ASHUMGulf news and Dubai stocks, live

Integrated report for the year 2022 DEWA

Dubai Electricity & Water Authority PJSC 195 pages

Document195 pages, a scan, not read yetOpen DFM’s file

Page 1

DEWA PJSCINTEGRATED REPORT2022

Page 2

Sheikh Zayed bin Sultan Al Nahyan, may his soul rest in peaceFounder of the UAE (1918 - 2004)

Page 3

The UAE will continue to play a leading role in shaping initiatives which serve humanity and help to achieve stability, prosperity and sustainable development.

His HighnessSheikh Mohamed bin Zayed Al NahyanPresident of the United Arab Emirates

Page 4

We have developed a sustainable infrastructure that will serve new generations. This infrastructure has been built by young Emiratis who will lead our country through the next phase of growth. We are proud of our nation’s advancements in clean energy and green economy.

His HighnessSheikh Mohammed bin Rashid Al MaktoumVice President and Prime Minister of the UAE and Ruler of Dubai

Page 5

His HighnessSheikh Hamdan bin Mohammed bin Rashid Al MaktoumCrown Prince of Dubai and Chairman of the Executive Council of Dubai

Page 6

His HighnessSheikh Maktoum bin Mohammed bin Rashid Al MaktoumDeputy Ruler of Dubai, Deputy Prime Minister and Minister of Finance

Page 7

DEWA PJSC Integrated Report 2022 7TABLE OFCONTENTSCHAIRMAN’SMESSAGECONSOLIDATEDFINANCIALSTATEMENTS810108 12MD & CEO’SMESSAGESUSTAINABILITYABOUTDEWA PJSCCORPORATEGOVERNANCE31170

Page 8

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 8

Dubai has become a global hub for trade, finance, tourism, and green economy thanks to the insightful vision and wise directives of HH Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai. The impressive achievements the Emirate makes across all areas are supported by a world-class robust infrastructure that enhances its readiness to serve over 3.5 million people who live in Dubai, and more than 4.7 million people during the day.

Dubai Electricity and Water Authority (DEWA) is a crucial player in ensuring that the Dubai’s infrastructure keeps pace with the increasing demand for energy and water. Our unwavering efforts have strengthened Dubai’s record of achievements, consolidated the competitiveness of the UAE, and established the country as a global leader, especially in the shift towards renewable and clean energy.

At DEWA, we take pride in contributing to the wise leadership’s vision of enhancing sustainability and shifting towards a green economy. Sustainability is a fundamental pillar of our strategy, and we are committed to achieving long-term sustainability goals and the 17 UN Sustainable Development Goals (SDGs) 2030, while promoting sustainable green growth and economic, environmental, and social sustainability. Our achievements reflect DEWA’s world-class governance system, efficiency, sustainability, and innovation. We have comprehensive policies and programmes for environmental, social, and corporate governance (ESG) management. Sustainability is ingrained in all our operations, work mechanisms, and decision-making processes.

Our circular economy strategy supports our ongoing efforts to optimise resource usage and enhance social, economic, and environmental value, promoting sustainability. We adopt several policies and plans that align with ambitious national strategies.

In 2022, DEWA became a Public Joint Stock Company (PJSC) and was listed on the Dubai Financial Market (DFM), becoming the largest company on the DFM by market capitalisation. Our initial public offering (IPO) was the world’s largest in the utility sector in 2022, with exceptional investor demand, exceeding AED 300 billion. The wide interest from local and international investors affirms DEWA’s position as one of the most distinguished and pioneering utilities in the world. In 2022, DEWA delivered the best full year consolidated

HE MATAR HUMAID AL TAYERChairman of Dubai Electricity and WaterAuthority (DEWA)CHAIRMAN’S MESSAGE

Page 9

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 9H.E Matar Humaid Al TayerChairman of the Board

and standalone financial performance in its operating history. As a result, we have increased our dividend payout for the year 2022 by 60% to AED 9.9 billion.

We are committed to the best governance practices within an integrated framework, continuously reviewing all our activities and operations to stay abreast of rapid developments and enhance DEWA’s agility and resilience to deal with change. We look forward to continuing our journey towards sustainability, innovation, and excellence in all our operations.

I would like to thank our shareholders for their unwavering support and trust in DEWA. We remain committed to delivering sustainable value to all our stakeholders. I also extend my thanks to DEWA’s management team and dedicated staff, who work tirelessly to ensure that we continue to provide reliable and efficient services to our customers. Their commitment, hard work, and passion have been the driving force behind our success, and we remain committed to providing them with the support they need to continue to excel.

Page 10

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 10

Dubai Electricity and Water Authority (DEWA) is dedicated to achieving excellence and sustainable growth in alignment with the vision of HH Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, and the directives of HH Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai and Chairman of the Executive Council of Dubai, and HH Sheikh Maktoum bin Mohammed bin Rashid Al Maktoum, Deputy Ruler of Dubai, Deputy Prime Minister, and Minister of Finance.

2022 marked a transformative year for DEWA as it became a Public Joint Stock Company (PJSC) and was listed on the Dubai Financial Market (DFM) in April, becoming the largest company on the DFM by market capitalisation. In 2022, DEWA achieved record-breaking results, with increased gross, operating and net profit margins relative to 2021. DEWA’s consolidated net profit for the year reached AED 8 billion, a 22% increase over the previous year. As a result, the company has decided to pay AED 9.9 billion in dividends instead of the initially committed AED 6.2 billion (60% extra).

Sustainability is a vital part of our strategy. We are consistently improving fuel efficiency, replacing conventional energy generation with clean energy in our future projects and have adopted reverse osmosis process for future water desalination. As part of our commitment to achieving Dubai’s Net Zero 2050 ambition, we have developed the landmark Mohammed bin Rashid Al Maktoum Solar Park, the largest single-site solar park in the world that aims to eventually produce 5,000MW of Solar PV and Concentrated Solar Power generation capacity. 2127 MW capacity is already commissioned.

DEWA is continually developing world-class infrastructure to meet Dubai’s growing demand for power and water. We have invested over AED 210 billion cumulatively on generation, transmission and distribution capacity that are operating at highest levels of efficiency and reliability. This is clearly evident when benchmarking operating parameters with global utilities. DEWA is number 1 in the world with lowest electricity line loss of 2.2 % and water line loss of 4.5% as well as lowest Customer Minutes lost of 1.19 minutes in a year.

HE SAEED MOHAMMED AL TAYERMD & CEO of DEWAMD & CEO MESSAGE

Page 11

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 11H.E Saeed Mohammad Al TayerMD & CEO of DEWA

In conclusion, we reiterate our commitment to providing world-class services supporting Dubai’s ambitious green energy plans, leveraging digital and smart services, providing highest levels of customer service and developing a sustainable business in order to generate consistent returns for our valued shareholders. I extend my thanks to our shareholders for their confidence in us and to our dedicated employees for their commitment and contribution to building an efficient and customer focused utility.

Page 12

ABOUTDEWA PJSC

Page 13

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 13BRIEF ABOUT DUBAI ELECTRICITYAND WATER AUTHORITYDubai Electricity and WaterAuthority (DEWA) was formed

on 1 January 1992, by a decree issued by the late Sheikh

Maktoum bin Rashid Al Maktoumto merge Dubai ElectricityCompany and Dubai WaterDepartment, which had been

operating independently before then. Both organisations were

established by the late Sheikh Rashid bin Saeed Al Maktoum

in 1959. Dubai Government fully supported the two organisations to provide Dubai’s citizens and residents with their electricity and water needs.

Since its establishment, DEWA has made considerable achievements, to be ranked as one of the best utilities in the world. Today, DEWA provides its services to more than one million customers in Dubai, according to the highest standards of efficiency, reliability, and availability.

In April 2022, DEWA was listed on the Dubai Financial Market

(DFM). DEWA became the largest listed company in the market,

with a market value of AED 124 billion (USD 33.8 billion). The offering included the sale of 9 billion shares, representing 18% of its capital.

As Dubai’s exclusive power and water provider, DEWA provides

its services to 3.541 millionpeople living in Dubai and the

Emirate’s active daytime population of over 4.7 million. These numbers are expected to grow to 5.8 million and 7.8 million, respectively, by 2040.

By the end of 2022, DEWA served 1,157,501 customers, representing an increase of 14,438 customers from the third quarter of 2022. DEWA added 51,089 new customers in 2022, which is a 4.6% increase from 2021.

PURPOSE

Providing globally leading sustainable, efficient, and reliable power and water services, and related innovative smart solutions towards Net-Zero Future.

VISION

A globally leading sustainable innovative corporation committed to achieving Net-Zero by 2050.

MISSION

We are committed and aligned to Dubai’s 8 Guiding Principles and 50-Year Charter supporting the UAE’s directions through the delivery of global leading services and innovative energy and potable water solutions enriching lives and ensuring the happiness of our stakeholders for a sustainable Net-Zero carbon 2050.

MOTTOFor generations to comeVALUES

• Stakeholder Happiness

• Sustainability

• Innovation

• Excellence

• Good Governance

Page 14

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 14KEY HIGHLIGHTSIN 2022Q1

1. Launched DEWA-SAT-1

nanosatellite

(the world’s first utility to use nanosatellite) on 13 January

2022 and has received itsfirst signals from space

2. Won three diamond-level

awards at the HarvardBusiness Council2021 International AwardsSecond Cycle

3. Received the British

Standards Institution (BSI)Kitemark for Innovation,making it the firstgovernment organisation toreceive this certificate at aglobal level

4. DEWA received three

international certificationsfrom the British StandardsInstitute (BSI) for securitymanagement

5. Raised production capacity

of the first project of theMohammed bin Rashid AlMaktoum Solar Park’s fifthphase from 300 MW to330MW

6. DEWA achieved the highest

score among internationalcorporates in EFQM’sInnovation Lens Award(First organisation in theworld to receive 8 stars)

7. Implemented the smart

ball leak detectiontechnology in watertransmission networks

8. Completed the construction

of the first stage of theAquifer Storage andRecovery (ASR) projectfor desalinated water andstarted the operations andtesting stageQ2

1. Registered a new patent

for an innovative device formeasuring the amount ofwater that can be extractedfrom the air during thecondensation process

2. Added the Self-Assessment

tool for residential customers to easily understand their

consumption patterns

3. Launched the ‘Dubai EV

Community Hub’ websitefor Dubai, aiming to increaseEV adoption by centralisinginformation regarding EVdevelopments in Dubai

4. DEWA received effective

governance certificationBSi13500:2013 from BSIand a special award for 6consecutive years

5. DEWA completed 98.83% of

its project to extend its water transmission network by 36

kilometres across Dubai, at atotal cost of aboutAED 266 million

6. DEWA completed

96.50% of the Sea WaterReverse Osmosis (SWRO)desalination plant at JebelAli Power Plant and WaterDesalination Complexat a cost of aroundAED 897 million

7. Registered a new patent for an Unmanned Aerial Vehicles

(UAV) charging system thatenables continuous chargingfor UAVs and thus providelonger flying hours with alarge storage capacity

8. Won three Global Excellence Assembly Awards 2022

in the same cycle. Theseawards were the Excellencein Innovation Award, theBusiness Innovation Award,and the OutstandingCustomer Service Award

9. Commissioned 287 11kV

substations in the first halfof 2022, with 177,875working hours accordingto the highest quality,efficiency, and safety

standards, while following all precautionary measures

Page 15

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 15

10. Won three Global Good

Governance (3G) Awardsfrom Cambridge IFA inthe UK

11. Added 700MW of energy

production capacity, totalling 14,117 MW, with 1,627 MW

from renewable energy

12. DEWA completed 57%

construction of water

microfiltration units in Hatta Q3

1. Received two ISO

certifications in InformationSecurity Governance andInformation TechnologyGovernance for the thirdconsecutive year

2. DEWA registered a patent

for a user-friendly roboticcarrier to transport solarphotovoltaic panels easilyand safely from any surface

3. DEWA signed a partnership

agreement with Dutchstart-up Desolenator BV, tobuild a sustainable, carbon-

neutral water purification and desalination system based

on solar thermal energy,targeting a levelised cost ofpotable water productionat a rate that is less thanUS$0.02 per litre

4. DEWA reduced the

maintenance outages forkey inspection operationsfrom 11 days to 9 days, areduction in the maintenanceduration of 18%, comparedto the previous world recordachieved by DEWA in 2019

5. DEWA achieved the Guinness

World Records title forowning and managing theLargest Single-Site WaterDesalination Facility in theworld with a productioncapacity of 490 (MIG) ofwater per day

6. DEWA’s R&D centre

published 103 researchpapers in internationalscientific conferencesand internationalpeer-reviewed journals

7. DEWA commissioned 389

11kV substations in Dubai,

resulted in a total of 404,712 man hours, according to the

highest standards of quality,efficiency and safety

8. DEWA ranked the third most

valuable utility brand in theMiddle East and the thirdfastest growing brand in theUAE as per ‘Brand Finance’Q4

1. DEWA’s customers

conducted around 8 million

transactions using its digital channels and those of its

partners

2. Added 600MW of clean

energy production capacityfrom the 5th phase of theMohammed bin Rashid AlMaktoum Solar Park

3. DEWA completed 75.9% of

the water reservoir projectin Hatta

4. DEWA commissioned two

new transmission substationsin two residential areasin Dubai

5. DEWA completed 93% of

4th phase of H-Station inAl Aweer with investmentstotalling AED 1.1 billion

6. Won the Best Creative

Electricity and WaterSolutions Brand award fromGlobal Brands MagazineAwards 2022

7. Launched the

construction work for theHatta SustainableWaterfalls project

8. DEWA achieved first place

worldwide in the International Digital Customer Experience

Standard (IDCXS) with100% score fromfirst assessment

9. DEWA completed 58.48% of

hydroelectric power plantin Hatta

10. DEWA achieved the best

financial results in itsoperating history

Page 16

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 16

DEWA has a portfolio of related business interests, apart from its primary business activity of producing and supplying electricity and water:

CORE PORTFOLIO

Empower, which is currently the world’s largest district cooling services provider by connected capacity, is 56% owned by DEWA, and it owns, manages, operates and maintains district cooling plants and affiliated distribution networks across Dubai.

Mai Dubai is a water-bottling, manufacturing and distribution company, which distributes water within the UAE and to other

markets. Mai Dubai is a wholly-owned subsidiary of DEWA and

it commenced operations in

2014. Mai Dubai is currently the number two ranked water-bottling company in the UAE for both

distribution and sales.Etihad ESCO is a wholly-ownedsubsidiary of DEWA. It wasestablished under a mandate

from the Dubai Supreme Council of Energy to implement energy

efficiency projects in Dubai.Etihad ESCO is a commercial

energy services company, and its activities have been expanded to include solar PV projects, as well as electromechanical and facility management services. The company has successfully completed a

number of significant building

retrofit projects for major public and private sector clients in the UAE.

Digital DEWA was created as a

holding company to group several subsidiaries that deliver digital business solutions. Six companies operate under Digital DEWA.

- Moro (Data Hub Integrated

Solutions) is currently the

backbone and core entity at the heart of Digital DEWA. Moro is a company that provides data

centre services, cloud solutions and hosting services, managed

business solutions and managed IT services for DEWA and other external public and private

organisations.

- Digital X was formed in

October 2019 to offerdigital services, resourceaugmentation, intelligent

automation solutions, robotics, advanced data analytics

solutions for optimal decision-making and mission-critical

analytical modelling systems.DigitalX’s services assistcompanies with designing,implementing and managingtechnologies to enhance theirbusiness capabilities as wellas accelerating their digitaltransformation by buildingcutting-edge and easy-to-usesystems powered by AI.

- Infra X: was formed in October 2019 and focuses on connecting Digital DEWA’s value-added

services from its data centres and cloud services to customers.

InfraX leverages DEWA’s

infrastructure to offer a secure, reliable, and independent super-fast network that meets the

future digital transformationdemands. InfraX is consideredto be the first non-telecom

company in the UAE to receive a special purpose IoT license from the Telecommunications and

Digital Government RegulatoryAuthority to commercialiseIoT networks and services. In

addition, Infra X partners with local service providers to provide 5G technologies.

DEWA’S PORTFOLIO

Page 17

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 17IPP PORTFOLIO

• Shuaa Energy 1 is a solar

photovoltaic independent power plant project that has contracted electricity generation capacity of 200 MW, which is located in, and constitutes the second phase of the MBR Solar Park.

• Shuaa Energy 2 is a solar

photovoltaic independent power plant project that has contracted electricity generation capacity of 800 MW, which is located in, and constitutes the third phase of the MBR Solar Park.

• Shuaa Energy 3 is a solar

photovoltaic independent power plant project that will have

contracted electricity generation capacity of 900 MW, which is

located in, and constitutes the fifth phase of the MBR Solar

Park.

• Noor Energy 1 is an independent power plant project that has

a 700 MW CSP and 250 MWPV (contracted electricity

generation) capacity, and which is located in, and constitutes the fourth phase of the MBR

Solar Park. Upon completion,it is expected to become the

largest single-site CSP plant in the world using a combination

of a central tower and parabolic trough CSP technologies.

• Hassyan Energy Phase 1 is an independent power producer

project that has a total

electricity generation capacity of 2,400 MW. While the plant

was designed to be operatedon dual fuel, DEWA, as off-taker, took the decision that

the plant should operate using only natural gas as the primary fuel, and the formal shift was publicly announced by DEWA.

In addition, the Hassyan Power Plant uses ultra-supercritical technology in its operations,

in compliance with setinternational standards.FINANCIAL COMPANIESPORTFOLIO

• Dubai Green Fund Investments is the first specialised green impact investment fund in the

MENA region. It is backed by

the Government and is currently 100% owned by DEWA. Its

mandate is to invest in greenprojects and support Dubai’s

position as a global hub for the green economy. Dubai Green

Fund’s current portfolio of green investments is expected to save approximately 8.5 million metric tonnes of CO2 emission per

year over the next 30 years.

• Forward Investments is

DEWA’s corporate venture

capital unit. Forward Investments was established in 2020 with

a mandate to invest in venture investments in renewable

energy, distributed generation, energy storage, utility

digitisation, smart technology and security, cleantech and other diversification opportunities

relevant to DEWA’s strategy. To date, the company has entered

into a number of successfulinvestments across the UnitedStates and Asia.

• E t i h a d C l e a n E n e r g y Development Company is a

DED-licensed limited liability company with the main objective of financing solar-bot projects executed by Etihad ESCO.

The above-related business

interests are excluded from the reported data found within this report.

Page 18

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 18

The ecosystem describes DEWA’s business and interaction with the external environment of the five key components. It shows the core business starting from planning and ending with customer happiness, and how this core business is supported by the other support functions to create a sustainable value for all stakeholders and collect feedback to improve the value provided through innovation.

It also demonstrates how DEWA has influence and is a leader in its ecosystem by motivating others and showcasing what can be accomplished for the benefit of others as well as DEWA.

The DEWA ecosystem is made up of five key components, which include:

• DEWA’s core business and support activities

• Extended enterprise (Subsidiaries)

• DEWA’s stakeholders

• The local environment

• The global environment and megatrends DEWA’S

ECOSYSTEM

Page 19

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 19STRATEGY, POLICIES,& PRACTICES

DEWA’s Strategic Intelligence Framework include the following:

STRATEGIESStrategically Driven:The UAE and the Dubaigovernment are continuing to

adopt and establish several policies to secure the UAE’s long-term

development and growth. DEWA’s strategy is constantly aligned with important international events and trends, as well as national strategies, to ensure its successful contribution to Dubai’s and the UAE’s long-term growth

DEWA’S STRATEGICINTELLIGENCE FRAMEWORKDEWA’s Strategic IntelligenceFramework is a systematiccontinuous past-forward,today-onward, and future-back

assessment that feeds strategic intelligence into the organisation by using an existing insights

ecosystem that supports the

strategy on each phase through innovation.

The Strategy framework isdivided into three phases:

1. The Strategy Formulation

process at DEWA includes

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C O N T I N O

USLEARNING,COMMUNICATION&INNOVATION.............................. . . . .STRATEGICINTELLIGENCEStrategyFormulationOrganisationAlignmentE xecutiona n dAssessmentidentifying the strategic

direction and then constructing the corporate strategy using

strategic insights.

2. The focus of Organisational Alignment is on aligning

divisions with the overall

st rateg y a n d d eve l o p i n g strategic initiatives to achieve it.

3 . T h e E x e c u t i o n a n d Assessment focus on putting

the strategy into action and

analysing progress in order to track business performance

versus specified goals andtargets.

Page 20

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 20

The Strategic Intelligence Framework of DEWA is built on five major pillars:

DEWA STRATEGY ALIGNMENT:

DEWA’s strategy is in line with global, UAE, and Dubai-level

directives.United Nations SustainableDevelopment Goals:The SDGs came into effect in

January 2016 and are a universal call to action to end poverty, protect the planet, and ensure that all people enjoy peace and prosperity. Each of the 17 Goals has specific targets to be achieved over the next 15 years.

10 Principles of the UnitedNations Global Compact:The United Nations Global

Compact is the world’s largest corporate sustainability initiative, with more than 13,000 corporate participants in over 170 countries.

The Global Compact is basedon ten fundamental principles

relating to human rights, labour, environment and anti-corruption.

8 Principles of Dubai:The 8 defining Principles of

Governance for Dubai, endorsed by HH Sheikh Mohammed bin Rashid

Al Maktoum, show the well-being of the UAE’s people, the sustained progress of the nation, and the welfare of future generations. The Principles lay a strong foundation for the UAE’s future growth,

economic conditions, business, law and more.

50-Year Charter:The Charter marks HH SheikhMohammed bin Rashid Al

Maktoum’s 50 years of service to the country and outlines plans to improve the quality of life in Dubai for its citizens and residents over the next 50 years. The Charter, issued in 2019, represents the pledge and promise to enhance

the lives of people in Dubai. It Process to

incorporatefuture orientedlong term thinking intoDEWA strategy to process by

incorporating a disciplined method for imagining possible futures scenarios and using them

to either pressure testexisting strategiesor design newstrategy.Networkof think tanks,academic institutions,government entities thatDEWA would collaboratewith to gather relevantinsights to incorporatein its strategyprocess. Process tocontinuouslyscan for signals inDEWA's externalenvironment to capturerelevant signals (and avoidblind spots) that couldsignificantly affectfuture businessof DEWA.Processto analyse theinternal capabilitiesand processes in orderto identify the strength,weaknesses and analyse theexternal threats andopportunities that areaffecting theorganisationbusiness. Processof comparingone's processes ,performance metrics,strategies to best inclass orworld class.

(A) Insights

Ecosystem

(E) Scenario

Planning

(D) Horizon

Scanning(B)Benchmarking

(C) Internal

Analysis

includes what will be undertaken to improve the quality of life, develop the community of Dubai and ensure a brighter future for generations to come.

UAE and Dubai InnovationStrategy:The Dubai Innovation Strategyfocuses on ten sectors thatare aligned with the National

Innovation Strategy and aim to improve living standards in Dubai.

For DEWA, innovation is a priority for improving its services and initiatives, and a key element in developing its strategies and work plans.

UAE Centennial 2071:The UAE Centennial 2071 planfocuses on human development

through educational programmes w i t h a c o n c e nt r at i o n o n Information Technology and

engineering, promoting the UAE’s

Page 21

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 21

image and soft power globally, enhancing community cohesion

and respect while strengthening Emirati values, and ethics

and building a diversified and competitive economy.

UAE Water Security Strategy2036:

The aim of the UAE Water Security Strategy 2036 is to sustain access to water under both regular and emergency conditions in keeping with national regulations and

international standards set by the World Health Organisation.

Some of the main targets for

the strategy include: reducing the demand for water by 21%,

increasing the reuse of treated water to 95% and increasing the national water storage capacity by up to two days.

UAE Strategy for ArtificialIntelligence:Launched in October 2017,

the UAE Strategy for Artificial Intelligence is the first of its kind in the world. It aims to achieve the objectives of the UAE Centennial 2 0 7 1 , b o o s t g o v e r n m e n t performance at all levels, use an integrated smart digital system that can overcome challenges and provide quick, efficient solutions, make the UAE the first in the

field of AI investments in various sectors, and create a new vital market with high economic value.

The UAE Strategy for theFourth Industrial Revolution:

The UAE Strategy for the Fourth Industrial Revolution aims to

achieve customer happinessand to position the UAE as

a model for interactive cities using AI, innovative education, intelligent genomic medicine and robotic healthcare to achieve

sustainability.Dubai Clean Energy Strategy& Demand Side ManagementStrategy (DSM):

The Dubai Clean Energy Strategy 2050 sets targets to have 25%

of Dubai’s total energy production capacity from clean energy by

2030 and 100% by 2050, whilethe DSM 2030 aims to reduce

energy and water demand by 30% by 2030. DEWA plays an essential role in achieving these goals by reinforcing the renewable energy sector and fuel diversification to meet the objectives of the Dubai Clean Energy Strategy 2050,

which maps out Dubai’s energy

sector over the next three decades.

The Dubai Clean Energy Strategy 2050 and the Dubai Net Zero

Carbon Emissions Strategy aim

to obtain 100 per cent of Dubai’s total power capacity from clean energy sources by 2050.

Dubai 10X:HH Sheikh Mohammed bin

Rashid Al Maktoum called on all Dubai Government entities to

embrace disruptive innovation, to exploit available technologies to deliver new or existing services in radically different ways that are designed thinking-based and customer-focused. Disruptive

innovation should be adoptedby all government entities as

the basis of their operations, and its methodologies should be incorporated into all aspects of their work.

Circular Economy Policy 2021-2031:

The UAE Circular Economy Policy is a comprehensive framework

for determining the country’s

approach to achieving sustainable governance and the ideal use of natural resources, by adopting consumption and production

methods that ensure the quality of life for current and future generations. The policy comprises several key objectives, such as:

• Promoting environmental

health

• Supporting the private sector in adopting clean production

methods

• Reducing natural environmental stress, to achieve the country’s vision to be a global pioneer of green development.

The UAE National SpaceStrategy 2030:

The UAE National Space Strategy 2030 aims to enhance the space sector’s contribution to the

national economy and promote the UAE’s regional and international presence in the space sector.

Dubai 2040 Urban Master Plan:Dubai 2040 Urban Master Planmaps out a comprehensive plan

for sustainable urban development in Dubai. It focuses on enhancing people’s happiness and quality of life and reinforcing Dubai as a global destination for citizens, residents and visitors over the next 20 years.

Dubai 3D Printing Strategy:

The Dubai 3D Printing Strategy aims to exploit technology for the service of humanity and promote the status of the UAE and Dubai

Page 22

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 22Top priority goalsSecond priority goalsOther priority goals

as a leading hub of 3D printing technology by the year 2030.

Dubai’s key goal is to ensure that 25% of buildings in Dubai are

based on 3D printing technology by 2030

The United Nations Sustainable Development Goals 2030

Since the announcement of

the United Nations Sustainable Development Goals (UNSDGs)

2030 in 2015, DEWA has taken

proactive steps to acknowledge the importance of the UNSDGs

for global well-being. It designed an award-winning approach to

the SDGs, built on five key pillars, which include:

• Acknowledge and affirm the

importance of the SDGs

• Identify the SDGs of greatest relevance

• Align DEWA’s strategy to the SDGs

• Build capacity and embed SDGs Progress towards the SDGs

It is crucial to reinforce global commitments and unify efforts

towards achieving the SDGs. These include joint efforts of governments and businesses alike. Every year, DEWA reaffirms its position as a leading organisation striving to achieve sustainable development for Dubai, with an impact that extends beyond the UAE and the MENA region to the world. One

such example is the Mohammed

bin Rashid Al Maktoum Solar Park.

In 2015, the MBR Phase II tender achieved a world record electricity price of 5.84c/kWh while the

global average was above 10c/

kWh. A second world-record was registered in 2017 as the first below 3c/kWh project for MBR

Phase III. A third near-world record was achieved for Phase IV tender at 1.69c/kWh in 2019. These

projects demonstrated that solar energy without subsidies can be competitive even with low-cost domestic fossil fuels. Not only did the success of the solar project in Dubai pave the way for other similar projects in the region, but it also played a significant role in driving down the global cost of renewable energy, making modern renewable energy more affordable in direct alignment with Goal 7 of the SDGs: Affordable and Clean Energy.

To learn more about DEWA’s

efforts towards specific goals or targets, please refer to the GRI content index available at the end of this report.

United Nations Global Compact

DEWA is a signatory of the United Nations Global Compact (UNGC)

since 2017. In February2019,DEWA was invited by the UNGC

to take part in and chair the UNGC UAE Local Network. This came

as a result of DEWA’s proactive into decision-making processes

• Report publicly on progress

Prioritising the SDGsDEWA has prioritised the SDGs

into three main tiers, considering the goals as either business-

critical priorities for DEWA as a successful water and electricity company, key to DEWA’s

leadership commitments as a

leading sustainable innovative global corporation, or important for DEWA as a stakeholder in

Dubai and internationally.

Page 23

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 23DEWA Strategic ObjectivesPERFORMANCE MANAGEMENT

The Balanced Scorecard shows a relationship between the four perspectives (triple-bottom line, stakeholders, internal processes and learning and growth). The Key Performance Indicators (KPIs) are based on the need to provide leading and lagging indicators of an organisation’s performance. DEWA uses the third generation Balanced Scorecard to manage and measure the performance of its strategic direction, broken down into the themes, strategic objectives and corporate KPIs.

KEY PERFORMANCE INDICATORS

The Key Performance Indicators (KPIs) are significant measurements used to track and manage performance against strategic objectives. A KPI measures progress in the performance of an objective critical to the organisation’s strategic direction. However, corporate-level KPIs are determined under each strategic objective on DEWA’s Strategy Map to assess the overall progress in executing the corporate strategy based on the contributory approach from divisions.

Selected KPIs should be understood, acceptable, have a well-defined formula and, above all, measurable.

DEWA intends to maintain its position as a leading global utility, providing smart and sustainable power and water services.

DEWA’s Strategy Map given below, provides a clear visual indicator of how the themes and the four perspectives of the third generation Balanced Scorecard interrelate with each other and form a cohesive strategy.

role in contributing to the UnitedNations Sustainable DevelopmentGoals 2030 and in recognition forthe support DEWA has shown

to the UN Global Compact since joining in 2017.

DEWA is committed to the 10principles of the UNGC, which

are integrated in the policies and processes of the organisation.

DEWA previously used itsannual Sustainability Reportsas its Communication onProgress forthe UNGC. TheUNGC updated its reporting

mechanism, effective as of 2023, for the 2022 reporting cycle and onwards. Participants of the

Global Compact are to submit

their commitments and progress towards the 10 principles

through a new standardisedonline questionnaire directlyon the UNGC website. As such,DEWA’s annual Communicationson Progress for each calendar

year will be available on the UNGC website by the end of the 1st

quarter of the following year.

Page 24

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 24POLICIES

DEWA has different policies to affirm its commitments and business activities that are in line with national and international strategies, laws, regulations and goals in relation to economic, environmental, social, and human rights aspects.

DEWA has developed the InsiderTrading Policy in accordance with theApplicable Laws of the United Arab

Emirates, regulations governed by the Securities and Commodities Authority and the Dubai Financial Market. The Policy provides guidelines to those DEWA values and manages its HR

diversity through planning, organising, administering as well as supporting varied characteristics and plurality amongst its employees and by

recognising them as individuals and teams, in a way that adds tangible and positive effect in the organisational performance, and contributing to the happiness of employees.

RELATED PARTY TRANSACTIONS POLICYINSIDER TRADING POLICYGENDER DIVERSITY POLICY

who have access to ‘Inside Information’ amongst all employees as well as members of the Board of Directors and Audit Committee and their relatives with respect to transactions in the Company’s securities. The Policy aims at preserving the reputation and integrity of DEWA as DEWA aims to uphold the values

of diversity and being fair to all employees without discrimination in any manner, whether based on sex, race, nationality, age, citizenship, religion, social status, in line with the laws and regulations of the UAE and the Emirate of Dubai as well as the strategic direction of DEWA.

well as that of all persons affiliated with the Company. For more details, please refer to DEWA Insider Trading policy on For more details on DEWA’s Policy for Valuing and Managing HR diversity policy, please refer to

Our Related Party Transaction Policy is designed to ensure that:

• Transactions with related parties are conducted on arm’s length

terms;

• The Board of Directors and

Management are aware of the steps required to approve transactions with related parties; and

• A legitimate business case is present, which supports the

relevant related party transactions, including their arm’s length nature.

In accordance with this Policy, we may not enter into a related party transaction unless it has been approved by:

• Our Board of Directors; or

• Our shareholders at a General Assembly.

At DEWA, no transactions were

entered with any related party during the year 2022 in accordance with the applicable UAE Companies Law or SCA Corporate Governance Procedures.

DEWA’s Related Party Transaction Policy is reviewed by the Board on a periodic basis to ensure compliance with the applicable governing laws and regulations.

For more details on DEWA Related

Party Transactions policy, please refer to See DEWA PJSC

(Policies for full details)

Page 25

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 25PRACTICESEmployee Grievances andComplaints

D E W A i s c o m m i t t e d t o implementing administrative

action procedures that are fair, consistent and uniform and

prompt to discourage negativebehaviour in the workplaceenvironment. DEWA has

grievances and c o m p l a i n t s r e g u l a t i o n / mechanisms and systems for its employees, seconded or deputed to

DEWA in order to raise anyconcerns/ complaints fromtheir end. DEWA establishedthe Grievances & ComplaintsCommittee to oversee anddetermine employee grievancesand complaints cases that arereferred to it.

The following is the grievances process within DEWA:

• The employee submits a

grievance either to HR directly or through email or to his/her direct manager, EVP or to the

MD&CEO office.

• HR receives and forwards

the grievance form to theemployee’s divisional head toprovide his/her commentsand/or justification.

• HR obtains approval from the MD&CEO to refer the grievance

request to the Grievances &

Complaints Committee for study.

• The Grievances & Complaints

Committee studies thesubmitted grievance request

along with the divisional head’s comments and prepares its

recommendation and forwardsit to the MD & CEO forapproval.

• The employee is notified

officially of the Grievances& Complaints Committee’srecommendation.

The following is the complaint process within DEWA:

• The employee submits his/her complaint either to HR directly or through email or to the

MD&CEO’s office

• HR receives and forwards

the complaint form to theemployee’s divisional head to

investigate and try to solve it. If the complaint is resolved by the divisional head, HR is notified and the case is closed.

• If the complaint is not closed at the level of the divisional head, the divisional head forwards

the investigation report to HR for further action.

• HR obtains the MD&CEO’s

approval to refer the complaint request to the administrative

violation committee forinvestigation.

• The administrative violation committee investigates the

complaint and forwards theirrecommendation to the MD &CEO for approval.

• The employee is notified

officially of the administrative v i o l a t i o n c o m m i t t e e ’ s recommendation.

CUSTOMER COMPLAINTS &SUGGESTIONS PROCESSESDEWA’s customers can voicetheir complaints or providesuggestions related to DEWAservicesthrough Dubai Government’sUnified eComplain System inorder to improve the services

and enhance practices. From the time of submitting complaints, complainants can get resolved

within (0-3) working days. Please refer to the graph.

Besides the unified system,

complainants can also approach D E WA t o e x p re s s t h e i r dissatisfaction through the below channels:

1. DEWA website

www.dewa.gov.ae

2. Email:

customercare@dewa.gov.ae

3. Smart devices at Customer

Happiness Centres

4. Customer Care Centre

Telephone: 04-6019999

5. DEWA smart app

Page 26

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 26MECHANISMS FORSEEKING ADVICEAND RAISINGCONCERNS

DEWA recognises the prevention of wrongdoings, including any

breaches of the laws in its

operations or business relationship, and affirms its commitment

to conduct its business andoperations in an honest and

ethical manner. DEWA will ensure transparency and integrity in all its business dealings and relationships wherever it operates and will

implement and enforce effective systems and procedures to ensure prevention, detection and action against wrongdoings.

DEWA adopts a zero-

tolerance approach towards any wrongdoings in its business

activities and operations; and in line with best practices and procedures, and the DEWA

Code of Conduct for employees, appropriate preventive and

punitive action will be takenagainst such acts.MEMBERSHIPASSOCIATIONSDEWA plays an active rolein a number of national andinternational organisations,

councils, and committees. These include, but are not limited to, the following organisation’s Councils and committees:

1. Dubai Council

2. The Executive Council of Dubai 3. The Dubai Supreme Council

of Energy

4. Dubai Future Council on

Energy

5. Strategic Affairs Council

6. United Nations Global

Compact

7. World Green Economy

Organization

8. The Carbon Abatement

Committee

9. The Dubai Demand Side

Management Committee

10. Dubai Supreme Fiscal

CommitteeCOMMITTEES

The Management team is assisted in its work by a number of additional committees, which are made up

of members of the managementteam or other DEWA division

representatives. These include the Complaints & Grievances

Committee; Women’s Committee;

DEWA Youth Council; Investment Committee; Takaful and Theqa

Committee; AdministrationViolation Committee; ScrapVerification Committee; DEWAExcellence Award Committee;Crisis Management Committee;Group Risk and ResilienceTarget98% 99% 100% 100%75%100%% of resolvingcomplaintswithin (0-3)working days(DEWA’sinternal KPI)% of resolvingcomplaintswithin (0-7)working days(DEWA’sinternal KPI)% of resolvingcomplaints within(0-7) workingdays (DEWA’sexternalKPI - TEC)Actual

Page 27

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 27Committee; Health, Safety& Environment Committee;

Corporate Governance Committee;

IT Security Response Team, Drones Robotics Committee, ISO 50001

Energy Management System-TopManagement Committee, CyberEmergency Response Committee,and Digital TransformationCommittee.STAKEHOLDERENGAGEMENT

Every strategy revolves around the stakeholders, as they

play a major role in assuringthe success, continuity, and

effectiveness of the strategy.

DEWA places stakeholdersat the centre of its strategyand objectives and maintainscontinuous communicationand collaboration with them.For this reason, stakeholderengagement is crucial, along

with understanding their needs and expectations. This enables DEWA to keep improving its

performance, services, and

initiatives that ensure the best possible happiness results and service delivery.

The stakeholder managementframework is DEWA’s way ofidentifying the methods ofdelivering the best and most

inclusive engagement to ensure valuable outcomes, in alignment with the principles of both the AA1000 Stakeholder Engagement

Standard 2015 and the Global

Reporting Initiatives’ Sustainability Reporting Standards. DEWA’s

key strategic initiatives relating to its stakeholders were developed from the strategic objective

“S02 engaged and happy

stakeholders” key initiatives and are continuously reviewed. They include:

• Organising stakeholder-

engagement workshops for keystakeholder groups

• Defining a compelling,

overarching value propositionfor each stakeholder group

• Managing and responding

to stakeholders’ needs andexpectations

• Seeking new opportunities

through multi-stakeholderpartnerships to advancesustainable development

• Establishing community-based initiatives that benefit Dubai and the UAE.

Annually, DEWA’s Corporate

Strategy department is responsible for reviewing the list below and updating it, if necessary, as well as ensuring that DEWA’s strategic plan includes fulfilling the needs and expectations of prioritised stakeholder groups.

Institutionalinvestors, local &foreign banks,financial servicesInfrastructure & Network ProjectsOwners, Infrastructure & Network DirectCustomers, Electricity & Water SupplyCustomers, Potential CustomersStrategic,Basic, CoreEnvironmentalEntities, GeneralPublic, MediaProviderof Capital/InvestorsCustomersSuppliersSub-ContractorsSociety &FutureGenerationGovernment Employees PartnersFederal,LocalTop ManagementMiddle Management,Non-supervisoryStrategicPartners, MainPartners

Page 28

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 28DEWASTAKEHOLDERENGAGEMENTACTIVITIESDEWA has an entire departmentdedicated to Stakeholder

Happiness and its responsibility is to oversee and coordinate

the efforts of stakeholdermanagement across all DEWAdivisions to meet stakeholderexpectations.Implementing the HappinessStrategy helps DEWA tounderstand the needs of all

stakeholders (Customers, People, Government, Capital Investors, Partners, Suppliers & Society).

DEWA delivers products andservices beyond stakeholderexpectations and anticipatestheir future needs. DEWA

c o n s t a nt l y m e a s u re s i t s stakeholder happiness level and responds accordingly. All these elements work together to ensure the best representation of the UAE to the world. In addition, this supports DEWA’s aim to

create sustainable value for all its stakeholders.

To support DEWA’s aim of

creating sustainable value for all its stakeholders, the Stakeholders Happiness department identified key divisions within DEWA as

champions to be responsiblefor managing the happinessof a stakeholder group. Theresponsibility of Happinesschampions is to follow up andreport on the outcomes ofthe associated projects and

initiatives. In addition, DEWA has created a registry form

to identify the definition of a stakeholder, its sub-categories, the preferred channel of

communication, factors affecting DEWA’s relationship with the

stakeholder, and the best ways to engage.

Below is a champions and agents workshop conducted for the

happiness champions with the

cooperation with the Agility team which was followed by a visit to Museum of the Future.

D E W A r u n s a n a n n u a l creativity lab with each of its stakeholder groups. During the meeting, DEWA presents its

latest achievements and thechampions provide informationand updates relevant to thestakeholder group. It is anopportunity to get directfeedback from, and brainstormnew ideas with stakeholders.On a regular basis, DEWAengages with its stakeholders

through a range of initiatives and communication channels,

such as satisfaction surveys,

roadshows, joint ventures, and partnerships with government

agencies on regulatory matters, as shown in below.

Actively supportinggovernment policy& regulationINFORM INVOLVE EMPOWEROne way process ofproviding informationto stakeholderCONSULTStakeholder askingquestions & organizationproviding answersTwo-way engagement &learning but stakeholdersact independentlyCOLLABORATEJoint learningdecision & actionsStakeholder playa role in governanceSustainabilitystakeholder workshopsJoint venturesPublic privatepartnershipsOne-on-one meetingsSupplier managementSeminarsVarious programmesCustomer suggestionschemesMystery shoppersHappiness Surveys forall stakeholder groupsWritten and verbalcommunicationTopic-specific surveysDirect customerfeedbackSupervisor interactionAwareness sessionsMarket campaignsMedia eventsIncentive programmesCorporate strategypresentation sessionsStudent visitRoad shows

Page 29

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 29Government

• Aligning with national development plans & programmes

• Commitment to good citizenship

• Regulatory compliance

Stakeholder Needs & ExpectationsCustomers

• Quality safety and cost - effectiveness of service

• Ethical business

• Reducing the environmental impact of organisation activities Employees

• Secure working environment

• Competetive salaries

• Ethical behaviour

• Non-discrimination & recognition

• Investment in professional developments

• Career progression & recognition Partners

• Sharing best practices

• Continuous and systematic dialogue and engagement

• MoUs to collaborate on issues

Society andFuturegeneration

• Transparency and effective communicaton

• Raising awareness on sustainability issues

• Supporting social and cultural initiatives

• Management of environmental impacts of organisation activities Suppliers

• Supplier qualification based on cost and quality including environmental and social assessment

• Transparent procurement processes

• Profitability

Providers ofcapital/Investors

• Creating value in the short and long term

• Reliability, profitability and transparency STAKEHOLDER

NEEDS ANDEXPECTATIONSDEWA strives to achieve atransparent and consistent

c o m m u n i c at i o n a p p ro a c h to engage directly with its

stakeholders in the most suitable manner. This is reflected in the stakeholders’ register form, which documents the communication

options available and preferred for each category to ensure

accessibility for all. DEWAengages with its stakeholder

groups in a variety of ways. For example, in 2022, the Stakeholder Happiness Department conducted its creativity labs to collect their needs and expectations. This

feedback is recorded and shared with the management and

concerned teams internally to be integrated into decision-making.

For each stakeholder category, the following table shows the most important needs expressed during its engagement activities.

Page 30

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 30

Through a centralised Happiness Index Dashboard that is accessible to the top management, DEWA

can measure the effectivenessof stakeholder engagement

activities. The perceptions of all stakeholders group can be

reflected within the dashboard.

In addition to that, happiness initiatives also are shown for all concerned stakeholder

champions along with the

progress, showing benchmarking results at a local and international level, displaying the stakeholder’s prioritisation weights, including the stakeholders’ registry form.

STAKEHOLDERHAPPINESS RATE

DEWA recognises the importance of stakeholder management to

the achievement of its business objectives. DEWA gives special attention to its stakeholders’ voices and strives to collect their input and feedback through

different channels, methodologies and frequencies, leveraging on the added value that DEWA could

accomplish from engaging all its stakeholders in the journey to excellence.

In order to ensure the effectiveness of the stakeholders’ management framework, DEWA systematically evaluates stakeholder experience, captures their perceptions about DEWA and regularly monitors the level of their happiness on both relationship and transactional dimensions.

DEWA’s annual Stakeholder

Happiness Survey is a key tool for understanding stakeholder

expectations to measure the

effectiveness and improvement of its work. The survey addresses key issues relating to various factors, including specific questions

addressed to each stakeholdergroup. The outcomes from the

survey are used to analyse gaps in DEWA’s approach to Stakeholder Happiness and evaluate areas

for further improvement. Finally, a continuous benchmarking of

these KPIs is conducted for this purpose.

DEWA Stakeholders Overall Happiness Results 2022 are as follows:

Survey EmployeeHappinessRatePartnerHappinessRateSupplierHappinessRateSocietyHappinessRateGovernmentHappinessRateProvider ofCapital HappinessRate

Rate90.00%92.47%86.52%93.02%95.56%94.87%

Topic DEWA has clearlydefined andcommunicated itscommitments tosustainabilityEmployeesI understand DEWA’srole in contributing tothe achievement ofthe 17 UN SustainableDevelopment GoalsEmployeesHow does theSustainabilityperformance of yourorganisation affectsyour investmentdecisions forproviders of capitalSustainable andenvironmentalproducts andservicesDEWA Suppliers

Rate92%91.8%57.1%90.16%

Results of Stakeholder Sustainability Satisfaction Survey 2022

DEWA is keen to engage with the stakeholders and measure their perception on DEWA’s role towards sustainability:

Society(Community) Society

(Bunsiness) Government Suppliers Customers Provider of Capital

Partners

91.05%95.34%94.17%90.33%87.31%92.90%92.49%

Page 31

CONSOLIDATEDFINANCIALSTATEMENTS

Page 32

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 32INDEPENDENT AUDITORS’ REPORTTo the Shareholders of Dubai Electricity and Water Authority (PJSC)Report on the Audit of the Consolidated Financial StatementsOpinion

We have audited the consolidated financial statements of Dubai Electricity and Water Authority (PJSC) (“DEWA” or “the Authority” or “the Company”) and its subsidiaries (“the Group”), which comprise the consolidated statement of financial position as at 31 December 2022, the consolidated statements of profit or loss and other comprehensive income, changes in equity and cash flows for the year then ended, and notes, comprising significant accounting policies and other explanatory information.

