for borrowing purposes.
Leases are recognised as a right-of-use asset and a corresponding liability at the date at which the leased asset is available for use by the Group. Each lease payment is allocated between the liability and finance cost. The finance cost is charged to profit or loss over the lease period so as to produce a constant periodic rate of interest on the remaining balance of the liability for each period. The right-of-use asset is depreciated over the shorter of the asset's useful life and the lease term on a straight-line basis.
Assets and liabilities arising from a lease are initially measured on a present value basis. Lease liabilities include the net present value of the following lease payments:
fixed payments (including in-substance fixed payments), less any lease incentives receivable;
variable lease payment that are based on an index or a rate;
amounts expected to be payable by the lessee under residual value guarantees;
Document 21 page, a scan, not read yetThis file at DFM
This file is a scan and its pages are still waiting to be read. The original is at DFM.