In our opinion, the accompanying consolidated financial statements present fairly, in all material respects, the consolidated financial position of the Group as at 31 December 2022, and its consolidated financial performance and its consolidated cash flows for the year then ended in accordance with IFRS Standards as issued by the International Accounting Standards Board (IFRS Standards).

Basis for Opinion

We conducted our audit in accordance with International Standards on Auditing (ISAs). Our responsibilities under those standards are further described in the Auditors’ Responsibilities for the Audit of the Consolidated Financial Statements section of our report. We are independent of the Group in accordance with International Ethics Standards Board for Accountants International Code of Ethics for Professional Accountants (including International Independence Standards) (IESBA Code) together with the ethical requirements that are relevant to our audit of the consolidated financial statements in the United Arab Emirates, and we have fulfilled our other ethical responsibilities in accordance with these requirements and the IESBA Code. We believe that the audit evidence we have obtained is sufficient and appropriate to provide a basis for our opinion.

Key Audit Matters

Key Audit Matters are those matters that, in our professional judgment, were of most significance in our audit of the consolidated financial statements of the current year. These matters were addressed in the context of our audit of the consolidated financial statements as a whole, and in forming our opinion thereon, and we do not provide a separate opinion on these matters.

Page 33

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 33Accrual of unbilled electricity and water revenue

See Note 3.23, 5.1 and 24 to the consolidated financial statements.

The key audit matter How the matter was addressed in our audit The Group recognizes revenue on sales of electricity and water in accordance with IFRS 15 “Revenue

from Contracts with Customers”.

The recognition of the Group’s electricity and water revenue includes an estimation of the value of electricity and water supplied to customers between the date of the last cyclical meter reading and the year-end date (‘unbilled revenue’). The value of unbilled electricity and water revenue of AED 972 million (2021: AED 886 million) is shown as accrued revenue and included within revenue and trade receivables.

The method of estimating such revenues is complex and involves judgements, including:

• Management estimating the volume of units of electricity and water consumed by customers between their last cyclical meter reading and the yearend. Management’s accrual estimate for unbilled revenue at the yearend is based on historical consumption pattern as per customer categories; and

• Management assessing the value by applying the most appropriate tariff rates to the volume estimates given the range of tariffs applied by the Group. Management applies the tariff rate (depending on customer category and tariff slab) to the estimated consumed units of electricity and water to be accrued at year end to arrive at the total estimated value of electricity and water revenue.

• We have identified accrual of unbilled electricity and water revenue as key audit matter because of the complexities and uncertainties involved in arriving at the unbilled revenue figure as described above and because of the potential material impact on the consolidated financial statements if errors were made in this calculation or if the assumptions used in estimating consumption patterns had been incorrectly applied.

Our procedures involved:

• We obtained an understanding of the accrual of unbilled electricity and water revenue process implemented by the Group;

• We have performed test of design and implementation of relevant controls.

• We recalculated accrued electricity and water revenue, by using actual historical data to set an expectation of unbilled electricity and water revenue and compare this with the management’s estimate, obtaining explanations for any significant differences;

• We obtained and tested management’s underlying assumptions and base reference data relating to volume and price used in determining the level of unbilled revenue, including:

VolumeWe agreed the core volume data used for

calculating the estimated unbilled volumes with the units generation report, internal consumption report and units billed report extracted from the internal systems. We performed testing of the key information technology automated controls, manual controls and substantive testing on the reports. We have also verified the line losses with the previous years and sought explanations for any variances.

Tariff rates

We tested the assumptions for selection of tariff rate per unit from the tariff rate slab by comparing the tariff rate applied in the estimation model with current data for each customer category.

• We assessed the overall consistency of the calculated unbilled revenue compared to the prior year based on our knowledge of the trends and the process.

• We considered the adequacy of the Group’s disclosures in the consolidated financial statements relating to this area.

Page 34

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 34Other Information

Management is responsible for the other information. The other information comprises the information included in the Annual Report, but does not include the consolidated financial statements and our auditors’ report thereon. We obtained the Directors’ Report prior to the date of our auditors’ report, and we expect to obtain the remaining sections of the Annual Report after the date of the auditors’ report.

Our opinion on the consolidated financial statements does not cover the other information and we do not express any form of assurance conclusion thereon.

In connection with our audit of the consolidated financial statements, our responsibility is to read the other information and, in doing so, consider whether the other information is materially inconsistent with the consolidated financial statements or our knowledge obtained in the audit, or otherwise appears to be materially misstated. If, based on the work we have performed, we conclude that there is a material misstatement of this other information, we are required to report that fact. We have nothing to report in this regard.

Responsibilities of Management and Those Charged withGovernance for the Consolidated Financial Statements

Management is responsible for the preparation and fair presentation of the consolidated financial statements in accordance with IFRS Standards and their preparation in compliance with the applicable provisions of the UAE Federal Decree Law No. 32 of 2021 and for such internal control as management determines is necessary to enable the preparation of consolidated financial statements that are free from material misstatement, whether due to fraud or error.

In preparing the consolidated financial statements, management is responsible for assessing the Group’s ability to continue as a going concern, disclosing, as applicable, matters related to going concern and using the going concern basis of accounting unless management either intends to liquidate the Group or to cease operations, or has no realistic alternative but to do so.

Those Charged with Governance are responsible for overseeing the Group’s financial reporting process.

Page 35

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 35Auditors’ Responsibilities for the Audit of theConsolidated Financial Statements

Our objectives are to obtain reasonable assurance about whether the consolidated financial statements as a whole are free from material misstatement, whether due to fraud or error, and to issue an auditors’ report that includes our opinion. Reasonable assurance is a high level of assurance, but is not a guarantee that an audit conducted in accordance with ISAs will always detect a material misstatement when it exists.

Misstatements can arise from fraud or error and are considered material if, individually or in the aggregate, they could reasonably be expected to influence the economic decisions of users taken on the basis of these consolidated financial statements.

As part of an audit in accordance with ISAs, we exercise professional judgment and maintain professional skepticism throughout the audit. We also:

• Identify and assess the risks of material misstatement of the consolidated financial statements, whether due to fraud or error, design and perform audit procedures responsive to those risks, and obtain audit evidence that is sufficient and appropriate to provide a basis for our opinion. The risk of not detecting a material misstatement resulting from fraud is higher than for one resulting from error, as fraud may involve collusion, forgery, intentional omissions, misrepresentations, or the override of internal control.

• Obtain an understanding of internal control relevant to the audit in order to design audit procedures that are appropriate in the circumstances, but not for the purpose of expressing an opinion on the effectiveness of the Group’s internal control.

• Evaluate the appropriateness of accounting policies used and the reasonableness of accounting estimates and related disclosures made by management.

• Conclude on the appropriateness of management’s use of the going concern basis of accounting and, based on the audit evidence obtained, whether a material uncertainty exists related to events or conditions that may cast significant doubt on the Group’s ability to continue as a going concern. If we conclude that a material uncertainty exists, we are required to draw attention in our auditors’ report to the related disclosures in the consolidated financial statements or, if such disclosures are inadequate, to modify our opinion. Our conclusions are based on the audit evidence obtained up to the date of our auditors’ report. However, future events or conditions may cause the Group to cease to continue as a going concern.

• Evaluate the overall presentation, structure and content of the consolidated financial statements, including the disclosures, and whether the consolidated financial statements represent the underlying transactions and events in a manner that achieves fair presentation.

• Obtain sufficient appropriate audit evidence regarding the financial information of the entities or business activities within the Group to express an opinion on the consolidated financial statements. We are responsible for the direction, supervision and performance of the group audit. We remain solely responsible for our audit opinion.

We communicate with those charged with governance regarding, among other matters, the planned scope and timing of the audit and significant audit findings, including any significant deficiencies in internal control that we identify during our audit.

We also provide those charged with governance with a statement that we have complied with relevant ethical requirements regarding independence, and communicate with them all relationships and other matters that may reasonably be thought to bear on our independence, and where applicable, actions taken to eliminate threats or safeguards applied.

Page 36

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 36

From the matters communicated with those charged with governance, we determine those matters that were of most significance in the audit of the consolidated financial statements of the current year and are therefore the Key Audit Matters. We describe these matters in our auditors’ report unless law or regulation precludes public disclosure about the matter or when, in extremely rare circumstances, we determine that a matter should not be communicated in our report because the adverse consequences of doing so would reasonably be expected to outweigh the public interest benefits of such communication Report on Other Legal and Regulatory Requirements

Further, as required by the UAE Federal Decree Law No. 32 of 2021 we report that for the year 31

December 2022:

i) we have obtained all the information and explanations we considered necessary for the purposes of our audit;

ii) the consolidated financial statements have been prepared and comply, in all material respects, with the applicable provisions of the UAE Federal Decree Law No. 32 of 2021;

iii) the Group has maintained proper books of account;

iv) the financial information included in the Directors’ report is consistent with the books of account of the Group;

v) as disclosed in note 1 to the consolidated financial statements, the Group has not purchased any shares during the year ended 31 December 2022;

vi) note 23 to the consolidated financial statements discloses material related party transactions and the terms under which they were conducted;

vii) based on the information that has been made available to us, nothing has come to our attention which causes us to believe that the Group has contravened during the financial year ended 31 December 2022 any of the applicable provisions of the UAE Federal Decree Law No. 32 of 2021 or in respect of the Authority, its Articles of Association, which would materially affect its activities or its consolidated financial position as at year ended 31 December 2022; and

viii) note 23(b) to the consolidated financial statements discloses the social contributions made during the year ended 31 December 2022.

Page 37

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 37CONSOLIDATED STATEMENT OF FINANCIAL POSITIONAs at 31 December

Note20222021

AED’000AED’000

AssetsNon-current assets

Property, plant and equipment8154,029,411149,472,061

Intangible assets10471,123529,577

Investments accounted for using the equity method7.3640640

Derivative financial instruments321,294,80210,645

Financial assets at fair value through other comprehensive income1152,91158,113

Investment properties3772,859-

Other assets121,134,8971,012,826

Other financial assets151,457,9561,223,569

Total non-current assets158,514,599152,307,431

Current assets

Inventories141,445,2161,451,149

Other assets12131,845445,671

Trade receivables134,211,3353,849,578

Other financial assets153,133,7582,149,528

Derivative financial instruments32492,106-

Short-term deposits with banks97,532,5034,798,864

Cash and cash equivalents165,287,4154,406,164

Total current assets22,234,17817,100,954

Total assets180,748,777169,408,385

Equity and liabilitiesEquity

Share capital17500,000500,000

Capital contribution1740,042,88540,037,040

General reserve17-53,343,435

Retained earnings1747,338,862-

Statutory reserve17591,346355,467

Hedging reserve17954,247(1,236,145)

Equity Attributable to the Owners of the Company89,427,34092,999,797

Non-controlling interests7.22,953,130591,911

Total equity92,380,47093,591,708

Page 38

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 38LiabilitiesNon-current liabilities

Borrowings1837,317,97523,325,798

Retirement benefit obligations191,010,4931,008,904

Derivative financial instruments324,5782,259,830

Lease liabilities2023,52811,939

Other long term liabilities2132,802,52831,710,788

Total non-current liabilities71,159,10258,317,259

Current liabilities

Trade and other payables2213,729,12413,531,012

Borrowings183,371,8543,430,072

Derivative financial instruments32-156,297

Lease liabilities2012,8843,013

Total current liabilities17,113,86217,120,394

Total liabilities88,272,96475,437,653

Total equity and liabilities180,653,434169,029,361

Regulatory deferral account credit balance3495,343379,024

Total equity, liabilities and regulatory deferral account credit balance180,748,777169,408,385

To the best of our knowledge, these consolidated financial statements fairly represent in all material respects, the consolidated financial position, results of operation and cash flows for the Group as of and for the year ended 31 December 2022 These consolidated financial statements were approved by the Board of Directors on 9 March 2023 and signed on their behalf by:

H.E Matar Humaid Al TayerChairman of the BoardH.E Saeed Mohammad Al TayerMD & CEO of DEWAThe independent auditors’ report is set out on pages 32 to 36

The notes on pages 43 to 107 form an integral part of these consolidated financial statements

Page 39

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 39CONSOLIDATED STATEMENTS OF PROFIT OR LOSS AND OTHER COMPREHENSIVE INCOMEFor the year ended 31 December

Note20222021

AED’000AED’000

Revenue2427,335,53423,823,968

Cost of sales25(16,488,998)(15,539,787)

Gross profit10,846,5368,284,181

Administrative expenses26(2,890,365)(2,916,445)

Credit impairment losses 13 &23(144,529)(83,822)

Other income404,286921,993

Operating profit8,215,9286,205,907

Finance costs28(1,005,765)(382,866)

Finance income28552,532165,465

Finance cost – net28(453,233)(217,401)

Provision for impairment of investment in a joint venture7.3-(4,785)

Share of profit from investments in joint ventures7.3-502

Profit for the year before net movement in regulatory deferral account

7,762,6955,984,223

Net movement in regulatory deferral account credit balance34283,681569,224

Profit for the year and net movement in regulatory deferral

account8,046,3766,553,447

Other comprehensive income:Items that will not be reclassified to profit or loss

Remeasurements of retirement benefit obligations19.170,46896,851

Debt instrument at FVOCI – change in fair value11(5,202)460

Items that may be reclassified to profit or loss

Hedging losses reclassified to profit or loss58,916388,164

Cash flow hedges324,118,9941,033,370

Other comprehensive income for the year4,243,1761,518,845

Total comprehensive income for the year12,289,5528,072,292

Profit for the year attributable to

- Owners of the Company7,722,8346,123,112

- Non-controlling interests323,542430,335

8,046,3766,553,447

Total comprehensive income for the year attributable to

- Owners of the Company9,976,4536,966,805

- Non-controlling interests2,313,0991,105,487

12,289,5528,072,292

Earnings per share

Basic and diluted earnings per share (AED)350.150.12

The independent auditors’ report is set out on pages 32 to 36.

The notes on pages 43 to 107 form an integral part of these consolidated financial statements.

Page 40

CONSOLIDATED STATEMENT OF CHANGES IN EQUITYSharecapitalGovernment ofDubai accountGeneralreserveStatutoryreserveHedgingreserveRetainedearnings TotalNon-controllinginterests Total equity

AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000

At 1 January2021-39,829,87852,239,576352,103(1,982,987)-90,438,570(416,991)90,021,579

Transfer to share capital (refer note17)500,000(500,000)-------

Total comprehensive income for the year

Profit for the year-----6,123,1126,123,112430,3356,553,447

Other comprehensive income----746,84296,851843,693675,1521,518,845

Total comprehensive income for the year----746,8426,219,9636,966,8051,105,4878,072,292

Transfer to reserve--3,103,8593,364-(3,107,223)---

Transactions with the Owner

Non-cash distribution (refer note17)-----(3,112,740)(3,112,740)-(3,112,740)

Capital contribution by non-controlling interests - - - - - - - - - Capital contribution by Government of Dubai –

value of lands (net) (refer notes 8 (g))-707,162----707,162-707,162

Dividend paid (refer note33)--(2,000,000)---(2,000,000)(96,585)(2,096,585)

Total contributions and distributions-707,162(2,000,000)--(3,112,740)(4,405,578)(96,585)(4,502,163)

At 31 December2021500,00040,037,04053,343,435355,467(1,236,145)-92,999,797591,91193,591,708

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 202240

Page 41

SharecapitalGovernment ofDubai accountGeneralreserveStatutoryreserveHedgingreserveRetainedearnings TotalNon-controllinginterests Total equity

AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000

At 1 January2022500,00040,037,04053,343,435355,467(1,236,145)-92,999,797591,91193,591,708

Total comprehensive income for the year

Profit for the year----7,722,8347,722,834323,5428,046,376

Other comprehensive income----2,190,39263,2272,253,6191,989,5574,243,176

Total comprehensive income for the year----2,190,3927,786,0619,976,4532,313,09912,289,552

Transfer to reserve (refer note 17 (b))-305,879-(305,879)---

Transfer to retained earnings (refer note 17 (d))-(43,343,435)43,343,435---

Transactions with the Owner

Capital contribution by non-controlling interests-------839,385839,385

Capital contribution – value of lands (net) (refer

notes 8 (g) and (h)-5,845----5,845-5,845

Dividend paid (refer note33)--(10,000,000)--(5,130,000)(15,130,000)(1,025,090)(16,155,090)

Total contributions and distributions-5,845(10,000,000)--(5,130,000)(15,124,155)(185,705)(15,309,860)

Changes in ownership interest

Partial disposal without change in control (refer note 1)

-----1,669,0701,669,070140,0001,809,070

Change in statutory reserve(70,000)--(70,000)70,000-

Change in other reserve-----(23,825)(23,825)23,825-

Total changes in ownership interest(70,000)1,645,2451,575,245233,8251,809,070

At 31 December2022500,00040,042,885-591,346954,24747,338,86289,427,3402,953,13092,380,470

The notes on pages 43 to 107 form an integral part of these consolidated financial statements.

CONSOLIDATED STATEMENT OF CHANGES IN EQUITY(CONTINUED)About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 202241

Page 42

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 42CONSOLIDATED STATEMENT OF CASH FLOWSFor the year ended 31 December

Note20222021

AED’000AED’000

Net cash inflow from operating activities2914,219,99510,019,994

Cash flows from investing activities

Purchase of property, plant and equipment net of movements in capital payables and other long term liabilities

(8,630,297)(12,268,280)

Deposits with original maturity of greater than three months

– placed during the year

9 &16(4,172,725)(2,685,403)

Deposits with original maturity of greater than three months

– matured during the year

9 &16430,863325,000

Purchase of intangible assets10(8,627)(381,752)

Interest received286,117138,225

Sale of investment in a joint venture-947

Investment in a joint venture-(150)

Movement in other financial assets(644,039)(337,402)

Proceeds from disposal of property, plant and equipment4,2353,916

Net cash outflow from investing activities(12,734,473)(15,204,899)

Cash flows from financing activities

Repayments of borrowings(4,581,208)(517,537)

Proceeds from borrowings18,511,4448,552,340

Interest paid(1,833,852)(1,076,336)

Payment of lease liabilities20(12,451)(7,443)

Proceeds from partial disposal of subsidisary without loss of control1,755,564-

Capital contribution by non-controlling interests580,319-

Dividends paid to the Owners33(15,130,000)(2,000,000)

Dividends paid to non-controlling interests(1,025,090)(96,585)

Net cash (outflow)/inflow from financing activities(1,735,274)4,854,439

Net (decrease)/increase in cash and cash equivalents(249,752)(330,466)

Cash and cash equivalents at the beginning of the year164,972,0485,302,514

Cash and cash equivalents at the end of the year164,722,2964,972,048

Material non-cash transactions:

- Net transfer of land to the Group recorded through equity amounting to AED 6 million (2021: AED 707 million) (refer notes 8(g) and (h)).

- During the year, non-cash distributions to the Government of Dubai amounted to AED Nil (2021: AED 3,113 million).

The independent auditors’ report is set out on pages 32 to 36.

The notes on pages 43 to 107 form an integral part of these consolidated financial statements.

Page 43

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 43Dubai Electricity and WaterAuthority (“DEWA” or “theAuthority” or “the Company”)was incorporated on 1 January

1992 in the Emirate of Dubai by a Decree (“the Original Decree”) issued by H.H. The Ruler of

Dubai, effective 1 January1992, as an independentpublic authority having the

status of a body corporate, and financially and administratively independent from the

Government. In accordance with the Original Decree, all rights, property and assets of Dubai

Electricity Company (“DEC”) and Dubai Water Department (“the

Department”) belonging to the

Government, were vested in the Authority, and the Authority

was held responsible for all

liabilities and debts of DEC and the Department, of any kind

whatsoever. Together, DEC andthe Department formed DEWA

from the effective date of the Original Decree.

The principal activities of the Authority, in accordance with

the Original Decree and Decree No. 13 of 1999 which amended

some of the provisions of the

Original Decree, comprise water desalination and distribution

and the generation, transmission and distribution of electricity,

throughout the Emirate of

Dubai. The registered address of the Authority is P.O. Box 564, Dubai, United Arab Emirates (“UAE”).

During the prior years, the Authority was wholly owned by the Government of Dubai which announced its plan to list the shares of the Authority on the Dubai Financial Market (DFM). In order to comply with the listing requirements, based on Decree under Law No. (27) of 2021 issued in The Official Gazette of Dubai Government on 29 December 2021, the legal status of the Authority had been amended to a Public Joint Stock Company, and hence the revised name of the Authority is “Dubai Electricity and Water Authority (PJSC)” (formerly Dubai Electricity and Water Authority). During the current year, Government of Dubai has sold 18% of its shareholding in the Authority through an Initial Public Offering (“IPO”). The Authority has been listed on the Dubai Financial Market (DFM) and its shares started trading with effect from 12 April 2022.

As a result of listing, the ownership structure of the Authority has been changed as follows:

Ownershipbefore listingOwnershipafter listingDepartment of Finance (DoF), Government of

Dubai100%82%

Local and international investors (including

institutional and retail investors)-18%

100%100%

Before the change in status of the Authority to Public Joint Stock Company (PJSC), the Authority was wholly owned directly by Government of Dubai through a Decree.

During the year ended 31 December 2022, the Group has not purchased any shares.

DEWA and its subsidiaries are collectively referred to as “the Group”. The Group either directly or indirectly controls following significant subsidiaries, which are domiciled in UAE:

1. ESTABLISHMENT

AND OPERATIONS

Page 44

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 44Percentage ofbeneficialownershipPrincipal business activities

Name of the entity20222021

Al Etihad Energy Services Company

LLC 100 100 Implement energy efficiency measures in buildings Etihad Clean Energy Development

Company LLC 100 100 Buildings energy efficiency services, solar energy systems rental and solar energy systems installation

Jumeirah Energy InternationalHoldings LLC (JEIHL) 100 100 Holding CompanyJumeirah Energy International LLC(JEI) 100 100 Holding CompanyMai Dubai LLC 100 100 Purification and sale of potable waterHassyan Energy 1 Holdings LLC 100 100 Holding CompanyShuaa Energy 2 Holdings LLC 100 100 Holding CompanyShuaa Energy 3 Holdings LLC 100 100 Holding CompanyJumeirah Energy International CapitalHolding LLC 100 100 Holding CompanyJumeirah Energy International SiliconValley LLC 100 100 Holding Company

Noor Energy 1 Holdings LLC 100 100 Holding Company Data Hub Integrated Solutions LLC

(MORO)100100

Established to provide services including IT, and infrastructure, networking and computer system housing

services

Digital DEWA LLC 100 100 Investment in commercial, industrial, retail trade and energy enterprises and management

Infra X 100 100 To provide services including IT and computer housing services

Dubai Green Fund Investments LLC 100 100 To invest and manage commercial, industrial, retail trade and energy enterprises

Utilities Management Company LLC * 78 85 Holding Company Emirates Central Cooling Systems

Corporation PJSC (EMPOWER) *5670

Provision of district cooling services, management,

maintenance of central cooling plants and related distribution networks

EMPOWER FM LLC * 56 70 Air conditioning, ventilation and air filtration system, installation and maintenance

EMPOWER Engineering & ConsultancyLLC * 56 70 Project development consultant services

Palm Utilities LLC *5670

Establish and operate district cooling projects and provide air conditioning, ventilator and refrigeration services

Palm District Cooling LLC (PDC)*5670

Establish and operate district cooling projects and provide air conditioning, ventilator and refrigeration

services.

EMPOWER Logstor LLC * 54.3 67.9 Manufacturing of pre-insulated pipes, mainly for district cooling

Shuaa Energy 2 P.S.C 60 60 Establish and provide full range of services for generation of electricity

Page 45

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 45Percentage ofbeneficialownershipPrincipal business activitiesName of the entity 2022 2021

Innogy International Middle East LLC 51 51 Energy projects consultancy, desalination and sewage treatment plants operations and maintenance

Shuaa Energy 1 P.S.C 51 51 Establish and provide full range of services for generation of electricity

Hassyan Energy Phase 1 P.S.C 51 51 Establish and provide full range of services for generation of electricity

Noor Energy 1 P.S.C 51 51 Establish and provide full range of services for generation of electricity

Digital X LLC 100 100 Establish and provide full range of services for information technology, data entry, network consultancies

Smart Energy X LLC 100 100 Establish and provide full range of services for parking management electronic systems installation and

maintenance

Hassyan by Products LLC ** - 100 Establish for sale of cement products trading, fly ash trading, cement and gypsum trading, repackaging and

refilling services

Shuaa Energy 3 P.S.C 60 60 Establish and provide full range of services for generation of electricity

Forward Investments Limited 100 100 Holding Company

Dubai Carbon Centre of Excellence 100 100 Energy projects engineering consultancy and carbon control systems trading

Hassyan Water Company 1 HoldingLLC100 100 Investment in commercial enterprises & managementand industrial enterprises & management

Hassyan Water Company 1 P.S.C 60 60 Water desalination including collecting of water, sterilizing and transporting it in lines and linking it to a water distribution network and operating and

maintaining water production projects

SecureX 100 100 Computer systems housing services, communication equipment, software design, data classification & analysis services, IT infrastructure, data center colocation services and information technology network services

Space D 100 100 Managing & operating satellites & provision satellite services, wired & wireless communication systems

installation and space situational tracking, monitoring & awareness services

EMPOWER Snow LLC* 56 70 Establish and operate district cooling projects and

provide air-conditioning, ventilation and refrigerationservices

* On 14 October 2022, the legal status of EMPOWER was amended to a Public Joint Stock Company through Decree No. (22) of 2022 issued by the Ruler of Dubai. EMPOWER was listed on the Dubai Financial Market (“DFM”), on 15 November 2022, by listing 20% of its share capital.

As a result of listing, DEWA’s interest in EMPOWER and its subsidiaries have been diluted by 14% from 70% to 56%. The sales proceeds net off expenses in relation to the Initial Public Offering (IPO) from sale of EMPOWER interest amounted to AED 1,809 million.

** During the year, the shareholders of Hassyan by Products LLC have resolved to voluntarily wind up the operations and liquidate the entity. On 5 October 2022, Hassyan by Products LLC has completed it liquidation process and cancelled the trade license.

Page 46

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 46The principal accountingpolicies applied by theGroup in the preparation ofthese consolidated financialstatements are set out below.These policies have beenconsistently applied to allthe years presented, unlessotherwise stated.

2.1 STATEMENT OF

COMPLIANCEThese consolidated financialstatements of the Group havebeen prepared in accordancewith International FinancialReporting Standards (IFRS)and interpretations issuedby the IFRS Interpretations

Committee (IFRS IC) applicable to companies reporting

under IFRS and UAE FederalDecree Law No. 32 of 2021.These consolidated financialstatements comply withIFRS as issued by theInternational AccountingStandards Board (IASB) andUAE Federal Decree Law No.32 of 2021.These consolidated financialstatements are presented inUAE Dirhams (AED), whichis the Authority’s functionalcurrency and have beenrounded to nearest thousands.

Subsidiaries and joint ventures determine their own functional currency and items included

in the financial statements of these companies are measured

using that functional currency.

2.2 BASIS OF

MEASUREMENTThe consolidated financialstatements have been preparedon a historical cost basis

except for financial assets and financial liabilities measured at fair value, wherever applicable.

2.3 USE OF ESTIMATES

AND JUDGEMENTS

The preparation of consolidated financial statements in

conformity with InternationalFinancial Reporting Standards(“IFRS”) requires the use ofcertain critical accountingestimates. It also requiresmanagement to exercise itsjudgement in the processof applying the Group’s

accounting policies. The areas involving a higher degree of

judgement or complexity, orareas where assumptions and

estimates are significant to the Group’s consolidated financial statements are disclosed in

note 5.

2. BASIS OF

PREPARATION

Page 47

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 47

3.1 NEW STANDARDS, AMENDMENTS AND INTERPRETATIONS ISSUED BUT

NOT YET EFFECTIVE

A number of new standards are effective for annual periods beginning after 1 January 2023 and earlier application is permitted, however, the Group has not early adopted the new or amended standards in preparing these consolidated financial statements.

The following amended standards and interpretations are not expected to have a significant impact on the Group’s consolidated financial statements:

Effective date

Classification of Liabilities as Current and Non-current (Amendments to IAS 1)

01-Jan-23IFRS 17 Insurance Contracts 01-Jan-23

Disclosure of Accounting Policies (Amendments to IAS 1 and IFRS Practice Statement 2)

01-Jan-23Definition of Accounting Estimates (Amendments to IAS 8) 01-Jan-23Deferred Tax related to Assets and Liabilities arising from a SingleTransaction (Amendments to IAS 12)01-Jan-23

Sale or Contribution of Assets between an Investor and its Associates or Joint Venture (Amendments to IFRS 10 and IAS 28)

Effective date deferredindefinitely

3.2 OTHER NEW OR AMENDED STANDARDS

The following new or amended standards that are required to be adopted in annual periods beginning on 1 January 2022 and do not have a significant impact on the Group’s consolidated financial statements:.

Effective dateOnerous Contracts – Cost of Fulfilling a Contract (Amendment toIAS 37)01-Jan-22

Annual improvements to IFRS Standards 2018-2020 01-Jan-22 Property, Plant and Equipment: Proceeds before Intended Use (Amendments to IAS 16)

01-Jan-22

Reference to Conceptual Framework (Amendments to IFRS 3) 01-Jan-22 3. SIGNIFICANT

ACCOUNTING POLICIES

Page 48

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 48

3.3 BASIS OF

CONSOLIDATION

(a) Business combinations

The Group accounts forbusiness combinations usingthe acquisition method when

the acquired set of activities and assets meets the definition of a business and control is

transferred to the Group.In determining whether a

particular set of activities and assets is a business, the Group assesses whether the set of

assets and activities acquired includes, at a minimum, an

input and substantive processand whether the acquired sethas the ability to produceoutputs.The Group has an option toapply a ‘concentration test’that permits a simplifiedassessment of whether an

acquired set of activities and assets is not a business. The

optional concentration test is met if substantially all of the fair value of the gross assets acquired is concentrated in

a single identifiable asset or group of similar identifiable

assets.The consideration transferred

in the acquisition is generally measured at fair value, as are the identifiable net assets acquired.

Any goodwill that arises is

tested annually for impairment.

Any gain on a bargain purchase is recognised in profit or loss immediately. Transaction costs are expensed as incurred, except if related to the issue of debt or equity securities.

The consideration transferreddoes not include amountsrelated to the settlement ofpre-existing relationships.Such amounts are generallyrecognised in profit or loss.Any contingent considerationis measured at fair value at

the date of acquisition. If an obligation to pay contingent

consideration that meetsthe definition of a financialinstrument is classified as

equity, then it is not remeasured and settlement is accounted for within equity. Otherwise, other contingent consideration is

remeasured at fair value at each reporting date and subsequent

changes in the fair value of the contingent consideration are

recognised in profit or loss.If share-based payment awards(replacement awards) arerequired to be exchanged forawards held by the acquiree’s

employees (acquiree’s awards), then all or a portion of the

amount of the acquirer’sreplacement awards isincluded in measuring theconsideration transferred in

the business combination. This determination is based on the

market-based measure of thereplacement awards comparedwith the market-based measureof the acquiree’s awardsand the extent to which thereplacement awards relate topre-combination service.

(b) Subsidiaries

Subsidiaries are entitiescontrolled by the Group. TheGroup ‘controls’ an entitywhen it is exposed to, or hasrights to, variable returnsfrom its involvement with theentity and has the ability toaffect those returns throughits power over the entity.The financial statements ofsubsidiaries are included inthe consolidated financialstatements from the date onwhich control commences

until the date on which control ceases.

(c) Non-controlling interests

(NCI)NCI are measured initially at

their proportionate share of the acquiree’s identifiable net assets at the date of acquisition.

Changes in the Group’s interest in a subsidiary that do not result in a loss of control are accounted for as equity transactions.

(d) Loss of control

When the Group loses control

over a subsidiary, it derecognises the assets and liabilities of the subsidiary, and any related NCI and other components of equity.

Any resulting gain or loss is

recognised in profit or loss. Any interest retained in the former subsidiary is measured at fair value when control is lost.

(e) Interests in equity-

accounted investees

The Group’s interests in equity-accounted investees comprise

interests in associates and ajoint venture.

Associates are those entities in which the Group has significant influence, but not control or

joint control, over the financial and operating policies. A joint venture is an arrangement

in which the Group has jointcontrol, whereby the Grouphas rights to the net assetsof the arrangement, ratherthan rights to its assets and

obligations for its liabilities.

Page 49

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 49

Interests in associates and the joint venture are accounted

for using the equity method.

They are initially recognised at cost, which includes transaction costs. Subsequent to initial

recognition, the consolidated

financial statements include the Group’s share of the profit or loss and OCI of equity accounted investees, until the date on

which significant influence or joint control ceases.

(f) Transactions eliminated on consolidation

Intra-group balances andtransactions, and anyunrealised income andexpenses (except for foreigncurrency transaction gains

or losses) arising from intra-group transactions, are

eliminated. Unrealised gains

arising from transactions with equity-accounted investees

are eliminated against theinvestment to the extent ofthe Group’s interest in the

investee. Unrealised losses are eliminated in the same way

as unrealised gains, but only

to the extent that there is no evidence of impairment.

3.4 PROPERTY, PLANT

AND EQUIPMENT

Property, plant and equipment, other than land and capital

work in progress, are stated at historical cost less accumulated depreciation and any provisions for impairment. The initial

cost of an asset comprises its purchase price or construction cost and any costs directly

attributable to bringing theasset into operation. The

purchase price or construction cost is the aggregate amount

paid and the fair value of any other consideration given to

acquire the asset.When parts of property, plant

and equipment are significant in cost in comparison to the total cost of the item, and where

such parts/components have a

useful life different than other parts and are required to be

replaced at different intervals, the Group recognises such parts as individual assets with specific useful lives and depreciates

them accordingly. Likewise, when a major overhaul is performed, the directly attributable cost of the overhaul is recognised

in the carrying amount of theplant and equipment if the

recognition criteria are satisfied.

This is recorded as a separate component with a useful life

generally equal to the time

period up to the next scheduled major overhaul.

Subsequent expenditure

incurred to replace a component of an item of property, plant

and equipment or to improve its operational performance, that

is accounted for separately, is included in the asset’s carrying amount or recognised as a

separate asset as appropriate

when it is probable that future economic benefits in excess of the originally assessed standard of performance of the existing asset will flow to the Group

and the cost of the item can be measured reliably. The carrying amount of the replaced asset is subsequently derecognised.

Expenditure on major inspection and overhauls of production

plant is capitalised when itmeets the asset recognition

criteria and is depreciated over the period until the next major overhaul. All other repair and maintenance costs are charged

to profit or loss during the year in which they are incurred.

Generation and desalinationplants, supply lines andsubstation equipment are

capitalised from the date these are available for use, after

satisfactory completion of trial and reliability runs.

Capital work in progress is stated at cost, less any impairment.

When commissioned, capital

work in progress is transferred to the appropriate property,

plant and equipment categoryand depreciated in accordancewith the Group’s policies.

Land is stated at a value which is based on valuation received from Land Department of the

Government of Dubai, whichis considered the deemed costand is not depreciated.Depreciation on other assets

is calculated using the straight line method at rates calculated to reduce the cost of assets to their estimated residual values over their estimated useful

lives or in case of leased assets, the shorter term.

Page 50

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 50Depreciation method, usefullives and residual values are

reviewed at each reporting date and adjusted, if appropriate.

The carrying amount ofproperty, plant and equipmentis reviewed for impairmentwhen events or changes incircumstances indicate thecarrying amount may not be

recoverable. An asset’s carrying amount is written down

immediately to its recoverable amount if the asset’s carrying amount is greater than its

estimated recoverable amount.Any gain and loss on disposalof an item of property, plant

and equipment is recognised in profit of loss and determined

as the difference between theproceeds received and theasset’s carrying amount.Insurance spares acquiredtogether with the plant orpurchased subsequently but

related to a particular plant and are; i) only expected to be used during emergency breakdown

situations, ii) critical to the plant operation and must be

available at stand-by at alltimes are capitalised withinproperty, plant and equipmentand depreciated from purchase

date over the remaining useful life of the plant in which it is to be utilised. These do not form

The estimated useful lives of property, plant and equipment for current and comparative periods are as follows:

YearsBuildings 10 to 30Generation and desalination plants 10 to 38Transmission and distribution networks 10 to 30Other equipment and assets 2 to 20part of inventory providedthe capitalisation criteria forproperty, plant and equipmentis met.

Capital spares are spare parts that are regularly replaced,

repaired or overhauled usually as part of a replacement

programme and are; i) onlyexpected to be used inconnection with an item of

property, plant and equipment;

ii) expected to be used during more than one period. These

are carried under capital work in progress until they are put to use.

3.5 INTANGIBLE ASSETS

(a) Recognition and

measurementIntangible assets mainlyinclude expenditure incurredon computer software by theGroup. These are measured at

cost upon initial recognition.

Following initial recognition, intangible assets are carried

at cost less any accumulatedamortisation and accumulatedimpairment losses.

The costs of acquired computer software are capitalised on the basis of the costs incurred

to acquire and bring into usethe specific software. Costsdirectly associated with thedevelopment of computersoftware programmes that areexpected to generate economicbenefits over a period inexcess of one year are alsocapitalised and amortisedover their estimated usefullives. Costs associated withmaintaining computer softwareprogrammes are recognised asan expense as incurred.

(b) Subsequent expenditure

Subsequent expenditureis capitalised only when itincreases the future economicbenefits embodied in thespecific asset to which it

relates. All other expenditure, including expenditure on

internally generated goodwilland brands, is recognised inprofit or loss as incurred.

(c) Amortisation

Amortisation is calculated to

write off the cost of intangible assets less their estimated

residual values using thestraight-line method overtheir estimated useful lives,

and is generally recognised in profit or loss. The estimated

useful lives for current and

comparative periods are 3 to 5 years.

Page 51

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 51Amortisation method, usefullives and residual values are

reviewed at each reporting date and adjusted, if appropriate.

Gains or losses arising fromderecognising an intangibleasset are measured as thedifference between the netdisposal proceeds and thecarrying amount of the assetand are recognised in profitor loss when the asset isderecognised.

3.6 FINANCIAL

INSTRUMENTS

(i) Recognition and initial

measurementTrade receivables and debt

securities issued are initially recognised when they are

originated. All other financial assets and financial liabilities are initially recognised when

the Group becomes a partyto the contractual provisions

of the instrument. A financial asset (unless it is a trade

receivable without a significant financing component) or

financial liability is initially measured at fair value plus

or minus, for an item not atFVTPL, transaction costs that

are directly attributable to its acquisition or issue. A trade

receivable without a significant financing component is initially measured at the transaction

price.

(ii) Classification and

subsequent measurementFinancial assetsOn initial recognition, a

financial asset is classified as measured at: amortised cost;

FVOCI – debt investment;FVOCI – equity investment; orFVTPL.Financial assets are notreclassified subsequentto their initial recognitionunless the Group changes itsbusiness model for managing

financial assets, in which case all affected financial assets are reclassified on the first day

of the first reporting periodfollowing the change in thebusiness model.

A financial asset is measured at amortised cost if it meets both of the following conditions and is not designated as at FVTPL:

• it is held within a business model whose objective is

to hold assets to collectcontractual cash flows; and

• its contractual terms give

rise on specified dates tocash flows that are solelypayments of principal andinterest on the principalamount outstanding.A debt investment is measuredat FVOCI if it meets both of

the following conditions and is not designated as at FVTPL:

• it is held within a business model whose objective is

achieved by both collectingcontractual cash flows andselling financial assets; and

• its contractual terms give

rise on specified dates tocash flows that are solelypayments of principal andinterest on the principalamount outstanding.On initial recognition of anequity investment that is notheld for trading, the Groupmay irrevocably elect topresent subsequent changes in

the investment’s fair value in OCI. This election is made on

an investment-by-investmentbasis.All financial assets notclassified as measured atamortised cost or FVOCI asdescribed above are measuredat FVTPL. This includes all

derivative financial assets. On initial recognition, the Group may irrevocably designate a

financial asset that otherwise meets the requirements to be

measured at amortised cost orat FVOCI as at FVTPL if doing

so eliminates or significantly reduces an accounting

mismatch that would otherwisearise.Financial assets – Businessmodel assessmentThe Group makes an

assessment of the objective of the business model in which

a financial asset is held at a portfolio level because this best reflects the way the business

is managed and informationis provided to management.The information consideredincludes:

Page 52

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 52

• The stated policies and

objectives for the portfolio and the operation of those policies in practice. These include

whether management’sstrategy focuses on earningcontractual interest income,maintaining a particular

interest rate profile, matching the duration of the financial

assets to the duration of any

related liabilities or expected cash outflows or realising

cash flows through the saleof the assets;

• how the performance of

the portfolio is evaluatedand reported to the Group’smanagement;

• the risks that affect the

performance of the businessmodel (and the financialassets held within thatbusiness model) and howthose risks are managed;

• how managers of the

business are compensated –e.g. whether compensationis based on the fair valueof the assets managed orthe contractual cash flowscollected; and

• the frequency, volume and

timing of sales of financialassets in prior periods, thereasons for such sales andexpectations about futuresales activity.Transfers of financialassets to third parties intransactions that do notqualify for derecognition arenot considered sales for thispurpose, consistent with the

Group’s continuing recognition of the assets.

Financial assets that are held for trading or are managed

and whose performance is

evaluated on a fair value basis are measured at FVTPL.

Financial assets – Assessment

whether contractual cash flows are solely payments of principal and interest

For the purposes of thisassessment, ‘principal’ isdefined as the fair value of

the financial asset on initial recognition. ‘Interest’ is defined as consideration for the time

value of money and for the

credit risk associated with the principal amount outstanding

during a particular period of

time and for other basic lending risks and costs (e.g. liquidity risk and administrative costs), as well as a profit margin.

In assessing whether thecontractual cash flows are

solely payments of principal and interest, the Group considers

the contractual terms of theinstrument. This includes

assessing whether the financial asset contains a contractual

term that could change the

timing or amount of contractual cash flows such that it would

not meet this condition. Inmaking this assessment, theGroup considers:

• contingent events that

would change the amount ortiming of cash flows;

• terms that may adjust the

contractual coupon rate,including variable-ratefeatures;

• prepayment and extension

features; and

• terms that limit the Group’s claim to cash flows from

specified assets (e.g. non-recourse features).A prepayment feature isconsistent with the solely

payments of principal and interest criterion if the prepayment

amount substantially represents unpaid amounts of principal and interest on the principal amount outstanding, which may include reasonable compensation

for early termination of thecontract.Additionally, for a financial

asset acquired at a discount or premium to its contractual par amount, a feature that permits or requires prepayment at

an amount that substantiallyrepresents the contractualpar amount plus accrued (butunpaid) contractual interest(which may also includereasonable compensation for

early termination) is treated as consistent with this criterion if the fair value of the prepayment feature is insignificant at initial recognition.

Page 53

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 53Financial assets – Subsequent measurement and gains and losses

Financial assets at FVTPL These assets are subsequently measured at fair value. Net gains and losses, including any interest or dividend income, are recognised in profit or loss.

Financial assets atamortised cost

These assets are subsequently measured at amortised cost using the effective interest method. The amortised cost is reduced by impairment losses. Interest income, foreign exchange gains and losses and impairment are recognised in profit or loss. Any gain or loss on derecognition is recognised in profit or loss.

Debt investments at FVOCI These assets are subsequently measured at fair value. Interest income calculated using the effective interest method, foreign exchange gains and losses and impairment are recognised in

profit or loss. Other net gains and losses are recognised inOCI. On derecognition, gains and losses accumulated in OCI arereclassified to profit or loss.

Equity investments at FVOCI These assets are subsequently measured at fair value. Dividends are recognised as income in profit or loss unless the dividend clearly represents a recovery of part of the cost of the investment.

Other net gains and losses are recognised in OCI and are never reclassified to profit or loss.

Financial liabilities –Classification, subsequentmeasurement and gains andlosses

Financial liabilities are classified as measured at amortised cost

or FVTPL. A financial liability is classified as at FVTPL if it is classified as held-for-trading, it is a derivative or it is designated as such on initial recognition.

Financial liabilities at FVTPL are measured at fair value and net gains and losses, including any interest expense, are recognised in profit or loss. Other financial liabilities are subsequently

measured at amortised cost using the effective interest method.

Interest expense and foreignexchange gains and losses are

recognised in profit or loss. Any gain or loss on derecognition is also recognised in profit or loss.

(iii) Derecognition

Financial assets

The Group derecognises a financial asset when:

• the contractual rights to the cash flows from the financial

asset expire; or

• it transfers the rights to receive the contractual cash flows in a transaction in which either:

• substantially all of the risks and rewards of ownership of the

financial asset are transferred; or

• the Group neither transfers

nor retains substantially allof the risks and rewards ofownership and it does not

retain control of the financial asset.

The Group enters into transactions whereby it transfers assets

recognised in its consolidated statement of financial position, but retains either all or substantially all of the risks and rewards of the transferred assets. In these cases, the transferred assets are not derecognised.

Page 54

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 54Financial liabilitiesThe Group derecognises afinancial liability when itscontractual obligations aredischarged or cancelled,or expire. The Group also

derecognises a financial liability when its terms are modified and the cash flows of the modified liability are substantially

different, in which case a new financial liability based on the modified terms is recognised at fair value.

On derecognition of afinancial liability, thedifference between thecarrying amount extinguishedand the consideration paid(including any non-cash

assets transferred or liabilities assumed) is recognised in

profit or loss.

(iv) Offsetting

Financial assets and financial liabilities are offset and the net amount presented in the

consolidated statement offinancial position when, and

only when, the Group currently has a legally enforceable right to set off the amounts and it

intends either to settle them

on a net basis or to realise the asset and settle the liability simultaneously.

(v) Derivative financial

instruments and hedgeaccountingThe Group holds derivative

financial instruments to hedge its foreign currency and interest rate risk exposures. Embedded

derivatives are separatedfrom the host contract andaccounted for separately ifthe host contract is not afinancial asset and certaincriteria are met. Derivatives

are initially measured at fair value. Subsequent to initial

recognition, derivatives aremeasured at fair value, andchanges therein are generallyrecognised in profit or loss.The Group designates certain

derivatives as hedging instruments to hedge the variability in cash flows associated with highly

probable forecast transactions arising from changes in foreign exchange rates and interest rates and certain derivatives and non-derivative financial liabilities as hedges of foreign exchange risk on a net investment in a foreign operation.

At inception of designated

hedging relationships, the Group documents the risk management

objective and strategy forundertaking the hedge. TheGroup also documents theeconomic relationship between

the hedged item and the hedging instrument, including whether

the changes in cash flows ofthe hedged item and hedginginstrument are expected tooffset each other.Hedges directly affected by

interest rate benchmark reform For the purpose of evaluating

whether there is an economicrelationship between thehedged item(s) and thehedging instrument(s), theGroup assumes that the

benchmark interest rate is not altered as a result of interest rate benchmark reform.

For a cash flow hedge of a

forecast transaction, the Group assumes that the benchmark

interest rate will not be altered as a result of interest rate

benchmark reform for thepurpose of assessing whetherthe forecast transaction is

highly probable and presents an exposure to variations in cash flows that could ultimately affect profit or loss. In determining whether a previously designated forecast transaction in a

discontinued cash flow hedge

is still expected to occur, the Group assumes that the interest rate benchmark cash flows

designated as a hedge will not be altered as a result of interest rate benchmark reform.

The Group will cease to apply the specific policy for assessing the economic relationship between

the hedged item and the hedging instrument (i) to a hedged item or hedging instrument when the uncertainty arising from interest rate benchmark reform is no

longer present with respect to the timing and the amount of

the interest rate benchmark-based cash flows of therespective item or instrumentor (ii) when the hedging

relationship is discontinued. For its highly probable assessment of the hedged item, the Group

will no longer apply the specific policy when the uncertainty

arising from interest ratebenchmark reform about thetiming and the amount of theinterest rate benchmark-based

future cash flows of the hedged item is no longer present, or

when the hedging relationshipis discontinued.Cash flow hedgesWhen a derivative isdesignated as a cash flowhedging instrument, theeffective portion of changesin the fair value of the

Page 55

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 55derivative is recognised inOCI and accumulated in the

hedging reserve. The effective portion of changes in the fair value of the derivative that is recognised in OCI is limited

to the cumulative change in

fair value of the hedged item, determined on a present value

basis, from inception of the

hedge. Any ineffective portion of changes in the fair value of the derivative is recognised

immediately in profit or loss.

The Group designates only the

change in fair value of the spot element of forward exchange

contracts as the hedging

instrument in cash flow hedging relationships. The change in fair value of the forward element

of forward exchange contracts

(forward points) is separately accounted for as a cost of

hedging and recognised in a

costs of hedging reserve within equity.

When the hedged forecasttransaction subsequentlyresults in the recognition ofa non-financial item suchas inventory, the amountaccumulated in the hedgingreserve and the cost ofhedging reserve is included

directly in the initial cost of the non-financial item when it is recognised.

For all other hedged forecasttransactions, the amountaccumulated in the hedging

reserve and the cost of hedging reserve is reclassified to profit or loss in the same period

or periods during which thehedged expected future cashflows affect profit or loss.If the hedge no longermeets the criteria for hedgeaccounting or the hedginginstrument is sold, expires,

is terminated or is exercised, then hedge accounting is

discontinued prospectively.When hedge accountingfor cash flow hedges isdiscontinued, the amount thathas been accumulated in thehedging reserve remains in

equity until, for a hedge of a transaction resulting in the

recognition of a non-financial item, it is included in the

non-financial item’s cost on

its initial recognition or, for other cash flow hedges, it is

reclassified to profit or loss in the same period or periods

as the hedged expected futurecash flows affect profit orloss.If the hedged future cashflows are no longer expectedto occur, then the amountsthat have been accumulatedin the hedging reserve andthe cost of hedging reserve

are immediately reclassified to profit or loss.

3.7 IMPAIRMENT

(i) Non-derivative financial

assetsFinancial instruments andcontract assetsThe Group recognises lossallowances for ECLs on:

• financial assets measured at amortised cost;

• debt investments measured

at FVOCI; and

• contract assets.

The Group also recognisesloss allowances for ECLs onlease receivables, which are

disclosed as part of trade and other receivables.

The Group measures lossallowances at an amount equal

to lifetime ECLs, except for the following, which are measured

at 12-month ECLs:

• debt securities that are

determined to have lowcredit risk at the reportingdate; and

• other debt securities and

bank balances for whichcredit risk (i.e. the risk ofdefault occurring over the

expected life of the financial instrument) has not

increased significantly sinceinitial recognition.Loss allowances for tradereceivables (including leasereceivables) and contractassets are always measured atan amount equal to lifetimeECLs.When determining whether the

credit risk of a financial asset has increased significantly since initial recognition and when estimating ECLs, the Group considers

reasonable and supportable

information that is relevant and available without undue cost

or effort. This includes bothquantitative and qualitative

information and analysis, based on the Group’s historical experience and informed credit assessment, that includes forward-looking

information.The Group assumes that thecredit risk on a financial asset

Page 56

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 56

has increased significantly if it is more than 360 days past

due.

The Group considers the credit risk on the investments in

government bonds and bankdeposits to be low at the

reporting date, as these financial assets have low risk of default, the borrowers have strong capacity to meet their contractual cash flow obligations in the near term and adverse changes in economic and business conditions in

the longer term may, but willnot necessarily, reduce theability of the borrower to

fulfil its contractual cash flow obligations.

Lifetime ECLs are the ECLs that result from all possible default events over the expected life

of a financial instrument.12-month ECLs are theportion of ECLs that resultfrom default events that arepossible within the 12 months

after the reporting date (or a shorter period if the expected life of the instrument is less than 12 months).

The maximum periodconsidered when estimatingECLs is the maximumcontractual period over which

the Group is exposed to credit risk.

Measurement of ECLsThe Group assesses on aforward-looking basis the

expected credit losses (“ECL”) associated with its debt

instrument assets carried atamortised cost. The Group

recognises a loss allowance for such losses at each reporting

date. The measurement of ECLreflects:

• An unbiased and probability-weighted amount that is

determined by evaluating arange of possible outcomes;

• The time value of resources; and

• Reasonable and supportable

information that is availablewithout undue cost oreffort at the reporting dateabout past events, currentconditions and forecasts offuture economic conditions.

Credit-impaired financial assets At each reporting date, the

Group assesses whether financial assets carried at amortised cost and debt securities at FVOCI

are credit-impaired. A financial asset is ‘credit-impaired’ when one or more events that have

a detrimental impact on the

estimated future cash flows of the financial asset have occurred.

Evidence that a financial asset is credit-impaired includes the following observable data:

• significant financial difficulty of the debtor;

• a breach of a contract such

as default or being morethan 360 days past due,except for receivables fromgovernment entities;

• the restructuring of a loan

or advance by the Group onterms that the Group wouldnot consider otherwise;

• it is probable that the debtor will enter bankruptcy or other financial reorganisation; or

• the disappearance of an

active market for a securitybecause of financialdifficulties.Presentation of allowancefor ECL in the consolidated

statement of financial position Loss allowances for financial

assets measured at amortisedcost are deducted from thegross carrying amount of theassets.For debt securities at FVOCI,

the loss allowance is charged to profit or loss and is recognised in OCI.

Write-off

The Group writes off financial assets, in whole or in part,

when it has exhausted all

practical recovery efforts and has concluded that there is

no reasonable expectation of

recovery. Indicators that there is no reasonable expectation of recovery include (i) financial asset has become more than

12 months overdue, (ii)ceasing enforcement activityand (iii) where the Group’s

recovery method is foreclosing on collateral and the value of the collateral is such that there is no reasonable expectation of recovering in full.

The Group may write-offfinancial assets that arestill subject to enforcement

activity. The Group still seeks to recover amounts it is legally owed in full, but which have

been partially written off due to no reasonable expectation

of full recovery.

Page 57

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 57

(ii) Non-financial assets

At each reporting date, theGroup reviews the carryingamounts of its non-financialassets (other than biologicalassets, investment property,inventories, contract assetsand deferred tax assets) to

determine whether there is any indication of impairment. If any such indication exists, then the asset’s recoverable amount is

estimated. Goodwill is testedannually for impairment.

For impairment testing, assets are grouped together into

the smallest group of assetsthat generates cash inflowsfrom continuing use that arelargely independent of thecash inflows of other assetsor CGUs. Goodwill arisingfrom a business combination

is allocated to CGUs or groups of CGUs that are expected to

benefit from the synergies ofthe combination.The recoverable amount of anasset or CGU is the greater

of its value in use and its fair value less costs of disposal.

Value in use is based on theestimated future cash flows,discounted to their present

value using a pre-tax discount rate that reflects current

market assessments of thetime value of money and the

risks specific to the asset or CGU.

An impairment loss isrecognised if the carryingamount of an asset or CGUexceeds its recoverableamount. Impairment losses arerecognised in profit or loss.They are allocated first toreduce the carrying amount ofany goodwill allocated to theCGU, and then to reduce thecarrying amounts of the otherassets in the CGU on a prorata basis.An impairment loss in respect

of goodwill is not reversed. For other assets, an impairment

loss is reversed only to the

extent that the asset’s carrying amount does not exceed the

carrying amount that wouldhave been determined, net ofdepreciation or amortisation,

if no impairment loss had been recognised.

The Group’s impairmentcalculation is based ondetailed budgets and forecast

calculations which are prepared separately for each of the

Group’s cash-generating units

(“CGU”) to which the individual asset is allocated. Impairment losses of continuing operations are recognised in profit or loss in those expense categories

consistent with the function of the impaired asset.

3.8 LEASES

At inception of a contract,the Group assesses whether a

contract is, or contains, a lease.

A contract is, or contains, alease if the contract conveysthe right to control the useof an identified asset for a

period of time in exchange for consideration.

(i) As a lessee

At commencement or on

modification of a contract that contains a lease component,

the Group allocates theconsideration in the contractto each lease component on

the basis of its relative stand-alone prices. However, for the leases of property the Group

has elected not to separatenon-lease components and

account for the lease and non-lease components as a single

lease component.The Group recognises a right-

of-use asset and a lease liability at the lease commencement

date. The right-of-use asset

is initially measured at cost, which comprises the initial

amount of the lease liabilityadjusted for any leasepayments made at or beforethe commencement date, plus

any initial direct costs incurred and an estimate of costs to

dismantle and remove the

underlying asset or to restore the underlying asset or the

site on which it is located, less any lease incentives received.

The right-of-use asset issubsequently depreciated

using the straight-line method from the commencement date

to the end of the lease term,unless the lease transfersownership of the underlyingasset to the Group by the end

of the lease term or the cost of the right-of-use asset reflects that the Group will exercise

a purchase option. In thatcase the right-of-use assetwill be depreciated over theuseful life of the underlyingasset, which is determinedon the same basis as thoseof property and equipment.In addition, the right-of-useasset is periodically reducedby impairment losses, if any,and adjusted for certainremeasurements of the leaseliability.

Page 58

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 58

The lease liability is initially measured at the present value

of the lease payments that are not paid at the commencement

date, discounted using theinterest rate implicit in thelease or, if that rate cannotbe readily determined, theGroup’s incremental borrowing

rate. Generally, the Group uses its incremental borrowing rate as the discount rate.

The Group determines itsincremental borrowing rate byobtaining interest rates fromvarious external financingsources and makes certainadjustments to reflect the

terms of the lease and type of the asset leased.

Lease payments included inthe measurement of the lease

liability comprise the following:

• fixed payments, including in-substance fixed payments;

• variable lease payments that depend on an index or a

rate, initially measured using the index or rate as at the

commencement date;

• amounts expected to be

payable under a residualvalue guarantee; and

• the exercise price under a

purchase option that the

Group is reasonably certain to exercise, lease payments in an optional renewal period if the Group is reasonably certain

to exercise an extension

option, and penalties for early termination of a lease unless

the Group is reasonably

certain not to terminate early.

The lease liability is measured at amortised cost using the

effective interest method.It is remeasured when thereis a change in future leasepayments arising from a

change in an index or rate, if there is a change in the Group’s estimate of the amount

expected to be payable under a residual value guarantee, if the Group changes its assessment

of whether it will exercisea purchase, extension or

termination option or if there is a revised in-substance fixed lease payment.

When the lease liability isremeasured in this way, acorresponding adjustment ismade to the carrying amount

of the right-of-use asset, or is recorded in profit or loss if the carrying amount of the right-

of-use asset has been reducedto zero.The Group presents right-of-use assets that do not meetthe definition of investment

property in ‘property, plant and equipment’ and lease liabilities in ‘loans and borrowings’ in

the consolidated statement offinancial position.

Short-term leases and leases of low-value assets

The Group has elected notto recognise right-of-use

assets and lease liabilities for leases of low-value assets and short-term leases, including

IT equipment. The Grouprecognises the lease payments

associated with these leases as an expense on a straight-line

basis over the lease term.

(ii) As a lessor

At inception or on modification of a contract that contains a

lease component, the Groupallocates the considerationin the contract to each leasecomponent on the basis oftheir relative standaloneprices.When the Group acts as a

lessor, it determines at lease inception whether each lease is a finance lease or an operating lease.

To classify each lease, the Group makes an overall assessment

of whether the lease transfers substantially all of the risks and rewards incidental to ownership of the underlying asset. If this is the case, then the lease is a finance lease; if not, then it is an operating lease. As part of this assessment, the Group

considers certain indicators

such as whether the lease is for the major part of the economic life of the asset.

When the Group is an

intermediate lessor, it accounts for its interests in the head

lease and the sub-lease

separately. It assesses the lease classification of a sub-lease

with reference to the right-of-use asset arising from the head lease, not with reference to

the underlying asset. If a head lease is a short-term lease to which the Group applies the

exemption described above,

then it classifies the sub-lease as an operating lease.

If an arrangement containslease and non-leasecomponents, then the Group

Page 59

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 59

applies IFRS 15 to allocate the consideration in the contract.

The Group applies thederecognition and impairmentrequirements in IFRS 9 tothe net investment in thelease. The Group furtherregularly reviews estimatedunguaranteed residual valuesused in calculating the grossinvestment in the lease.The Group recognises leasepayments received underoperating leases as income on

a straight line basis over the lease term as part of ‘other

revenue’.

3.9 INVENTORIES

Inventories compriseconsumables and repair sparesand operating stock of fuel.

Inventories are measured at the lower of cost and net realisable value. The cost of inventories is based on the weighted

average principle. Cost

comprises of direct materials, and where applicable, direct

labour and those overheadsthat have been incurred inbringing the inventories totheir present location andcondition. Net realisable

value is the estimated selling price in the ordinary course

of business, less applicableselling expenses.

3.10 BORROWING

COSTSBorrowing costs consists of

interest and other costs that the Group incurs in connection with the borrowing of funds. General and specific borrowing costs

that are directly attributable to the acquisition, construction or production of a qualifying

asset are capitalised during the period of time that is required to complete and prepare the

asset for its intended use orsale. Qualifying assets are

assets that necessarily take a substantial period of time to get ready for their intended use or sale. The Group has determined the substantial period to be

greater than 1 year.Investment income earned onthe temporary investment ofspecific borrowings pending

their expenditure on qualifying assets is deducted from the

borrowing costs eligible forcapitalisation.Other borrowing costs areexpensed in the year in whichthey are incurred.

3.11 TRADE

RECEIVABLESTrade receivables comprise oftrade receivables, due fromrelated parties and accrued

revenue. Trade receivables are amounts due from customers

for goods sold or servicesprovided in the ordinarycourse of business. Tradereceivables are recognised

initially at fair value, which is the original invoice amount,

and subsequently measuredat amortised cost using the

effective interest method, less provision for impairment.

Trade receivables are impaired as per the policy explained

in notes 3.7 and 13 tothe consolidated financialstatements which is incompliance with requirementsof IFRS 9.The carrying amount of anasset is reduced through theuse of an allowance account,and the amount of the loss isrecognised in profit or loss.When a trade receivable isuncollectible, it is writtenoff against the allowance

account for trade receivables.

Subsequent recoveries of

amounts previously written off are credited in profit or loss.

3.12 CASH AND CASH

EQUIVALENTSCash and cash equivalentscomprise of cash in hand,

current and call accounts with the banks and other institutions and term deposits held with

banks. Term deposits with

banks with remaining maturities greater than twelve months are disclosed as non-current assets.

Bank overdrafts are shownwithin borrowings in current

liabilities in the consolidated statement of financial position.

For the purposes of presentation in the consolidated statement

of cash flows, cash and cashequivalents include cash in

hand, deposits held at current and call accounts with banks,

other short term highly liquid investments with original

maturities of three months orless and bank overdrafts.

Page 60

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 60

3.13 ADVANCE

RECEIVEDFOR NEWCONNECTIONSAND SECURITYDEPOSITS

(a) Advances for new

connectionsThe Group receives amountsfrom customers for

construction and installation of equipment. These amounts are

classified as advances received for new connections until the

construction or installation of the equipment is completed.

On completion, these amountsare transferred from advancesreceived for new connectionsto deferred revenue underliabilities.Management estimates the

current portion of the advances for new connections based

on historical experience and

anticipated installations. The remaining amounts are classified as non-current liabilities.

(b) Security deposits

The Group receives securitydeposits against electricityand water connectionsfrom its customers. These

deposits are refundable to the customers only at the time

of disconnection. The Group

classifies all amounts received as security deposits as current liabilities as these amounts are repayable to the customer on

demand upon disconnection.

3.14 DEFERRED

REVENUEDeferred revenue representsamounts transferred fromadvances for new connectionsupon completion of

construction and installation of equipment. Deferred revenue

is amortised and recognised in the statement of profit or loss on a straight-line basis over

the estimated useful life of the related equipment. Deferred

revenue also includes the

assets taken over by the Group at free of cost.

3.15 BORROWINGS

Borrowings are recognised

initially at fair value, net of transaction costs incurred.

Borrowings are subsequentlystated at amortised cost;any difference between theproceeds (net of transactioncosts) and the redemptionvalue is recognised in profit

or loss over the period of the borrowings using the effective interest method. Borrowings

are classified as current

liabilities unless the Group has an unconditional right to defer settlement of the liability for at least 12 months after the

reporting date.

Fees paid on the establishment of loan facilities are recognised as transaction costs of the

loan to the extent that it isprobable that some or all of

the facility will be drawn down.

In this case the fee is deferred until the draw down occurs. To the extent there is no evidence that it is probable that some or all of the facility will be drawn down, the fee is capitalised as a pre-payment for liquidity

services and amortised over the period of the facility to which it relates.

Financial liabilities arederecognised when theyare extinguished (i.e. whenthe obligation specified inthe contract is discharged,cancelled or expires).

3.16 EMPLOYEE

BENEFITSShort-term employee benefitsShort-term employee benefitsare expensed as the related

service is provided. A liability is recognised for the amount

expected to be paid if theGroup has a present legal or

constructive obligation to pay this amount as a result of

past service provided by theemployee and the obligationcan be estimated reliably.Liabilities for wages andsalaries, including non-monetary benefits andaccumulating leave that areexpected to be settled whollywithin 12 months after the

end of the period in which the employees render the related

service are recognised in

respect of employees’ services up to the end of the reporting period and are measured at

the amounts expected to bepaid when the liabilities aresettled. The liabilities are

presented as current liability in the consolidated statement

of financial position.Post-employment obligations

(a) Defined benefit plan

Pension obligations for UAEnationals retired before 1January 2003The Group operates a defined

benefit pension plan for eligible UAE national employees

Page 61

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 61

retired before 1 January 2003.

The cost of providing pensions is charged to profit or loss.

Post-employment benefitobligations for eligibleexpatriatesThe Group operates a defined

benefit payment plan for eligible expatriates and specific UAE

national employees in accordance with the Dubai Government

Human Resource ManagementLaw No. 27 of 2006.The Group’s net obligationin respect of defined benefit

plans is calculated separately for each plan by estimating

the amount of future benefitthat employees have earned in

the current and prior periods, discounting that amount and

deducting the fair value of any plan assets, as applicable.

The net benefit obligation isdetermined by discountingthe estimated future cash

outflows using interest rates of high-quality corporate bonds

that are denominated in the

currency in which the benefits will be paid, and that have

terms approximating to the

terms of the related obligation.

In countries where there is no deep market for such bonds,

the market rates on government bonds are used.

The calculation of defined benefit obligations is performed annually by a qualified actuary using the projected unit credit method.

When the calculation resultsin a potential asset for the

Group, the recognised asset is limited to the present value of economic benefits available in the form of any future refunds from the plan or reductions

in future contributions to the plan, as applicable.

To calculate the presentvalue of economic benefits,consideration is given to anyapplicable minimum fundingrequirements.Remeasurements of the net

defined benefit liability, which comprise actuarial gains and

losses, the return on plan

assets (excluding interest) and the effect of the asset ceiling (if any, excluding interest),

as applicable, are recognisedimmediately in OCI.The Group determines the netinterest expense (income) on

the net defined benefit liability (asset) for the period by

applying the discount rate used to measure the defined benefit obligation at the beginning of the annual period to the then-net

defined benefit liability (asset), taking into account any changes in the net defined benefit

liability (asset) during the period as a result of contributions and benefit payments.

Net interest expense and other expenses related to defined

benefit plans are recognised in profit or loss.

When the benefits of a planare changed or when a plan is

curtailed, the resulting change in benefit that relates to past service or the gain or loss

on curtailment is recognised

immediately in profit or loss.

The Group recognises gainsand losses on the settlement

of a defined benefit plan when the settlement occurs.

(b) Defined contribution plan

Pension obligations for UAEnational from 1 January 2003Effective 1 January 2003,the Group joined the pensionscheme operated by theFederal Pension General andSocial Security Group which

is a defined contribution plan.

The Group’s contributions foreligible active UAE nationalemployees are calculated as apercentage of the employees’

salaries and charged to profit or loss, in accordance with

the provisions of Federal LawNo. 7 of 1999 on Pension andSocial Security. The Grouphas no legal or constructiveobligation to pay any furthercontributions.Obligations for contributionsto defined contribution plansare expenses as the relatedservice is provided. Prepaidcontributions are recognised

as an asset to the extent that cash refund or a reduction in

future payments is available.

3.17 TRADE AND OTHER

PAYABLESThese amounts representliabilities for goods and

services provided to the Group prior to the end of financial

year which are unpaid. Theamounts are unsecured andare usually paid within 30to 60 days of recognition.Trade and other payables are

presented as current liabilities unless payment is not due

within twelve months afterthe reporting year. Trade andother payables are recognisedinitially at their fair valueand subsequently measuredat amortised cost using the

Page 62

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 62

effective interest rate method.

Trade and other payablesare derecognised when theyare extinguished (i.e. whenthe obligation specified inthe contract is discharged,cancelled or expires).

3.18 PROVISIONS

Provisions are recognised when the Group has a present legal or constructive obligation as a result of past events, it is probable that an outflow of resources will be required to settle the obligation, and the amount has been reliably estimated.

Provisions are not recognised for future operating losses.

Where there are a numberof similar obligations, the

likelihood that an outflow will be required in settlement is

determined by considering the

class of obligations as a whole.

A provision is recognised even if the likelihood of an outflow with respect to any one item

included in the same class ofobligations may be small.Provisions are determinedby discounting the expectedfuture cash flows at a pre-

tax rate that reflects current market assessments of the

time value of money and the

risks specific to the liability.

The unwinding of the discount

is recognised in profit or loss.

3.19 DIVIDENDS

Provision is made for the amount of any dividend declared, being appropriately authorised and

no longer at the discretion of the Group, on or before the

end of the reporting period

but not distributed at the end of the reporting period. Non-

cash distributions are measured at the fair value of the assets to be distributed with fair

value measurement recogniseddirectly in equity.

3.20 CAPITAL

CONTRIBUTION(PREVIOUSLYGOVERNMENT OFDUBAI ACCOUNT)Amounts contributed to the

Authority by the Government of Dubai to finance the activities of the Authority are classified as equity. There is no contractual obligation for the Authority to pay these funds back to the

Government of Dubai. Increasein the Capital contribution(previously Government ofDubai account) is generally

additional contributions either monetary or non-monetary.

Non-monetary contributionsare measured at fair value.

On initial recognition the fair value of plots of land transferred as per order of the Ruler of

Dubai had been determinedby the management based onvalue derived from valuation

certificates obtained from the Land Department of Dubai. The

fair value measurement had been categorised as a Level 3 fair

value based on the inputs to the valuation techniques used. Refer note 8 (b).

3.21 GENERAL

RESERVE/ RETAINEDEARNINGGeneral reserve represents

surplus distributable profit of the Group. The transfer to

general reserve is determinedbased on the profit for theyear after deducting cash andnon-cash distributions. Refernote 17 (d).

3.22 STATUTORY

RESERVE

In accordance with Article 241 of the UAE Federal Commercial

Companies Law, a minimum of10% of the net profit of the

Authority and the subsidiaries that fall under the definition of UAE Federal Commercial

Companies Law, are allocated

each year to a non-distributable legal reserve. Such allocations may cease when the legal

reserve equals half of thenominal value of the paid up

share capital. This reserve is not available for distribution except as stipulated by law.

Refer note 17 (b).

Page 63

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 63

3.23 REVENUE FROM CONTRACTS WITH CUSTOMERS

The Group recognises revenue from contracts with customers based on a five-step model as set out in IFRS 15:

StepStepStepStepStep

Identify the contract(s) with a customer: A contract is defined as an agreement between two or more parties that creates enforceable rights and obligations and sets out the criteria for every contract that must be met.

Identify the performance obligations in the contract: A performance obligation is a promise in a contract with a customer to transfer a good or service to the customer.

Determine the transaction price: The transaction price is the amount of consideration to which the Group expects to be entitled in exchange for transferring promised goods or services to a customer, excluding amounts collected on behalf of third parties.

Allocate the transaction price to the performance obligations in the contract:

For a contract that has more than one performance obligation, the Group will allocate the transaction price to each performance obligation in an amount that depicts the amount of consideration to which the Group expects to be entitled in exchange for satisfying each performance obligation.

Recognise revenue when (or as) the entity satisfies a performance obligation.

The Group satisfies a performanceobligation and recognises revenueover time, if one of the followingcriteria is met:

(a) The customer simultaneously receives and consumes the

benefits provided by theGroup’s performance as theGroup performs; or

(b) The Group’s performance

creates or enhances an assetthat the customer controlsas the asset is created orenhanced; or

(c) The Group’s performance

does not create an asset withan alternative use to theGroup and the entity has anenforceable right to paymentfor performance completedto date.For performance obligationswhere one of the above

conditions are not met, revenue is recognised at the point in

time at which the performanceobligation is satisfied.Revenue comprises the fair

value of consideration received or receivable for the sales of goods and services in the

ordinary course of Group’s

activities and is shown net of discounts and allowances.

The Group recognises revenuewhen the amount of revenue

can be reliably measured; it is probable that future economic

benefits will flow to the Group and when specific criteria have been met for each of the Group’s activities, as described below:

Page 64

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 64

(a) Supply of electricity and

waterRevenue from the supplyof electricity and water isrecognised on the basis of

electricity and water supplied during the period on an

accruals basis with reference to meter readings. A management

estimate is included for thevalue of units supplied tocustomers between the dateof their last meter readingand the accounting period

end. The estimate is calculated using historical consumption

patterns and is included in

trade and other receivables as accrued revenue.

(b) District cooling services

Demand and consumptioncharges revenue comprises of

available capacity and variable output provided to customers

and is recognized when services are provided.

Energy transfer station (ETS)

service charges relates to services provided for ETS at customers’ buildings and are recognized at the time services are rendered.

Connection charges revenuerelates to connecting theindividual customer units and

is recognized over the period of providing district cooling services.

Other revenue comprises

services that are recognized as and when services are rendered..

(c) Meter rental

Meter rental income is

recognised on a time proportion basis over the period during

which the meter is provided to the customer.

(d) Interest income

Interest income is recognisedon a time-proportion basisusing the effective interestrate method.

(e) Dividends

Dividends are recognised as

other income when the right to receive payment is established.

(f) Amortisation of deferred

revenue

Deferred revenue is amortised and recognised as income on a straight line basis over the estimate useful life of the related equipment. Refer notes 3.13 and 3.14.

(g) Other services

Revenue from otherservices include handlingcharges, reconnection anddisconnection charges,which are recognised in the

accounting period in which the services are rendered.

3.24 INVESTMENT

PROPERTIES

Investment properties comprise building under construction

and land held with the intention to earn rentals or for capital appreciation or both. Investment properties other than building under construction and land,

are stated at cost net ofaccumulated depreciation and/or accumulated impairment

losses. Cost is defined either as cost of construction/

acquisition or deemed cost,

being the fair value determined by the experienced valuer at the date of recognition of the asset within investment properties,

less accumulated depreciationand impairment losses.Transfers are made to or frominvestment property only whenthere is a change in use. Fora transfer from investmentproperty to owner occupiedproperty, the deemed costfor subsequent accounting isin accordance with the policystated under property, plantand equipment at the date of

change in use. If owner occupied property becomes an investment property, the Group accounts for such property in accordance with the policy stated under property, plant and equipment up to the

date of change in use.

When the development of investment property commences, it is classified under capital work-in-progress until development is complete, at which time it is transferred to the respective category and depreciated using the straight- line method at rates calculated to reduce the cost of assets to their estimated residual values over their expected useful lives.

Land is not depreciated.

Expenditure towards preparation of land for development is added to land value.

Capital work-in-progressis stated at cost less any

impairment in value. It includes construction, administrative,

borrowing costs and other

costs directly attributable to the development of the project.

3.25 FOREIGN

CURRENCYTRANSLATIONS

(a) Functional and presentation currency

These consolidated financialstatements are presented in

Page 65

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 65UAE Dirhams (AED), whichis the Group’s functionalcurrency. All amounts havebeen rounded to the nearestthousand, unless otherwiseindicated. Subsidiaries andjoint ventures determinetheir own functional currencyand items included in thefinancial statements of thesecompanies are measured usingthat functional currency.

(b) Transactions and balances

Transactions in foreign

currencies are translated into the respective functional

currency of group companiesat the exchange rates at thedates of the transactions.

Monetary assets and liabilities denominated in foreign currencies are translated into the functional currency at the exchange rate

at the reporting date. Non-

monetary assets and liabilities that are measured at fair value in a foreign currency are translated into the functional currency at the exchange rate when the fair value was determined. Non-monetary

items that are measured based on historical cost in a foreign currency are translated at the exchange rate at the date of the transaction.

Foreign currency differences are generally recognised in profit or loss and presented within finance costs.

However, foreign currencydifferences arising from thetranslation of the followingitems are recognised in OCI:

• an investment in equity

securities designatedas at FVOCI (except onimpairment, in which caseforeign currency differencesthat have been recognised in

OCI are reclassified to profit or loss);

• a financial liability designated as a hedge of the net

investment in a foreignoperation to the extent thatthe hedge is effective; and

• qualifying cash flow hedges

to the extent that the hedgesare effective.

3.26 REGULATORY

DEFERRALACCOUNTThe Group has been allowedby the Dubai Supreme Councilof Energy (the “regulator”)to bill the increase in fuelprices considering 2010 asthe base year. Regulatorydeferral account balancearises on account of amountsbilled to and collected fromcustomers as fuel surchargein excess/short of amounts

to be billed to customers. The deferral account is deferred

and adjusted against the next

change in tariff approved by the regulator. Regulatory deferral account is not described as a

liability/asset for the purposes of the Group’s consolidated

financial statements and isdisclosed as a separate lineitem in the consolidated

statement of financial position.

3.27 FAIR VALUE

MEASUREMENT

Fair value is the price that would be received to sell an asset or paid to transfer a liability in an orderly transaction between market

participants at the measurement date in the principal or, in its absence, the most advantageous market to which the Group has

access at that date. The fair

value of a liability reflects its non-performance risk.

A number of the Group’saccounting policies anddisclosures require themeasurement of fair values,for both financial and non-

financial assets and liabilities.

The Group uses valuationtechniques that maximise theuse of relevant observable

inputs and minimise the use of unobservable inputs. The chosen valuation technique incorporates all of the factors that market participants would take into

account in pricing a transaction.

The best evidence of the fair

value of a financial instrument on initial recognition is normally the transaction price - i.e. the fair value of the consideration given or received. If the Group determines that the fair value on initial recognition differs from the transaction price

and the fair value is evidenced neither by a quoted price in an active market for an identical asset or liability nor based on a valuation technique for which any unobservable inputs are

judged to be insignificant inrelation to the measurement,

then the financial instrument is initially measured at fair value, adjusted to defer the difference between the fair value on initial recognition and the transaction price. Subsequently, that

difference is recognised in profit or loss on an appropriate basis over the life of the instrument but no later than when the

valuation is wholly supported by observable market data or the

transaction is closed out.

Page 66

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 66

4. FINANCIAL

RISK MANAGEMENT

4.1 FINANCIAL RISK

FACTORSRisk Management Framework

The Group’s board of directors has overall responsibility for the establishment and oversight of the Group’s risk management

framework. The board of

directors has established the risk management committee, which

is responsible for developingand monitoring the Group’srisk management policies. The

committee reports regularly to the board of directors on its activities.

The Board of the Directors have overall responsibility for the establishment and oversight of the Group’s risk management

framework. The Group’s riskmanagement policies are

established to identify and analyse the risks faced by the Group, to set appropriate risk limits and controls, and to monitor risks and adherence to limits. Risk

management policies and systems are reviewed regularly to reflect changes in market conditions

and products offered. The Group, through its management standards and procedures, aims to develop a disciplined and constructive control environment, in which all employees understand their roles and obligations. The Board of

Directors review and agree policies for managing each of these risks which are summarised below.

The Group has exposure to

the following risks arising from financial instruments:

Credit Risk Liquidity Risk Market Risk (i) Credit Risk

Credit risk is the risk of financial loss to the Group if a customer or counterparty to a financial instrument fails to meet its

contractual obligations, and

arises principally from the Group’s receivables from customers, other financial assets at amortised cost and investments in debt securities.

The carrying amounts of financial assets represent the maximum

credit exposure. Impairment losses on financial assets and contract assets recognised in profit or loss were as follows:

2022 2021AED’000 AED’000144,529 77,870Impairment loss on tradereceivables (refer note 13)

(a) Trade Receivables

The Group’s credit risk isprimarily attributable to its

trade receivables. The amounts presented in the consolidated

statement of financial position are net of provision for impairment of receivables.

The Group has a wide customer

base in the Emirate of Dubai and services commercial, industrial and governmental organisations as well as residential customers including UAE nationals and

expatriates. Carrying amount of trade receivables best represent the maximum exposure to credit risk at the end of each reporting period presented.

The Group taking intoconsideration the exposure to

the customer, when appropriate, manages credit risk by requesting additional deposits, disconnection of services and implementing

payment plans for customers in arrears.

Due to large and diversified

customer base, concentration of credit risk on few customers is limited.

Page 67

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 67As at 31 December 2022Expected LossRateGross CarryingAmount Loss Allowance Credit ImpairedAED’000 AED’000Current 0.91% 2,202,998 19,994 NoMore than 30 days past due 2.09% 594,132 12,425 NoMore than 60 days past due 8.21% 346,025 28,425 NoMore than 120 days past due 19.48% 535,067 104,248 NoMore than 360 days past due 36.54% 1,100,186 401,981 Yes4,778,408 567,073As at 31 December 2021Expected LossRateGross CarryingAmount Loss Allowance Credit ImpairedAED’000 AED’000Current 0.80% 1,906,075 15,304 NoMore than 30 days past due 3.39% 521,091 17,656 NoMore than 60 days past due 8.44% 351,882 29,705 NoMore than 120 days past due 17.51% 504,025 88,249 NoMore than 360 days past due 27.46% 989,048 271,630 Yes4,272,121 422,544Expected credit lossassessment for customersThe Group uses an allowancematrix to measure the ECLs of

fee receivables from customers.

Loss rates are calculated using “roll rate” method based on

the profitability of a receivable progressing through successive stages of delinquency to write off.

Roll rates are calculated separately to exposures in different segments based on common credit risks

characteristics.

The Group considers the credit risk on the outstanding balances from government customers to

be low at the reporting date, as these financial assets have low risk of default, the counterparties have strong capacity to meet

their contractual cash flow

obligations in the near term and adverse changes in economic

and business conditions inthe longer term may, but willnot necessarily, reduce the

ability of the counterparties to fulfil its contractual cash flow obligations.

To measure the expected credit losses, trade receivables and

accrued revenue have beengrouped together based on its

shared credit risk characteristics and the days past due. Accrued revenue has substantially the

same risk characteristics as the trade receivables and therefore concluded that the expected loss rates for trade receivables and accrued revenue are a reasonable approximation of the loss rates for the contract assets.

The following table provides

information about the exposure to credit risk and ECLs for trade receivables and contract assets from individual customers for

2022 and 2021:

Page 68

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 68

(b) Other financial assets

With respect to credit risk arising from the other financial assets of the Group, which comprise cash and cash equivalents, other financial assets and due from related parties, the Group’s exposure to credit risk arises from default of the counter party, with a maximum exposure equal to the carrying amount of these instruments.

The Group limits its credit risks with regard to bank deposits by dealing only with reputable banks.

Other financial assets include investments in UAE National bonds which are unrated and other receivables are held with reputed counter parties which management do not expect any loss from their non-performance.

Where non-performance is identified or expected a provision is made.

Balances due from related parties are held with reputed counter parties and management do not expect any loss from their non-performance.

Where non-performance is identified or expected a provision is made.

(c) Cash and cash equivalents

The Group held cash and cash equivalents of AED 5,287 million as at 31 December 2022 (2021: AED 4,406 million). The cash and cash equivalents are held with bank and financial institution counterparties and other government agencies having credit rating as detailed below:

(d) Derivatives

The derivatives are entered into with bank and financial institution counter parties, which are related to AA- to AA+ based on Fitch ratings..

As determined by Moody’s

20222021

AED’000AED’000

A3,807,9184,150,066

B1,478,888255,661

C42-

Unrated (including cash in hand)567437

5,287,4154,406,164

All other financial assets areunrated.Refer note 31.

(ii) Liquidity risk

Liquidity risk is the risk that the Group will encounter difficulty in meeting financial obligations due to shortage of funds. The Group’s exposure to liquidity risk arises primarily from mismatches of the maturities of financial assets and liabilities.

The Group’s approach to

managing liquidity is to ensure, as far as possible, that it will always have sufficient liquidity to meet its liabilities when due, under both normal and stressed conditions, without incurring unacceptable losses or risking damage to the Group’s reputation.

In the management of liquidity risk, the Group monitors and

maintains a level of cash and cash equivalents, deemed adequate

by management to finance the

Group’s operations and mitigate the effects of fluctuations in cash flows. The Group monitors its

risk of shortage of funds using cash flow budgeting in which it considers both the cash outflows as well as their sources of funding.

The following are the remaining contractual maturities of financial liabilities at the reporting date. The amounts are gross and undiscounted, and include contractual interest payments and exclude the impact of netting agreements:

Page 69

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 69Less Than 1Year 1 to 2 Years Over 2Years Total CarryingAmount

AED’000AED’000AED’000AED’000AED’000

Non-derivative financialliabilities31 December 2022

Secured borrowings4,125,6975,315,29540,699,79950,140,79127,359,623

Unsecured borrowings804,069238,94913,146,14714,189,16513,330,206

Trade and other payables**11,980,629--11,980,62911,980,629

Other long-term liabilities**-365,888493,372859,260806,220

Lease liabilities12,88413,77913,10739,77036,412

16,923,2795,933,91154,352,42577,209,61553,513,090

Less than 1

year 1 to 2 years Over 2 years Total Carrying amount

AED’000AED’000AED’000AED’000AED’000

Non-derivative financialliabilities31 December 2021

Secured borrowings2,571,1421,130,33827,363,34831,064,82823,980,793

Unsecured borrowings1,465,147224,6601,145,3522,835,1592,775,077

Trade and other payables**11,696,524--11,696,52411,696,524

Other long-term liabilities**-443,803452,290896,093876,234

Lease liabilities3,0131,64510,29414,95214,952

15,735,8261,800,44628,971,28446,507,55639,343,580

** These do not include advances for new connections, deferred revenue and retirement benefits obligations as these are non-financial liabilities.

Less than 1year 1 to 2 years Over 2years Total Carryingamount

AED’000AED’000AED’000AED’000AED’000

Derivative financial liabilities 31 December 2022

Interest rate swaps used for

hedging--4,5784,5784,578

Less than 1

year 1 to 2 years Over 2 years Total Carrying

amount

AED’000AED’000AED’000AED’000AED’000

Derivative financial liabilities 31 December 2021

Interest rate swaps used for

hedging220,944357,0031,838,1802,416,1272,416,127

Refer notes 31 and 32.

Page 70

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 70

(iii) Market risk

Market risk is the risk that changes in market prices – e.g. foreign exchange rates, interest rates and equity prices – will affect the Group’s income or the value of its holdings of financial instruments.

The objective of market riskmanagement is to manage andcontrol market risk exposureswithin acceptable parameters,while optimising the return.

(a) Foreign exchange risk

Currency risk arises on recognised assets or liabilities that are primarily denominated in a

currency that is not the Group’s functional currency. The Group has no significant exposure to this risk as the majority of its transactions are denominated is AED, or in

currencies AED is pegged with. The Group has certain transactions in foreign currencies, mainly in Euros.

However, the foreign currency

exposure arising out of foreign currency denominated balances as at 31 December 2022 and 2021

are not material.

(b) Price risk

Price risk is the risk that the value of a financial instrument will fluctuate as a result of changes in market prices, whether these changes

are caused by factors specific to the individual instrument or its issuers or factors affecting all the instruments traded in the market.

Hence, the Group has no exposure to price risk as there is no price sensitive financial instruments.

(c) Cash flow and fair value

interest rate riskThe Group’s interest rate riskarises from long term borrowings.

The Group is exposed to cash flow interest rate risk on its variable rate borrowings. The Group is not exposed to the fair value interest rate risk as fixed rate borrowings of the Group are carried at amortised cost in these consolidated financial statements.

The variable rate borrowings of the Group are based on LIBOR and EIBOR. The Group has entered into interest rate swaps to mitigate the risk of variable rate borrowings (refer note 32). The table below shows the exposure of Group’s variable and fixed rate borrowings:

20222021

AED’000AED’000

Variable rate borrowings38,247,34423,643,410

Fixed rate borrowings2,442,4853,112,460

40,689,82926,755,870

Profit Or Loss Equity

100 bp100 bp100 bp100 bp

Increase DecreaseIncrease Decrease

AED’000AED’000

31 December2022Variable rate

borrowings(382,473)382,473--

Interest rate

swaps--17,823(17,823)

Cash flow

sensitivity (net)(382,473)382,47317,823(17,823)

31 December2021Variable rate

borrowings(236,434)236,434--

Interest rate

swaps--24,055(24,055)

Cash flow

sensitivity (net)(236,434)236,43424,055(24,055)

Cashflow sensitivity analysis for variable-rate borrowings

A reasonably possible change of 100 basis points in interest rates at the reporting date would have increased (decreased) consolidated equity and consolidated profit or loss by the amounts shown below. This analysis assumes that all other variables, in particular foreign currency exchange rates, remain constant.

Page 71

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 71

Fair value sensitivity analysis for fixed-rate borrowings

The Group does not account for any fixed-rate financial assets or financial liabilities, at FVTPL, and the Group does not designate

derivatives (interest rate swaps) as hedging instruments under a fair value hedge accounting model.

Therefore, a change in interest rates at the reporting date would not affect profit or loss.

A change of 100 basis points in interest rates would have increased or decreased equity by AED 18

million (2021: AED 24 million).

This analysis assumes that all other variables, in particular foreign currency exchange rates, remain constant.

4.2 CAPITAL RISK

MANAGEMENTThe Group monitors andresponds pragmatically to

market conditions and business developments both locally and

internationally, and ensuresadequate funds are availableto meet the needs of itsbusinesses and support soundvalue enhancement objectives.

The Group’s strategic focus is the active management of the

business portfolio in order to deal with its debt service obligations and to enhance the value of the Owner’s equity.

4.3 FAIR VALUE

ESTIMATIONA number of the Group’saccounting policies anddisclosures require the

measurement of fair values, for both financial and non-financial assets and liabilities.

All financial assets and liabilities are initially measured at

transaction price, i.e. the fair value of the consideration given or

received. These financial assets and liabilities are subsequently measured at amortised cost

except the financial assetsat fair value through othercomprehensive income and

derivative financial instruments.

The carrying value of financial assets and financial liabilities approximates their fair value

except derivatives, which are

the only financial instruments which are carried at fair value and fall into level 2 of the fair value hierarchy (refer notes 11 and 32).

When measuring the fair value of an asset or a liability, the Group uses observable market data as far as possible. Fair values are categorised into different levels in a fair value hierarchy based on the inputs used in the valuation techniques as follows:

- Level 1: quoted prices

(unadjusted) in active markets for identical assets or liabilities.

- Level 2: inputs other than

quoted prices included in Level 1 that are observable for the

asset or liability, either directly (i.e. as prices) or indirectly (i.e. derived from prices).

- Level 3: inputs for the asset or liability that are not based on observable market data

(unobservable inputs).

If the inputs used to measure the fair value of an asset or a liability fall into different levels of the fair value hierarchy, then the fair value measurement is categorised in its entirety in the same level of the fair value hierarchy as the lowest level input that is significant to the entire measurement.

The Group recognises transfers between levels of the fair value hierarchy at the end of the

reporting period during which the change has occurred.

Page 72

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 72

5. CRITICAL ACCOUNTING

ESTIMATES & JUDGEMENTS

The preparation of the Group’s consolidated financial statements requires management to make

judgements, estimates andassumptions that affect thereported amounts of revenues,

expenses, assets and liabilities, and the accompanying disclosures, and the disclosure of contingent liabilities. Uncertainty about these assumptions and estimates could result in outcomes that

require a material adjustment to the carrying amount of asset or liability affected in future periods.

5.1 CRITICAL

ACCOUNTINGESTIMATES

(a) Revenue recognition –

unread electricity, water anddistrict cooling meters

Revenue for electricity, water supply and cooling services

includes an assessment of

electricity, water and cooling services supplied to customers between the date of the last

meter reading and the year end (unread). Unread electricity,

water and cooling services

supplied is estimated by using historical consumption patterns of respective customer categories.

Management applies judgement to the measurement of the estimated electricity, water and cooling units supplied to customers and the

valuation such units consumed.

The application of a 5% increase to management estimate of total units for all customer categories, in isolation would result in the increase in revenue and profit by AED 52 million (2021: AED 52

million). The application of a 5% decrease to management estimate of total units for all customer categories, in isolation would result in the decrease in revenue and profit by AED 52 million (2021:

AED 52 million).

(b) Expected credit loss (ECL) assessment

The Group uses an allowancematrix to measure the ECLs of

trade receivables from individual customers, which comprise a very large number of small balances.

Loss rates are calculated using a ‘roll rate’ method based on

the probability of a receivable progressing through successive stages of delinquency. Roll rates are calculated separately for

exposures in different segments based on the following common

credit risk characteristics and age of customer relationship.

The Group reviews its trade

receivables to assess impairment on a regular basis. In determining whether impairment losses

should be reported in profit or loss, the Group makes assessment for expected credit loss for trade receivables.

Exposure within each credit

risk grade is based on customer segments and ECL rate is

calculated for each segment based on actual credit loss experience over the past years. These rates are multiplied by macro-economic factors to reflect the differences between economic conditions

during the period over whichthe historical data has been

collected, current conditions and the Group’s view of economic

conditions over the expected lives of the trade receivables.

Accordingly, an allowance forimpairment is made where

there is an identified loss event or condition which, based on

previous experience, is evidence of a reduction in the recoverability of the cash flows.

The Group’s estimation process for the determination of provision for impairment loss on trade

receivables based on the ECL

model is disclosed in notes 3.7 and 4.1.

5.2 CRITICAL

ACCOUNTINGJUDGEMENTS

(a) Component parts of

property, plant and equipment

The Group’s assets, classified within property, plant and

equipment, are depreciated on

a straight-line basis over their useful lives. When determining the useful life of an asset, it is broken down into significant component

Page 73

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 73

parts such that each significant component part is depreciated

separately. Judgement is required in ascertaining the significant components of a larger asset, and while defining the significance of a component, management

considers quantitative materiality of the component part as well

as qualitative factors such

as difference in useful life as compared to related asset, its pattern of consumption and its replacement cycle/maintenance

schedule.

(b) Determination of control

over certain subsidiaries

The Group has entered into various agreements to establish Shuaa

Energy 1 P.S.C, Hassyan Energy Phase 1 P.S.C, Shuaa Energy 2 P.S.C, Shuaa Energy 3 P.S.C and Noor

Energy 1 P.S.C for construction of power plant and generation of electricity from renewable and non-renewable sources. To determine control over these entities, the Group considers the purpose and design of these entities along with the fact that whether it has the power to govern the financial and operational strategy of the respective entity and whether a significant portion of the entity’s activities are carried on the behalf of the Group.

Management has thereforeconcluded that the relevant

activities of these entities are pre-determined and directed via contractual arrangements in the normal course of business and

consequently has consolidated the results of these entities in these consolidated financial statements.

The Group will continue to

evaluate these circumstances at each reporting date to determine whether this judgement continues to be valid. If the Group determines that it no longer has control over any of these entities, it will be de-consolidate the entities and account for these entities using the equity method from the date that control is deemed to cease.

Page 74

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 74

6. OPERATING SEGMENTS

(i) Basis for Segmentation

The chief operating decision-makers (CODM) have been identified as the Board of Directors of the Group that make all the strategic decisions related to the Group’s activities. The Board of Directors reviews the Group’s internal reporting in order to assess the performance and allocate its resources based on which the operating segments have been determined.

For the Board of Directors, the Group is currently organised into four major operating segments.

Reportable segments OperationsDEWA

DEWA is engaged in the generation, transmission and distribution of electricity and water desalination, transmission and distribution to residential, commercial, industrial and government customers in the Emirate of Dubai.

EMPOWER EMPOWER and its subsidiaries are engaged in the provision of district cooling, maintenance of central cooling plants and manufacturing and sale of insulated pipes.

IPP JEIHL and its subsidiaries are engaged in provide full range of services for the development, operation and maintenance of power and water plants under the independent power producer (IPP) model.

Others The other operations of group include purification and sale of potable water, providing services including IT, and infrastructure, networking and computer system housing services, invest and manage commercial, industrial, retail trade and energy enterprises and implement energy efficiency measures in buildings.

(ii) Information about reportable segments and reconciliations of information on reportable segments to the amount reported in the consolidated financial statements

Information related to each reportable segment is set out below. Segment profit (loss) before tax is used to measure performance because management believes that this information is the most relevant in evaluating the results of the respective segments relative to other entities that operate in the same industries.

a) Segment wise statement of financial position

DEWA EMPOWER IPP Others Eliminations Total31 December 2022 AED’000 AED’000 AED’000 AED’000 AED’000 AED’000Segment assets

Non-current assets132,111,4707,776,10131,016,0602,194,551(14,583,583)158,514,599

Current assets14,825,8581,878,8742,825,2004,133,381(1,429,135)22,234,178

Total assets146,937,3289,654,97533,841,2606,327,932(16,012,718)180,748,777

Segment liabilities

Non-current liabilities47,483,8074,859,94527,933,985135,690(9,254,325)71,159,102

Current liabilities12,059,4061,760,2882,597,0683,237,266(2,540,166)17,113,862

Regulatory deferral account

credit balance95,343----95,343

Total liabilities and regulatory

deferral account credit balance59,638,5566,620,23330,531,0533,372,956(11,794,491)88,368,307

Net segment assets87,298,7723,034,7423,310,2072,954,976(4,218,227)92,380,470

Page 75

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 75DEWA EMPOWER IPP Others Eliminations Total

31 December 2021 AED’000 AED’000 AED’000 AED’000 AED’000 AED’000 Segment assets

Non-current assets131,323,5627,774,28325,372,5131,622,590(13,785,517)152,307,431

Current assets10,250,8731,769,4332,299,8143,924,930(1,144,096)17,100,954

Total assets141,574,4359,543,71627,672,3275,547,520(14,929,613)169,408,385

Segment liabilities

Non-current liabilities38,378,5311,420,19828,596,536113,128(10,402,752)58,105,641

Current liabilities11,648,6582,692,6261,267,7062,640,113(917,091)17,332,012

Regulatory deferral account credit

balance379,024----379,024

Total liabilities and regulatory

deferral account credit balance50,406,2134,112,82429,864,2422,753,241(11,319,843)75,816,677

Net segment assets/(liabilities)91,168,2225,430,892(2,191,915)2,794,279(3,609,770)93,591,708

b) Segment wise statement of profit or loss and other comprehensive income DEWA EMPOWER IPP Others Eliminations Total 31 December 2022

AED’000AED’000AED’000AED’000AED’000AED’000

Revenue25,161,1942,792,5391,134,7221,241,492(2,994,413)27,335,534

Cost of sales(15,624,075)(1,520,576)(719,014)(761,705)2,136,372(16,488,998)

Gross profit9,537,1191,271,963415,708479,787(858,041)10,846,536

Other income4,445,1737,76554,92427,062(4,130,638)404,286

Credit impairment losses(127,834)(17,865)-1,170-(144,529)

Administrative expenses(2,653,090)(209,977)(27,269)(451,265)451,236(2,890,365)

Operating profit11,201,3681,051,886443,36356,754(4,537,443)8,215,928

Finance income251,68935,554249,770131,262(115,743)552,532

Finance costs(603,588)(86,685)(674,665)(29,987)389,160(1,005,765)

Finance (costs)/income – net(351,899)(51,131)(424,895)101,275273,417(453,233)

Net movement in regulatory

deferral account credit balance283,681----283,681

Profit for the year11,133,1501,000,75518,468158,029(4,264,026)8,046,376

Other comprehensive income62,1713,0954,179,416(1,506)-4,243,176

Total comprehensive income for

the year11,195,3211,003,8504,197,884156,523(4,264,026)12,289,552

Page 76

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 76DEWA EMPOWER IPP Others Eliminations Total31 December 2021 AED’000 AED’000 AED’000 AED’000 AED’000 AED’000

Revenue21,745,1932,463,8741,323,519987,816(2,696,434)23,823,968

Cost of sales(14,739,083)(1,394,449)(867,285)(567,905)2,028,935(15,539,787)

Gross profit7,006,1101,069,425456,234419,911(667,499)8,284,181

Other income815,66348,500453,54110,893(406,604)921,993

Credit impairment losses(75,619)(8,568)-(6,097)6,462(83,822)

Adjustment on financial assets(29,876)--29,876-

Administrative expenses(2,704,471)(175,881)(231,906)(378,979)574,792(2,916,445)

Operating profit5,011,807933,476677,86945,728(462,973)6,205,907

Finance income172,45311,633233119,257(138,111)165,465

Finance costs(252,829)(9,127)(358,297)(30,735)268,122(382,866)

Finance (costs)/income – net(80,376)2,506(358,064)88,522130,011(217,401)

Provision for impairment of

investment in a joint venture(4785)----(4785)

Share of profit in a joint venture1,004--(502)-502

Net movement in regulatory

deferral account credit balance569,224----569,224

Profit for the year5,496,874935,982319,805133,748(332,962)6,553,447

Other comprehensive income96,8514601,421,534--1,518,845

Total comprehensive income for

the year5,593,725936,4421,741,339133,748(332,962)8,072,292

c) Other segment information

DEWA EMPOWER IPP Others Eliminations Total

31 December 2022 AED’000 AED’000 AED’000 AED’000 AED’000 AED’000 Capital expenditure (property,

plant and equipment)4,849,905332,8874,767,497169,314-10,119,603

Depreciation (property, plant

and equipment)4,734,106311,807237,33798,332(6,843)5,374,739

DEWA EMPOWER IPP Others Eliminations Total

31 December 2021 AED’000 AED’000 AED’000 AED’000 AED’000 AED’000 Capital expenditure (property,

plant and equipment)6,452,461611,6166,508,077170,674-13,742,828

Depreciation (property, plant and

equipment)4,637,423304,965187,813106,594(5,113)5,231,682

(iii) Geographic information

Majority of the Group›s revenues, profits and assets relate to its operations in Dubai.

Page 77

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 77

7. INTERESTS IN OTHER ENTITIES

7.1 MATERIAL SUBSIDIARIES

The Group’s principal subsidiaries are set out in note 1.

7.2 NON-CONTROLLING INTERESTS

The Group’s material subsidiaries are Jumeirah Energy International Holdings LLC (“JEIHL”) and EMPOWER. JEIHL holds investment in Shuaa Energy 1 P.S.C, Shuaa Energy 2 P.S.C, Shuaa Energy 3 P.S.C, Hassyan Energy Phase 1 P.S.C and Noor Energy 1 P.S.C. Proportion of ownership interests held by non-controlling interest is as follows:

20222021

%%

Shuaa Energy 1 P.S.C4949

Shuaa Energy 2 P.S.C4040

Hassyan Energy Phase 1 P.S.C4949

Noor Energy 1 P.S.C4949

Shuaa Energy 3 P.S.C4040

EMPOWER (refer note1)4430

The summarised financial information for JEIHL and EMPOWER group before inter-company eliminations is as follows:

Summarised statements of financial positionJEIHL EMPOWER

2022202120222021

AED’000AED’000AED’000AED’000

Non-current

Assets31,016,06025,372,5137,776,1017,774,283

Liabilities(27,933,985)(28,596,536)(4,859,945)(1,420,198)

3,082,075(3,224,023)2,916,1566,354,085

Current

Assets2,825,2002,299,8141,878,8741,769,434

Liabilities(2,597,068)(1,267,706)(1,760,288)(2,692,628)

228,1321,032,108118,586(923,194)

Net assets / liabilities(100%)3,310,207(2,191,915)3,034,7425,430,891

Net assets / liabilities attributable

to NCI1,780,488(1,048,884)1,186,8961,655,049

Other non-material subsidiary includes negative net assets attributable to NCI amounting to AED 14,254 thousand (2021 : AED 14,254 thousand).

Page 78

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 78

Summarised statements of profit or loss and other comprehensive income

JEIHL EMPOWER

2022202120222021

AED’000AED’000AED’000AED’000

Revenue1,134,7221,323,5192,792,5392,463,874

Profit for the year18,468319,8051,000,755935,982

Total comprehensive income4,197,8841,741,3391,003,850936,442

Total comprehensive income

allocated to non-controlling interests1,995,076831,074318,023276,658

Dividends paid to non-controlling

interests5,0906,2851,020,00090,300

Total comprehensive loss allocated to non-controlling interest of other non-material subsidiary amounts to AED Nil (2021: AED 2,245 thousand).

Summarised statement of cash flowsJEIHL EMPOWER

2022202120222021

AED’000AED’000AED’000AED’000

Net cash inflow/(outflow) from

operating activities416,619(126,663)1,424,6361,366,206

Net cash outflow from investing

activities(3,495,378)(6,862,547)(195,777)(1,426,124)

Net cash inflow/(outflow) from

financing activities2,835,7747,455,756(1,000,539)236,310

Net (decrease)/increase in cash

and cash equivalents(242,985)466,546228,320176,392

Cash and cash equivalents,

as at 1 January1,519,0861,052,5401,245,5881,069,196

Cash and cash equivalents, as at

31 December1,276,1011,519,0861,473,9081,245,588

Page 79

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 79

7.3 INVESTMENTS ACCOUNTED

FOR USING THE EQUITY METHOD

The entities listed below have share capital solely consisting of ordinary shares, which are held by the Group.

Name of the entity Country ofincorporationEffective %of holdingEffective %of holding

2022202120222021

% %AED’000AED’000

Utility Management LLC UAE5050490490

Etihad Smart Energy Solutions LLC UAE5050150150

640640

All joint ventures are accounted for using the equity method of accounting and are immaterial to the Group individually.

Movement of investments in joint ventures

20222021

AED’000AED’000

At 1 January6405,720

Addition during the year-150

Disposal during the year-(947)

Share of profit from joint ventures-502

Less: provision made during the year-(4,785)

At 31 December640640

During the year, the Group recognised its share of profit from joint ventures amounting to AED Nil (2021: AED 502 thousand).

Page 80

8 PROPERTY, PLANT AND EQUIPMENTLand andbuildingsRight-of-useassetsGeneration anddesalinationplantsTransmissionand distributionnetworksOther equipmentand assetsCapital work inprogress Total

AED’000AED’000AED’000AED’000AED’000AED’000AED’000

Year ended 31 December 2021

Opening net book amount37,410,15119,10428,753,49645,972,583816,17728,027,895140,999,406

Additions693,6101,071263,234666,58370,96412,047,36613,742,828

Transfer to right of use assets-20,069(20,069)----

Reversal of impairment (refer note 8(j))-----32,32832,328

Transfers1,329,622-6,535,2774,375,930255,685(12,496,514)-

Transfers to intangible assets (refer note10)----(453)(66,631)(67,084)

Disposals, net(732)-(204)(2,576)(223)-(3,735)

Depreciation(344,534)(16,388)(2,094,461)(2,438,352)(337,947)-(5,231,682)

Closing net book amount39,088,11723,85633,437,27348,574,168804,20327,544,444149,472,061

At 31 December 2021

Cost42,990,63254,83853,927,44873,573,7893,272,86927,544,444201,364,020

Accumulated depreciation(3,902,515)(30,982)(20,490,175)(24,999,621)(2,468,666)-(51,891,959)

Net book amount39,088,11723,85633,437,27348,574,168804,20327,544,444149,472,061

Year ended 31 December 2022

Opening net book amount39,088,11723,85633,437,27348,574,168804,20327,544,444149,472,061

Additions7,84217,037107,939413,280111,8629,461,64310,119,603

Transfer to right of use assets-18,316(7,780)-(10,536)--

Reversal of impairment (refer note 8(j))-----12,72712,727

Reclassification to investment property (refer note 37)

(2,536)----(70,323)(72,859)

Transfers604,118-2,147,0844,288,607119,198(7,159,007)-

Transfers to intangible assets (refer note10)----(320)(19,335)(19,655)

Modification of right-of-use assets-(11,558)----(11,558)

Disposals, net--(3,853)(92,247)(69)-(96,169)

Depreciation(365,773)(12,827)(2,048,742)(2,620,607)(326,790)-(5,374,739)

Closing net book amount39,331,76834,82433,631,92150,563,201697,54829,770,149154,029,411

At 31 December 2022

Cost43,600,05664,67855,574,76578,069,7683,478,81329,770,149210,558,229

Accumulated depreciation(4,268,288)(29,854)(21,942,844)(27,506,567)(2,781,265)-(56,528,818)

Net book amount39,331,76834,82433,631,92150,563,201697,54829,770,149154,029,411

080 ContentsAbout DEWA PJSC | Financials | Sustainability | Corporate Governence

Page 81

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 81

(a) The Group has engaged in a joint operation pertaining to Emirates National Grid Corporation (“ENGC”). The Group’s share in the carrying amount of ENGC’s assets as at 31 December 2022 is AED 109 million (2021: AED 116 million) and is included under transmission and distribution networks.

(b) During 2008, by way of a Decree issued by H.H. The Ruler of Dubai, all existing plots of land held by the Authority were transferred to the Authority. As a result, the Authority has capitalised the plots of land on the basis of valuations (i.e. valuation based on use limitations) obtained from the Land Department of the Government of Dubai, which is considered the deemed cost and has been treated as a capital contribution by the Government of Dubai.

On initial recognition:

- The valuation of land is done based on the valuation of certificate issued by Dubai Land Department and such valuation is considered for the lands issued in the same area/zone in future.

- The valuation of land so adopted (original value) will not be changed even if the area/zone is changed by the Dubai Land Department subsequently.

As per communication from Department of Finance, Government of Dubai, effective 10 March 2022, the new land policy in respect of allotment and granting of lands in the Emirate of Dubai by the Dubai Land Department to the Authority will be in consideration for a rental value of AED 1 per plot per annum for 30 years. This policy shall apply to all future lands that will be allotted to the Authority, but not on the existing lands that are currently being governed under the existing regime. The Department of Finance, Government of Dubai and the Authority shall coordinate to take all actions and procedures to procure the issuance of a decree that shall formalize the proposed policy for all future lands.

(c) The carrying value of property, plant and equipment, pledged as collateral on borrowings, amounts to AED 27,886 million (2021: AED 25,255 million) (refer note 18).

(d) Capital work in progress mainly comprises construction of additional electricity generation, water desalination facilities, transmission and distribution networks and district cooling facilities.

(e) The interest rate used for capitalizing the borrowing cost is LIBOR plus applicable Margin. The interest on borrowings capitalised using this interest rate is AED 1,164 million (2021: AED 650 million). (refer note 28).

(f) Right-of-use assets mainly represents vehicles and other equipment as of the reporting date.

(g) During the year, the Group received plots of land from the Land Department of the Government of Dubai amounting to AED 65 million (2021: AED 707 million).

(h) During the year, one of the subsidiaries’ of the Group returned eleven plots of land to related parties amounting to AED 59 million which were granted to the subsidiary by the related parties in prior years.

(i) Depreciation is allocated as detailed below:

20222021

AED’000AED’000

Cost of sales:

Generation and desalination expenditure (refer note25.1)2,186,5902,213,432

Transmission and distribution expenditure (refer note25.2)2,886,8172,682,658

Administrative expenses (refer note26)301,332335,592

5,374,7395,231,682

(j) In prior years, a subsidiary management had recognised an impairment loss relating to costs incurred on shoring and enabling works for certain projects which were not developed as anticipated. As a result, an impairment loss of AED 55 million was recorded.

In the current year, construction of these projects was resumed and hence management assessed the recoverable amount using value-in-use calculations which involved cash flow projections based on management budgets, discounted at a rate of 4%.

Management also analyzed the work which can be utilized and will not have to be undertaken again. As a result, the Group reversed the impairment amounting to AED 13 million (2021: AED 32 million) in relation to these projects.

Page 82

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 82

9. SHORT-TERM DEPOSITS WITH BANKS

10. INTANGIBLE ASSETS

20222021

AED’000AED’000

Term deposits with banks7,532,5034,798,864

Computersoftware Others TotalYear ended 31 December 2021 AED’000 AED’000 AED’000

Opening net book amount161,862-161,862

Additions17,056364,696381,752

Transfer from property, plant and

equipment (refer note8)67,084-67,084

Amortisation (refer note26)(80,721)(400)(81,121)

Closing net book amount165,281364,296529,577

At 31 December 2021

Cost523,091364,696887,787

Accumulated amortisation(357,810)(400)(358,210)

Net book amount165,281364,296529,577

Computersoftware Others TotalYear ended 31 December 2022 AED’000 AED’000 AED’000

Opening net book amount165,281364,296529,577

Additions8,627-8,627

Transfer from property, plant and

equipment (refer note8)19,655-19,655

Amortisation (refer note26)(74,579)(12,157)(86,736)

Closing net book amount118,984352,139471,123

At 31 December 2022

Cost551,373364,696916,069

Accumulated amortisation(432,389)(12,557)(444,946)

Net book amount118,984352,139471,123

Term deposits amounting to AED 7,533 million (2021: AED 4,799 million) carries an interest ranging from 1.5% to 4.70% per annum.

Others relates to a contract entered into by a subsidiary in prior years wherein a part was recorded under intangible assets and the balance under other financial assets. Refer notes 15 and 36.

Page 83

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 8311 . FINANCIAL ASSETS AT FAIRVALUE THROUGH OTHERCOMPREHENSIVE INCOME12 . OTHER ASSETS

20222021

AED’000AED’000

At the beginning of the year58,11357,653

Addition during the year - -

Fair value adjustment during the year(5,202)460

At the end of the year52,91158,113

2022AED’0002021AED’000

Advances to suppliers1,222,4981,346,191

Prepayments44,244112,306

1,266,7421,458,497

Less: non-current portion(1,134,897)(1,012,826)

Current portion131,845445,671

2022AED’0002021AED’000

Trade receivables3,737,9083,232,014

Accrued revenue1,040,5001,040,108

Less: provision for impairment of receivables(567,073)(422,544)

Trade receivables and accrued revenue – net4,211,3353,849,578

Financial assets at fair value through other comprehensive income pertains to an investment in Tier 1 Capital Certificates (“the Bonds”) issued at their par value. The Bonds are listed perpetual instruments and carry non-cumulative interest at a rate of 6% per annum payable every six months at the discretion of the issuer.

The Group has classified them as financial assets at fair value through other comprehensive income under IFRS 9 as the Bonds are not held for trading.

During the year, loss recognised in other comprehensive loss amounted to AED 5 million (2021: gain of AED 460 thousand).

13 . TRADE RECEIVABLES

Page 84

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 84

The Group holds trade receivables with the objective to collect the contractual cash flows and therefore measures these receivables subsequently at amortised cost using the effective interest rate method. Information about methods and assumptions used in determining the impairment loss has been explained in note 3.7.

The Group considers the creditrisk on the outstanding balancesfrom government customers to

be low at the reporting date, as these financial assets have low risk of default, the counterparties have strong capacity to meet their contractual cash flow obligations in the near term and adverse

changes in economic and business conditions in the longer term may, but will not necessarily, reduce the ability of the counterparties to fulfil its contractual cash flow

obligations.

The carrying amount of the Group’s trade receivables is primarily denominated in AED and approximates its fair value.

The Group primarily supplies electricity and water and cooling services to a diversified customer base and the standard credit period applied to all customers for electricity and water is 14 days and cooling services is 21 days from the date of invoice.

Impairment of trade receivables:

The movement in the provision for impairment of trade receivables is as follows:

14 . INVENTORIES2022AED’0002021AED’000

At 1 January422,544344,674

Charge for the year144,52977,870

31 December567,073422,544

2022AED’0002021AED’000

Consumables and others657,301642,947

Less: provision for slow moving and obsolete inventories(220,021)(205,653)

437,280437,294

Fuel1,007,9361,013,855

1,445,2161,451,149

Movements in the provision for slow moving and obsolete inventories were as follows:

2022AED’0002021AED’000

At 1 January205,653177,032

Charge for the year14,36828,621

At 31 December220,021205,653

Page 85

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 85Refer notes 10 and 36.15 . OTHER FINANCIAL ASSETS2022AED’0002021AED’000

UAE National Bonds and Sukuk Bonds1,041,138397,099

Other receivables3,598,4893,023,911

Less: provision for impairment on other receivables(47,913)(47,913)

4,591,7143,373,097

Less: non-current portion(1,457,956)(1,223,569)

Current portion3,133,7582,149,528

Other financial assets include investments in UAE National Bonds amounting to AED 1,041 million (2021: AED 397 million), which have a maturity of 12 months from the date of purchase. UAE National Bonds carry an interest rate ranging from 3% to 5.25% per annum

(2021: 2.25% per annum).

Other receivables mainly include housing and sewerage fee

receivable on behalf of a related party and interest receivable

on bank deposits. As at 31

December 2022, other receivables amounting to AED 3,550 million (2021: AED 2,976 million) are

not impaired and amounts ofAED 48 million (2021: AED 48

million) are impaired and fully provided for. The carrying amount of the Group’s other receivables is primarily denominated in AED and approximates its fair value.

Page 86

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 8616 . CASH AND CASH EQUIVALENTS17 . EQUITY2022AED’0002021AED’000

Current and call accounts and short-term deposit5,286,8484,403,945

Cash on hand5672,219

5,287,4154,406,164

Cash and cash equivalents include AED 1,660 million (2021: AED 1,906 million) in foreign currencies. The majority of these foreign currency balances are denominated in USD. These balances are held for settlement of existing and anticipated liabilities denominated in foreign currencies.

Cash and cash equivalents also include AED 801 million (2021: AED 716 million) of cash collected by local banks and government collection agencies on behalf of the Group.

For the purpose of the consolidated statement of cash flow, cash and cash equivalents comprise the following:

Cash and cash equivalents are subject to the impairment requirements of IFRS 9, the identified impairment loss was immaterial.

2022AED’0002021AED’000

Cash and cash equivalents5,287,4154,406,164

Add: term deposits (maturity less than 3 months)-1,008,223

Bank overdrafts (refer note18)(565,119)(442,339)

Cash and cash equivalents for the purpose of cashflow4,722,2964,972,048

a) SHARE CAPITAL

In the previous year, an amount of AED 500 million had been

transferred to share capitalaccount from Governmentof Dubai account (capitalcontribution). The Board of

Directors of the Authority had authorised the breakup of the

share capital into 50 billionshares of AED 0.01 each. Allshares of the Authority shallrank equally with one another

in all aspects. Hence, the share capital of Authority consists of authorised and paid-up capital of AED 500 million as of 31

December 2022.

b) STATUTORY RESERVE

As required by applicable lawand Articles of Associationof the Authority and certainsubsidiaries, 10% of the net

profit for each period has been transferred to a statutory

reserve. Such transfers toreserves may cease whenthe statutory reserve equals

to half of the share capitals, respectively. The reserve is

not available for distribution except as stipulated by the law.

The statutory reserve of theAuthority has already reachedthe 50% threshold and hence

no further transfers were made to statutory reserves. On 10

October 2022, the suspension

of transfer to statutory reserve was approved by the General

Assembly.

Page 87

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 87

c) CAPITAL

CONTRIBUTION

During the year, the Government of Dubai account nomenclature

has been changed to ‘capitalcontribution’. This account

represents amounts contributed by the Government of Dubai (both in kind and cash) as an Owner of the Group since the incorporation of the Group.

d) GENERAL RESERVE /

RETAINED EARNINGSThe general reserve representedsurplus distributable profits

The borrowing balance is net off deferred borrowing cost amounting to AED 722 million (2021: AED 862 million).

The Group has secured borrowings amounting to AED 27,360 million (2021: AED 23,981 million) and unsecured borrowings amounting to AED 13,330 million (2021: AED 2,775 million).

Borrowings are secured by pledge of assets (refer note 8 (c)), corporate guarntees, government guarntees and letter of undertakings.

2022AED’0002021AED’000 Non-current

Others (refer (i) below)29,042,47523,325,798

Long-term loan (ii)8,275,500-

37,317,97523,325,798

2022AED’0002021AED’000 Non-current

US Dollars25,432,23424,626,044

UAE Dirham15,257,5952,129,826

40,689,82926,755,870

Current

Bank overdrafts (refer note16)565,119442,339

Others (refer (i) below)2,806,7352,987,733

3,371,8543,430,072

40,689,82926,755,870

earned by the Group. During

the year, the balance in general reserve amounting to AED 43.34 billion was transferred to retained earnings.

e) HEDGING RESERVE

The hedging reserve primarily

represents the fair value of derivatives which are part of effective cash flow hedging relationships at year end. As the derivatives are held for hedging purposes as defined by IFRS 9, their fair value movements are retained in other comprehensive income instead of being charged to profit or loss during the year.

The fair value movements will be adjusted in other comprehensive income in the same period as the corresponding hedged transaction.

f) NON-CASH

DISTRIBUTION

Non-cash distributions represent amounts transferred to the

Government of Dubai, as an

appropriation of retained earnings, which is equivalent to the amount owed by the Government of Dubai to the Group based on amounts

owed by third parties assumed by the Government of Dubai.

18 . BORROWINGS

Borrowings are denominated in the following currencies:

Page 88

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 88

(i) Others

Shuaa Energy 1 P.S.C had an equity bridge loan carrying an interest rate of one-month LIBOR+0.70% per

annum. The entire loan was repayable on 1 April 2018. The equity bridge loan amounting AED 73 million

was converted to subordinated loan by the shareholder, ACWA Power Solar Limited on 29 March 2018 and an amount of AED 43 million is outstanding (2021: AED 47 million).

Shuaa Energy 1 P.S.C Shuaa Energy 1 P.S.C has a commercial facility from a syndicate of banks amounting to AED 485 million (2021: AED 494 million) carrying an interest rate, which is the aggregate of the applicable margin and LIBOR. The loan is repayable in quarterly instalments beginning September 2017.

Shuaa Energy 1 P.S.C has an Istisna- Ijara facility amounting to AED 391 million (2021: AED 403 million)

carrying an interest rate, which is the aggregate of the applicable margin and LIBOR. The loan is repayable in quarterly instalments beginning September 2017.

During the year, Shuaa Energy

2 P.S.C has an equity bridge loan of AED 213 million carrying a

fixed interest rate of 2.965% per annum. During the year, these were converted to capital contribution in line with IAS 32.

Shuaa Energy 2 P.S.C had an equity bridge loan of AED Nil (2021: AED 142 million) carrying an interest rate of one-month LIBOR + 1.08% per annum. The loan was repaid two years after the commercial operation date in March 2022, in line with the agreed terms.

Shuaa Energy 2 P.S.C has loan

amounting to AED 1,918 million (2021: AED 1,423 million) from a syndicate of banks. The rate of interest is the percentage rate per annum which is the aggregate of the applicable margin and the Secured Overnight Financing Rate (“SOFR”) starting 1 June 2022, prior to which the rate of interest was the percentage rate per annum which is the aggregate of the

applicable margin and LIBOR.

Shuaa Energy 2 P.S.C has an Islamic facility from a syndicate of banks amounting to AED 503 million

(2021: AED 849 million) carrying an interest rate, which is the aggregate of the applicable margin and LIBOR.

The loan is repayable on quarterly instalments beginning from 30

September 2020.Shuaa Energy 2 P.S.C has afinancing agreement of AED 44

million with a bank. The rate of interest is the percentage rate per annum which is the aggregate of the applicable margin and the Secured Overnight Financing Rate (SOFR).

Mai Dubai LLC has a bank

overdraft amounting to AED 515 million (2021: AED 442 million) carrying an interest rate of 0.5%.

Etihad Clean Energy Development Company LLC has a bank overdraft amounting to AED 50 million

(2021: Nil) carrying an interest rate of EIBOR+ 0.7% per annum.

Hassyan Energy Phase 1 P.S.C

has a commercial facility of AED 8,305 million (2021: AED 8,305 million) from a syndicate of banks carrying an interest rate, which is the aggregate of the applicable margin and LIBOR. As at 31

December 2022, the Hassyan

Energy Phase 1 P.S.C has utilized an amount of AED 8,189 million (2021: AED 8,211 million).

Hassyan Energy Phase 1 P.S.C has a mezzanine facility of AED 433 million (2021: AED 433 million) carrying a effective rate interest of 6.64% per annum. The loan is repayable beginning from 31 May 2041 up to 29 February 2048.

Hassyan Energy Phase 1 P.S.Chas Subordinated advances ofAED 528 million (2021: AED 296

million). The loans are interest free.

Hassyan Energy Phase 1 P.S.Chas a financing agreement ofAED 573 million (2021: AED

250 million) with a bank. As at 31 December 2022, the Hassyan

Energy Phase 1 P.S.C has utlilized an amount of AED 257 million

(2021: AED Nil).EMPOWER has a loan amounting

to AED 4,500 million (2021: AED 1,995 million) carrying an interest rate which is the aggregate of the applicable margin and EIBOR. On 29 March 2022, EPOWER entered

into a bridge loan facility with Dubai Islamic Bank PJSC to finance the acquisition of Dubai Airports district cooling assets amounting to USD 250 million (AED 918

million) with a tenor of 1 year from utilisation date with a profit rate of LIBOR + margin and with a fee of 1% of the loan amount.

The amount was fully drawn down on 31 March 2022. EMPOWER

utilised AED 4,500 million from the new long term loan facility of AED 5,500 million and repaid its existing borrowings amounting to AED 2,913 million.

Dubai Green Fund Investments

LLC has a loan amounting to AED 1,892 million (2021: AED 1,647 million) carrying an interest rate of 0.9% per annum. The loan is repayable over tenor of 1 year. This

Page 89

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 89borrowing has been secured by

lien over deposits with the bank to extent of AED 1.9 billion.

Al Etihad Energy Services

Company LLC has a loan amounting to AED 36 million (2021: AED 41 million) carrying an interest rate of 6.95% per annum. The loan is repayable over period of five years commenced from August 2019.

Shuaa Energy 3 P.S.C has a loan amounting to AED 1,352 million (2021: AED 936 million) carrying an interest rate, which is the aggregate of the applicable margin and LIBOR.

The loan repayment is scheduled from September 2023 until March 2047.

Shuaa Energy 3 P.S.C has equity bridge loans of AED 147 million (2021: AED 147 million) carrying an interest rate of LIBOR+0.75% per annum. The final maturity date is the date falling one hundred and twenty (120) months after the

date of Financial Close.Shuaa Energy 3 P.S.C has afinancing agreement of AED 15

million with a bank. The effective interest rate for the year was LIBOR + 1.2%.

Noor Energy 1 P.S.C has an equity bridge loan amounting to AED

2,797 million (2021: AED 2,797 million) carrying an interest rate of LIBOR+1% per annum. The final

maturity date is the earlier of the date falling on the second anniversary of the Commercial Operation Date and 10 February 2025.

Noor Energy 1 P.S.C has a

commercial facility of AED 8,673 million (2021: AED 7,103 million) from a syndicate of banks carrying an interest rate, which is the aggregate of the applicable margin and LIBOR. The loan is repayable beginning from 31 July 2023 up to 22 December 2045.

Noor Energy 1 P.S.C has amezzanine facility of AED 682

million (2021: AED 682 million) from various banks. The loan is repayable commencing on 31

March 2046 and ending on 31December 2047. The effective

interest rate for the year was 8.23% per annum. The utilised

portion of the facility amounted to AED 343 million (2021: AED Nil).

At 31 December 2022, the Group had available AED 3,681 million (2021: AED 5,055 million) of

undrawn borrowing facilities

from various lenders. The Group has complied with the financial covenants of its borrowing facilities during the 2022 and 2021

reporting periods.

The fair values of other loans are not materially different to their carrying amounts since the interest payable on these borrowings is close to current market rates.

(ii) Long-term loan

During the year ended 31 December 2022, the Authority has obtained a long-term Shariah compliant

loan of AED 10,000 million from Emirates NBD PJSC. The loan

carries interest at 1-month EIBOR + 0.7%. The term of the loan is five years and repayable in full upon its maturity. However, during the year, the Authority has repaid AED 1,700 million of the loan.

19 . RETIREMENT BENEFITSOBLIGATIONS2022AED’0002021AED’000Provision for employees’ end of service benefits

(refer note19.1)948,333937,561

Provision for pension (refer note19.2)74,08883,017

1,022,4211,020,578

Less: non-current portion(1,010,493)(1,008,904)

Current portion (refer note22)11,92811,674

Page 90

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 90

The charge for the year grouped within the employee benefit expense in profit or loss includes current service cost and interest cost. Actuarial profit during the year is recognised in other comprehensive income.

Although the analysis does not take account of the full distribution of cash flows expected under the benefit, it does provide an approximation of the sensitivity of the assumptions shown.

In 2022 and 2021, an actuarialvaluation was performed usingthe projected unit credit method

to ascertain the present value of the obligation relating to the end of service benefits payable to expatriate employees in

accordance with the DubaiGovernment Human ResourcesManagement Law No. 27 of2006. Under this method, anassessment has been made of

an employee’s expected service life with the Group and the

expected basic salary at thedate of leaving service. Theobligation for end of servicebenefits is not funded.The principal actuarialassumptions used were asfollows:

• Expected salary increase of

4.43% per annum (2021:2.35% per annum);

• Discount rate used to

determine the present valueof the obligation was 5.43%per annum (2021: 3.12%per annum); and

• The average rate of

mortality and withdrawal isnot significantly differentfrom the trends noted at thevaluation date. The mortalityrates are based on EmployersGroups reinsurance rates.Withdrawal rates assumedthe age wise withdrawalrates that incorporatesthe experience of DEWAin terms of the overallwithdrawals during the lastthree years.The rate used fordiscounting the employees’

end of service benefits should be based on market yields on

high quality corporate bonds.

In countries where there is no deep market for such bonds, the market yields on government

bonds should be used. In the

UAE, there is no deep market for corporate bonds and no market

for government bonds and,

therefore, the discount rate has been estimated using the High

Quality Market (HQM) yield

rate at the appropriate duration as a proxy with adjustment for country risk premium.

As a result, the Group hasrecognised re-measurmentgains of AED 70.5 million

(2021: AED 97 million) in other comprehensive income.

SENSITIVITYANALYSIS

Reasonably possible changes at the reporting date to one of the relevant actuarial assumptions, holding other assumptions

constant, would have affected

the obligation for end of service benefits as the amounts shown

below:

19.1 PROVISION FOR EMPLOYEES’ END OF SERVICE BENEFITS

20222021

AED’000IncreaseAED’000DecreaseAED’000IncreaseAED’000Decrease

Salary growth (+/-0.5%)926,552821,065926,811822,623

Discount rate (+/-0.5%)825,318922,240826,932923,683

Life expectancy (increase/ decrease by 1 year)871,261871,087873,235873,060

Page 91

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 91

The charge for the year included within employee benefit expense in profit or loss includes current service cost and interest cost. Actuarial (gain)/loss during the year is recognised in other comprehensive income.

The expected gratuityexpense for the next one yearcommencing 1st January 2023works out to AED 121 million

(2022: AED 93.5 million). These amounts are the sum of current

service cost and net interestcost /(income).

Movements in the provision for end of service benefits are analysed below:

The provision made during the year for end of service benefits and recognised in profit or loss is analysed as follows:

During the year, the other re-measurment gain pertains to subsidiary amounted to AED 8.3 million.

Component of defined benefit costs (re-measurement) recognised in other comprehensive income

2022AED’0002021AED’000At 1 January

At 1 January937,561962,091

Charge for the year (refer note27)132,870124,204

Re-measurements(70,468)(96,851)

Payments made during the year(51,630)(51,883)

At 31 December948,333937,561

2022AED’0002021AED’000

Current service cost87,83698,415

Interest cost45,03425,789

132,870124,204

2022AED’0002021AED’000Re-measurements: Actuarial (gain)/loss on obligation

(Gain)/loss due to change in financial assumptions(20,560)(66,380)

(Gain) due to change in experience adjustments(41,610)(30,471)

(62,170)(96,851)

Page 92

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 92Maturity profile

The employee profile of the Group is as detailed below:

2022AED’0002021AED’000At 1 January

0 to 1 year67,73692,614

1 to 2 year35,54944,826

2 to 5 year112,213126,840

5 years and above1,440,6141,315,524

1,656,1121,579,804

20222021

Average age (years)45.3243.02

Average past service (years)10.1112.00

Average entry age (years)30.6130.77

19.2 PROVISION FOR PENSION

19.2.1 PROVISION FOR PENSIONS (FOR ELIGIBLE UAE NATIONAL

EMPLOYEES WHO RETIRED BEFORE 1 JANUARY 2003)In 2022 and 2021, an actuarialvaluation was performed usingassumptions based on market

expectations, at the reporting date, for the period over which the obligations are to be

settled for eligible UAE national employees who retired before 1

January 2003. The obligationfor end of service benefitsis not funded. The principalactuarial assumptions usedwere as follows:

• Discount rate used to

determine the present valueof the obligation was 4.10%per annum (2021: 2.83%per annum);

• The average rate of

mortality and withdrawal isnot significantly differentfrom the trends noted atthe valuation date. Themortality rates are based onreinsurance rates; and

• Administrative expenses

would be borne by theAuthority and accordinglyno allowance for these havebeen considered for thevaluation.

The rate used to discount post-employment benefit obligations should be determined by

reference to market yields onhigh quality corporate bonds.

In countries where there is no deep market for such bonds, the market yields on government

bonds should be used. In theUAE, there is no deep marketfor corporate bonds and nomarket for government bondsand, therefore, the discountrate has been estimated usingthe High Quality Market (HQM)

yield curve at the appropriate duration rate as a proxy with

adjustment for country riskpremium.

Page 93

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 93

The movements in the provision for pensions are analysed below:

Total provision for pension has been presented as follows:

2022AED’0002021AED’000

At 1 January71,34374,307

Reversal during the year(4,270)-

Payments made during the year(4,913)(2,964)

At 31 December62,16071,343

2022AED’0002021AED’000

At 1 January11,67412,399

Charge for the year (refer note27)118,122112,810

Payments made during the year(117,868)(113,535)

At 31 December11,92811,674

19.2.2 PROVISION FOR PENSIONS (FOR ELIGIBLE UAE NATIONAL

EMPLOYEES FROM 1 JANUARY 2003)

Effective 1 January 2003, the Group joined a defined contribution plan operated by the Federal Pension General and Social Security Group for its active eligible UAE national employees in accordance with the provision of Federal Law No. 7 of 1999 relating to Pension and Social Security Law. The movements in the provision for pensions are analysed below:

2022AED’0002021AED’000

At the beginning of the year83,01786,706

Charge for the year118,122112,810

Reversal during the year(4,270)-

Payments made during the year(122,781)(116,499)

At the end of the year74,08883,017

Page 94

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 94

20. LEASE LIABILITIES

21. OTHER LONG-TERM LIABILITIES

2022AED’0002021AED’000

At 1 January14,95221,325

Additions during the year46,9301,070

Modification(13,019)-

Payments during the year(12,451)(7,443)

At 31 December36,41214,952

Less: current portion(12,884)(3,013)

Non-current portion23,52811,939

2022AED’0002021AED’000

Deferred revenue24,940,69323,585,317

Asset retirement obligations181,917211,618

Advances for new connections6,873,6987,037,619

Retentions payable806,220876,234

32,802,52831,710,788

2022AED’0002021AED’000

Less than one year12,8843,013

More than one year23,52811,939

At 31 December36,41214,952

Lease liabilities related to right-of-use assets recognised as per IFRS 16 (refer note 8).

Maturity analysis of lease liabilities:

Page 95

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 95

22. TRADE AND OTHER PAYABLES

23. RELATED PARTY TRANSACTIONS

AND BALANCES2022AED’0002021AED’000

Consumers’ security deposits4,231,8333,797,877

Capital projects payables2,009,8182,120,104

Trade payables1,214,6431,599,340

Retentions payable1,349,5021,569,971

Deferred revenue1,374,7931,040,856

Advances for new connections361,774781,958

Accrual for staff benefits278,592269,969

Retirement benefit obligations (refer note19)11,92811,674

Other payables2,896,2412,339,263

13,729,12413,531,012

The Group transacts with the

Government of Dubai, subsidiaries, joint ventures and entities

controlled, jointly controlled or significantly influenced by the Government of Dubai within the scope of its ordinary business activities. Since the Group is majority owned by the Government of Dubai post its listing of shares on Dubai Financial Market (DFM), these entities are jointly referred to as ‘government related entities’.

The Group applies the exemption relating to government related entities under IAS 24 ‘Related Parties’ and only discloses

transactions and balances with government related entities which are individually or collectively significant. To determine

significance, the Group considers various qualitative and quantitative factors including whether

transactions with related parties are conducted in the ordinary

course of business.Key management personnel and

entities controlled by them are also related to the Group. Key management personnel of the

Group comprise the directors and executive vice presidents (EVPs) of the Authority and employees of the Authority who are acting as

directors of the subsidiaries.Related party transactions

The material transactions and balances with related parties are disclosed below, except as disclosed in notes 8, 13, 15, 18, 20, 24, 25, 26, 27, 28, 33 and 34 in these consolidated financial statements:

Page 96

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 962022AED’0002021AED’000

Salaries and short-term employee benefits102,60682,294

Post-employment benefits2,5202,520

105,12684,814

2022AED’0002021AED’000

Board of directors’ remuneration39,5005,640

a) SALE OF ELECTRICITY

AND WATERAs is common with many other

entities, the Group deals with various government entities in Dubai. Quantities of electricity and water sold to UAE nationals are at subsidised rates. The

Group calculates the valueof these quantities suppliedat approved rates and theseamounts are settled by theDepartment of Finance (DoF),Government of Dubai.

During the year, the Group has collected AED 54 million (2021:

AED 52 million) in respect of

handling charges from a related party (refer note 24).

b) PURCHASE OF GOODS

AND SERVICESThe Group purchases fuelfrom entities owned by theGovernment of Dubai. Duringthe year, the Group consumedfuel amounting to AED 7,374million (2021: AED 6,500

million) from various entities.

During the year, the Grouppurchased water amounting toAED 5 million (2021: AED 24million) from an entity undercommon control.During the year, the Groupcontributed an amount of AEDNil (2021: AED 30 million)to an organisation managedby the Group for purposesof promotion of clean energyand water conservation. Thisis included in administrativeexpenses.

c) TRANSACTIONS WITH

BANKS OWNED BYTHE GOVERNMENTOF DUBAIThe Group transacts withvarious banks and financialinstitutions which are wholly

or partially controlled by the Government of Dubai. All of

the Group’s transactions withsuch banks are on approved

commercial terms. A portion of the cash and cash equivalents

as disclosed in note 16 wasincluded in deposit held withsuch banks.

d) COMPENSATION TO KEY MANAGEMENT PERSONNEL

e) KEY MANAGEMENT REMUNERATION

f) BOARD MEMBERS’ INTERESTS

Other than remuneration paid to key management personnel, the Board members of the Authority had no beneficial interest in DEWA or its subsidiaries during 2022 and 2021.

Impairment of a joint venture

During the prior year, provision of an amount of AED 4.8 million has been recognised (refer note 7.3).

Impairment of a subsidiary

During the prior year, assets of AED 5.95 million are unlikely to be recovered from a subsidiary. Hence, the provision of AED 5.95 million had been recognised during the year ended 31 December 2021.

Page 97

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 97

24. REVENUE

24.1 DISAGGREGATION OF REVENUE

25. COST OF SALES2022AED’0002021AED’000

Sale of electricity17,519,11915,099,572

Sale of water5,171,5934,341,902

District cooling2,766,2312,456,586

Others1,878,5911,925,908

27,335,53423,823,968

Others include:

• Handling fees amounting to AED 54 million (2021: AED 52 million) represent amounts paid by a related party to the Group for providing collection services.

• Amortisation of deferred revenue amounting to AED 1,037 million (2021: AED 933 million).

Net movement in regulatory deferral account credit balance has been shown as a separate line item on the face of profit or loss.

Electricity Water District coolingcharges Others TotalTiming ofrevenuerecognition2022AED’0002021AED’0002022AED’0002021AED’0002022AED’0002021AED’0002022AED’0002021AED’0002022AED’0002021AED’000Productsandservicestransferred

- at a point

in time17,519,11915,099,5725,171,5934,341,9022,766,2312,456,586841,933992,74126,298,87622,890,801

- over time------1,036,658933,1671,036,658933,167

17,519,11915,099,5725,171,5934,341,9022,766,2312,456,5861,878,5911,925,90827,335,53423,823,968

2022AED’0002021AED’000

Generation and desalination expenditures (refer note25.1)11,075,12711,023,395

Transmission and distribution expenditures (refer note25.2)4,762,5994,418,456

Purchase of gas,power and water651,27297,936

16,488,99815,539,787

Page 98

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 98

25.1 GENERATION AND

DESALINATION EXPENDITURES

26. ADMINISTRATIVE EXPENSES

25.2 TRANSMISSION AND

DISTRIBUTION EXPENDITURES2022AED’0002021AED’000

Fuel costs6,821,8246,500,052

Depreciation (refer note8)2,186,5902,213,432

Amortisation (refer note10)12,157400

Employee benefit expenses (refer note27)563,349548,894

Repairs and maintenance215,580475,705

Others1,275,6271,284,912

11,075,12711,023,395

2022AED’0002021AED’000

Employee benefit expenses (refer note27)1,599,0941,504,018

Repairs and maintenance289,445240,762

Depreciation (refer note8)301,332335,592

Amortisation (refer note10)74,57980,721

Insurance93,22565,618

Others532,690689,734

2,890,3652,916,445

2022AED’0002021AED’000

Depreciation (refer note8)2,886,8172,682,658

Employee benefit expenses (refer note27)1,497,3851,461,095

Repairs and maintenance219,046230,780

Others159,35143,923

4,762,5994,418,456

Page 99

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 99

27. EMPLOYEE BENEFIT EXPENSES

2022AED’0002021AED’000

Salaries2,564,9882,457,931

Retirement benefit obligations (refer note19)246,722237,014

Bonus267,777240,923

Other benefits580,341578,139

3,659,8283,514,007

2022AED’0002021AED’000Cost of sales

• Generation and desalination expenditures (refer note25.1)563,349548,894

• Transmission and distribution expenditures (refer note25.2)1,497,3851,461,095

Administrative expenses (refer note26)1,599,0941,504,018

3,659,8283,514,007

Employee benefit expenses are allocated as detailed below:

Page 100

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 100

28. FINANCE (COSTS)/INCOME - NET 2022

AED’0002021AED’000Finance costs

Interest on bank and other borrowings(1,967,602)(1,030,630)

Discounting of cheques-(1,963)

Cash flow hedges – ineffective portion of changes in fair

value of derivative financial instruments(194,140)-

Interest on lease liabilities(2,054)(718)

Amortisation of borrowing costs(5,500)-

(2,169,296)(1,033,311)

Amounts capitalised (refer note8)1,163,531650,445

(1,005,765)(382,866)

Finance income

Amortisation of financial liabilities33,153-

Interest income on short term bank deposits282,237135,413

Interest earned on financial assets28,339610

Cash flow hedges – ineffective portion of changes in fair

value of derivative financial instruments208,803-

Reversal of fair value adjustment for trade receivables-29,442

552,532165,465

Finance costs - net(453,233)(217,401)

Page 101

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 101

29. NET CASH INFLOW FROM

OPERATING ACTIVITIESNotes 2022AED’0002021AED’000Cash flows from operating activities

Profit for the year8,046,3766,553,447

Adjustments for:

Depreciation85,374,7395,231,682

Amortisation – intangible assets1086,73681,121

Write off of fixed assets92,246-

Gain on modification of lease(1,461)-

Provision for slow moving and obsolete inventories1414,36828,621

Reversal of impairment of property, plant and equipment8(12,727)(32,328)

Fair value adjustments(29,701)(48,832)

Reversal of fair value adjustment for trade receivables-7,204

Charge for impairment of trade receivables 13&23144,52983,822

Deferred income24.1(1,036,658)(933,167)

Retirement benefit obligations – gratuity19132,870124,204

Retirement benefit obligations – pensions19113,852112,810

Provision for impairment from investment in joint venture7.3-4,785

Share of profit from investment in joint ventures7.3-(502)

Ineffective portion of gain on derivative financial instrument28(14,663)(5,969)

Loss on sale of property, plant and equipment(313)(181)

Finance costs28811,625382,866

Finance income28(343,729)(165,465)

Operating cash flows before changes in operating assets

and liabilities13,378,08911,424,118

Changes in operating assets and liabilities:

Inventories14(8,434)(64,368)

Other assets191,755285,367

Trade receivables(506,285)(1,064,227)

Other financial assets(496,614)(661,766)

Trade and other payables2,119,576838,477

Regulatory deferral account credit balance34(283,681)(569,225)

Net operating cash flows14,394,40610,188,376

Payment for retirement benefit obligations – gratuity19(51,630)(51,883)

Payment for retirement benefit obligations – pensions19(122,781)(116,499)

Net cash inflow from operating activities14,219,99510,019,994

Page 102

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 102

30. COMMITMENTS

31. FINANCIAL INSTRUMENTS

BY CATEGORY2022AED’0002021AED’000

Future commitments including capital expenditure11,106,41316,802,580

2022AED’0002021AED’000At fair value through profit or loss

Derivative financial instruments (refer note32)1,786,90810,645

At amortised cost

Trade receivables (refer note13)4,211,3353,849,578

Other financial assets (refer note15)4,591,7143,373,097

Financial assets at fair value through other comprehensive income

(refer note11)52,91158,113

Short-term deposits (refer note9)7,532,5034,798,864

Cash and cash equivalents (refer note16)5,286,8484,403,945

21,675,31116,483,597

2022AED’0002021AED’000At fair value through profit or loss

Derivative financial instruments (refer note32)4,5782,416,127

At amortised cost

Trade and other payables* (refer note22)11,980,62911,696,524

Other long term liabilities* (refer note21)806,220876,234

Borrowings (refer note18)40,689,82926,755,870

53,476,67839,328,628

Financial assetsFinancial liabilities

* These do not include advances for new connections, deferred revenue and retirement benefit obligations as these are non-financial liabilities.

Page 103

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 103

32. DERIVATIVE FINANCIAL

INSTRUMENTS

The tables below show a summary of the hedged items, the hedging instruments and their fair values. The notional amounts indicate the amount outstanding at the year end.

The following table presents the Group’s derivative assets and liabilities that are measured at fair value:

The Group is exposed to interest rate movements on various borrowings maturing between 2023 and 2042.

Certain subsidiaries have entered into a series of interest rate swaps for the duration of the borrowings to mitigate the risk of variation in future interest rates. These interest rate swaps were designated as cash flow hedges and were assessed to be highly effective. Net unrealised gains of AED 4,119 million (2021: losses of AED 1,033 million) relating to these hedging instruments is included in other comprehensive income.

Description of the hedged item HedginginstrumentNotionalamountAED’000Positive fairvalueAED’000Negativefair valueAED’0002022:

Interest payments on floating rate loans

Interest rate

swap31,125,0231,786,9084,578

2021:

Interest payments on floating rate loans

Interest rate

swap32,083,27810,6452,416,127

Level 1AED’000Level 2AED’000Level 3AED’000TotalAED’00031 December 2022Assets measured at fair valueDerivative financial instruments

(non-current portion)-1,294,802-1,294,802

Derivative financial instruments

(current portion)-492,106-492,106

Liabilities measured at fair value Derivative financial instruments

(non-current portion)-4,578-4,578

Derivative financial instruments

(current portion)----

31 December 2021Assets measured at fair valueDerivative financial instruments (non-

current portion)-10,645-10,645

Liabilities measured at fair value Derivative financial instruments

(non-current portion)-2,259,830-2,259,830

Derivative financial instruments

(non-current portion)-156,297-156,297

Page 104

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 104

33. DIVIDENDS

34. REGULATORY DEFERRAL ACCOUNT

CREDIT BALANCEOn 31 January 2022, DEWAdeclared and paid a dividend

amounting to AED 10,000 million in respect of the year ended 31

December 2021 (31 December

2021: AED 1,000 million in respect of the year ended 31 December

2020 and AED 1,000 million as

interim dividend during the year ended 31 December 2021) Further, DEWA paid dividend of AED 5,130 million as interim dividend during the year 2022.

During the year, EMPOWER

declared a dividend of AED 3,400 million (31 December 2021:

AED 300 million). An amount of AED 1,020 million (2021: AED

90 million) was paid to the non-controlling interest as dividend.

The prices that can be charged to customers for electricity and water by the Group are subject to oversight and/or approval by the Supreme Council of Energy; hence the Group is subject to

rate regulation. The SupremeCouncil of Energy through its

notification issued in 2010 has allowed the Group to recover

the additional costs it incurs due to the escalation in fuel

prices considering 2010 as the base year from its customers.

The Supreme Council of

Energy is also controlled by the Government of Dubai and it is a related party of the Group.

The Group has recorded AED95 million as at 31 December2022 (2021: AED 379 million)

in excess of the actual increase in fuel costs incurred since

2010 till date as regulatory

deferral account credit balance.

On the transition date, theGroup has elected to apply

the requirements of IFRS14–

‘Regulatory Deferral Accounts’ and will continue to apply its current accounting policy for

recognition, measurement and

derecognition of this regulatory deferral account balance.

The movement in regulatory deferral account credit balance is detailed below:

2022AED’0002021AED’000

At 1 January379,024948,248

Short collection during the year(283,681)(569,224)

At 31 December95,343379,024

Interest rate swaps were measured primarily using valuations provided by the financial institutions based on the observable spot exchange rates and the yield curves of the respective swap contracts and were categorised in Level 2 hierarchy.

Page 105

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 105

35. EARNINGS PER SHARE/DILUTED

SHARE

20222021

Number of shares in thousandsNumber of ordinary shares for basic earnings per share at 31

December50,000,00050,000,000

2022AED’0002021AED’000Earnings

Profit for the year, attributable to the Owners of the Authority7,722,8346,123,112

20222021

Earnings per share

Basic and diluted earnings per share (AED)0.150.12

36. ACQUISITION OF SNOW LLC

On 18 August 2021, lateramended on 16 December2021, EMPOWER entered intoa sale and purchase agreement

with Nakheel PJSC (Nakheel) to acquire the 100% share capital of Snow LLC, a subsidiary of

Nakheel, for a period of 30 years for a consideration of AED 673.9 million. Of the consideration, an amount of AED 5.6 million was

retained towards the customers prepayment and security deposit balance transferred by Nakheel on the effective date (net payment:

AED 668.3 million). Subsequent to the aquisition, Snow LLC name has been changed to EMPOWER

Snow LLC.EMPOWER Snow LLC is a

company incorporated in Dubai, UAE (registration no. 1569318).

The company is a special purpose vehicle that entered into a master concession agreement with

Nakheel, whereby Nakheel granted rights to EMPOWER Snow LLC

to operate and maintain the

cooling systems and to provide district cooling services to its developments, in accordance with the terms and conditions set out in the agreement.

Furthermore, on 16 December2021, Nakheel signed anasset transfer agreementwith EMPOWER Snow LLC

transferring the rights, title, and interest in 16 district cooling assets. Management performed

a detailed analysis on thistransaction with Nakheel and

concluded this as a failed sale transaction and accounted for

it as a finance arrangement at the net present value of the

consideration paid amountingto AED 309.2 million (giventhe minimum guaranteedamount guaranteed by the

seller under the contract). The excess consideration paid of

AED 364.7 million represents

an intangible asset for the right to charge users of the district cooling services under the

transaction for a period of 30 years (refer notes 10 and 15).

The acquisition of Snow LLC did not qualify as a transaction to be accounted for under IFRS 3

(Business Combinations) giventhe lack of business processesavailable in Snow LLC.

Basic earnings per share amounts are calculated by dividing net profit or loss for the year attributable to the shareholders of the Authority by the weighted average number of ordinary shares outstanding during the year.

Page 106

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 106

37. INVESTMENT PROPERTIES

31 December2022AED’00031 December2021AED’000

Property under development72,859-

31 December2022AED’00031 December2021AED’000At the beginning of the year - -Reclassification from property, plant and equipmentcapital work in

progress (refer note8)72,859-

At the end of the year72,859-

The movement in property under development is as follows:

The Group’s subsidiary startedconstruction of its headquarter project in 2021. The

project consists of two towers with common area and retail

outlets which are expected tobe completed during the thirdquarter of 2023.During the year, management

revisited its plan of occupation and concluded to occupy only

one tower for its use along with its related common area. As a

result, the carrying amount of one tower and related areas

were transferred to investment properties from property, plant and equipment (refer note 8).

The investment property isunder construction which isexpected to be completed in2023 with an expected cost tocomplete amounting to AED 21

million. As of 31 December 2022, the fair value of investment

property approximates to AED74 million.

38. COMPARATIVE FIGURES

The previous year figures have been regrouped/reclassified wherever necessary, in order to conform to the current year presentation. The regrouping/reclassification does not affect the previously reported net assets, total equity and profit or loss and other comprehensive income.

Page 107

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 107

39. SUBSEQUENT EVENTS

(a) Subsequent to the year

end, the Board of Directors of the Authority recommended

a dividend amounting to AED4,770 million in respect ofthe year ended 31 December2022, which is subject to the

approval of the shareholders at the forthcoming Annual General Meeting of the Company.

The aggregate amount of the

proposed dividend expected to be paid in April 2023 out of retained earnings at 31 December 2022,

but not recognised as liability at year end.

(b) In addition to the above

dividends, since year end the

directors of a subsidiary have recommended the payment

of a final dividend amountingto AED 425 million which is

subject to the approval of the shareholders at the forthcoming Annual General Meeting of

the subsidiary. The aggregateamount of the proposeddividend expected to be paidin April 2023 out of retainedearnings at 31 December 2022,

but not recognised as liability at year end.

c) UAE Corporate Tax Law

on 9 December 2022, the UAEMinistry of Finance releasedthe Federal Decree-Law No.47 of 2022 on the Taxation ofCorporations and Businesses(the Law) to enact a FederalCorporate Tax (CT) regime inthe UAE. The CT regime will

become effective for accounting periods beginning on or after 1

June 2023.A rate of 9% will apply totaxable income exceeding aparticular threshold to be

prescribed by way of a Cabinet Decision (expected to be AED

375,000 based on informationreleased by the Ministry ofFinance), a rate of 0% willapply to taxable income notexceeding this threshold. Inaddition, there are several

other decisions that are yet to be finalized by way of a Cabinet Decision that are significant in order for entities to determine their tax status and taxable

income. Therefore, pendingsuch important decisions, theGroup has considered that the

Law, as it currently stands, is not substantively enacted as

at 31 December 2022 fromthe perspective of IAS 12 –“Income Taxes”. The Groupshall continue to monitor the

timing of the issuance of these critical Cabinet Decisions to

determine their tax status andthe application of IAS 12 –Income Taxes.The Group is currently in the

process of assessing the possible impact on the consolidated

financial statements, bothfrom current and deferredtax perspective, once the Law

becomes substantively enacted.

Page 108

SUSTAINABILITY

Page 109

SOCIAL HIGHLIGHT10,932employeeswith a low turnoverrate of 2.62%Zerofatalitiessince 2000101 Health and SafetyTraining and seminarsdelivered for2170 employeesLowest customerminutes lost in theworld 1.19 minutescustomer in 2022DEWA served1,157,501customersduring 2022DEWA received over7631 ideas through theAfkari internal platformInvestments in Smart Gridinitiatives between 2014 and 2035ECONOMIC HIGHLIGHTENVIRONMENTAL HIGHLIGHTTotal RevenueAED 27.34 BillionEmployee wages & benefitsAED 3.659 BillionNet ProfitAED 8 Billion Operating CostsAED 19.524 Billion

AED 7 Billion Total value of purchase with its local and global suppliers

AED 5.919 BillionCumulativeefficiencyimprovementof 37.78%between 2006and 2022Over 350 EVGreen ChargingStations withover 630charging pointsthroughout theEmirate ofDubai14%share ofclean energycapacity ofDEWA’senergy mixDEWA wasnot in violationof anyenvironmentalregulation nordid it receiveany complaintsrelating toenvironmentalmatters

9.22 Million

Tons of Carbonemissionreduction2.2%lossesfromelectricitytransmissionanddistributionnetworksAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022109SUSTAINABILITY HIGHLIGHTS

Page 110

SUSTAINABILITYREPORTING ATDEWASince 2013, DEWA has been

issuing its sustainability reports in alignment with Global Reporting Initiative (GRI) Standards. We are pleased to prepare our

sustainability report in accordance with the Sustainable Development Goals (SDGs), and the principles of the United Nations Global

Compact.DEWA is a member of the GRI

Gold Community and part of the Standards Pioneers Programme,

being one of the first 100

organisations in the world to adopt the new standards for the 2016 report onwards for the Core

option. In our previous report, DEWA had aligned its report to the Revised Universal Standards 2021 ahead of the effective

implementation date on January 1, 2023. DEWA continues to

implement the latest update on GRI standards and its disclosure requirements in DEWA’s tenth

report. The report has beendeveloped by considering GRI

Reporting Principles of Accuracy, Balance, Clarity, Comparability, Completeness, Sustainability

C o n t e x t , T i m e l i n e s s a n d Verifiability.

Through this report and theoutcomes of our continual

s t a k e h o l d e r e n g a g e m e n t processes, the report summarises the materially relevant economic, e nv i ro n m e nt a l a n d s o c i a l perspectives for the year 2022.

Unless otherwise stated, all data is as of December 31, 2022. In addition, the report highlights the ways in which DEWA is fulfilling its long–term commitments towards

sustainability, enabling the

organisation to communicate its sustainability to its stakeholders and to further enhance dialogue

with them.

Note: for any questions about the report or the reported information, you may contact sustainability@dewa.gov.ae

MATERIALITYASSESSMENTStakeholder engagement is

the fundamental starting point for an organisation to carry

out its sustainability reporting cycle. DEWA has engaged with

relevant internal and external stakeholders including DEWA’s top management, DEWA’s employees,

government entities, investors, suppliers, customers, society, and partners.

In December 2022, DEWA

organised 4 virtual stakeholder engagement workshops through

an innovative and interactive

tool (Mentimeter) to assess 35 material topics. The aim of the workshops was to identify the

material topics and to assess the impact to be reported for the next reporting cycle 2022.

Besides the material topics of GRI, DEWA’s 2022 sustainability materiality analysis accounted for the latest megatrends including net zero carbon emission, circular economy, cyber security and

business ecosystem that are likely to become more relevant in the coming years.

In line with the GRI Standards, the sustainability report is

required to disclose the highest ranked material topics, which

have the most significant impact on the economy, environment

and people including impacts on their human rights as a result of the organisation’s activities or business relationships.

The materiality matrix below

illustrates the outcomes of the 2022 materiality assessment

process. This matrix has been

a p p ro v e d b y D E WA’ s t o p management and used as a basis to develop the current report.

The horizontal axis depictsDEWA management’s viewpoints,

whereas the vertical axis depicts the viewpoints of DEWA’s

stakeholders.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022110

Page 111

DEWA Employees & External Stakeholders

Dubai Electricity and Water Authority Management Topic scored high Recommended topics High

HighEnergyDEP&RR&DAccess to ElectricityDemand Side ManagementTraining and EducationEmissions

Availability and Reliability of Electricity Waste

CustomerEmploymentWater and EffluentsCustomer Health and SafetyProcurement Practices

Occupational Health and Safety Circular Economy

Economic PerformanceCybersecuritySystem EfficiencyBusiness EcosystemNon-discriminationLocal CommunitiesIndirect Economic ImpactsCompliance with Environmental Laws and RegulationCompliance with Socio-economic Laws and RegulationClimate ChangeNet Zero CarbonInnovation

Supplier Environmental Assessment Anti-corruption

Market PresenceProvision of informationHuman Rights AssessmentDiversity and Equal OpportunityDEWA’S 2022 MATERIALITY ASSESSMENT RESULTSAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022111

Page 112

SERVICES

In 2022 DEWA revised and updated its services catalogue to have 25 public services to its customers under 6 main services in response to Dubai government directives to reduce government procedures for doing business by 30%. The following are DEWA’s 6 main services:

1. Electricity & Water Management Services 2. Billing Services

3. Sustainability & Consumption Management Services

4. NOC Services

5. Electricity Network Services

6. Water Network Services

For more information about consumer services, visit the following link:

SUPPLIERS

Across its upstream supply chain and operations in 2022, DEWA engaged with different global and local suppliers in the areas including, but are not limited to, maintenances, consultant, constructions services as well as materials and equipment for water and electricity services. It worked with 1,676 suppliers of which 22 are strategic suppliers, 183 core suppliers and 1,471 basic suppliers. Geographically, DEWA worked with 1,585 local suppliers whereas 91 were considered as global suppliers. The Number of Local transactions conducted during 2022 were 13,338 and the total value of Purchase with its local and global suppliers were AED 5,918,713,000, of which 94.53% products and services were purchased locally.

DEWA is committed to promoting sustainable

environmental p r a c t i c e s w i t h s u p p l i e r s , contractors and customers by applying supplier assessment, and green procurement criteria based on environmental performance. In addition, DEWA selects suppliers taking into consideration the environmental impact of their product or service.

DEWA has the responsibility and the ability to motivate its suppliers to improve their environmental, ethical and social performance through actions that foster excellence in their management of sustainability.

VALUE CHAIN AND OTHERBUSINESS RELATIONSHIPSAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022112

Page 113

DEWA’S CUSTOMERS

During 2022, DEWA served 1,157,501 customers, representing a 4.62% increase compared to the last year. Accordingly, DEWA has added 51,089 new customers since the end of Q4 2021. During 2022, DEWA generated 52.89 Terawatt hour, representing a 5.36 % increase from the last year. Similarly, DEWA produced 136.254 MIG of desalinated water, representing an 8.01% increase from last year.

Number of Customer Accounts as of 31 December 2022Electricity Water

Description No. of customer accounts Percentage No. of customer accounts Percentage

UAE National72,0796.46%67,9656.83%

Expatriates797,47371.42%772,03677.55%

Commercial226,66720.30%150,92115.16%

Government

Organisations6,1840.55%1,9920.20%

Industrial3,1500.28%1,6400.16%

EV9,6530.86%--

Port sales--4240.04%

Exempted1,3690.12%5000.05%

Total 1,116,575 100.00% 995,478 100.00%About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022113

Page 114

ECONOMICPERFORMANCELISTING IN DFMIn April 2022 DEWA became a

public listed company on the DFM after a successful IPO for US$ 6.1 billion, that was oversubscribed 37 times, becoming the largest IPO in UAE history and the biggest issue by any utility company in the world after 2008. With a valuation of AED 124 billion, DEWA became

the largest company by market

value on the DFM and significantly boosted the exchange’s profile.

Investors acknowledged DEWA’shealthy balance sheet, track

record of operating excellence and financial prudence, its ESG strategy and commitment to a

green future including Dubai’s ambitious 2050 net zero emission goal. The IPO also signalled a strong vote of confidence by local and international investors in the Dubai Capital markets and the

business-friendly environmentoffered by the Emirate.FINANCIAL PERFORMANCE

As part of the journey towards achieving Dubai’s vision and

long-term sustainability goal, the UAE Vision 2071 and Net

Zero Emission Target by 2050,

DEWA has endeavored to achieve operating and technical milestones that are comparable with the best ECONOMIC

PERSPECTIVE

utilities globally and at the same time, maintain a robust financial profile. In 2022, DEWA achieved record results and delivered

the best financial performance in its operating history. DEWA delivered on its strategic objective, which is focused on sustainable growth, staying at the forefront of smart and innovative operational excellence and optimising returns for its shareholders whilst

minimising its carbon footprint.

The investments made in AI and digitalisation have streamlined internal processes, reduced costs while simultaneously improving operating efficiency across all lines of business while delivering an excellent customer experience.

The consolidated revenue increase of 15% to AED 27.34 billion was mainly driven by an increase in demand for electricity, water and cooling services. The consolidated net profit for the year 2022 was AED 8 billion compared to AED

6.6 billion in 2021 which is an increase of 22%, demonstrating sustainable growth. Consolidated Earnings Per Share increased by 25% from AED 0.12 in 2021

to AED 0.15 in 2022. DEWAdelivered a sector-leading

dividend yield of 8% at the IPO price of AED 2.48 per share for the year 2022. Besides achieving excellent financial results, DEWA also set distinguished operating and technical benchmarks

including the world’s lowest line loss in electricity and water at 2.2% and 4.5% respectively; and the world’s lowest Customer CML time of 1.19 minutes.

KEY FACTS ABOUT DEWA:

1. AED 27.34 Billion Total

Revenues - consolidated

2. AED 8 Billion

Net Profit - consolidated

3. AED 19.524 Billion

Operating costs -Consolidated

4. AED 3.659 Billion

Employee Wages andBenefits - Consolidated

5. AED 16.155 Billion

Payment to Providers ofCapital - Consolidated

6. 127.041 Billion Imperial

Gallons Unit Sold - Water

7. 47.312 Terawatt Hour

Units Sold - Electricity

8. 44.07% Debt to Equity -

Consolidated

9. 8.88% Return on Equity

- Consolidated

10. AED 10,120 Million

Capital Expenditure -ConsolidatedAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022114

Page 115

AVAILABILITY ANDRELIABILITY OFELECTRICITY

DEWA is the sole electricity and water service provider in the

emirate of Dubai. Hence, DEWA

priorities ensuring the availability, reliability and uninterrupted

supply of all services to its

customers through its enhanced and developed facilities such

as power stations, desalination plants, transmission networks, and distribution networks. In

2022, the total power generation in DEWA was 52,892,299

Megawatt-hours (MWh). The

primary source of fuel for the power generation and water

desalination operations is the natural gas. DEWA also ensure

investing in renewable energies, specifically Solar Energy.

Source of Energy2019202020212022

DEWA GasPlant

Natural Gas Generation (MWh)45,184,88642,025,85343,025,63344,322,308

% of total generation96.7591.9485.0783.80

Diesel FuelOil (DFO)

Generation (MWh)42,77920,54735,49513,651

% of total generation0.090.040.070.03

Medium FuelOil (MFO)

Generation (MWh)420.41745

% of total generation0.00010.0000010.000030.00008

Solar Energy Generation (MWh)1,476,0152,855,1423,460,0464,645,350

% of total generation3.166.256.898.78

HassyanPowerPlant(HPP)

HPP-NG Generation (MWh)-116,083137,8473,754,142

% of total generation-0.250.277.10

HPP-CleanCoal

Generation (MWh)-693,9873,543,384156,803

% of total generation-1.527.060.30

HPP Generation (MWh)-810,0703,681,2323,910,945

% of total generation-1.777.337.39

DEWA Gas Plant + HPP -NG

Generation (MWh)45,184,88642,141,93643,163,48048,076,450

% of total generation96.7592.1985.9890.89

Total Generation (MWh)46,703,72245,711,61250,202,42452,892,299

Gross generation by DEWA gas plant and DEWA Solar & Net electricity sent to DEWA network by Solar IPP and HPP DEWA’s two primary sources of electricity generation are natural gas and solar energy. DFO and MFO are backup fuels used only during an emergency in case of an interruption of gas supply. The DFO & MFO consumption during the year is due to testing and commissioning purposes. As the electricity demand

increases every year, the electricity generated from DEWA’s primary energy sources increases.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022115

Page 116

ACCESS TOELECTRICITYDEWA is responsible for thegeneration, transmission, and

distribution of electricity in the emirate of Dubai. Hence, DEWA

is responsible for providing the access to electricity for residential, commercial, and industrial

customers through a network of power plants, substations, and distribution lines. DEWA operates a mix of power generation plants including natural gas, solar energy park, and co-generation plants.

DEWA has been investing heavily in renewable energy, specifically solar power, in order to reduce its dependency on fossil fuels and lower its carbon emissions.

In line with Dubai Plan 2030 and the UAE vision 2071, DEWA’s

corporate strategy map included the strategic objective (SO2:

Engaged & Happy Stakeholders)and IP03 (Leading Innovativecustomer experience). ThroughCustomer happiness survey,DEWA has tracked customersatisfaction to develop andimplement a work mechanism

that ensures a pleasant customer experience while also improving their quality of life, positivity, and well-being, as well as meeting and exceeding the community’s

demands and expectations.

DEWA has several initiatives in place to improve the accessibility and reliability of electricity, which includes the following (Not

limited to):

1. Smart Grid Technology: DEWA h a s i m p l e m e nt e d s m a r t grid technologies across the

transmission and distribution

(T&D) of electricity and water, allowing real-time monitoring

and control of the electricity and water grids. Such technology

improves the grid’s reliability and efficiency by reducing the outages’ duration, optimizing

resources, and allowingcustomers to understand theirconsumption behavior.

2. Connection of solar PV systems at customers’ premises:

under Shams Dubai initiativecustomers can generate

renewable energy for their own consumption, also benefitting

from any surplus fed into thegrid, which is deducted from

their bills under a net metering scheme. For more information,

you may visit

3 . A d v a n c e d M e t e r i n g Infrastructure (AMI) for

electricity and water: DEWAreplaced the traditionalmechanical meters with smart

meters for all electricity and water customers, allowing

DEWA to bill customers based

on the information received and allowing customers to get daily consumption details to compare themselves with their neighbors.

4. EV charging stations: As of December 2022, DEWA installed

350 charging stations with over 630 charging points throughout the emirate of Dubai to support the growth of EV

5. DEWA has also launched the

‘Dubai EV Community Hub’website, aiming to increaseEV adoption by centralizinginformation regarding EVdevelopments within theemirate of Dubai. For moreinformation, you may visit

6. Customer services: DEWA

provides various channels forcustomers to report poweroutages, request new serviceconnections, or ask for otherservices which can all becompleted through DEWA’sofficial website or mobileapplication.

Fu r t h e r m o re , D E WA’ s accomplishment of receiving

the ISO certificates is a result of intensive efforts to achieve the happiness and satisfaction of customers by providing an

environment which gives them

priority, providing high-quality services and improving DEWA’s

ability to further develop customer services. The ISO certificates reflect DEWA’s ongoing efforts to adhere to the best global criteria for customer service, in accordance with clear guidelines and codes of conduct, customer charter, and customer complaints to increase customer happiness by upgrading the ISO 10000 series of standards successfully and upgrading to

2018 as follows:

1. ISO 10001: 2018 - DEWA

Customer Happiness Department

services pertaining to the Planning, Development 1 Implementation

and Measurements of CustomerHappiness Charter.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022116

Page 117

2. ISO 10002: 2018 - DEWA

Customer Happiness Departmentservices pertaining to theOperation and Maintenance ofthe Unified e-Complain Systemfor Complaint Handling andResolution Process.

3. ISO 10003: 2018 - DEWA

C u s t o m e r H a p p i n e s s Department services pertaining to the Internal Grievance

Resolution Process of theUnified e-Complain System.

4. ISO 10004:2018-

DEWA Customer Happiness

Department services pertaining to the Planning Development,

Operation and Maintenance ofMonitoring & Measurement

p ro c e s s e s f o r C u s t o m e r Happiness.

OPERATIONAL EXCELLENCE:In order to meet the growing

demand on electricity and water within the emirate of Dubai. DEWA continuously focuses on improving its services and operations by providing electricity and water services according to the highest standards of efficiency and

reliability. DEWA achieved first place worldwide in the International Digital Customer Experience

Standard (IDCXS) with full score 100% from first assessment.

SYSTEM AVERAGE INTERRUPTION FREQUENCY INDEX (SAIFI):

System average interruption frequency index (SAIFI) Unplanned TARGET AND ACTUAL2018-2022

20182019202020212022

0.0950.087

0.0710.0640.059

0.0620.057

0.0390.092Actual TargetTHE SAIDI (CUSTOMER MINUTES LOST):

Customer Minutes Lost Unplanned (CML), Target & Actual2018-2022

2.552.392.351.661.66

1.601.40

1.191.431.86

20182019202020212022

Actual Target

Over the years, DEWA developed a wide range of exclusive services through DEWA’s Customer

Centres. Those services are

endorsed by different technologies and solutions such as Interactive Voice System enhanced by AI

and available around the clock to response to customers’ needs and requests. Furthermore,

DEWA adopted internationalstandards, such as System

Average Interruption Frequency Index (SAIFI), Availability Factor (AF) and CML, to validate and

certify its performance excellence and ensure obtaining the highest

levels of customer satisfactions.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022117

Page 118

AVAILABILITY FACTOR (AF):

Availability Factor (AF), Target & Actual2018-2022

YearAvailability Factor(Summer) TargetAvailability Factor(Summer) ActualAvailability Factor(Annual) TargetAvailability Factor(Annual) Actual

201898.50%99.46%91.50%91.72%

201998.50%99.18%92.00%92.10%

202098.50%99.73%92.00%92.28%

202198.50%99.66%92.00%92.35%

202298.50%98.39%90.00%90.09%

DEMAND SIDEMANAGEMENTThe DSCE announced, developed

and published the DSM Strategy in 2013, which aims to make

Dubai a leader in the efficient management of electricity and

water demand with an ambitious target of 30% reduction in energy and water consumption by 2030.

The DSM Strategy was updatedin 2020 by the DSCE to ensure

expediting achieving the strategy’s main targets. The DSM strategy consists of 11 main programmes.

9 of the programmes are related to DEWA’s core business and scope of work. The strategy includes seven implementation mechanisms that will allow the Emirate of Dubai to become a smart city and a pioneer in electricity and water efficiency management. The below chart

demonstrates the 11 programmesand 7 mechanisms:About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022118

Page 119

BUILDING & INFRASTRUCTURETARIFFSPROGRAMMESIMPLEMENTINGMECHANISMS &ENABLERSIMPLEMENTINGMECHANISMS &ENABLERSGreenBuildingRegulationsBuildingRetrofitsOutdoorLightingEfficientCoolingESMAStandards& LabelsConsumerBehaviourShamsDubaiEQUIPMENT, DEVICES& PROCESSESTariffsPolicies &RegulationsData &M&VGovernmentSupport &LeadershipSTAY ON TRACKEFFICIENT VEHICLESEfficientMobility & SmartChargingFuel & EngineEfficiencyWATER RESOURCEMANAGEMENTRecycled & Groundwater demandmanagementP1P81IM1 IM1 IM1P9 P10 P11ACCELERATE FOR DUBAIAS A SMART CITYDEWACollaborationGreen building regulations2 Building retrofits3 Outdoor lighting4 Efficient cooling5 ESMA Standards & Labels6 Consumer behaviour7 Shams Dubai8 Tariffs

9 Recycled & ground water demand management 10 Efficient mobility & smart charging 11 Fuel & engine efficiency

Technologies& InnovationIM6 IM7BOOST PROGRAMMESCommunication& Engagement FinancingIM4 IM5P2 P3 P4 P5 P6 P7

The DSCE has eight different entity members who are responsible for implementing and managing the DSM programmes. Three main programmes are owned and managed by DEWA, which are the following:

1. Consumer Behaviour programme

2. Shams Dubai programme

3. Tariff RateAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022119

Page 120

DEWA is one of the top utility companies globally in terms

of efficiency and reliability. In 2022, its electricity generation capacity increased to 14,517

MW and desalinated water

production capacity maintained at 490 MIG per day, where the

electricity T&D network losses were improved to 2.2% and the

water network losses improvedto 4.5% compared to 2021.The increase in energy demand

reflects the strong performance of all economic sectors in Dubai, in addition to the continuous

growth in population and the

expansion the Emirate of Dubai is witnessing in all key activities.

The energy demand in Dubaiincreased in 2022 by around5.5% compared to 2021.MEETING FUTURE DEMANDDEWA developed and forecast

the power demand for electricity and water for the short, medium and long-term demand, along

with capacity plans up to 2030 using recognised international practices and state of the art tools considering demographic

and econometric growth. Inaddition, to ensure meetingfuture demand, DEWA capturesand measures the effect offuture uncertainties throughscenario planning . Besides,DEWA updates the demandforecasts every year.

In 2022, those programmes achieved savings as shown in the table below:

Programme2020 2021 2022*

Electricity WaterElectricity WaterElectricity Water

Consumer behavior 40 GWh 241 MIG 43 GWh 202 MIG 85 GWh 315 MIG Shams Dubai 311 GWh - 459 GWh - 668 GWh** -

Tariff rates 1,076 GWh 2,051 MIG 1,177 GWh 2,084 MIG 1,190 GWh 2,153 MIG

*Preliminary Data **Connected capacity of Shams Dubai 493.4 MW

Peak Power Demand and Planned Capacity Additions (2022 - 2030):

2022

9,5029,768

13,91916,54610,13013,91916,77910,42614,95918,119

10,72510,72511,28711,61011,930

14,95920,01914,95919,71914,95919,01914,95918,71914,95918,41912,49014,517

20232024202520262027202820292030

Peak Power Demand (MW)Total Installed Power Capacity (MW)Total Firm Power Generation Capacity (MW)About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022120

Page 121

RESEARCH &DEVELOPMENT(R&D) CENTREThe DEWA R&D Centre, atthe Mohammed bin Rashid AlMaktoum Solar Park, aims tobecome a global platform thatdevelops and tests innovativesolutions to enhance the

operations and services of DEWA.

The Centre’s research areas include solar power, water, smart grid integration, and energy efficiency.

These core areas of the R&D are supported by 3 Enablers: Fourth Industrial Revolution including AI, IoT, Robotics & Drones, 3D Printing & Advanced Materials), Energy System Analyses, and

Space. Through Space-D, the

Centre develops several niche use-cases for grid and water networks.

The R&D Centre infrastructureincludes:

• Solar indoor testing and

accelerated ageing lab,

• Outdoor test facility for

continuous monitoringof solar photovoltaic moduleperformance in actual

conditions, a building-integrated photovoltaics testing facility, and a cleaning test field for

robotic solutions.

• Labs to support Robotics and Drone, Advanced Materials and

Characterisation, and IoT

• Several types of 3D printers (metal, plastic PLA, ABS, Nylon, composites, clay etc.),

• High-Performance Computing

Cluster,

• Energy Storage Testing and

Validation Field,

• Green Hydrogen Pilot,

• Photovoltaic-driven Reverse

Osmosis (RO) and Trans-Membrane Distillation system,

• Satellite ground station for DEWA’s space initiative

(Space-D) and more.RESEARCH AREAS ACTIVITIESSolar Research AreaThe Solar Research Areastudies ways to improve solarphotovoltaic technologies to

mitigate the effects of soiling and extreme desert conditions on the performance of solar photovoltaic panels. It leverages the results and knowledge collected from testing PV module long-term performance to inform the production of

desert-ready PV modules and for developing appropriate standards.

The Solar Resource Assessmentand Forecasting programme

develops methods to accurately forecast solar irradiance and

power output in order to improve the overall integration of solar in the DEWA grid.

WATER RESEARCH AREAThe Water Research Area

assesses and develops sustainable solutions for the desalination and purification of water with a primary focus on RO enabling

the use of solar power, detecting and reducing water transmission losses, and resource use by

minimizing brine effluent.SMART GRID INTEGRATIONRESEARCH AREAThe Smart Grid IntegrationResearch Area evaluates and

develops systems to facilitate and optimise the integration of renewables in the grid, maintaining power quality standards, and

further improving overall

performance and reliability of grid operations. This includes the use of electricity storage systems (chemical, thermal, and mechanical technologies), and the aggregation of distributed energy and storage resources, such as Virtual Power Plants and EV chargers.

ENERGY EFFICIENCYRESEARCH AREA

The Energy Efficiency Research A r e a f o s t e r s s m a r t a n d sustainable development, reduces energy waste by improving the

efficiency of energy systems

(with a focus on cooling), and overall accelerate the clean energy transition. Its research work

identifies, develops, and validates innovative solutions that enable smart and efficient energy use in the built environment, guide demand response measures,

p rov i d e d et a i l e d b u i l d i n g energy forecasting models, and improve the efficiency of energy conversion processes.

SPACE RESEARCH AREAThe Space Research Area aimsto support DEWA with high-

efficiency, low-cost remote sensing & operations using satellites and ground station capabilities. Its developed solutions are designed specifically to address utility needs including substation feeder

monitoring, asset integrity, andAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022121

Page 122

enriching weather forecasting

services. DEWA launched its first IoT nanosatellite, DEWASAT-1,

in 2022 and plans to launch the remote sensing DEWASAT-2 in

2023. DEWA was the world’s first utility to launch nanosatellites to enhance the maintenance and

planning of electricity and water networks.

FOURTH INDUSTRIALREVOLUTION (4IR)4IR enables the effectivedevelopment of solutions that

support the core research areas mentioned earlier. Its robotics and drone solutions are used to provide inspection and maintenance

services using unmanned/autonomous operations across

the whole utility value chain (e.g. photovoltaic plants, transmission line inspection and maintenance).

The AI team develops, tests, and integrates AI technologies for the optimisation of grid operations, short-term solar forecasting etc. IoT enables remote monitoring

diagnostics, and power andasset management using smart

sensors and analytics with AI and cloud capabilities. The advanced materials team provide expertise in the form of forensic analysis of materials to detect failures and the development of advanced

energy storage systems (batteries and supercapacitors). Finally, the 3D printing team is developing 3D printing capabilities for

addressing DEWA’s spare parts

and rapid prototyping needs. The facility currently operates 16 3D Printing systems that can utilise more than 20 materials which can cover a wide range of applications and use cases within DEWA.

ENERGY SYSTEM ANALYSISRESEARCH

Energy System Analysis Research develops and applies advanced

capabilities for joint technical and economic assessment of

energy-related technologies,systems, and policies. Thearea develops energy models,

lifecycle assessment models, and business strategy assessments

to support DEWA’s future

readiness. This area models and assesses new energy system

configurations and technologies at the macro level with a focus on cost-optimal integration of renewable energy systems and

strategies for the deployment of new energy technologies.

R&D TRANSACTION 2022SYSTEMEFFICIENCYPOWER TRANSMISSION &DISTRIBUTIONIn line with increasing the

electricity generation to meet Dubai’s electricity demand, DEWA expands the investment in the

electrical T&D substations in order to secure delivering electricity to the consumers at the highest levels of reliability.

POWER TRANSMISSION:In 2022, DEWA commissioned 17

nos. new Transmission Substations, which included fifteen 132 kV

(kilovolt) Substations and two 400 kV Substations with a total investment cost of AED 11 billion (Between 2021 to 2024). So far, the cost of energised projects during 2021-2022 is about AED

6.1 billion, whereas for ongoing projects under execution, it is about AED 4.9 billion.

In 2022, the net increase inlength for 400kV Transmissionlines (including Overhead &

Underground) was 2 kilometres, whereas for 132 kV Transmission lines (including Overhead &

Underground), it was 215kilometres.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022122

Page 123

The table below demonstrates details about the transmission substations and lines:

Transmission Substations

Type20182019202020212022

132 kV258285307319334

400 kV2122232527

Length of Transmission Lines, 2022

Type20182019202020212022

Overheadlines (KM)*

132402402402369367

4001,1251,1641,1681,3861,388

Underground lines(KM)

1322,0162,1462,2492,3352,552

4002424242525

*kilometresPower Distribution:

By 2022 DEWA had 73 (33 kV) distribution substations and 42,771 (11-6.6kV) substations in services across the Emirate of Dubai. In 2022 the length of distribution lines for the 33kV overhead line and underground cables are 99.75 kilometres & 2,000.44 kilometres respectively, and the length of distribution lines for the 11-6.6 kV overhead line and underground cable are 613.28 kilometres and 35,441 kilometres respectively.

The table below demonstrates details about the distribution substations and lines:

Distribution Substations

Type20182019202020212022

33 kV10193858173

11-6.6 kV35,50038,24040,58841,81442,771

Length of Distribution Lines, 2022

Type20182019202020212022

Overhead lines (KM) 33kV112111.88104.33100.199.75

11- 6.6 kV628616.02608.26606.4613.28

Underground lines(KM)

33kV2,0762,1422,119.492,1082,000.44

11-6.6 kV 32,482 33,940 34,475 35,001 35,541About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022123

Page 124

DEWA continuously focuses onimproving and maintaining the

best operational efficiency of its T&D network. Therefore, in 2014, DEWA developed its first Smart Grid strategy up to 2035, which is a key component of a smart city.

One of the most important factors for the success of smart cities is the seamlessness and availability of round-the-clock integrated

and connected services that meet daily living requirements, which is only possible via a Smart Grid.

A Smart Grid ensures two-waycommunication between the

utility and its consumer and allows for monitoring along the power and water grids. A Smart Grid

consists of controls, computers, automation, and equipment

working together. DEWA’s Smart Grid will provide advanced features and includes automated decision-making and interoperability across the entire electricity and water network.

For more details about DEWA’s

Smart Grid, you may visit the link below:

SUPPLY SIDE

To increase production efficiency, DEWA produces electricity

and water using cogenerationtechnology. Heat RecoverySteam Generators uses wasteheat from gas turbines andpass the steam through steam

turbines to produce additional electricity and provide energy to the Multi-Stage Flashing (MSF) water desalination. DEWA adopts an ideal design for the water

desalination plants using a hybrid system, in which water is produced using several technologies, such as desalination through MSF and Reverse Osmosis. This ensures

the highest efficiency during

the life cycle of the plant, at the lowest cost. In addition, DEWA implements innovative gas turbine upgrades as DEWA continues to

follow up with original equipment manufacturers regarding new

cost-effective upgrades andtechnologies throughout the

turbine life cycle, increasing capacity and enhancing efficiency and reliability.

2007200820092010201120122013201420152016201720182019202020212022

YEAR2.52

9.0212.84

18.0820.04

26.1826.8828.3627.0025.4728.8729.6831.4033.4137.6337.7840

3020100EfficiencyImprovement (%)

2007200820092010201120122013201420152016201720182019202020212022

YEAR0.3

1.52.2

3.33.7

4.85.05.55.65.56.46.77.17.18.09.2

8.010.06.04.0100Million Totns (CO2)

Efficiency Gains from improvement in Gross Heat Rate 2007-2022 compared to 2006

Carbon reduction (Million Tons CO2) due to efficiency improvements compared to 2006About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022124

Page 125

DEWA consistently invests inefficiency improvements. From2006 to 2022, DEWA achieveda 37.78% of improvement in

cumulative efficiency, which is equivalent to 82.0 million tons of CO2 emission reduction. These

saving are due to improved

generation efficiency with respect to 2006 mainly by decoupling

of Power Generation & Water

Production (Addition of Solar & Sea Water RO Plants), DEWA

Initiatives and Optimum Design and Reengineering. The availability of cogeneration, reduced number of trips & optimised operation to meet the required power &

water demand with minimum fuel consumption while maintaining

system security and reliability enabled these savings.

TOWARDSA CIRCULARECONOMYDEWA already has a strongcommitment to sustainability

which is reflected in the overall purpose, vision and mission of the company. Building on the

momentum of its sustainablebusiness and operations, the

organisation continues to move along this pathway by developing a clear circular economy strategy, with the objective to shift away from the traditional linear business approach to a circular economy.

DEWA has set a clear ambition

to become a circular leader in the region by focusing on optimal

resource use, creating social, economic and environmental

value. Through this strategy,

DEWA continues to successfully perform its core activities in line with the best global practices.

DEWA’s circular economy modelholds a particular mandate to

contribute towards many of the strategies and objectives set on a global, federal and local level, which include the UNSDGs 2030, UAE Net Zero 2050, UAE Vision

2021, UAE Circular EconomyPolicy, and the Dubai CleanEnergy Strategy 2050.DEWA’s Circular Economy Modelis based on five key circular

principles that serve as a basis for circularity within DEWA:

1. Circular Design and Use of

Circular Material

2. Optimise Asset Management

3. Value Retention and End-of- Life Treatment

4. Circular Partnership

5. Renewable Energy, Energy and Water Efficiency

DEWA’s Circular EconomyModel provides insight into its

It aims to develop business and fully collaborate with stakeholders in the value chain by focusing on smart users, circular procurement and supplier engagement.

focus, while moving its business to become more circular:About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022125

Page 126

INNOVATIONFOSTERING INNOVATIONIn line with the National InnovationStrategy launched by His HighnessSheikh Mohammed bin Rashid Al

Maktoum, to make the UAE one of the most innovative nations in the world, and the Dubai Innovation strategy to make Dubai the most innovative city in the world,

DEWA maintained its position as one of the biggest supporters of innovation in the UAE and Dubai, It was awarded the ISO 56002:

2019 in Innovation Management, becoming the first organisation in the world to receive this certificate.

DEWA also received ISO 30401:

2018 certification in Knowledge Management Systems; becoming

the first utility in the world to receive this certification.

DEWA promotes a culture of

innovation among its employees; it adopts innovation in its work through an institutional approach and is moving steadily toward the future by building a sustainable future.

D E W A a l s o i m p l e m e n t s knowledge management activities and programmes in line with

the directives of the DubaiGovernment and DEWA’s vision,

strategy, and global best practices based on accessibility, availability, accuracy, appropriateness, and sharing of knowledge.

It is committed to supportingand developing a culture of

creating, learning, sharing, and exchange of knowledge among

its employees, departments, and divisions, to support creativity, innovation, and excellence.

DEWA has an integratedknowledge management systemthat includes a KnowledgeManagement policy, strategy,

structure, and quality procedures to promote the growth of

employee awareness, abilities, and practices through the

following:•Activities such as KnowledgeDays, Knowledge Management

training, Share an Hour, Annual ShareK Recognition award,

Communities of Practice,

Ma’rifa Collaboration Platform, Expert Knowledge, Sessions,

LinkedIn Learning, and the iAsk Reference & Research Service

to promote the transfer ofknowledge between individualsand groups.

• A c c e s s f o r a l l D E W A stakeholders to physical

collections and creative spaces through the 7 DEWA Knowledge

Centres, 6 Knowledge Chairsand 3, Reading Trees.

• DEWA Smart Library, Smart

Office Application and DEWAOnline Catalogue for all.AFKARIIn 2022, DEWA received over

7,631 ideas through the Afkari internal platform. This brings the platform’s total number of ideas received since 2015 to

54,839 ideas. DEWA organised11 campaigns, 88 workshops,

and 74 brainstorming sessions in 2022 to encourage employees to participate in its initiatives and

projects, listen to their ideas, andstudy their suggestions.

Smart Users DEWA aims to actively support its clients in optimising the energy consumption, lowering resource use by focus on real -life data and offering smart use solutions.

CircularProcurement

DEWA sets circular procurement criteria for its assets and equipment, to aim for circular procurement throughout the value chain.

SupplierEngagement

In order to ensure full value chain collaboration, DEWA engages with its suppliers on the use of circular material, the re -use of assets, and creating collaborations to

jointly contribute to the transition towards a circular economy.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022126

Page 127

DEWA has also established aninnovation fund to supportemployees in implementing and

developing creative ideas. Its Future Trends Platform, enables employees to access the most

recent innovations from around the world. It demonstrates

examples of innovation practices in various industries, as well as in products, services, technologies, and trending topics such as:

digitalisation, cyber security, digital economy, smart society, and sustainability.

In addition, Catalogue is now

available for all employees. This database and communication

platform enables employees to

log, search, and share signals, which are anything that is already happening today that could signal the future.

DIGITALISATION

Digitalisation has been at the centre of DEWA strategy for

multiple years. It is considered a key enabler to improve its services, achieving sustainability objectives, introducing new lines of business, and the Digital Transformation Strategy has been determined to provide the following key benefits:

• Improved customer experience and enhanced customer value

• Cost optimization through

improved asset utilisation,capacity planning

• E f f i c i e n c y i m p ro v e m e nt through process optimisation

& optimal resource utilisation

• Revenue enhancement through

new business models andproductsDEWA worked with partners

to i nt ro d u c e t h e D i g i t a l Transformation House, which

consists of six key pillars to drive digital transformation

implementation smoothly across the organisation. The six pillars are Enablers; Governance & Operating Model; Technology Engine; Digital Applications/Use Cases; Strategic Objectives; Digital Ambition. The Digital Transformation House is aligned with DEWA’s Strategy Map and the vision to be “A Globally Leading Sustainable Innovative Corporation Committed to

Achieving Net Zero by 2050”.

As a result of this strategy DEWA was able to achieve significant benefits. A total of 15 initiatives have been completed out of the 65 identified initiatives.

DEWAVERSE:DEWA launched its ‘DEWAVerse’platform on the Metaverse andbecame one of the first local

government organisation to launch its platform on the Metaverse to provide its services to customers, employees, and members of

society. DEWA invests in Metaverse technology to implement and develop its current and future projects, which contributes towards stakeholder happiness, the development of

business, enhancing efficiency and production, and reducing costs. This is in line with the directives of His Highness Sheikh Mohammed bin

Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, to leverage digital technologies and AI to improve performance and improve people’s lives, and His Highness Sheikh Hamdan bin Mohammed bin Rashid Al Maktoum, Crown Prince of Dubai and Chairman of The Executive

Council of Dubai, who launched the Dubai Metaverse Strategy that aims to turn Dubai into one of the world’s top 10 Metaverse economies as well as a global hub for the Metaverse community.

IdeasYEAR 2022AFKARI7,6316,51669519759AED 258.603 Million

Participants used the Afkari platform Proposed Ideas (cost savings)

Total Number of Ideas with cost saving Total Number of ideas

Total Number of ideas in progressAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022127

Page 128

To be the most innovative digital

corporation with superior stakeholder proposition Digital Ambition

StrategicobjectivesTechnologyEngineDigital applications/use casesGovernance &operating modelEnablersoptimized costs,revenues anddiversified globalinvestmentsAI & data analytics Automation

Enterprise systems Smart visualisation Operations technology

MetadataAccess and sharingDigital Governance:Digital policiesand processesData managementand governanceCybersecurityArchival and disposal Data acquisition Data sourcesAggregation and storage HarmonizationDigital Work EnablementTBL01Available, reliableand high qualitysupply ofelectricityand waterEngaged& Happystake-holdersLeadingInnovativecustomerexperienceS01 S02 IP03Enabling Al& DisruptiveDigitalTechnologiesLG03Human Capital - Talent Management and Future SkillsetsCommunication and change managementPartnership/ExternalCollaborationDEWA DIGITAL TRANSFORMATION STRATEGY

The project aims develop a corporate wide digital transformation strategy that shall define DEWA digital aspiration, key areas of action and the roadmap to achieve effective and value adding digital transformation

across all divisions to support our stakeholders happinessAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022128

Page 129

DAQRIVRTraining

DEWA announced its platform on the Metaverse to provide its services to customers, employees, and members of the society VR

Fire SafetyVRFirst AidVRStudioVirtualWETEXVR DEWAOn BoardingAR SolarInnovationCentreSAP/ARField ServicemanagementLaunchedDEWAverseHololens 1Google Glass2014-20172020 - 20212022Moving ForwardPresent upto10 POC’sduringGITEXDEWAStoreFloatTender forMetaverseStrategy and20 use cases DEWAAcademyFleetManagementHROnBoarding+METAVERSE - DEWAVERSEAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022129

Page 130

RAMMAS:

Rammas is the first robot launched by a governmental organisation to serve customers and answer

their enquiries in both Arabic & English. Rammas was developed

and launched to support DEWA’scustomer centre by simulating aDEWA’S SMART DOCUMENT SYSTEM:

DEWA Smart Document system consists of a mobile application where all employees can easily access the application at any time and from any location to perform their day-to-day work-related services.

Smart Document Savings 2022

Number of procedures (completed) 5,354,184 documents archived (completed the workflow process).

Number of services (provided) 66 process automations(excluding the sub-processes or systems integrations).Saving (AED) AED 104,430,271 (estimated).

Dubai Paperless Strategy 100% achieved (this is a Smart Government initiative &; not related to Smart Document specifically).

live agent to assist different typesof customers while continuing to

learn and understand their needs based on their enquiries, offer transactional and informational services, and provide two ways of seamless interaction either by menu selection or direct questions.

One of the main purposes of

Rammas is to increase customer happiness and satisfaction

records.

The following table demonstrate the environmental impact of

Rammas:YearTotal PaymenttransactionTotal cost saving(AED)Totaltrees savedCO2 emissionsreduction (Tons)

20192,68837,380,76613,7342,747

20205,8829,165,60217,4553,491

20216,87518,153,4287,0541,402.52

20227,28415,281,15111,8972,365

Smart Design for ElectricityDistribution NetworksIn 2022, DEWA created new

software for the ‘Smart Design of Electricity Distribution Networks’ and obtained the IP from the

UAE Ministry of Economy The

innovation is based on merging databases and electric network designs (11kV) through developed solutions to enable the Network Design Engineers to design a more effective and smoother network.

All information is collected through advanced software from several data sources such as peak load, SAP system and other databases.

It includes several features such as automated calculations, and archiving them electronically.

Digital IntegrationsDEWA also completed thedigital integration of more than70 projects with more thanAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022130

Page 131

30 government and private

organisations. This is part of its continuous efforts to enrich the customer experience in Dubai

and enhance the happiness of its stakeholders. These organisations include Digital Dubai Authority, Dubai Municipality, Roads and

Transport Authority Dubai, Dubai Land Department, Dubai Health

Authority, the Department ofEconomic Development, more

than 20 banks, Etisalat, du, ENOC, EPPCO, Noqodi wallet, Western

Union, and Empay. Through this step, DEWA makes it easier to

get a wide range of services,

including bill payment, information updates, activation of electricity/ water (Move-in), housing fees

adjustment, refunds, updatingtrade license and others.

Through the digital integrations and digital channels more than 10 million smart transactions

have been completed in 2022,which contributed to reducingmore than 41,000 tonnes of

CO2. This is equal to planting more than 46,000 trees over an area equivalent to 88 football pitches until December 2022.

DEWA provides all its services through its website and smart

app for customers to complete

their transactions anytime and anywhere, easily and safely. This is in addition to protecting the environment and preserving

natural resources.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022131

Page 132

ENVIRONMENTALPERSPECTIVEENVIRONMENTAL COMPLIANCE

DEWA has excellent environmental management system and programmes that strictly adhere to the local, federal, and international regulations. Its working culture prioritises sustainability and environmental management, which has led to ongoing environmental and sustainability improvement programmes.

Moreover, DEWA has a strong commitment to protect and preserve natural resources and the environment; starting from the top management, through the direct instructions of His Excellency the MD and CEO. This guides the organisation’s mission, vision and values, while considering the needs and expectations of its stakeholders and business objectives. Furthermore, DEWA undoubtedly initiated a long-term strategy and has demonstrated its ongoing commitment to having state of the art environmental and sustainability programmes.

DEWA continuously engages in implementing a range of ISO standards with internal, external, and third-party audits to ensure continual improvement in its operations and business areas. DEWA’s current IMS policy clearly outlines its intentions and principles, providing strong evidence of strategic leadership. The organisation allocates adequate resources to deliver environmental and sustainability programmes at all levels, aligning them with its mission statement, objectives, environmental values, and strategic plan.

ENERGY:INSTALLED CAPACITY

With the population growth in the Emirate of Dubai and increasing demand for energy, DEWA continued to provide electricity and water services to the highest standards. DEWA is transforming Dubai into a clean energy global hub by targeting 100% of the city’s total power capacity to be obtained from clean energy sources by 2050. Since 1992, DEWA has developed and expanded to reach an installed capacity of 14,517 MW (including 2027 MW from renewable energy source, especially from Solar Energy) and 490 MIGD for electricity generation and water production respectively. The share of clean energy in Dubai is about 14%

of the total installed capacity.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022132

Page 133

MOHAMMED BIN RASHIDAL MAKTOUM SOLAR PARK:

The Mohammed bin Rashid Al Maktoum Solar Park in Dubai is the largest single-site solar park in the world.

The project is aligned with the Dubai Clean Energy Strategy 2050 and Dubai Net Zero Emission Strategy 2050. The solar park will be fully operational by 2030 with a total planned capacity of 5,000 MW. The project’s completion will reduce 6.5 million tons of CO2 emissions annually.

In 2022, DEWA used the latest solar photovoltaic bifacial technologies with Single Axis Tracking to increase energy production in phase 5. As a result, the production capacity of the first project of the fifth phase has increased from 300MW to 330MW. The 900MW fifth phase, with investments of AED 2.06 billion, is 60% completed with a 4.225 million safe working hours without injuries.

DEWA Installed CapacitySite (Dubai) Station Installed Power Capacity (MW) at 50 C & 30% R.HJebel AliD 1,026.99E 615.50G 818K 948L 2,400.60M 2,885.20Aweer H 1,995.86

Seih Al Dahal Mohammed bin Rashid Al Maktoum Solar Park* 2,027

Hassyan Hassyan Power Plant** 1,800 Total (MW) 14,517

* Solar PV Plant Capacity Maximum MWac.

** Net Generation capacity for Hassyan Power PlantAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022133

Page 134

Phase 1 Phase 2 Phase 3 Phase 4 Phase 5 Phase 6

Status Completed Completed Completed In progress In progress Announced Date of

completion 2013 2017 2020 2024 2023 2026EnergyGenerated(InstalledCapacity) 13 MW 200 MW 800 MW 950 MW 900 MW 1,800MWTechnologies Photovoltaic Photovoltaic PhotovoltaicPhotovoltaic& CSP Photovoltaic Photovoltaic# Solar Cells

used 153,000 2.3 Million 3 Million 791,560 2.7 Million 5.4 Million

(Estimated)EmissionReduction 15,000 tons214,000tons1.055 Milliontons

1.6 Million

tons

1.18 Million

tons2.36Million tons(Estimated)InvestmentAED 82.7MillionAED 1.2BillionAED3.47BillionAED 15.78BillionAED 2.06Billion(Estimated)AED 5.57Billion(Estimated)

Land Used 0.3 sq.km 4.5sq.km 18 sq.km 44 sq.km 10.17 sq.km 20 sq.km Partners &

SharesDEWA(100%)DEWA(51%)ACWAPower(49%)DEWA(60%)Masdar(24%)EDFEnergiesNouvelles(16%)DEWA(51%)ACWAPower(25%)Silk RoadFund (24%)DEWA(60%)ACWAPower(40%)DEWA(60%)ProjectCompany(40%)End Users(Residents) Pilot Project 50,000 240,000 320,000 270,000 540,000(Estimated)About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022134

Page 135

HYDROELECTRICPOWER PLANT INHATTADEWA’s hydroelectric power

station in Hatta is the first of its kind in the region with investments of up to AED 1.421 billion. The hydroelectric power station

expected to generate 250MW by

making use of the water stored in Hatta Dam. The station will have a storage capacity of 1,500 MWh and a life span of 80 years.

The hydroelectric power station will use water in the Hatta Dam and an upper reservoir that is being built in the mountain.

During off-peak hours, advanced turbines will use clean energy to pump water from the dam to the upper reservoir. Turbines operated by the speed of the waterfall from the upper reservoir will be used to generate electricity through a 1.2 kilometre subterranean water canal, with high efficiency in power generation and storage of up to 78.9% and with a 90-second

response to demand for electricity.

The project is around 60%completed and planned to be

operational by the end of 2024.

Furthermore, DEWA isimplementing two main otherprojects in Hatta:

1. The Dubai Mountain Peak: The Dubai Mountain Peak project

includes the constructionof a 5.4-kilometre cable carto transport tourists to thesummit of Um Al-Nesoor. At

1,300 meters above sea level, it is the highest natural summit in Dubai. The project is expected to be a major tourist attraction in the UAE. The cable car route passes over the Hatta Dam Lake and the Upper Dam Lake for

the hydroelectric power station, as well as through mountains,

ending at the summit of Um AlNesoor Mountain.

2. The Hatta Sustainable

Waterfalls: The Hatta

Sustainable Waterfalls project will use the slope of the upper dam to create a natural waterfall.

A waterway will be built along the parking area below the

dam. The water used in the

waterfall will be collected at the end of the stream, recycled, and pumped back to the top of the

dam. Fish bred in the stream will provide an additional attraction for tourists and families.

Through these projects, DEWA

aim to develop Hatta and provide innovative job opportunities for the citizens of the area, as well as promote society happiness. For instance, the Hatta Sustainable Waterfalls project aims to create a sustainable natural environment, in addition to developing the area and turning it into recreational spaces and a tourist attraction in the UAE. The idea began with creating a natural water stream aligning with Hatta’s nature.

Investment opportunities abound with four oases that will have coffee shops, restaurants, and children’s playgrounds, in addition to shops for selling natural honey, local products and souvenirs. The shops will be given as grants from His Highness Sheikh Mohammed

bin Rashid Al Maktoum to thecitizens of Hatta to createadditional job opportunitiesand meet the needs of social,economic and environmentaldevelopment.DEWA OFFSETTINGPROGRAMME

D E W A i n i t i a t e d t h e implementation of its offsetting programme by registering several emission-reduction projects

under the Clean DevelopmentMechanism (CDM) and the

International Renewable Energy Certificates (I-RECs).

THE CLEAN DEVELOPMENTMECHANISM (CDM):In 2012, DEWA initiated the

implementation of its Offsetting Programme by registering

several emission-reduction

projects under the CDM, of the UNFCCC. DEWA has issued

10,635 Certified EmissionReduction (CER) from its 13MW Mohammed Bin RashidAl Maktoum Solar Park’sphotovoltaic plant and 95,197CERs from Thermal Energy

Storage Turbine Inlet Air Cooling project. There was no issuance of

CERs in 2022.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022135

Page 136

Mohammed BinRashid Al MaktoumSolar Park(Phase 1, 13 MW)Thermal EnergyStorage TurbineInlet Air cooling(TESTIAC) ProjectMohammed BinRashid Al MaktoumSolar Park(Phase 2, 200 MW)Small ScaleSolar Programmeof ActivitiesDEWA’sregistered CleanDevelopmentMechanismprojects➀➁➂➃THE INTERNATIONALRENEWABLE ENERGYCERTIFICATE (I-RECS):

DEWA was the first entity in the MENA region in 2017 to join the renewable energy market via the I-RECs Registry Platform to issue the I-RECs from the Mohammed

bin Rashid Solar Park 13 MW PV Plant, 200 MW and 800 MW PV

Plants.

The I-REC Standard is a voluntary system for international trade in renewable energy certificates that was created to provide electric

utilities with a financial incentive to increase the amount of renewable or clean energy in their supply mix relative to fossil fuels, and offset the environmental impact of the purchaser’s non-renewable energy use by subsidising clean energy from renewable sources.

I-RECs are particularly useful to companies with global operations and a target to source 100%

renewable energy for strategy or compliance purposes.

Participation in the I-REC system is aligned with DEWA’s strategic objective to diversify its investment portfolio by issuing renewable energy certificates to stimulate the international development of renewable energy.

without RECPurchasewith RECPurchaseElectricityConsumersElectricityProducersElectricity MarketTransmission System

Renewable Energy Certification Association of

Issuing BodiesAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022136

Page 137

SUSTAINABLE ANDENERGY-EFFICIENTBUILDINGSENERGY MANAGEMENT OFDEWA PREMISES AND ASSETS

DEWA is committed to creating a sustainable built environment that is energy, water, and material resource efficient by applying national and international standards for green buildings at all its assets. DEWA’s sustainable efficient buildings are in line with the UAE’s efforts to create a green and sustainable economy, the Nationally Determined

Contributions for the UAE against Climate Change, and the Dubai

Digital Authority initiative.DEWA applies an EnergyManagement System on itsbuildings which have beenrecently expanded to cover

generations, plants its Substations, administration buildings, and fleet.

The Energy Management system

allows DEWA to keep track of its energy performance and identify energy conservation opportunities which would also reflect a cost benefit for the organisation.

The below table demonstrates the total auxiliary energy consumption from power generation and water production facilities located at Jabel Ali, Al Aweer, and MBR Solar Park Phase 1.

DEWA has been continuously

achieving progress in improving the energy production efficiency, Auxiliary Power Consumption

Reduction, carbon emission

reduction, and fuel savings. Since 2006, DEWA has achieved the

following in 2022:

1. 37.78% of efficiency

improvement

2. 225,873 MWh of Auxiliary

Power Consumption Reduction

3. 9.22 Million tons of Carbon emission reduction

4. Fuel savings of 172,973,272

Metric Million British ThermalUni (MMBtu) due to efficiencyimprovement2018201920202021202229.6831.4033.4137.6337.78413,745408,148293,385314,781225,873EfficiencyImprovementcompared to 2006 (%)Auxiliary PowerConsumption Reduction(MWh) compared to 20066.657.067.118.049.22Carbon Reduction MillionTons of CO2) due toefficiency improvementcompared to 2006124,713,523132,295,018133,309,503150,786,454172,973,272Fuel saving due toefficiency improvementcompared to 2006 - MMBTU

1,6851,6361,6421,6471,652

3,689,6133,761,6143,715,4083,838,667

4,191,042

20182019202020212022

Solar (10MW MBR Ph-1) Gas, DFO & MFO (DEWA Gas Plant) Auxiliary Consumption (MWh)

Note: DFO: Diesel Fuel Oil, MFO: Medium Fuel OilAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022137

Page 138

EMISSIONSCO2 EMISSION REDUCTIONPROGRAMME:

DEWA aims to reduce its carbon footprint while maintaining a

secure, reliable and affordable supply of power and water.

DEWA has systematically worked on reducing its CO2 Emission

Reduction Programme launched in 2012.

The Emission Reduction Program (ERP) is a long-term carbon

emissions abatement strategy

that provides an extensive analysis of DEWA’s current greenhouse

gas emissions, sets targets to reduce CO2 emissions up to

2030 from all operations, and

incorporates proposed emission reduction targets within its

business decisions and overall growth strategies. DEWA’s efforts have led to a significant reduction in carbon emissions in Dubai.

DEWA’s CO2 ERP has three

strategic pillars to ensure its strategic objectives are met:

climate change functional strategy, emission reduction targets

forecast model, robust monitoring reporting and verification

system aligned with the annual performance management system.

The ERP is a comprehensiveprogramme that considers

reductions from both the demand and supply sides. It considers several key factors: Dubai’s energy and water growth requirements, Dubai’s water and electricity

consumption rationalisationinitiatives, DEWA supply-sideefficiency improvements, and

the diversification of its energy mix. The ERP targets were

developed for both emissionintensity (tCO2e/MWh) and

the absolute emissions (tCO2e) for short-, medium-, and long-term emission-reduction tasks

up to 2030, with 2010 used

as the baseline. DEWA’s actual emission reduction performance is measured annually against

the Business As Usual (BAU)

scenario. DEWA’s CO2 ERP sets a planned reduction target of 35% of its scope 1 greenhouse gas

emissions by 2030 against the

BAU scenario. This is based on DEWA’s 2020 Power and Water

Master Plan, which is updatedevery year.Emissions by Source from Scope 1 MtCO2e 2019-2022

19,511,29218,146,957

21,290,42221,472,817.02

2,988,8513,154,9642,741,8653,036,157.19

102,700.6582,50088,47981,078

2019202020212022

Emissions by Source from Scope 1 MtCO2e 2020-2022Electricity Generation Water Desalination OthersAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022138

Page 139

2019 2020 2021

Carbon emission intensity, tCO2/MWH of electricity generated (2019-2022) Electricity tCO2e/MWh Combined (Electri city & Water) tCO2e/MWh 0.4818

0.483420220.46060.47440.41780.42930.40350.4041

in circuit breakers, fuel combustion in vehicles, and refrigerant

usage for air conditioning and maintenance operations, in

addition to emissions from small emission sources:

• CO2 usage in fire protection systems and labs

• Diesel usage during emergencies

• Acetylene usage for

maintenance activities

• LPG usage for cable termination works

• Process emissions due to

desalination

• Laboratory acetylene usage

DEWA follows an operational

control approach in consolidating, monitoring and reporting on

its GHG emissions, quantifying them in terms of CO2 equivalent, and therefore its subsidiaries or affiliates were not considered.

DEWA has gone to all reasonable lengths to ensure the relevance, completeness, consistency, accuracy, and transparency of its Carbon Footprint Report. The quantification methodology employs the formula of GHG activity data multiplied by the GHG emission factor.

In 2022, DEWA’s total carbonemissions from Scope 1 were

24,61 MtCO2e against BAU 31.15 MtCO2e and the carbon intensity based on Grid Emission Factor for Electricity is 0.4035 tCO2e/MWh.

Since DEWA itself is the producer of the electricity it consumes, Scope 2 emissions from its own consumption are part of Scope 1 emissions to avoid double counting.

Indirect emissions from the power purchased are reported under Scope 2 emissions only. In 2022, no power was purchased by DEWA from other electricity grids.

MINIMISATION OFAIR EMISSIONSSimilar to carbon emissionreduction, DEWA focuseson reducing air emissions byminimising and limiting other typesDEWA’S CARBON FOOTPRINT:DEWA is one of the first

entities in the region to develop a comprehensive Monitoring,

Reporting and Verification (MRV) framework for its Greenhouse

Gases (GHG) emissions since

2012, establishing that year as the baseline for reporting emissions.

The MRV framework enables the

reporting of emissions through DEWA’s Carbon Footprint Report, which is prepared in accordance with the GHG Protocol and

compatible with the ISO 14064-1, which also allows for integration with national and international GHG registries.

DEWA annually reports its Carbon Footprint Report, which quantifies and calculates its annual direct GHG emissions (Scope 1), covering CO2, CH4, N2O, SF6, HFCs and

PFCs and indirect GHG emissions (Scope 2) from electricity

imports. Scope 1 sources include fuel combustion during power

generation and water desalination,sulphur hexafluoride (SF6) usageAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022139

Page 140

of toxic emissions such as Sulphur Dioxide (SO2), Nitrogen oxide

(NOx), and Sulphur Hexafluoride (SF6). Such emissions are

considered are considered harmful and have a significant impact on the environment.

WASTEWASTE MANAGEMENTWaste is one of DEWA’s focus

areas therefore, the organisation has built an effective waste

management system. Since each

division has its own scope of work and different daily operational practices, DEWA customised

the waste management systems

for its 13 divisions differently.

However, all systems have a

unified target which is capturing and reducing the amount of

waste generated. DEWA has

recently created its own Circular Economy strategy which consists of five principles as mentioned in the Circular economy

section. The third principle“Value Retention and End oflife Treatment” is consistentwith its waste management to

include the process of mapping waste streams resulting from

various divisions activities and developing practices to minimise waste.

DEWA implements efficientmanagement procedures for

its non-hazardous material and waste management programme

to preserve valuable landfill space and natural resources and to

promote waste minimisation byadapting 5Rs (Refuse, Reduce,

Reuse/Repair, Repurpose/Recover & Recycle) practice for managing its non-hazardous material and waste.

As for wastewater discharge,DEWA obtains a wastewaterdischarge permit bi-annually

and follows Dubai Municipality regulations to ensure that both the quality and quantity of the wastewater discharged from

Jebel Ali Power and Desalination Complex are within the permitted discharge quality and quantity limit.

DEWA collaborates with Dubai

Municipality, the environmental regulatory body in Dubai, to

manage the waste generatedfrom its daily operations. In2022, DEWA transported

5,297.68 tons of general waste to Dubai Municipality disposal areas. DEWA collaborates with

third party companies that are certified by Dubai Municipality for hazardous waste management according to a comprehensive

hazardous waste management

system to ensure proper handling.

This includes collecting, storing, transporting and disposal of

hazardous waste in accordance

with the best local, federal, and international procedures and

standards. DEWA earned a total of AED 104 Million from selling scrap waste materials and waste oil and AED 29,716.25 from the recycled paper waste in 2022.

The SO2 emissions have been

slightly reduced to be 0.52 Parts Per Million (PPM). Moreover, DEWA

reduced its NOx emissions from all units including all types of fuel, gas turbines, and boilers in 2022. The 23.06

0.700.760.550.540.52

20182019202020212022

21.1818.91

17.5517.36

Annual NOx & SO2 Air Emissions (2018 - 2022) - PPM Nitrogen Oxide (NOx) Sulphur Dioxide (SO2) graphs below show the average

annual NOx and SO2 emissions:About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022140

Page 141

The table below demonstrates the hazardous and non-hazardous waste generated and methods of disposal from (2017-2022):

Waste Figure UnitYear

20182019202020212022

General waste Tons2,628.635,335.454,823.644,378.535,297.68

Hazardous waste Tons49.2568.89181.69420.56418.337

Wooden packingreusedCubic

Foot16,4097,0496,46211,9059,278

Wastewater

recovered MIG226.59193.24200.93238.63285.13

Waste oil

recovered for use Liters60,566.623,63618,184.45,455.3115,911.0

Recycled

wastepaper Tons38.4277.78269.59127.18118.87

Spill Pallet made of

IBC drum No.10022311795150

Revenue fromscrap/wastematerials sold -

Consolidated AED1,126,817.325,548,069.4857,294,66759,770,306104,000,000

DEWA’S SMART RECYCLE BIN:

In line with its efforts to promote circularity within the organisation, DEWA has launched an initiative called the “Smart Recycle Bin”.

Currently, there are two such bins at: its Head Office & Al Warsan.

The objective is to encourage & engage with employees to recycle plastic bottles and aluminum cans by a reward system that gives

points each item they recycle.

The employee will be able to

scan through the machine using the smart office application to get reward points and enter

into monthly raffle draw. During 2022, more than 68,829 bottles/ aluminum cans were collected. The plastic bottles/ aluminum cans at a later stage are picked up by a third party company that provides sustainable manufacturing

solution, where they will convert the plastic bottles into T-shirts and recycle the aluminum cans

in through the standard recycling mechanism. Such initiatives have encouraged employees to collect their bottles from office and

home to be recycled. The project concept also follows DEWA’s

ongoing approach to increaseawareness among employees

about sustainability trends and alignment with Sustainable

Development Goals.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022141

Page 142

CLIMATE CHANGE

DEWA recognises that utilities play a crucial role in a decarbonising societies. It considers the impact of its operations on the climate and how tackling climate change may present key benefits for its business by improving brand reputation, cost reduction, resilience against harmful impacts, alignment with regulations and increasing investors’ confidence. DEWA established itself as a regional leader in climate change mitigation and adaptation efforts over the past years.

Below is a snapshot of DEWA’s climate change mitigation and adaptation efforts:

DEWA’s Mitigation Efforts and Initiatives DEWA’s Adaptation Efforts and Initiatives

• DEWA’s CO2 Emission Reduction

Program aligned with Dubai CarbonAbatement Strategy 2030

• Comprehensive Monitoring, Reporting and Verification (MRV) framework for DEWA’s carbon emissions in compliance with ISO 14064

• Main stakeholder for the UAE Climate Change Taskforce and international climate change negotiations.

• Driving the transition towards a low carbon economy by deploying initiatives critical to decarbonization.

• Key stakeholder in implementing the Demand Side Management Strategy 2030

• Supply side energy efficiency improvements and optimisation

projects

• DEWA’s Offsetting Programme

• Comprehensive climate change resilience plan

• Setting adequate reserve margin for power generation and water production

• Diversification of generation & desalination sites

• Planning considerations and operational feats for reliability, security and stability

• Asset management planning and

framework

• Managing quality of source water

• Reducing unaccounted water lossesAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022142

Page 143

Vision A climate-resilient utility ensuring sustainable, innovative and resilient operations and assets to withstand the impacts of climate change Guiding

principlesRobustnessResourcefulnessRapid RecoveryAdaptabilityApproach Risk Assessment | Prevention and Management | Adaptive Practices | StakeholderEngagementGoals

1. Integrate climate change considerations into business practices 2. Align with local and national climate change resilience plans 3. Maintain an evidence-based resilience plan

4. Ensure safe and sustainable operations

5. Build and maintain resilient infrastructure

6. Maintain a business model aligned with national and international strategies and policies 7. Improve DEWA’s Adaptive Capacity

DEWA’s Climate Change Resilience Plan was developed based on a detailed risk assessment and in line with best practices. The Climate Change Resilience Plan is integrated into DEWA’s Enterprise Risk Management (ERM) system and is also a part of its strategic planning. The annual management of the Climate Change Resilience Plan is developed following DEWA’s ERM framework:

DEWA’S CLIMATE CHANGERESILIENCE PLANClimate change has emerged

as one of the leading priorities worldwide and one of the main

issues facing the international community. Globally, it is causing extreme heat, rainfall, floods, droughts, tropical storms, and hurricanes. Regionally, the power and water sectors in the UAE are also vulnerable to the adverse effects of climate change. Climate change is a cross-cutting risk that can have a physical impact on

DEWA’s operations, and economic, regulatory, and reputational impact on its business.

This is why climate change action is one of DEWA’s top priorities, and in efforts to evaluate,

understand and respond tothe potential climate changeimpacts on our assets and

operations, DEWA has developed a comprehensive Climate Change Resilience Plan. DEWA is one of the first entities in the region to develop such a Resilience Plan that identifies existing mitigation measures, preventive controls

and future resilience actions that address the potential impacts of various climate change drivers.

DEWA’s Climate Change Resilience Plan is driven by a vision, guiding principles, approach, and goals to ensure power and water sector

resilience.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022143

Page 144

IDENTIFYING CLIMATE-RELATED RISKS

To cope with an uncertain future where climate change may have

wide-ranging effects on theenvironment, and on socio-economic conditions, DEWA hasanalysed and assessed climatechange trends and projections

using climate models to provide an overview of observed climatic trends and projections at the

global and local levels; which are essential in shaping an effective climate change resilience plan for DEWA. The output of these

projections helped indicate the climate change conditions that could impose potential physical and transitional risks on DEWA’s business and operations.

There are several ways of

classifying climate change risks; either based on the cause of the risk or its impact. DEWA have

assessed two main drivers when identifying Climate-Related Risks:

Policy drivers and Climate drivers.

For the policy driver risks, the global, national and regional

climate change policies and

strategies relevant to DEWA were assessed to identify potential risks for each policy driver that DEWA may face in the coming

years and decades. As for the

climate drivers, it has considered the climate variables identified based on available regional climate change trends and projections

aligned with Dubai Climate

Change Adaptation Strategy. This is due to variations in geography and climate conditions across the different Emirates in the UAE.

Furthermore, variations in the risks associated with the specific power facilities result from factors such as location, age, design, and the adaptive capacity of facilities.

In 2020, DEWA identified andintroduced a “Climate Change

Risk” index, based on the climatic and policy drivers in its ERM

system, and overseen by the Group Risk & Resilience Committee.

After analysis and classification of potential impacts, various

interdependencies, outlining risk heat maps, and identifying key risk indicators, the risk of climate change reflects the potential

impacts of both policy and climatic drivers on DEWA’s strategy and operations.

The risk of climate change could have financial and non-financial consequences for DEWA. These

include revenue loss, service

disruption, health and safety, environment, and reputation.

Climate change is expected to bring warmer ambient temperatures,

rising sea levels, more frequent and severe extreme weather

events, and warmer seawater

temperatures. Furthermore, there will be less fresh water, an increase in sea acidity and a change in precipitation levels. These may have several impacts on DEWA’s business and operations.

In 2022, DEWA continued to be

adaptive to the potential impacts of the identified climate change drivers due to all the key preventive controls and mitigation measures it has set. The organisation

continuously monitors climatechange drivers to be able tomitigate potential climateResilience plan review6

Communication and Consultation5 Resilience plan update

Risk analysis and evaluation 3 2 Risk identification

1 Establish the context4About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022144

Page 145

change impacts on its physical assets and business operations.

Through the established climate change resilience governance and framework, the climate change

resilience team analyses climate change drivers and trends,

classifies and rank the identified risks, studies vulnerabilities and opportunities from projected

climate change scenarios.WATER & EFFLUENTSUSTAINABILITY OF WATERPRODUCTIONAs Dubai grows, the demand

for water is increasing, DEWA is committed to delivering water

service to its customers. In 2022, desalinated water production

remains at 490 MIGD. In line

with DEWA’s decoupling strategy of power generation and water

desalination, all future expansions in water production will be based on SWRO technology using

renewable energy.

By the end of 2022, the number of water customer accounts was 995,478 compared to 960,032

accounts by the end of 2021. The table below demonstrates the

Installed Capacity and total water produced between 2018 to 2022

MIG:YearInstalledCapacity(MIGD)TotalWaterProduction(MIG)

2018470120,880

2019470123,090

2020470121,006

2021490126,147

2022490136,254

In 2022, DEWA produced

136,254 MIG of desalinated water, representing a 8.01% increase

from last year and the installed capacity was 490 MIGD. The peak daily desalinated water demand of 413.427 MIG was recorded on 14-September 2022, an increase of 4.31% growth compared

to 2021. The average daily

desalinated water demand in 2022 was 375.278 MIGD compared to

352.346 MIGD in 2021, which is an increase of 6.51%. The peak monthly average desalinated water demand of 407.710 MIGD occurred in September 2022, an increase of 7.30% compared to 2021.

In 2022, the installed capacity from underground wells, which

is maintained exclusively foremergency purposes, was

approximately 35.56 MIGD (total production of 582.203 MIG). The daily production from wells was approximately 1.61 MIGD from

groundwater. This is to maintain the wells in an operational

state for use in an emergency.

The groundwater productionis monitored through metersinstalled on each well.The total amount of waterwithdrawn through DEWAwater wells is 582.203 MIG

(approximately 2,201 mega litres).

This is considered ‘Other Water’ since the average Total Dissolved Solids (TDS) for well water is more than 1000 mg/L (i.e. 1286 mg/L

precisely).

Water Data Unit20182019202020212022

Installed Capacity

(Underground wells) MIGD3232323535.56

Furthermore, the potable water produced, transmitted and distributed by DEWA is in compliance with the requirements of the latest WHO potable water guidelines.

Sl.No. Particulars Of AnalysisWHOGuidelineValue(Max)DEWA-JAPSSpecificationTypicalFigure

1 pH value at 25°C 6.5 ~8.57.90-8.508.37

2 Conductivity at 25°C μS/cm-200-900407.8

3 TDS mg/L1000100-450224.3

4 Chlorine Dioxide as ClO2 mg/L-0.40-0.500.47

5 Turbidity NTU - < 5.0 0.9About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022145

Page 146

6 M-Alkalinity as CaCO3 mg/L-25-6550.3

7 Carbonate as CaCO3 mg/L-0-100.4

8 Bicarbonate as HCO3 mg/L-30-8060.9

9 Total Hardness as CaCO3 mg/L50040-12058.9

10 Calcium Hardness as CaCO3 mg/L-25-6540.9

11 Calcium as Ca mg/L-10-2616.4

12 Magnesium as Mg mg/L-2-204.4

13 Chloride as Cl mg/L25025-25085.5

14 Sulphate as SO4 mg/L2502-359.4

15Free Carbon

dioxide as CO2 mg/L - ≤1.50.4

16 Fluoride as F mg/L 1.5 ≤ 1.5 <0.05

17 Chromium as Cr mg/L 0.05 <0.050.0035

18 Iron as Fe mg/L - ≤0.30.0186

19 Copper as Cu mg/L 2 ≤1.00.0732

20 Nickel as Ni mg/L 0.07 ≤0.070.0093

21 Cadmium as Cd mg/L 0.003 ≤ 0.003 <0.0020 22 Mercury as Hg mg/L 0.006 ≤ 0.006 <0.0020

23 Sodium as Na mg/L20010-20051.3

24 Lead as Pb mg/L 0.01 ≤ 0.01 <0.0020

25 Boron as B mg/L 2.4 ≤2.40.3260

26 Cyanide as CN mg/L - ≤ 0.07 <0.005 27 Selenium as Se mg/L 0.04 ≤ 0.04 <0.0020 28 Arsenic as As mg/L 0.01 ≤ 0.01 <0.0020

29 Manganese as Mn mg/L - ≤0.40.0030

30 Molybdenum as Mo mg/L - ≤ 0.07 <0.0020 31 Antimony as Sb mg/L 0.02 ≤ 0.02 <0.0020 32 Barium as Ba mg/L 1.3 ≤ 0.7 <0.0020 33 Uranium as U mg/L 0.03 ≤ 0.03 <0.0020 34 Nitrate as NO3 mg/L 50 ≤ 50 <0.05 35 Nitrite as NO2 mg/L 3 ≤ 3 <0.01

36 Bromate as BrO3 mg/L 0.01 ≤ 0.01 <0.0002

37 Chlorite as ClO2 mg/L 0.7 ≤0.70.2858

38 Chlorate as ClO3 mg/L 0.7 ≤0.70.1758

39TTHMs(Concentration

ratio) 1 ≤1.00.0952

a) Chloroform as CHCl3 mg/L 0.3 ≤ 0.3 <0.001

b) Bromoform as CHBr3 mg/L 0.1 ≤0.10.009

c)Dibromochloro

methane as CHBr2Cl mg/L 0.1 ≤0.10.001

d)Bromodichloromethane as CHBrCl2 mg/L 0.06 ≤ 0.06 <0.001About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022146

Page 147

40Dissolved

hydrocarbons mg/L - < 0.01 (*) <0.01 41

Total ColiformBacteria Present/Absent - Absent Absent42 E. Coli Bacteria Present/Absent - Absent Absent

43 Saturation pH - 7.89 ~8.498.29

44 Saturation Index Positive PositiveRemarks:

- (*) The taste and smell threshold value varies widely according to product and it is 0.0005 ppm (mg/L) for hydrocarbons and distillate should be dumped if it is having smell or taste of oil.

- DEWA JAPS typical figure is the average of individual station averages during the year 2022

- WHO guideline values is based on W.H.O drinking water guidelines values 4th edition with Addendum 1 of 2017.

24.7min 21min 19min 18.53min 18.18min

2017201820192020

Average Time for Response + Isolation (Transmission Breakages)

Average Time for Response + Isolation (Minutes)

20212022

22.73min

DEWA has also started operating the Smart Meters Analysis and

Diagnosis Centre, where smartmeters are read and monitoredremotely every 15 minutes. Asof 31 December 2022, DEWA

installed 996,917 smart meters, out of which 985,144 are

monitored and read remotely

every 15 minutes. This allowed DEWA to improve the availability of meter readings to 99.22%. with 978,430 water meters remotely

billed in SAP. The AMI improves meter reading & billing accuracy, customer happiness, and reduces Unaccounted for Water.

The state-of-the-art infrastructure for smart meters helped detect 1,329,944 water leakages; 26,657 defects; and 13,172 increase load cases in the past five years. This saved customers a total of AED 540.3 million. The High-Water

Usage Alert service, which is part of the Smart Living initiative, helps customers detect leakage in water connections after the meter. The system sends instant notifications to the customer if there is an unusual increase in consumption to check the internal connections and repair any leaks. This reduces waste as well as incurred costs for

customers.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022147

Page 148

DEWA has successfully completed the first stage of the ASR project for desalinated water. The full scale of the ASR project can store up to 6,000 MIG of water once completed by 2025 as a strategic reserve. This makes it the largest ASR of its kind in the GCC and world to store potable water and retrieve it in case of an emergency.

This will secure the Emirate with an additional source of potable water strategic reserve of 50 MIGD for 90 days in emergencies, while ensuring the quality of the stored water.

DEWA plans to increase the storage capacity of Dubai through new projects to reach 7,212 MIG in 2025 as compared to the present storage capacity of 822MIG.

The table blow demonstrates the water consumption within the Emirate of Dubai:

Total water storageat the beginning of thereporting period (MIG)Total water storageat the end of thereporting period (MIG)Change in waterstorage (MIG)2019202020212022622.130611.788412.436661.60611.788412.436661.600575.7410.342199.352- 249.164- 85.86SMART BALL LEAKDETECTIONIn 2022, DEWA adopted the

smart ball leak detection to detect invisible water leakages in water transmission pipelines that are hard to detect or reach. This is part of DEWA’s ongoing efforts to reduce water losses. The smart ball system consists of a small diameter sphere that is inserted into the water network where

it travels freely, driven by the water flow. Sounds generated by a leak, gas pocket or anomalies have unique characteristics. The system captures the sounds of

these from inside the pipeline with the software then able to detect the location of the leak.

The technology has saved 68.45 million gallons and AED 2.74

million since its implementation in April 2021.

WASTE WATER DISCHARGE:DEWA embeds environmental

solutions into its business by developing specified procedures for its daily operations that are in line with the environmental regulatory body Dubai Municipality. To

manage the wastewater generated from DEWA’s Jebel Ali Power and Desalination Stations Complex, DEWA follows its wastewater

management procedure to

ensure that the water discharge quality is up to standards

and safe for the surroundingecosystem. Furthermore, aspart of the procedure, DEWA

conducts ecological assessments on a bimonthly basis to

assess the phytoplankton,

zooplankton, and macro benthos concentrations four times a year.

The assessments are carried out at distances of 0.5 km and 2.0 km away from D, K, and L stations discharge points by specialist

environmental service providers.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022148

Page 149

TOTAL VOLUME (M3) DISCHARGEType of

effluent20182019202020212022

Process waterfrom Power

plant1,776,251,5681,719,495,0061,645,458,8181,654,577,1501,698,174,459

Process waterfrom Desal

plant3,595,084,4343,594,972,9403,573,859,4853,540,695,3413,777,922,079

Watertreatment

plant effluent74,31868,65868,40674,83161,298

Treated sewage

water (to land)38,636.30.000.000.000.00

Treated sewage

water (to sea)54,740.211,968.115,84915,81440,673.00

Treated sewage

water93,376.511,968.115,84915,81440,673.00

The Average of Temperature and Salinity Difference between the Seawater at Mixing Zone and Ambient Seawater 2022:

Particularssample

Salinity difference between the seawater at mixing zone and ambient seawater (g/kg)

20182019202020212022

D-I station0.70.70.60.50.6

D-II station10.90.60.50.7

E station0.50.50.60.50.6

G station10.50.90.70.8

K station0.60.50.70.40.7

K-SWRO----0.5

L station0.80.50.40.80.8

M station0.40.60.70.90.9

Average 0.7 0.6 0.7 0.6 0.7About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022149

Page 150

Temperature difference between the seawater at mixing zone and ambient seawater (oC) Particulars

sample20182019202020212022

D-I station1.81.51.10.81.8

D-II station2.42.11.21.01.8

E station1.41.21.71.01.3

G station2.41.01.51.41.5

K station1.31.01.11.11.3

K-SWRO----1.1

L station1.91.41.31.41.3

M station1.61.61.31.51.7

Average1.81.41.31.21.5

The Average of Temperature and Salinity Difference between Seawater at the Mixing Zone and Ambient Seawater 2022:

NET ZERO CARBONEMISSIONS

DEWA has set an ambitious goal of achieving net-zero carbon

emission by 2050, which means to eliminate or offset CO2 emissions.

DEWA has identified and initiated several steps to achieve this goal.

One important step is to increase the use of renewable energy and to promote energy efficiency and conservation through various

projects and initiatives. Through its Research and Development Centre, DEWA is researching and testing the use of carbon capture, utilisation and storage technologies which will capture and store CO2 emissions from power plants, thus reducing the overall emissions. DEWA also follows the UAE agenda, rules

and regulations related to carbon emissions.

Salinity g/kgTemperature̊ C1.50.7About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022150

Page 151

EMPLOYMENT

DEWA is focused on attracting, developing, and retaining the best talent in order to provide reliable and efficient electricity and water services to the people of Dubai.

As such, DEWA has a talentmanagement strategy in place,

which also focuses on identifying the skills and competencies

needed for different roles, as well as providing training and development opportunities to

help employees grow and advance in their careers. Furthermore, DEWA emphasises employee

engagement and participation

in decision making processes by encouraging open communication and feedback, and regularly has surveys to gather employees

insight, feedback and suggestions.

DEWA has developed the “Afkari” platform for employees to suggest solutions that will enhance and develop its performance in all areas.

D E WA a l s o f o c u s e s o n performance management, where

employees are evaluated based on their performance and provided with feedback and coaching to

improve their skills through the employee’s development centre.

In this way, DEWA ensures

continuous improvement of their employees and performance. The organisation regularly reviews and updates its policies and practices to ensure that it is providing the SOCIAL

PERSPECTIVE

best services to its customers, employees and the community.

A WORLD-CLASS WORKFORCE

DEWA’s workforce is composed of a mix of UAE nationals and expatriates from all genders, representing various cultural and educational backgrounds and qualifications. DEWA is committed to hiring and developing local talent with a significant proportion of its workforces being made up of UAE nationals.

DEWA’s workforce consists of a range of skilled professionals including engineers, technicians and other staff with the expertise and knowledge to provide reliable and efficient electricity and water services. In 2022, DEWA’s total number of employees was 10,932, of which 17.76% are females and 82.23% are males.

10,85810,93274Total number of employees:PermanentTOTALTemporary

* DEWA doesn’t have any non-guaranteed hours employees.

DEWA fosters and supports behavior that drives employees to bring innovation and excellence into their work which contributes to sustainable growth for the long-term development by ensuring that all employees are given the same opportunities without discrimination based on sex, race, nationality, age or creed, in line with the policies and regulations of the UAE government. In 2022, no incidents of non-discrimination were

recorded during the reporting period.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022151

Page 152

272

8,918

8,9901,942

1,940

PermanentPermanent

TemporaryTemporary

0Part Time0Part TimeFemale Male8,990Male1,9428,990Full Time1,942Full TimeFemale

Permanent & Temporary employees, and a breakdown by gender

Full-time employees and Part-time employees, and a breakdown by gender

Asia Europe MiddleEastAfricaNorthAmerica Oceania SouthAmerica

10,85874

Permanent TemporaryTotalTotalOceaniaAfricaSouthAmericaNorthAmericaMiddleEastEurope Asia

10,9320

Permanent TemporaryTotalTotal

158 0 6,359 0 49 0 Full-Time Part-Time Full-Time Part-Time Full-Time Part-Time 157 1 Permanent Temporary

17 0 Permanent Temporary6 0 Permanent Temporary1 0 Permanent Temporary6,288 71 Permanent Temporary17 0 Full-Time Part-Time6 0 Full-Time Part-Time1 0 Full-Time Part-Time4,342 0 Full-Time Part-Time49 0 Permanent Temporary4,340 2 Permanent TemporaryPermanent & Temporary employees, and a breakdown by regionFull-time employees and Part-time employees, and a breakdown by regionAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022152

Page 153

New employee hires and employee turnover by age group, gender and region New Employee Hires

Gender2019202020212022

Female51445743

Male335172231155

Total386216288198

Region2019202020212022

Africa182610

Asia357210279186

Europe10231

North America1201

Total386216288198

Age Group2019202020212022

18-29226170218113

30-39121355767

40-492991015

50-599233

60-691000

70-790000

Total386216288198

Employee TurnoverBy Gender

Gender20182019202020212022

Male260251156211244

Female3947183336

By Age

Category20182019202020212022

Under304836121517

30-50219224133203240

Over503238292623

By Region

Region20182019202020212022

Africa3235141927

Asia201178119181204

Australia00000

Europe28333

North America36210

Middle East6171364046

Total 299 298 174 244 280About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022153

Page 154

Percentage of employees eligible to retire in the next 5 years by category and region Retirement 5 Years

Continent Engineers Operators Linesmen Mechanics Others Total

Africa0.45%0.00%0.00%0.00%1.79%2.24%

Asia14.80%9.87%0.90%1.79%48.43%75.78%

Europe0.00%0.00%0.00%0.00%2.69%2.69%

Middle East0.90%0.45%0.00%0.45%17.49%19.28%

North America0.00%0.00%0.00%0.00%0.00%0.00%

Grand Total16.14%10.31%0.90%2.24%70.40%100%

The total number of employees eligible to retire in the next 5 years by category and region is 223.

Percentage of employees eligible to retire in the next 10 years by category and region Retirement 10 Years

Continent Engineers Operators Linesmen Mechanics Others Total

Africa0.38%0.05%0.00%0.00%1.32%1.76%

Asia15.44%7.97%0.88%4.56%49.51%78.35%

Europe0.00%0.00%0.00%0.00%1.32%1.32%

Middle East1.32%0.33%0.00%0.16%16.37%18.19%

North America0.05%0.00%0.00%0.00%0.33%0.38%

Grand Total17.20%8.35%0.88%4.73%68.85%100%

The total number of employees eligible to retire in the next 10 years by category and region is 1820.

Age Group under 30 years old, 30-50 years old, over 50 years old.

1,1338,0511,748

Number employees

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022154

Page 155

EMPLOYEEBENEFITSAs a world-class workplace,DEWA rewards its employeesfairly and generously, basedon their performance. DEWA

offers a comprehensive benefits to employees to meet their

personal and professionalrequirements. These mayinclude:

1. Allowances (house rent

deduction, duty car, nature of work allowance, mobile phone

allowance, shift allowance,special shift allowance etc.)

2. Retirement Provision

(Gratuity & Pensionschemes)

3. Leaves (Earned, special,

accident, condolence, sick,maternity, paternity, studyor exams, Hajj, Idda, andconfinement leave etc.)

4. Accommodation/ Air

Passage Entitlement

5. Children Education Allowance 6. Medical Insurance/Healthcare 7. Bonus

8. Joining & Repatriating tickets 9. Disability & Invalidity Coverage 10. Residence Visa costs for

employees & family

11. Salary Advance for New

joiners

12. Life insurance is voluntary.

In DEWA if the employeewishes he/she can enroll in

the scheme and it is optional.

H o n o u r i n g d i s t i n g u i s h e d employees is part of DEWA’s

strategy to recognise excellent and creative employees to raise its competitiveness and ensure the happiness of customers and society. This also supports top management’s commitment to

providing a motivational workenvironment that consolidatescreativity, innovation and

encourages positive competition among staff.

In line with this strategy the top management honoured 1,868

distinguished employees and 54 distinguished teams with the

Nujoom Awards 2022, the newname for its internal excellenceawards. The categories includedDistinguished Supervisory

E m p l o y e e , D i s t i n g u i s h e d A d m i n i s t r at i v e E m p l o y e e , Distinguished Innovative Employee,

Distinguished Field Employee,Youth Employee, DistinguishedTechnical Employee, DistinguishedFinancial Employee, DistinguishedSpecialised Employee, Unknown

Soldier, Distinguished Technical Project, Distinguished Innovative Administrative Initiative, Best Agile Project, Best Project / Initiative Attaining Sustainability, Best Project In Data Science and AI, Share.K, Long Service Employee and Special Recognition for those who help achieve DEWA’s vision.

Through the Nujoom awards,DEWA promotes sustainableexcellence by encouraging

creativity, innovation and positive employee competitiveness. This is achieved by adopting constructive ideas that contribute to the

development and upgrading ofservices as well as the happinessof all stakeholders.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022155

Page 156

EMPLOYEE PARENTAL LEAVE AND RESUMED DUTY, 2022Parental Leave

Employee Parental Leave & Resumed Duty Leave Type

Entitled toParentalLeaveTookParentalLeaveReturned toworkReturnedto workRateRetainedEmployeesRetentionRate**Maternity Leave 1,181 151 151** 100% 161*** 96%Paternity Leave 7,270 352 352* 100% 320**** 93%

Total 8451*****503503481

*Male employees returning to work immediately from 1 January, 2022 to 31 December,2022–100%

**Female employees returning to work immediately from 1 September, 2021 – to 31 August,2022–100%

***Out of 168 female employees of 2021, 161 female employees are retained after 12 months (96%).

****Out of 343 male employees of 2021, 320 employees are retained after 12 months (93%) ***** 539 employees have used parental leave as of 2022

DIVERSITYAND EQUALOPPORTUNITIES

DEWA follows all UAE government laws and regulations and is

committed to providing equal

opportunities for all employees and applicants for employment.

its equal opportunities policy prohibits discrimination against any applicant on the basis of

race, color, religion, sex, national origin, age, disability, and gender.

DEWA’s policies ensures that

all employees and applicants for employment are treated fairly and without discrimination. DEWA also provide training and development programmes to promote diversity and inclusion in the workforce, and it also provides accommodations for employees with disabilities.

Furthermore, DEWA has a number of initiatives and programmes

to support the developmentand advancement of women in

the workplace. These initiatives includes the following:

• For Her – Empowerment

programmes

• Celebrating International

Women’s Day through variousinitiatives

• Celebrating Emirati Women’s

Day through various initiatives

• Celebrating International

Women in Engineering Daythrough various initiatives

• Edha’aa bulletins

• Soft skills and social focused workshops

• Wellness and health

programmes

• “Together… We Learn”

CampaignOverall, DEWA is committed to

fostering an inclusive and diverse workplace where all employees

are treated with respect and haveequal opportunities to succeed.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022156

Page 157

HUMAN RIGHTSASSESSMENT

DEWA’s divisions, business units, and subsidiaries, are committed to conducting business with the highest level of integrity and in accordance with the letter and spirit of Dubai and UAE laws.

DEWA is a morally consciousorganisation, and uses to useits position as a responsible

organisation to promote ethical work practices in compliance with the human rights laws of the

country and international best practices as applicable.

In 2022, DEWA conducted 33sessions across its divisionsspanning different employee

groups, to discuss human rights and other employee related rights including but not limited to; HR Policies, Provisions and rules of conduct and work ethics in DEWA, HR Rules and Regulations, HR

Services. A total of 623 employees across all divisions have attended these sessions till November

2022 which were under the name HR Awareness sessions.

Furthermore, DEWA’s Code of

ethics for Contractors has included a requirement in all procurement contracts to comply with the SA 8000 Standard, which includes a good working environment, the

Universal Declaration of Human Rights, and ILO agreements.

All Tender Documents include

a special clause on compliance with the SA 8000 Standard, and tenderers must include a self-assessment form on SA8000

compliance in their offers. 100% of bulk purchase and project

procurement activities are subject to human rights reviews based

on tenderers’ self-assessment

forms and conformity with the SA 8000 norm. All new employees

of the procurement organisation, as well as those who work in

procurement, receive training

on the terms and conditions of contracts, which includes the

SA8000 standards. The Human

Rights clause was incorporated in all 357 bulk purchases and project contracts for the year 2022. In the year 2022, the aforementioned

sum and percent representprocurement contracts worthmore than AED 2 million.DEWA values and manages its

HR diversity through planning, organising , administering

as well as supporting variedcharacteristics and pluralityamongst its employees and by

recognising them as individuals and teams, in a way that adds

tangible and positive effect in the organisational performance and contributing to the happiness of employees. In addition, the below list is other DEWA’s policies that are related to Human Rights:

1. DEWA Policy For The

Happiness, Accommodationand Empowerment of ThePeople of Determination (POD)

2. Employee Accommodation

Procedure

3. DEWA Inclusive Education

PolicyTRAINING ANDEDUCATION

DEWA provides various training and development opportunities

for its employees such ason-the-job training whereemployees receive hands-on

training in their specific roles and responsibilities, as well as cross-functional training to gain a broader understanding of the organisation.

The wide range of courses aredesigned to help employees

i m p ro v e t h e i r s k i l l s a n d advance their careers. These

courses cover topics suchas leadership, management,communication, and technicalskills. DEWA also encourages

m e n t o r i n g r e l a t i o n s h i p s between experienced employees

and newer staff members, to

provide guidance and support as employees learn and grow in their roles. Employees are encouraged to participate in international training programs to gain new

perspectives and learn fromexperts in other countries. Avariety of e-learning modules

are available for employees with flexibility to access the trainings

from anywhere and at any time.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022157

Page 158

Below is the Average Training Hours per Employee and by Gender:

Average Training Hours Per Employee

Grade/Year20182019202020212022

Leadership109.4890.3985.6283.7888.99

Management49.3155.7352.9651.0054.56

Non-Supervisory42.2242.6842.8346.3055.86

UAE Nationals58.3965.5857.9457.4867.47

Average Training Hours by Gender

Gender/Year20182019202020212022

Male26.2728.2627.0130.4334.92

Female55.3565.6265.8862.4075.41

DEWA provides a range ofplatforms, programmes, and

initiatives to spread and localise knowledge and transfer expertise among its employees. Many

educational courses to raise

employee awareness on knowledge and its management, types of

data, information and knowledge, intellectual property rights

and ways to protect them. For

instance, in 2022, DEWA enrolled their nominated employees in

several international and national programmes, such as:

1. Masters in Future Energy

Systems & Technology from UC

Berkeley. In 2022, 30 employees enrolled in the program (Batch 4). The programme started in

October 2022 and is expectedto end in November 2023

2. Capacity Building Programme 3. Robotic Process Automation

Learning Programme

Overall, one of DEWA’s goals is to provide and enroll its employees in such programmes to develop the necessary skills and knowledge needed for their roles, and to help them advance their careers within the organisation.

OCCUPATIONALHEALTH ANDSAFETY

DEWA is a strategically focused organisation incorporating the IMS comprising ISO-9001; ISO-14001 & ISO-45001 cascading the same within its management system

through a dedicated IMS Policy, IMS procedures and process maps; in line with Federal Law No. 8 of 1980, Ministerial Order No. 32 of 1982, Dubai Municipality Code of Construction, Dubai Municipality Guidelines, and the fourth-

generation Dubai Government

Excellence Programme, supported by Dubai Accelerators’ 10X

Strategy for future generations.

The key methodology in DEWA’sPerformance Management isbased on RADAR and 10-steps

of continual improvement. DEWA has a dedicated STRATEX, CAPEX and OPEX for health, safety, and environment (HSE) management

& objectives.

This is further complemented with policies on risk management, social responsibility and agility framework (vertical-alignment). The OHSMS Manual classifies risks, crisis, operations, functionality & controls for all employees, consultants and contractors. DEWA has a dedicated COVID-19 prevention framework

for its control, authenticated withDiamond Award for COVID-19About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022158

Page 159

from Harvard Business Council and British Safety Council Assurance Certificate.

HAZARDIDENTIFICATIONAND RISKASSESSMENTDEWA has a comprehensive and

intricate qualitative & quantitative IMSP03: Hazard Identification and HSE Risk assessment procedure

aligned to Enterprise RiskManagement in line with ISO-45001 & ISO-14001 and HSG-65 Guidelines, HSE, UK.

It is a British Safety Council recognised affiliate HSE training centre for DEWA employees and

has a dedicated SP14: Training, Awareness & competency

procedure aligned to employeeperformance, competency andappraisals.OCCUPATIONALHEALTH SERVICESIn line with ISO -45001,DEWA has a dedicated SP12:Occupational Health Procedure

and EP04: Employee Counselling & Stress Management procedure

that controls and monitors

ove ra l l h e a l t h , we l l - b e i n g and happiness of employees.

Furthermore, there are dedicatedguidelines for POD, Noise,

V i b rat i o n , M u s c u l o s ke l et a l Diseases, HACCP and Welfare &

Wellbeing.Regular stress assessmentsare carried out, referrals to

c o u n s e l l i n g ( E S T I S H A R AT I programme); welfare, wellbeing & hygiene assessments and

COSHH air monitoring are done.

DEWA meticulously crafted itsown COVID-19 prevention andmitigation guidelines, whichwere then distributed to all

of its divisions, departments, sections, contractors, and

vendors. The following were the main points:

COVID-19Prevention andMitigationShared Service withDubai AmbulanceCategorisation of COVID-19ExposureIsolation DeclarationFormTravel DeclarationFormPCR Testing & Screeningwith DHASanitisationProcessEstablished 3 in-houseIsolation Centres for exposedcases at Ruwaiyah Camp, SolarDecathlon Site and JAPSCirculars for working froma distance and Resumption ofwork for employeesAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022159

Page 160

H&SCOMMUNICATIONSANDREPRESENTATION

At t h e s t r at e g i c l e v e l , SO2: Engaged and happy

stakeholders perspective and

IMS policy (Vertical-alignment) with The IMSP06: Participation, Consultation & Communication

procedure has defined a two-way approach (Horizontal-alignment).

Trainings, awareness, ideas Afkari, consultations, participation in events/workshops/surveys are

carried out on a regular basis and employee happiness survey results are evaluated. Other tools are the dedicated DEWA Mobile App

(Smart Office); SAP-integration and Freejna portal. The strategic direction, objectives (SMARTER) and KPIs (Leading & Lagging)

are defined post a 360 degree.

evaluation using RADAR through a dedicated HSE corporate

committee that quarterly reviews performance and short-term

strategic plans.H&S TRAININGSince 2020, DEWA’s in-house

training deliverables have become hybrid, AI-oriented with adoption of AR-VR (Augmented Reality

- Virtual Reality) tech. The

trainings are customised in terms of scope, operations, functions and preventive using multilingual approach e.g. Arabic, English, Urdu/Hindi. Each employee

has a dedicated Training Needs Analysis which is linked to his/ her competency requirements

and aligned to employee-

appraisals. Each division has a dedicated training attrition rate to maintain and achieve the

Target Achievement Level for

hours of training per employee.

DEWA has its own dedicated HSE Training section which is also a BSC Certified training affiliate. In 2022, around 2170 employees

attended 101 training sessions, 87Covid-19 Awareness workshops,

74 one-one consulting sessions, and 96 infographic E-shots that were released through internal communication channels.

20182019202020212022

Number of DEWA Staff attended H&S Training

conducted by H&S Department from2018-2022

Staff attended

189717861857

24162170

PROMOTION OFEMPLOYEE HEALTH & SAFETY

The SO2: Engaged & Happy Stakeholder perspective is cascaded from key Dubai Strategic Accelerator (10x) Health & Wellbeing complemented by the strategic perspectives IP02: Leading HSE practices, LG02:

Motivated & happy human capital and TBL02: Pioneering socially responsible practices. Each employee has an insurance cover locally & internationally. Screenings for health parameters, stress indicators, nutrition and counselling are key practices. Each location is “safe-secure” with first-aid kits, evac-chairs & maps, AED Machines, POD-friendly e.g. Braille text, audio-loop, tactile paving and voice assist centres. All premises are CCTV monitored, with dedicated emergency & response command framework. DEWA also annually hosts its Sports Week and sporting events. Key health campaigns are carried out in line with WHO objectives and promotional campaigns. Some highlights are:

HEALTH & SAFETY WEEK OF DEWA:

The H&S Week is a participatory and interactive platform for creating and increasing awareness of Occupational Health and Safety issues among employees and the general public. In 2022 the H&S Internal Week successfully completed with 5700 attendees and H&S Public had

with 8313 attendees.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022160

Page 161

ANNUAL CONTRACTOR DAY:Annual Awareness Day wasconducted for contractors,

consultants, and suppliers in order to reinforce DEWA’s mission,

vision, and policy of integrated administrative systems.

DEWA’SRESPONSIBILITIESThe IMS Policy of DEWA is atestament of its commitment

to Quality, Health, Safety and Environment (QHSE) and

responsibilities along with the CSR Policy and Stakeholder

Policy (www.dewa.gov.ae) stating that DEWA is committed to

effective implementation of QHSE management within its businesses, in order to attain its purpose by services, and related innovative smart solutions minimising HSE risk, incidents/accidents, injury/ illness and environmental foot-print (Vertical-alignment to Dubai Strategy). The Corporate IMS

procedures cascade to divisions and departments to formulate

procedures and process-maps

linked to RACI matrix and Balanced Scorecard (Horizontal Alignment).

The approach to responsible& accountable implementationis governed by procedures andmonitored by proactive steps

such as inspections, surveillances, screenings and near-miss

reporting along with reactive steps of incident and crisis & emergency management and evaluating the

gaps to make corrections.DEWA’s Health & SafetyPerformances & AchievementsPerformanceIndicatorsScore as of2022Fatality Zero since2000Lost TimeInjuryFrequency Rate(LTIFR)0.53TotalRecordableInjuries Rate(TRIR)0.1201600.51.01.52.02.53.03.5

201720182019202020212022

3.33.283.11

2.121.91.56

3.282.34

1.561.881.29

0.710.53

LTIFRLOSS TIME INJURY FREQUENCY RATE (LTIFR) 2016-2022Target Actual (LTIFR) Linear (Actual (LTIFR)About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022161

Page 162

LOCALCOMMUNITIES:FROM DEWA TOTHE COMMUNITYThrough various initiatives,DEWA engages with the

community on a yearly basis. In 2022, DEWA initiated 30 social and humanitarian initiatives

which included a total of 44,067 volunteering hours. The outcome of these initiatives was reflected on 13,943,554 beneficiaries.

PROVISION OFINFORMATIONEMPOWERINGPEOPLE OFDETERMINATION

A s a s o c i a l l y re s p o n s i b l e governmental organisation,

in 2022, DEWA continued itscontribution to achieving the

vision of the wise leadership to include and empower POD. This

supports the National Policy to Empower POD, launched by His

Highness Sheikh Mohammed bin

Rashid Al Maktoum, Vice President and Prime Minister of the UAE

and Ruler of Dubai, to create an inclusive society that ensures empowerment and a decent life

for POD and their families. It also supports the ‘My Community...

a City for Everyone’ initiative, launched by His Highness Sheikh Hamdan bin Mohammed bin

Rashid Al Maktoum, Crown Prince of Dubai and Chairman of the

Executive Council of Dubai, to transform Dubai into a city that is accessible to POD. DEWA sustain its efforts to include and empower POD through four strategic pillars:

Employees, Customers, Society, and Partners.

DEWA collaborated with its

strategic and community partners to promote POD inclusion into

society and at the workplace. In collaboration with the Ministry of Community Development, it

organised an “Arabic and Emirati Sign Language” Training courses, in addition to Coaching Skill

Training for Managers & Sadiqi of Employees of Determination

(EOD). DEWA collaborated with

Dubai Club for POD in conducting and participating in several events to empower POD in sport and

community events such as: Expo 2020, World Autism Day, and

the World Archery Championship for POD. It also, sponsored the summer activity of Dubai Club

for POD.

D E W A i m p l e m e n t e d a n d sponsored several corporate social responsibility programmes &

initiatives to include and empower POD. Between 2015 and 2022,

there were 82 programmers and

initiatives for POD that reached 3,509,986 people. The Society

Happiness score for DEWA’s

support to POD was 94% in 2022.

WORKING WITH EMPLOYEESOF DETERMINATIONTOWARDS AN INCLUSIVEWORKPLACE:DEWA has come a long wayin supporting and empowering

people of determination (PODs) at work and in society. It has launched many initiatives, programmes and services in accordance with careful plans and strategies that ensure an inclusive employment journey for its employees of determination (EODs). DEWA has continued its efforts in developing an inclusive environment for its employees by providing all assistive technologies, reasonable accommodation, and

special equipment to its EODswith different abilities.Abshir Office - the dedicatedHR team for supporting theinclusion of EODs in theworkplace collaborated withother departments in 2022 toensure the engagement of EODs

by coordinating and conducting 14 virtual activities, events, and workshops, including ‘Emirati

Women’s’ Day’, events, sports

competitions and virtual lectures.

Thirty-nine awareness circulars were sent to DEWA EOD on

Safety Protocols Upon Returning to Work.

In 2022, a special happiness event was arranged for EODs, with the participation of 38 employees and their friends to provide insights into happiness hacks as well as indoor sports, quizzes and fun activities.

DEWA has enhanced itscapabilities as an inclusiveorganisation, with the total

number of employees trained to deal with PODs increasing from 8443 in 2021 to 9688 by 2022.

Examples of training coursesconducted in 2022 include‘Skills On How To Deal With

People Of Determination’ (Smart Learning), ‘Coaching Skills For Managers’/Sadiqi Of EOD, Sanad Toolkit (Arabic) and Inclusion & Accommodation Awareness

for PODs. 100% of EODs have

completed their annual training plan for 2022. The number of

EODs of various disabilities

increased from 19 in 2017 to 41 in 2022. The happiness level of

EODs reached 100% in 2022,About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022162

Page 163

while the happiness level of their relatives reached 96.60%in 2022.

In 2022, the POD Health & Safety (H&S) Standards, the inclusive COVID-19 Management System

and the DEWA H&S Management

System were externally assessed by the 45001:2018 audit conducted by Bureau Veritas as well as the British Safety Council 5 Star H&S Audit. DEWA has achieved an

excellent result of 97.88% and maintained its 5 Star Rating for 2022. The British Safety Council has awarded DEWA with a ‘Double Sword and Globe of Honour

Supreme Achievement Award –

2022’, which is considered the most prestigious award worldwide in the field of health, safety, and environment, recognising DEWA

for simultaneously winning the Globe of Honour Award for

Environment and the Sword of

Honour for Health and Safety, for eleven years running.

DEWA won the Globe of HonourAward for Environment for the11th consecutive time and the

Sword of Honour for its inclusive H&S Management System for

the 15th time. In addition, DEWA successfully conducted four

follow-up refresher POD H&S

Awareness sessions, and all EODs signed an EOD Individual Risk

Assessment.DEWA has come a long wayin supporting and empowering

people of determination (PODs) at work and in society. It has launched many initiatives, programmes and services in accordance with careful plans and strategies that ensure an inclusive employment journey for its employees of determination (EODs). DEWA has continued its efforts in developing an inclusive environment for its employees by providing all assistive technologies, reasonable accommodation, and

special equipment to its EODswith different abilities.Abshir Office - the dedicatedHR team for supporting theinclusion of EODs in theworkplace collaborated withother departments in 2022 toensure the engagement of EODs

by coordinating and conducting 14 virtual activities, events, and workshops, including ‘Emirati

Women’s’ Day’, events, sports

competitions and virtual lectures.

Thirty-nine awareness circulars were sent to DEWA EOD on

Safety Protocols Upon Returning to Work.

CUSTOMERS OFDETERMINATION

DEWA supports the design of the urban environment, the people of Dubai, and the empowerment of

POD to become more productive

and effective. This is done by providing its employees and

Customers of Determination

with easy access to its services, buildings, and facilities, including its Customer Happiness Centres.

In 2022, DEWA continued its

efforts in converting all of its newly constructed buildings and facilities to be compliant 100% with the Dubai Universal Design Code. In addition, DEWA received the Golden Certificate (Universally accessible) for its Head Office Building, which is the highest certification to be granted by Dubai Municipality for a public building based on accessibility compliance and the availability of innovative assistive technologies.

Furthermore, DEWA has been

re-certified to be in conformance with the international ISO

standard 21542:2021 Building

Construction – Accessibility and Usability of the Built Environment, further highlighting DEWA’s

continuous efforts in attaining the highest standards in the well-being of the built environment users. DEWA Customer Happiness Rate for POD achieved 95.24%

in 2022.DEWA’s buildings have beenequipped to be ready for all

emergencies by placing audio and visual alarms, alarms in toilets, and evacuation wheelchairs on all floors. Its Customer Happiness Centres (Self-Service) provide many services and facilities for POD such as special parking with a dedicated helpline for assistance, customised entrances, wheelchair service, directional tactile paving for people with visual impairments, staff trained on how to deal with POD and certified in sign language, dedicated virtual screens to

communicate with POD, DEWA’s

booklets in Braille, tactile map with voice notifications, and hearing loop technology, which is an

advanced hearing aid technology designed to assist people with hearing disabilities. In addition, DEWA videos are available in sign language. Customer Happiness

staff are also present to guide and educate POD on how to use digital services.

DEWA is committed to providing seamless access to information for Customers of Determination through its website, and smart app according to Digital Dubai standards. DEWA has created a

section on its website to include and empower POD. DEWA’s

website compliance scored 100% while the smart app was scored

10/10 by the POD AccessibilityAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022163

Page 164

Evaluation Report by Digital Dubai 2022. In addition, DEWA provides a number of discounts on service charges to POD who are Sanad

Card holders (UAE Nationals), such as discounts on fees for activation and de-activation of electricity and water, and meter inspection (in case meter is working in order). The DEWA Store provides exclusive

offers and discounts from some of the biggest companies, with extra special privileges and discounts for POD.

DEWA’S PAVILION AT EXPO2020 DUBAIDEWA’s pavilion at Expo 2020

Dubai welcomed 547,493 visitors from 1 October 2021 to the end of February 2022. Several local and international officials from public and private organisations visited DEWA’s pavilion in the Sustainability District. These included a 40-person Brazilian delegation, many university

p ro f e s s o r s a n d s t u d e nt s , researchers, and stakeholders

in different areas of clean and renewable energy. DEWA’s pavilion also displayed its key projects and initiatives, such as the Mohammed bin Rashid Al Maktoum Solar Park, the largest single-site solar park in the world; the Green Hydrogen project, the first of its kind in the Middle East and North Africa to produce hydrogen using solar

power; Digital DEWA, the digital arm of DEWA, which is making

DEWA the first digital utility in the world with autonomous systems

for renewable energy and storage with the expansion in AI and

digital services; and the 250MW hydroelectric pumped-storage

power plant in Hatta. The pavilion provided unique and innovative experience for visitors to introduce them to its efforts that contribute to making Dubai the smartest and happiest city in the world through pioneering projects and initiatives, especially in clean and renewable energy using the Fourth Industrial Revolution technologies to

redefine the concept of a utility and become the world’s first

digital utility.FUTURE ENGINEER CAMP –13TH CYCLE

DEWA organised the 13th Future Engineer winter camp, virtually, from 12 to 23 December 2022,

with the participation of 30students aged 11 to 14 years.The camp aimed to expand

knowledge in cybersecurity, basics of electronic engineering, 3D

printing, developing smartphone apps, and using advanced

programming languages. The

camp activities also included a field visit to DEWA’s Innovation Centre at the Mohammed bin

Rashid Al Maktoum Solar Park,

where the participants went on a virtual tour across the Solar Park using metaverse technology. It also allowed students to attend innovative shows using drones

and hologram technology, trythe autonomous bus ride, and

explore the latest innovations in clean energy technologies. The Future Engineer camp aligns

with DEWA’s efforts to prepare students for promising careers by strengthening their technical skills and promoting scientific research, innovation and creativity.

DEWA also encourages the nextgeneration towards scientificspecialisations.The Future Engineer camp has

attracted 374 students over its past editions. Students’ happiness was 99%, while their parents’

happiness was 100% for the 13th edition of the camp.

DEWA’S CLEANTECHHACKATHON

In conjunction with UAE Innovates 2022, DEWA’s Innovation Centre launched Cleantech Hackathon to encourage innovators, university students, and specialists to

compete in the latest innovations in energy, urban environment,

digital transformation, and a

sustainable lifestyle. Centre also launched the second batch of

the Cleantech Youth Programme.

It comprised a wide range of

training workshops, specialist education sessions, and field visits to accredited institutions with the participation of academics, specialists, and experts from

several schools, universities, start-ups, and local and global organisations. The programme

sheds light on different fields of clean energy and the uses

of disruptive technologies. The second batch of the programme

witnessed the participation of 25 graduates or those pursuing university degrees in 15 different majors including engineering or science fields at 13 accredited academic institutions in the UAE.

It attracted 145 applications.

The programme graduated 25youth leaders from across all

UAE universities, who presented innovative projects during the programme.

EARTH HOUR 2022

Earth Hour is one of the largest international environmental

initiatives that unite millions of people around the world to

tackle the threats posed by theAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022164

Page 165

growing issue of climate change, by making a concerted effort to switch off unnecessary lights

and electronic appliances for an hour. In 2008, Dubai became

the first city in the Arab world to participate in Earth Hour.

The “EarthHourDubai” initiative is held under the patronage of Sheikh Hamdan bin Mohammed

bin Rashid Al Maktoum, CrownPrince of Dubai and Chairman

of the Dubai Executive Council, and in cooperation with the

Dubai Supreme Council ofEnergy and the Emirates Nature

- WWF, in association with the World Wide Fund for Nature

(EWS-WWF). This initiative

exemplifies the pioneering role of Dubai, continuously supporting initiatives to raise awareness around environmental issues,

and supporting sustainable

development locally, regionally, and internationally.

In 2022, the EarthHourDubaiinitiative theme “Speak UpFor Nature” aimed to raise

responsibility between community groups and government entities to connect positively with our environment, by promising to

protect planet Earth by adopting a sustainable lifestyle.

RAMADAN AWARENESSCAMPAIGNDEWA launched its annualRamadan awareness campaign to

raise awareness about conservation and having a sustainable and

responsible lifestyle. This supports Islamic values that encourage

moderation and reducingwaste. DEWA also organised

a series of virtual and physical awareness lectures to encourage the community to contribute

to sustainable development,

protecting the environment, and reducing emissions. The campaign focuses on senior citizens, POD, Qur’an recital centres, participants of the Ramadan Aman campaign,

sport club members, orphans, and recent converts.

For the Holy Month, DEWA also

organised several virtual events, competitions, and internal lectures in Arabic and English, about the values of Ramadan. DEWA also

launched an awareness page

on its internal website Freejna about Ramadan as the month of

worship, righteousness, piety, and tolerance.

SUSTAINABLE SUMMER CAMPDEWA in cooperation with theUAE Ministry of Education,

organised a series of physical awareness workshops as part of the ‘Sustainable Summer Camp’

held by the Ministry. This is part of DEWA’s social responsibility and its strategy to promote a culture of creativity and innovation among the new generation. More than

250 female students from Mariya AlQubtya High School in Dubai

participated in the workshops. The workshops highlighted the latest disruptive technologies such as AI, 3D printing, and robotics, in addition to project management.

DEWA endorses the national

efforts to empower and train the youth and invest in their potential, time, and skills. This qualifies them to become the next generation of sustainability leaders and to carry on the journey of development in the UAE in all areas.

COMMUNITY CYCLINGCHALLENGEDEWA is keen to encouragecommunity members to adopt a

healthy and vibrant lifestyle, in line with the wise leadership’s vision to make sports part of Emirati society. Therefore, DEWA hosted the Community Cycling Challenge organised by Peloton Events, with the participation of 11 teams from across the UAE. The event was

held under the patronage of the Dubai Sports Council and spanned 66 kilometers. The participants in the challenge praised DEWA’s efforts to promote harmony and cultural rapprochement among

all members of society. They

also pointed to DEWA’s fruitful efforts to ensure a brighter and more sustainable future. This

is by supporting the future of sustainable energy through

pioneering global projects, such as the Mohammed bin Rashid Al

Maktoum Solar Park.CUSTOMER HEALTH &SAFETYDEWA prioritise the customer

health and safety by developing proactive plans to provide all all services according to the

highest standards of availability, reliability and efficiency. DEWA called on customers to undertake necessary measures during the

rainy season to avoid any internal interruptions and ensure the

safety and continuity of electricity supply. DEWA urges its customers to visit its website and official pages on social media for all tips and guidelines to be followed to ensure a safe use of its services. In addition, DEWA urged customers to close all electrical cabinets, replace any damaged meter

windows, seal all spare conduitson rooftops and check if all theAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022165

Page 166

connections are properly earthed to ensure the continuity of safe and stable electricity supplies.

CUSTOMER HAPPINESS

In line with its 2022 Strategy, DEWA is dedicated to achieve

excellence in service provision to attain customer happiness and

exceed their expectations. As

such DEWA, transformed all of its Customer Happiness Centres into Unmanned Self-Service Centres, effectively adapting a new strategy to ensure successful business

operations. DEWA adopted a

state-of-art Customer Happiness Framework, aligned with many

of the new national and local

development plans focusing on:

Collecting Customers’ insights/ needs, designing convenient

services/products, delivering them through targeted channels, and measuring Customer Experience

through consolidated and

continuously improved set of tools, in addition to customer feedback.

In 2022, DEWA achieved 100%

in the Complaints resolved within 7 Working Days (WDs), 100% in

the % of suggestions responded within 15WDs, 99% in the DEWA

Mystery Shopper Index, and96.47% in the Service QualityLevel - Customer Care Centre.DEWA also accomplished 98%in Instant Customer Happiness

Meter for Dubai Digital Authority.

DEWA scored 98% in the instant Customer Happiness Meter with

high utilisation of DEWA digital services by customers, and reached to 99% in Smart Adoption. With such achievements, DEWA won

several Customer Happiness such as:

1. Dubai Awards Model Centre for BestContact Centre –Managed

by Moro Hub- (Top 3)

2. First organisation to achieve 100% in the “International

Digital Customer ExperienceStandard” (IDCXS: 2022)certificate from the firstassessment.

3. Achieved the 1st global

position in implementingthe requirements of theInternational CustomerExperience Standard (ICXS)2019 by, achieving 100%in the updated InternationalCustomer Experience Standard.

4. ISO 10000 series certifications 5. ISO 18295:2017 for Customer Contact Centres.

6. Won in 4 different Categories in Insights award.

As part of DEWA’s CustomerHappiness journey, DEWA

launched the Universal Service Centre concept to provide a full digital experience that provides comprehensive, reliable and secure services to customers. The centre uses the latest AI technologies and interactive digital solutions for customers to communicate

remotely with representatives

from departments such as Finance, Human Resources, Contracts,

Procurement, and Legal Affairs.

DISASTER ANDEMERGENCYPLANNING ANDRESPONSECORPORATE RISK &RESILIENCECorporate Risk and resilience

are integral to DEWA’s strategic direction, and the organisation proactively anticipates for, and adapts to risks and threats whilst responding to, and recovering from incidents to safeguard Dubai’s critical infrastructure. In doing so, ensuring risks and threats are mitigated and electricity and water demands are maintained according to the highest international

standards of reliability, availability, efficiency, and quality.

DEWA has implemented theCorporate Risk & ResiliencePolicy & Framework to embed

and sustain resilience across the organisation in line with local (AE/ SCNS/NCEMA 7000:2015) and

international (ISO 22301:2019, ISO 31000:2018, and BS

11200:2014, PAS 60518:2020)standards and best practices.Following the launch of PAS60518:2020 - Enterprise Risk& Resilience Management in

Utilities Guide launch in 2020, DEWA and many of its peers have implemented the requirements of this risk and resilience standard.

Following its success and industry breakthrough, DEWA has initiated work on a broader International Standard Organization (ISO)

critical infrastructure standard to further enhance risk and resilience best practices at international

level.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022166

Page 167

ENTERPRISE RISKMANAGEMENT (ERM)

Corporate Risk & Resilience is guided by ERM. The purpose

of ERM is to support DEWA’sorganisational context by

facilitating enhanced decision making and planning through

awareness of all types of risks and threats. DEWA proactively

anticipates for and adapts to

all types of risks and threats to safeguard the organisation.

DEWA applies its ERM Framework in alignment with ISO 31000:

2018 - Risk Management

Guidelines to ensure that risks and threats across the organization are managed consistently.

The Framework defines the

management policies, procedures, and practices to be applied to the risk management process steps of identifying, analysing, evaluating, treating, and continuing to

monitor risks. Regular monitoring, review and reporting of risks is an important component of DEWA’s

ERM Framework, as it ensures

new risks and changes to existing risks are identified and mitigation plans are implemented to address such risks.

Risks are identified using a top-down (corporate) and bottom-up (divisional) approach to ensure the full spectrum of risks to DEWA are identified and, where required, mitigated to an acceptable level as articulated in the ERM Framework and governed by the Group Risk & Resilience Committee (GRRC); who continue to identify and

mitigate new and emerging risks to ensure the strategic priorities of the organisation are not

compromised. To further improve the efficiency and productivity of risk management, DEWA has and

will continue to explore cognitive technologies such as AI and

machine learning (ML) to maintain its competitive advantage and use risk management to power and

drive organisational performance.

BUSINESS CONTINUITY ANDCRISIS MANAGEMENT

To further enhance the resiliency level across the organisation, DEWA has developed Division-

wide Business Continuity Plans (BCP) which are reviewed,

tested, and updated annually or more frequently if necessitated.

During the testing phase, areas for improvement are identified and prioritised with support from the Corporate Risk & Resilience Department.

For externally facing risks and scenarios, DEWA has developed

joint response plans with itsstrategic partners to ensure

collaborative response and critical communication interchange

during emergencies. Information sharing between local and

national authorities is two-way and regular, ensuring that DEWA’s preparedness for emergencies

meets the required local andnational requirements andstandards.DEWA undertakes division-wide

mock drill exercises based on risk-based crisis situations including cyber-attacks, fire, accidents due to human error and equipment

malfunction to ensure the

preparedness and adaptive capacity for handling such emergent and crisis situations. Following each mock drill, a comprehensive review is undertaken indicating the

outline of the crisis, response of the various teams, observations, and effectiveness for handling the emergency and scope for

improvements, where necessary.

In supporting Dubai, the wider UAE resilience ecosystem and critical infrastructure, DEWA collaborates, coordinates, and communicates

with local and national levelministries and authorities to

share best practices to enhance the resilience of national critical infrastructure, ensuring continuous coordination and communication through participation, exercising, exchange of information,

intelligence, and response.Business Continuity & Crisis

Management in DEWA is governed by the Crisis Management

Committee (CMC).CRISIS MEDIA RESPONSE &COMMUNICATIONSDEWA has a media response

and crisis communications plan in place with pre-defined holding statements to ensure swift and effective communications to

employees and the public during emergency situations. DEWA’s

Crisis Command Centre (CCC)

acts as the hub for directing, supporting, and provisioning all the necessary steps during a crisis with direct communication links to Dubai level crisis management teams and Dubai Media Office.

CYBER SECURITYDEWA places a high priorityon Cybersecurity due to the

fact that it is a critical national infrastructure. Therefore, DEWA has established a comprehensive Cybersecurity framework that

consists of four pillars, withunique technologies, processes,About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022167

Page 168

guidelines, international and local standards and a dedicated team.

The purpose of this framework

is to leverage existing policies, procedures, frameworks and other guidelines to enable DEWA to

adopt a posture of cyber resilience.

The four pillars are:

• Manage & Protect

• Identify & Detect

• Respond & Recover

• Govern & Assure

The first element of DEWA’s Cyber Resilience Framework is Manage & Protect which involves managing security defenses and protecting DEWA from cyber threats. Critical assets are identified and their associated risks are identified to target areas for improvement through implementation of

control measures, reviews andaudits. This is done through

information security policies and security Programmes, malware

protection, identity and access control, security team competence and training, staff awareness

training, encryption, physical and environmental security, patch

management, systems, network,and communications security,asset management and supplychain risk management. Thesecond element of the Cyber

Resilience Framework is Identify & Detect which focuses on

monitoring DEWA’s information, information systems and industrial control systems for anomalies

through security monitoring

and active detection. The third element of the Cyber Resilience Framework is Respond & Recover to manage incidents quickly and effectively to limit harm and

return to functionality after a cyber-incident has occurred. This is done through incident response management, IT service continuity management, business continuity management, and information

sharing and collaboration. Finally, the fourth element of the Cyber Resilience Framework is Govern & Assure which includes activities for the Board and senior managers to ensure that cyber resilience is overseen and validated by

DEWA Top Management. This isdone through a comprehensiverisk management programme,

external validation/ certification, board level commitment and

involvement, governance structure and processes, and continual

improvement process.

1. Unique technologies such

as AI, Big Data, Zero trust,Automation, simulation andintegration.

2. Unique processes, guidelines, i nt e r n at i o n a l a n d l o c a l standards

3. A dedicated and collaborative team

The framework is also governed and compliant with multiple

international and local bestsecurity standards such as ISO27001 and Dubai ISR.About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022168

Page 169

Manage & ProtectManaging security defensesand protecting DEWA fromCyber threatesGovern & AssureDevelop and implement the

appropriate activities to take action regarding a detected

cybersecurity event and restore impacted services

Identify & DetectMonitoring DEWA'sinformation systems andindustrial control systemsfor anomaliesRespond & RecoverOverseeing andensuringcybersecurity andcyber resilence inDEWAContinuousGovernance &ImprovementSecurityArchitechtureR i s kManagementCompliancePolicyFrameworkOUR CYBER SECURITY FRAMEWORKAbout DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022169

Page 170

CORPORATEGOVERNANCE

Page 171

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 171DEWA PJSC has implemented in

letter and spirit the best principles of “Good Governance” by choice and voluntary action for the adoption of best practices. DEWA Corporate Governance Policy provides direction on:

• DEWA’s Good Governance

model based on four pillars

(trust, fairness, transparency and accountability);

• The Company’s key stakeholders (including shareholders); and

• Decision-making mechanisms

within the Company and between its stakeholders.

The Company continuously

benchmarks its activities with international institutions such as the OECD, the World Bank, UN

organisations and global peers.

DEWA’s good governance framework cascades from the strategic directions of the government of Dubai and the UAE, translated into the goals of its good governance practices, underlined by DEWA’s good governance principles.

We are committed to having a robust governance framework that complies with the local requirements set by the Securities and Commodity Authority (SCA) and the Dubai Financial Market (DFM).

The Company currently positions

itself as the benchmark for many local, regional and global utility companies due to its outstanding performance and achievements over the years.

DEWA Good Governance FrameworkDEWA’S GOOD GOVERNANCE

Page 172

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 172APPOINTMENT

DEWA’s Board of Directors, pursuant to its jurisdiction stipulated under Law No. 27 of 2021 and DEWA’s Articles of Association, defines the strategic business guidelines and directions of DEWA and supervises its implementation.

DEWA Board of the organization and Directors comprises 11 members; and 90% of the Board are independent board members.

DEWABoard of DirectorsIndependent Member Non-Independent MemberESG, Nomination andRemuneration CommitteeBOD Committees

Budget Committee Audit Committee MD & CEO Management Committees DEWA

Executive Vice PresidentsShare TradingCompliance Committee10 1DEWA Governance StructureCOMPOSITION

The composition of the Board reflects various complementary experiences, allowing its members to protect and promote the interests of the organization and all stakeholders.

Female Representation on the Board:

Dr. Moza Suwaidan was appointed as a non-executive Board member in 2021. Accordingly, there is currently one female member of the Board, which is in compliance with SCA’s Corporate Governance Rules.

Where Board vacancies arise, we will actively seek out larger female representation while at the same time considering all qualified candidates, regardless of gender, and recognising that appointment or election of directors is subject to shareholders’ approval in the General Assembly in accordance with the provisions of DEWA’s Articles of Association.

DEWA BOARD OF DIRECTORS APPOINTMENT,STRUCTURE AND COMPOSITION

Page 173

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 173BOARD OF DIRECTORS PROFILES AND EXPERIENCESHE Matar Humaid Al-Tayer

Chairman of the Board of Directors – Non- Executive Board Member (since 2004) HE Matar Al Tayer is the Chairman of the Board of Directors of the Group since 2004. He is also the vice chairman and a member of the Board of the Al Tayer Group of Companies. Between 2003 and 2011, HE Al Tayer was the Chairman of Oman Insurance, between 1992 and 1997 he was the Under Secretary at the UAE Ministry of Communication and between 1997 and 2004 he was the UAE Minister of Labour and Social Affairs. HE Matar Al Tayer holds a degree in business administration from the University of Denver, Colorado, USA.

HE Saeed Mohammed Al Tayer

Board Member and MD & CEO – Executive Board Member (since 2004)

HE Saeed Mohammed Al Tayer wasappointed Managing Director and

Chief Executive Officer of the Group in 2004 and has served as a member of the Board of Directors since then. He has 35 years experience in the fields of telecommunications, energy and water.

He was appointed as general manager of the group in 1992. Mr. Al Tayer is the vice-chairman of the Dubai Supreme Council of Energy, a member of the Dubai Executive Council and Strategic Affairs Council, a member of the Dubai Supreme Fiscal Committee and Vice Chairman of the Board of Directors of EGA. He is the first UAE personality to be awarded Honorary Fellowship from the Energy Institute (EI), UK. Mr. Al Tayer has a bachelor in Business Administration from Columbus State University, Georgia, USA and was conferred with an honorary Doctorate by Amity University in Dubai.

HE Khalfan Ahmad Harib

Board Member – Non-Executive Board Member (since 2002) Audit Committee member Mr. Harib is the Chairman of the Central Grievance Committee for employees of Government departments since 2008 and Board member of the Consultative Commission for the Supreme Council for the Arab States of the Gulf since 2010.

He had also occupied positions such as Director of H.H. The Ruler’s Court, Govt.

of Dubai from 2005 to 2008, Deputy Chairman of the Sheikh Zayed Housing Programme from 2006 to 2012, Chairman of the Mohammed Bin Rashid National Housing Establishment from 2004 to 2008, Deputy Chairman of the Judiciary Council of the Dubai Government from 2004 to 2008, Chairman of the Dubai Educational Establishment from 2004 to 2008, Board Member of the Executive Council, Govt. of Dubai from 2002 to 2008, Director General of Dubai Finance Department from 2001 to 2006, Director of Financial Affairs at H.H. The Ruler’s Court from 1996 to 2001.

Mr. Harib holds a degree in Management Information Systems from the University of Arizona, USA.

HE Majid Hamad Rahma Al Shamsi

Board Member – Non-Executive Board Member (since 1992)

Mr. AlShamsi is the 1st Vice Chairman of Dubai Chamber of Commerce and Industry since 2007 and is a director of the Group since 1991. He is the Chairman of Union Coop, Dubai, Chairman of Consumer Cooperative Union of UAE, Chairman of the Board of Trustees of the University of Dubai and Chairman of Hamad Rahma Al Shamsi General Trading. He was a Member of the Federal National Council.

Mr. AlShamsi holds a bachelor’s degree in management and finance from New York University.

Mr. Saeed Mohammed Al Shared

Board Member – Non-Executive Board Member (since 1992)

Audit Committee Chairman

Mr. Al Shared is Board member of Union Coop. and member of UAE Accounting & Auditing Association. He is an accredited auditor in the Ministry of Economy.

Positions held include general manager of Emirates Transport, Chairman of the Board of directors of Emirates Islamic Bank and director of Etisalat. He holds a bachelor’s degree in Accounting & Business Administration from UAE University.

Mr. Mohammed Juma Al-Suwaidi

Board Member – Non-Executive Board Member (since 2021)

Mr. AlSuwaidi has been a director at DEWA since 2021. He is Assistant Secretary General of the Supreme Legislation Committee in Dubai (since 2015) and Judicial member of the Rental Dispute Resolution Center in the Emirate of Dubai (since 2014). Prior to that, he held key legal and legislative roles in Dubai Government Legal Affairs Department. Mr. Al Suwaidi holds a bachelor’s degree in law from Sharjah University.

Page 174

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 174Mr. Al Sayed Abdullah MohamadAl Hashemi

Board Member – Non-Executive Board Member (since 2004)

Audit Committee Member

Mr. Al Hashemi has been a director of the Group since 2004. He is currently a member of the investment board of Emirates REIT (CEIC) plc. He also acts as an arbitrator for the UAE Federal Government and Dubai Government and is involved in the design of projects undertaken by Al Hashemi

Consultant Office. Past roles include Board Director, Dubai Islamic Bank, Head of Planning, Dubai Municipality and Board Director, Private Housing Finance scheme. Mr. Al Hashemi holds a bachelor’s degree in architecture from the Fine Arts Academy in Egypt.

Dr. Moza Shaiban Sweidan

Board Member – Non-Executive Board Member (since 2021)

Dr. Suwaidan serves as the director of strategy and innovation and director general consultant for the Digital Dubai Authority. Before that, she was Director of Information Technology Department at Dubai Culture. She has also worked in Dubal Aluminium. She has over 20 years’ experience in information technology and strategic planning and held key roles in government and private sector. Dr. Suwaidan holds a Ph.D. in quality management from Hamdan Bin Mohammed Smart University and an MBA degree from the American University of Dubai.

Mr. Hilal Khalfan Bin Dhaher

Board Member – Non-Executive Board Member (since 2003)

Chairman of ESG, Nomination and

Remuneration Committee (since 2021) Mr. Hilal Bin Dhaher has been a member of the Board of Directors of DEWA since 2003. During his 23 years’ professional career at Citibank NA. UAE, Mr. Hilal served as VP in different sectors such as Corporate Banking, Consumer Banking and established the first outsourcing concept for Citibank in UAE, which resulted in a reputable business model. Mr. Hilal serves on the boards of Dubal Holding and Emirates Global Aluminium (EGA).

He is also a member of the Human Capital Committee and Finance & Commercial Committee in EGA. Formerly, he served on the Board of directors in different entities such as UAE Central Bank, Majid Al Futtaim Group (MAF), Securities & Commodities Authority (SCA), Dubai Aluminium

company (DUBAL) and Emirates

Aluminium company (EMAL). Mr. Hilal obtained a Bachelor’s degree in Business Administration from University of Arizona, USA. He took an MBA while at Citibank Training Center in Athens, Greece, covering Credit, Treasury & Operations.

Mr. Obaid Bin Mes’har

Board Member – Non-Executive Board Member (since 1995)

Member of ESG, Nomination and

Remuneration Committee (since 2021) Mr. Mes’har has been a director of the Group since 1995. He has over 35 years of experience in telecom, water & electricity industries and runs a

mediation/arbitration practice in this field.

Past positions held include Chairman of Etisalat Investment Committee, Chairman of Canartel (CDMA) operator in Sudan, Chairman of Zantel (Fixed and Mobile Operator in Tanzania), Chairman of the Etisalat Academy, member of Dubai e-Government executive team, board member of Etihad Etisalat, Atlantique Telecom (GSM operator in six West African countries) and board member of Mohammed Bin Rashid Housing Establishment. Mr. Mes’har holds a bachelor’s degree in finance and business administration from UAE University and an MBA from the University of Minnesota, USA.

Mr. Nabil Abdulrahman AhmadArif

Board Member – Non-Executive Board Member (since 1995)

Member of ESG, Nomination and

Remuneration Committee (since 2021) Mr. Arif has been a director of the Group since 1995. He is also a member of the Board of Mustafa Bin Abdullatif Investment LLC and the Najibi Investment Company. Mr Arif is a founding member of the UAE Society of Engineers and founding partner of M/S Arif & Bintoak Consulting Architects & Engineers.

Mr. Arif obtained a bachelor of science degree in civil engineering from the Loughborough University of Technology, United Kingdom in 1973.

Page 175

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 175

S.N Name Position Total sale during 2022

Total purchaseduring 2022Owned shares as on31 Dec. 2022

1 HE Matar Humaid Al-Tayer Chairman Nil Nil 1,612,903 2 HE Saeed Mohammed Ahmad Al Tayer Director Nil Nil 20,161,290 3 HE Khalfan Ahmad Harib Director Nil Nil Nil 4 HE Majid Hamad Rahma Al Shamsi Director Nil Nil 40,866 5 Mr. Hilal Khalfan Bin Dhaher Director Nil Nil 278,729 6 Mr. Al Sayed Abdullah Mohamad

AlHashemi Director Nil Nil Nil7 Mr. Obaid Bin Mes’har Director Nil Nil Nil8 Mr. Saeed Mohammed Al Shared Director Nil Nil Nil9 Mr. Nabil Abdulrahman Ahmad Arif Director Nil 250,000 250,000

10 Mr. Mohammed Juma Al-Suwaidi Director Nil Nil Nil 11 Dr. Moza Shaiban Sweidan Director Nil Nil 7,431

STATEMENT OF OWNERSHIP AND TRANSACTIONS OF BOARD MEMBERS INDEWA’S SHARES DURING 2022

Subject to approval by the shareholders at an upcoming general assembly in April, 2023, the total renumeration to be paid to the Board of Directors in AED 39.5 million.

STATEMENT OF OWNERSHIPBOARD RENUMERATION

Page 176

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 176BOARD MEETINGS

During the year 2022, a total of nine (9) board meetings were held. The invitation and the agenda are sent to the members at least a week ahead of the meeting date, and details of issues and decisions made during the meeting are recorded as minutes taking into account any members’ opinions that are expressed during the meeting.

The Board appreciated andacknowledged DEWA management

and employees’ efforts throughout the year 2022. The management and employees are constantly encouraged to aspire for excellence with the goal to deliver sustainable stakeholder value.

DEWA’s Articles of Association require that the Board of Directors meet a minimum of 6 times each year. The quorum for meetings is a majority of directors, and approval on subjects is

by majority vote of attendees.Name Position M1 M2 M3 M4 M5 M6 M7 M8 M9HE Matar Humaid Al-Tayer Chairman P P P P P P P P PHE Saeed Mohammed Ahmad Al Tayer Director P P P P P P P P PHE Khalfan Ahmad Harib Director P P P P P A P P PHE Majid Hamad Rahma Al Shamsi Director P P P P P P P P PMr. Hilal Khalfan Bin Dhaher Director P P P P A P P P PMr. Al Sayed Abdullah MohamadAlHashemi Director P P P P A P P P PMr. Obaid Bin Mes’har Director P P P A P A P P PMr. Saeed Mohammed Al Shared Director P P P P P P P P PMr. Nabil Abdulrahman Ahmad Arif Director P P P P P P P P PMr. Mohammed Juma Al-Suwaidi Director P P P P P P P P PDr. Moza Shaiban Sweidan Director P P P P P P P P PP – Present, A – Absent

The following table sets forth the meetings held by DEWA ‘s Board of Directors in 2022:

BOARD MEETINGS ANDRESOLUTIONS IN 2022

Page 177

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 177GENERAL ASSEMBLY MEETINGS (GA) HELD IN 2022

The Board held two (2) General Assembly Meetings and below are the decisions and the resolutions taken:

1st GA Meeting: October 10th 2022:

• Approve the recommendation of the Board of Directors concerning a cash dividend distribution of AED 3.1 billion (6.2 fils per share) for H1, 2022, which was thereafter to be paid to the Company’s eligible shareholders in October 2022.

• Approve the recommendation of the Board of Directors to suspend any further allocation of profit towards legal reserve as the Company’s legal reserve is currently in excess of 50% of the paid-up share capital of the Company.

2nd GA Meeting: December 12th 2022:

• Approve the recommendation of the Board of Directors concerning a special one-time cash dividend distribution of AED 2.03 billion (4.06 fils per share), for 2022, which has thereafter been paid to the Company’s eligible shareholders in December, 2022.

BOARD RESOLUTIONS

In accordance with the applicable provisions from SCA Corporate Governance Procedures, nine (9) resolutions were passed by circulation by the Board (which were mostly for considering urgent operational matters) and these resolutions were recorded in the minutes of the subsequent meeting of the Board.

S.N No. Date1 Board Resolution No. 1/2022 passed by circulation 6/1/2022

2 Board Resolution No. 2/2022 passed by circulation 10/1/2022 3 Board Resolution No. 3/2022 passed by circulation 19/1/2022 4 Board Resolution No. 4/2022 passed by circulation 3/3/2022 5 Board Resolution No. 5/2022 passed by circulation 4/3/2022 6 Board Resolution No. 6/2022 passed by circulation 22/3/2022 7 Board Resolution No. 7/2022 passed by circulation 10/5/2022 8 Board Resolution No. 8/2022 passed by circulation 5/10/2022 9 Board Resolution No. 9/2022 passed by circulation 1/11/2022

Page 178

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 178

The below diagram highlights DEWA’s organisational structure and reporting channels:

DEWA Board of DirectorsHE MD & CEO Technical Advisors

Share Trading Compliance Committee CFO Finance Business Development

& ExcellenceEVPVP

Internal Audit Strategy & Government Communication

EVPLegal AffairsCLA

ESG, Nomination and Remuneration Committee Budget Committee

Audit CommitteeCompany SecretaryPower & Water PlanningEVPTransmission PowerEVPWater & CivilEVPInnovation & The FutureEVPGeneration (P&W)EVPDistribution PowerEVPBilling ServicesEVPBusiness Support& Human ResourcesEVPDEWA Organization StructureDEWA ORGANIZATIONALSTRUCTUREDEWA’s Board provides guidance

and direction to the Management for achieving its strategic objectives. The Board is responsible for the direction and oversight of DEWA, and the

day-to-day activities of DEWA are managed by the MD & CEO and the divisional heads in compliance with Law No 27 of 2021 and Articles of Association and the directions of the Board and the General Assembly.

The Board of Directors may delegate any of its powers to any of its committees or to the CEO in line with the provisions of the Law and the Articles of Association. Such Delegation of Authority is subject to regular review and amendment (if required) by the Board and the Audit Committee.

DEWA has implemented a robust SAP ERP system with carefully designed controls that enable transparency and promote efficiency and effective governance in all its processes.

DELEGATION TO MANAGEMENT

Page 179

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 179ROLE OF THE BOARD IN INTERNAL CONTROL

The Board has overall responsibility for ensuring effectiveness of the internal control system in DEWA. The Board is responsible for setting a clear framework for the purpose of ensuring effective and efficient operations, accurate financial reporting, and compliance with laws and regulations.

INTERNAL CONTROL SYSTEM PROCESS

DEWA follows the COSO Framework for internal controls and periodically conducts its reviews of effectiveness of internal controls. The 17 Principles of COSO Internal Control are applied across all DEWA Divisions, Departments, and Operations and are constantly scanned for compliance. Internal Control is broadly defined as a process designed to provide reasonable assurance regarding the achievement of objectives while simultaneously ensuring:

• Effectiveness and efficiency of operations: Addresses DEWA’s basic business objectives, including adherence to performance standards and the safeguarding of resources.

• Reliability of financial reports: Ensures that reliable financial statements and other financial information are presented to the shareholders, Board and Management.

• Compliance with applicable Legislations and Internal Regulations: Oversight over Regulatory Compliance with applicable legislations and internal regulations, policies and procedures which DEWA is subject to in order to avoid any risk of non-compliance with laws & regulations, damage to reputation or payment of fines/penalties.

Internal control within DEWA is established via the implementation of the Three Lines model:The Three Lines Model Financial Reporting Administrative Reporting

DEWA Board of DirectorsExternal Assurance ProvidersE.g. Financial control, Security,Inspection, Quality, Enterprise RiskManagement, Legal and ComplianceAudit Committee H.E. MD & CEOFirst line:

Provision of products/ services to clients; managing risk.

Third line:

Independent and objective assurance and advisory to support in achieving objectives.

Senior Management Internal Audit Independent assurance

Second line:

Expertise support, monitoring and challenge on risk-related matters.

The internal control system aims to establish, document, maintain and act consistently with the principles of the internal auditing policy. The system applies across all divisions/ departments and all activities related to corporate governance and risk management.

DEWA’s control management process ensures that the procedures are appropriately designed and effectively applied in accordance with DEWA’s annual strategic plan. This process is reviewed by the Audit Committee and approved by the Board.

DEWA Three Lines ModelINTERNAL CONTROL SYSTEM

Page 180

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 180

The Board is empowered to establish Board committees and to delegate powers to such committees as necessary or appropriate. The Board delegates certain functions to well-structured committees but without renouncing its own responsibilities.

Board committees are an effective way to distribute work between Board members and allow for more detailed consideration of specific matters. All the Board committees function on behalf of the Board and the Board is responsible for constituting, assigning, co-opting and fixing terms of service for Board committee members.

The Board has three (3) committees along with its charters that define the obligations, duration and authority of each committee, and these committees are regularly monitored by the Board regarding their performance and commitment.

These committees are: 1. Audit Committee, 2. ESG, Nomination and Remuneration Committee and 3. Budget Committee.

Furthermore, the Share Trading Compliance Committee, which is a Management committee is also in place which aims to supervise the transactions of the insiders and their ownership of the Company shares.

AUDIT COMMITTEE

The Board constituted an Audit Committee that monitors financial statements, reviews and recommends changes to DEWA’s financial and internal control systems, and reviews terms of appointment and maintains an appropriate relationship with its external auditors.

The Audit Committee’s key responsibilities are related but not limited to reviewing and monitoring the integrity of annual and interim financial statements, advising on the appointment of external auditors, supervise their independence, reviewing the effectiveness of the external audit and internal audit process. The Audit Committee consists of the following members:

Committee Members Position 1stMeeting2ndMeeting3rdMeeting4thMeeting5thMeeting6thMeeting7thMeeting

12/01/2022 25/01/2022 31/01/2022 17/03/2022 10/05/2022 09/08/2022 09/11/2022

Mr. Saeed Mohmmed Al Shared Chairman P P P P P P PHE Khalfan Ahmad Harib Member P P P P P P PMr. Abdulla Mohammad AlHashemi Member A P P P P P PP – Present, A – Absent

DEWA Management is responsible for implementing internal controls across DEWA processes and operations. The Internal Audit Department is responsible for evaluating the effectiveness of Internal Control processes.

The Internal Audit Department has reported 204 audit reports pertaining to internal controls during the year. Major problems were not present during the year.

BOARD ANDMANAGEMENT COMMITTEES

Page 181

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 181Committee Members Position

Mr. Hilal Khalfan Bin Dhaher Chairman Mr. Obaid Bin Mes’har Member

Mr. Nabil Abdulrahman Ahmad Arif Member Committee Members Position

Chief Financial Officer Chairman Head of Investor Relations Member

Vice President – Internal Audit MemberBoard Secretary MemberESG, NOMINATION AND REMUNERATION COMMITTEE

The ESG, Nomination and Remuneration Committee assists the Board in discharging its responsibilities in relation to Environment, Social and Governance matters in addition to the qualifications, compensation, appointment and succession of the Company’s directors and key management personnel.

The Committee also oversees the Company’s nomination process for the Board of Directors and continuously monitors the independence of the independent members of the Board.

The ESG, Nomination and Remuneration Committee consists of the below members:

BUDGET COMMITTEE

The Budget Committee reviews and approves the Company’s annual budget. The Committee meets once every year.

SHARE TRADING COMPLIANCE COMMITTEE

The Share Trading Compliance Committee oversees the implementation of an effective process to maintain an updated register of Insiders and monitor their adherence to the Insider Trading policy.

The key responsibilities of this Committee is to supervise the transactions of the insiders and their ownership of the Company shares and provide DFM with periodic reports on the transactions of insiders.

The Committee members are as follow:

Page 182

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 182ANTI-BRIBERY AND CORRUPTION AND FRAUD POLICY

DEWA adopts a zero-tolerance approach towards any occurrence of fraud, bribery or corruption across its business activities and operations. DEWA recognises that the prevention of fraud, bribery and corruption is an integral component of good governance and affirms its commitment to conduct its business and operations in an honest, transparent and ethical manner, and as per the applicable UAE federal laws and the Emirate of Dubai legislations.

While supporting the transition to a public listed company, DEWA continuously ensures to benchmark its policies and practices with leading international companies. Therefore, DEWA adopted a robust Ethics and Compliance system with the aim to govern, prevent, detect and respond to any instances of non-compliance that might occur.

For more details related to Anti-Bribery and Corruption and Fraud policy, please refer to https://www.dewa.gov.ae/ en/about-us/strategy-excellence/corporate-governance-and-strategy

CONFLICT OF INTEREST POLICY

DEWA is committed to implement an effective policy to prevent Conflict of Interest and uphold integrity in execution of duties and responsibilities, and compliance with applicable legislations. The Company conducts its business in such a way as to uphold and safeguard the rights and legitimate interests of all stakeholders, under the principle of fair treatment and non-discrimination.

Our Conflict of Interest Policy sets forth requirements for the avoidance and management of conflicts of interest that may arise in some activities, including the avoidance of situations that merely have the appearance of a conflict of interest. Under this Policy, conflicts of interest must be promptly disclosed so that the appropriate course of action can be taken in order to protect DEWA’s interests.

For more details related to DEWA Conflict of Interest policy,

please refer to https://www.dewa.gov.ae/en/about-us/strategy-excellence/corporate-governance-and-strategy Anti-Bribery & Corruption

and Fraud policy Conflict of Interest policy Gift & Hospitality policy (part of DEWA Code of Conduct) Anti-Money Laundering policy Whistleblowing policy Ethics & Compliance policies

ETHICS ANDCOMPLIANCE POLICIES

Page 183

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 183Management Information System

(MIS) is used for decision-making, and for the coordination, control, analysis, and visualisation of information in DEWA. A complex organisation like DEWA requires multiple systems

but needs an overarching platform in order to allow for more effective, data-driven decision-making.

The implementation of the SAP

Enterprise software platform and the SAP GRC (Governance, Risk & Compliance system) to automate and monitor all transactions has contributed to the control system and has made it much more robust.

Governance monitoring and reporting are driven by technology and

automated processes. Dashboards enable graphic information flows.

Integrity of data and the prompt processing of this data are crucial enablers for DEWA to improve

current products and services and design innovative services that respond to the changing needs of its stakeholders. DEWA has implemented a data governance model to ensure transparency, responsibility and accountability on the use of this data, in conformity with Dubai Government legislations related to Open and Big Data.

MANAGEMENT INFORMATIONSYSTEM (MIS) AND DISCLOSURECORPORATE RISK & RESILIENCE

DEWA (PJSC) is a globally leading organisation with a vision that articulates its future-orientated position in line with the vision and directives articulated by the leadership of the UAE. This is supported by its mission, which acts as a roadmap for achieving the vision to guide DEWA’s strategic direction.

Risk and resilience are integral to DEWA’s strategic direction, and the organisation proactively anticipates, and adapts to risks and threats whilst responding to, and recovering from incidents to safeguard Dubai’s critical infrastructure. In doing so, ensuring risks and threats are mitigated and electricity and water services are maintained according to the highest international standards of reliability, availability, efficiency, and quality.

In supporting Dubai, the wider UAE resilience ecosystem and critical national infrastructure, DEWA

collaborates, coordinates, and communicates with local and national level ministries and authorities to share best practices to enhance the resilience of critical national infrastructure, ensuring continuous coordination and communication through participation and exchange of information, intelligence and response.

The Board of Directors carries the responsibility of overseeing DEWA’s risk and resilience approach, and the Group Risk & Resilience Committee carries the responsibility of providing leadership, direction and governance on all risk and resilience matters, including the management of

emerging threats and risks.

Page 184

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 184EXTERNAL AUDIT

KPMG has been appointed as the Company’s external auditor for the fiscal year 2022. KPMG provides independent auditors report in accordance with International

Standard of Auditing (ISAs) and submits Internal Control Reports (ICR’s). It is worth mentioning that there are no qualified opinions made by DEWA’s external auditors in the annual financial statements for the year 2022.

KPMG is the successor ofthe previous auditors PWC,part of a rotational approachadopted by DEWA to showcaseand maintain its transparencyand objectiveness across itsstakeholders. Please refer toFederal Decree Law No.32 of2021 on Commercial Companiesfor more details.

DEWA has well-established disclosure and communication policies and

prepares its annual accounts according to the International Financial Reporting Standards. The entire accounting system is powered by the SAP Enterprise system. DEWA releases its audited financial statements on an annual basis to all relevant stakeholders.

INTERNAL AUDIT

DEWA’s Internal Audit Department is an independent assurance function that adopts the best-in-class

audit standards and practices, the International Professional Practices Framework (IPPF) promulgated by The Institute of Internal Auditors (IIA). The Internal Audit department at DEWA operates under an approved charter and conducts reviews to add value and provide assurance over the adequacy of the effectiveness of internal controls, risk management and governance processes and

systems of DEWA and its subsidiaries through an annually developed risk-based audit plan.

The Internal Audit Department; acts as a third line role to provide assurance, advice, and insight that DEWA and its Subsidiaries are

efficient and effective in conducting their responsibilities and to be in line with and support DEWA’s corporate vision, mission and objectives. The Internal Audit Department conducts regular reporting to the MD&CEO and the Audit Committee.

Moreover, the Internal Audit

Department established a Quality Assurance and Improvement Program (QAIP) as required by the Institute of Internal Auditors (IIA) which enables it to enhance the quality of audit and pursue continuous improvement.

External Audit Details

Name of the audit office and partner auditor KPMG Mr. Nitin Mehrotra

Number of years he served as the Company’s external auditor 3

Total audit fees for 2022 in (AED) AED 1,155,000 plus 6% outlays Fees and costs of other services other than auditing the financial statements for 2022 (AED), if any.

In case of absence of any other fees, this shall be expressly stated. AED 1,162,905

Details and nature of the other services (if any).

If there are no other services, this matter shall bestated expressly.

a) Services provided to Federal Audit Authority for auditing DEWA financials for 2021

– AED 95,400

b) Consultancy services for DEWA Circular Economy Project – AED 1,067,505 Statement of other services that an external

auditor other than the Company’s accounts auditor

provided during 2022 (if any). In the absence of another external auditor, this matter is explicitly stated.

EY

a) Group reporting related to audits of subsidiary companies b) Consultancy services for preparing HR manual

c) SAP GRC Risk management

d) Consultancy for productivity assessment and cost optimisation Deloitte

a) Consultancy service for governance

EXTERNAL AND INTERNAL AUDIT

Page 185

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 185

The Compliance Management Framework at DEWA has adopted key elements of the ISO 37301 – Compliance Management Systems – Requirements with Guidance for Use and ISO 37001 - Anti-Bribery Management Systems standards as the foundation for DEWA’s Compliance Management Framework, through which the Compliance Department designs, implements, maintains and oversees the Compliance Framework and fosters a culture of compliance across DEWA. The Compliance Framework reflects DEWA’s values, objectives, strategy, and compliance risks.

The scope of the Compliance Framework extends to laws and regulations that are issued by federal and local legislative and regulatory bodies relevant to DEWA’s business; both new or existing, and also extends to internal regulations and rules issued by the MD&CEO. The scope of the framework includes the following:

• Laws and Regulations

• Orders, Rules or Guidance Issued by Regulatory Agencies

• Environmental Commitments

• Relevant organisation and industry standards

• Internal Rules and Administrative Resolutions

INTERNAL AND EXTERNAL CONTEXT

DEWA’s business operations are in compliance with laws, regulations and compliance obligations of different federal and local governing bodies, including but not limited to the Executive Council, Supreme Legislative Council, Dubai Municipality, Dubai Roads and Transport Authority (RTA), Dubai Financial Market (DFM), Securities and Commodities Authority (SCA) international standards and guidelines and DEWA internal policies, circulars, and guidelines. Such obligations take into consideration risks arising from environmental, ethical, technological, and legal contexts. In order to establish the external context, the Compliance Department understands the needs and expectations of the interested parties.

Compliance FrameworkTHE FRAMEWORKDEWA’s Compliance Framework

(“Framework”) sets out the approach of DEWA to manage compliance

requirements and mitigating

compliance risk, in order to achieve its compliance objectives. An effective, organisation-wide Compliance

Framework enables DEWA todemonstrate its commitment to

compliance with relevant laws, including legislative requirements, industry codes and organisational standards, internal obligations as well as standards of good corporate governance, best practices, ethics and community expectations.

COMPLIANCE MANAGEMENT

Page 186

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 186DEWA holds the ISO/IEC27014:2020 and ISO/IEC38500:2015 certifications in

Information Security Governance and Information Technology Governance, respectively since 2019. DEWA’s integrated framework of IT and IS (ITS) Governance standards has been implemented by utilising internal competencies across all DEWA

divisions.DEWA’s integrated InformationTechnology and Security (ITS)Governance framework has beenendorsed by HE the MD&CEO and

establishes a model for governance of IT and information security and is based on eight principles for good governance of IT and Information security that cover strategy,

responsibility, adopting a risk-based approach, establishing organisation-wide information security, acquisition, conformance, human behaviour

and positive environment, and

performance. Information Technology and Security (ITS) Governance

additionally aligns with corporate governance requirements and

practices, aimed at efficient, effective and acceptable use of IT and IS. ITS Governance provides Governing Body visibility on the status of current and future use of IT and Information security in DEWA; in addition to assuring conformance to compliance obligations (legal, regulatory, contractual) requirements concerning acceptable use of IT and information security.

DEWA has an automated

Governance, risk and compliance (GRC) system to manage DEWA’s

overall governance and alignment of ITS and business objectives, while effectively mitigating risk and meeting compliance requirements. This

automation has allowed us to achieve improved decision-making, optimal IT investments, elimination of silos, and increased collaboration among Divisions and DEWA’s stakeholders.

INFORMATION TECHNOLOGYGOVERNANCE

All internal and external stakeholders that suspect or become aware of potential or actual unlawful act or misconduct within or in connection with DEWA activities including but not limited to fraudulent financial activities, and non-compliance to DEWA policies, have the obligation to report this immediately through any of the following, including a secured whistleblowing 24/7 hotline and other communication channels mentioned below:

• DEWA Ethics Hotline (+971 4 3222202)

• DEWA Ethics Email (ethicshotline@dewa.gov.ae)

• DEWA official website

For more details related to DEWA Whistleblowing policy, please refer to

https://www.dewa.gov.ae/en/about-us/strategy-excellence/corporate-governance-and-strategy WHISTLEBLOWING

Page 187

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 187

In its pursuit of excellence in all its operations DEWA adopts and implements a broad range of applicable standards, benchmarks and international best practices.

DEWA has been certified as compliant with the British standard BSI 13500 “Code of practice for delivering effective governance” in 2017 and in successive years including the year 2022.

As a result of a successful certification for consecutive years, DEWA was

awarded a trophy by BSI Governance Body marking DEWA’s five consecutive

years of receiving BSI 13500 in 2022.

As a result of its good governance practice, DEWA received the Global Award from the European Foundation for Quality Management (EFQM) for the second time. DEWA continues to maintain its position in the Platinum category, which includes leading companies and institutions that promote excellence. This new accolade crowns DEWA’s pioneering efforts and its record of accomplishment in excellence. DEWA is the first organisation outside Europe to receive this prestigious global award, which is the highest award from the EFQM Excellence Model.

Some of the other prominent certifications that DEWA has received recognition for during the year 2022 are:

ISO 21500:2012: Guide for Addressing Accessibility in Standards

ISO 21542:2011: Building Construction - Accessibility and Usability of Built Environment ISO 18788:2015: Management system for private security operations

BS 7958:2015: Closed circuit television (CCTV)

BS 10800:2020: Static site guarding and mobile patrol service.

INTERNATIONALSTANDARDS AND BENCHMARK

Page 188

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 188

In addition to providing electricity and water services according to the highest standards of efficiency, reliability, availability and quality, DEWA focuses on social work as an integral part of its efforts to empower society. DEWA is at the forefront of Corporate Social Responsibility (CSR) initiatives in Dubai, as it strives towards ensuring a sustainable future for all.

Its CSR practices are benchmarked against leading local, regional, and international organisations. DEWA also develops, implements and

supports projects and social initiatives that contribute to the development of the UAE’s national identity.

DEWA’s current CSR areas of focus include: The economic pillar, the environmental pillar, the social pillar, and the people pillar. DEWA has a robust partnership management

approach to build effective

partnerships with the government and private sectors as well as civil society, including educational institutions and non-profit organisations, within its values of stakeholder happiness; sustainability; innovation; excellence; and good governance.

Between 2013 and 2022, DEWA

launched and supported various community initiatives. Its employees recorded 206,560 volunteer hours in humanitarian and community

initiatives, benefiting 50,458,396 people in the UAE and abroad. In 2022, the percentage of society happiness towards DEWA reached 93.02%.

In line with its vision to become a globally leading sustainable innovative corporation committed to achieving Net-Zero by 2050, DEWA has developed a well-

defined framework for its CSR

activities. The framework includes identification of needs, planning, implementation, measurement &

review, and learning & continuous improvement. This is based on the Global Reporting Initiative (GRI) to ensure the sustainability of results. It is built on three pillars: Environmental Sustainability, Social Sustainability, and Economic Sustainability. These pillars support the UN Sustainable Development Goals (SDGs) 2030.

DEWA’s CSR initiatives cover a wide range of aspects, including supporting local communities, educating and empowering employees, promoting gender equality, and waste reduction.

In recognition of its CSR efforts, DEWA has been recognised on

multiple platforms locally and globally.

It won first place in the Public Sector Category of the Arabia CSR Awards 2022 for the 8th year running. It also received an honorary shield during the Community Development Authority (CDA)’s Partners Forum Ceremony. In 2019, DEWA received the Committed to Sustainability Certificate by the European Foundation of Quality Management (EFQM). DEWA has

been ranked the third most valuable utility brand in the Middle East and the third fastest growing brand in the UAE according to the annual report issued by ‘Brand Finance’ for the strongest and most valuable brands in the world in 2022. DEWA continues to set a high standard in sustainability practices while contributing towards achieving the SDGs.

CORPORATE SOCIALRESPONSIBILITY

Page 189

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 189STATEMENT OF THE COMPANY’S SHARE PRICEIN THE MARKET DURING 2022Month Highest price Lowest price Closing price

April20222.8702.7602.820

May20222.8302.5002.550

June20222.6002.5102.520

July20222.5702.5002.540

August20222.5902.5402.560

September20222.5902.5002.510

October20222.5502.4502.440

November20222.5102.3302.330

December20222.3802.2902.300

PERFORMANCE OF THE COMPANY’SSHARES IN 2022 COMPARED WITH THE DFM GENERAL INDEXGENERAL INFORMATION

Page 190

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 190STATEMENT OF THE SHAREHOLDERS’ OWNERSHIPDISTRIBUTION AS ON 31 DECEMBER 2022STATEMENT OF SHAREHOLDERS OWNING 5% OR MORE OF THE COMPANY’SCAPITAL AS ON 31 DECEMBER 2022Country Type of investor/

shareholders Number of shares Percentage UAE

Government 41,186,242,72297%Companies 5,403,566,304Individuals 1,681,162,797Banks 386,861,668Institutions 91,314,252GCC CountriesCompanies 129,130,9591% Individuals 94,627,483Banks 7,803,500

Unites States of America Companies282,480,1471%

Individuals 2,904,145Other NationalitiesGovernment 10,384,000<1%Companies 410,920,856Individuals 294,089,624Banks 4,603,881Institutions 6,154Rest of the world 13,901,508 <1%

Grand Total50,000,000,000100%

Name Number of owned shares Percentage of owned shares

Department of Finance – Govt of Dubai41,000,000,00082%

STATEMENT OF DISTRIBUTION OF SHAREHOLDERS ACCORDING TO THE SIZEOF THE EQUITY AS ON 31 DECEMBER 2022

Share (s) ownership Number of shareholders Number of owned shares

Percentage of ownedshares

Less than50,00053,148182,178,7780.4%

Between 50,000 and500,0003,303490,585,3601.0%

Between 500,000 and5,000,0007201,041,761,5912.0%

More than5,000,00013948,285,474,27196.6%

Total57,31050,000,000,000100%

Page 191

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 191

DEWA seeks to achieve the vision set by the Government’s wise Leadership in achieving the prosperity and sustainable prosperity of the nation and its citizens, by supporting the Emiratization process using best practices. This is done through the development of operational plans and strategies to enhance the participation of the UAE in all sectors to ensure the achievement of career aspirations of national competencies through training, guidance, and creating an attractive work environment for them.

DEWA’s Emiratization approach and commitment is to provide national employees with a positive work environment including exceptional opportunities for learning and growth.

Emiratization targets and actuals (in %) for the year 2020, 2021 and 2022:

DEWA achieved excellent

Emiratization results. DEWA aims to localize engineering jobs according to integrated strategy that includes innovative programmes and initiatives to attract and train Emiratis in engineering fields, as DEWA Academy, competitive allowances, scholarships inside and outside the country in

various energy fields:

KPI202020212022

Actual TargetActual TargetActual Target

Emiratization Rate - Leadership 87.93 % 87.42 % 88.33 % 87.97 % 88.33 % 89.05 %

Emiratization Rate - Management 59.18 % 59.65 % 60.16 % 60.55 % 70.10 % 61.46 %

Emiratization Rate - Non Supervisory 36.96 % 38.47 % 39.33 % 38.47 % 32.33 % 40.79 %

KPI20212022

Actual TargetActual Target

Emirati attrition rate (Turnover Rate)1.19%2%1.25%2%

Emirati attrition rate for the year 2021 and 2022:STATEMENT OFEMIRATIZATION PERCENTAGEINVESTORS RELATIONS

Through the year, DEWA’s Investor Relations publishes earnings, releases and arranges briefings, conference calls to raise investors’ awareness globally about the Company’s attractive value proposition among listed companies and provide updates on DEWA’s growth strategy and performance.

DEWA adopts a proactive Investor Relations engagement strategy to sustaining “investor” trust and maximizing shareholder value, particularly during volatile market conditions and global uncertainty.

DEWA Investor Relations Email: dewainvestors@dewa.gov.ae

DEWA Investor Relations Website: https://www.dewa.gov.ae/en/investor-relations

Page 192

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 192

• IPO of Subsidiary, EMPOWER – in mid-November, 2022, DEWA

listed its 70% majority ownedsubsidiary, EMPOWER on theDubai Financial Markets. DEWAnow holds a 56% stake inEMPOWER.

• Capacity Addition – over 2022, DEWA added 1,100 MW of

gross capacity to 14,517 MW.This includes 600 MW fromthe Hassyan Power Complex,which runs on natural gasand an additional 500 MW atthe Mohammed bin Rashid AlMaktoum Solar Park.

• Payment of Special dividend of AED 2.03 billion – on Dec 12th, 2022, DEWA’s shareholders

approved the payment of a

special one-time dividend of AED 2.03 billion, which was paid on Dec 28th, 2022.

• Payment of Ordinary Dividend of AED 3.10 billion – on Oct 26th, 2022, DEWA paid its shareholders a dividend of AED 3.1 billion for the first half of 2022.

• WETEX & Dubai Solar Show and WGES – from 27 to 29 September 2022, DEWA organized the 24th

Water, Energy, Technology, and Environment Exhibition (WETEX) and Dubai Solar Show (DSS). On 28th and 29th September 2022,

DEWA organized the 8th WorldGreen Energy Summit (WGES)

in collaboration with the World Green Economy Organization

(WGEO), and the Dubai SupremeCouncil of Energy.

• 2022 World Records – In Q3,

2022 DEWA broke its own

world record in major inspection outage duration for the overhaul of gas turbines and desalination units. Also, DEWA achieved

the Guinness World Recordstitle for owning and managingthe Largest Single-Site Water

Desalination Facility in the World with a production capacity of 490 million imperial gallons of water per day.

• Change to the Secretary of the Board of Directors – In October 2022, Mr. Ahmed Talaat was

appointed as Secretary to the

Board of Directors. He has served as Legal Advisor in DEWA for

more than 10 years. He has a

total experience of 23 years in different sectors of legal field.

Ahmed holds Master’s Degree in Law from Alexandria University in Egypt in 2003, and he did his postgraduate study in law of

international project finance from the University of London.

MAJOR EVENTS ANDDISCLOSURES IN 2022

Page 193

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 193ABBREVIATIONS

4IR Fourth Industrial Revolution AF Availability Factor

AI Artificial IntelligenceAMI Advanced Metering InfrastructureASR Aquifer Storage and RecoveryBAU Business As Usual

CDM The Clean Development Mechanism CEO Chief Executive Officer

CER Certified Emission Reduction CML Customer Minutes Loss

CO2 Carbon DioxideCSP Concentrated Solar PowerDEWA Dubai Electricity and Water Authority

DEWA PJSC Dubai Electricity and Water Authority (Public Joint-Stock Company) DFM Dubai Financial Market

DFO Diesel Fuel OilDSCE Dubai Supreme Council of EnergyDSM Demand Side Management StrategyDUSUP Dubai Supply AuthorityEOD Employees of DeterminationERM Enterprise Risk ManagementERP Emission Reduction ProgramEV Electric Vehicle

EWS-WWF Emirates Nature - World Wide Fund for Nature GHG Greenhouse Gases

GRI Global Reporting Initiative GWh Gigawatt Hour

H&S Health and SafetyHPP Hassyan Power PlantHR Human ResourcesHSE Health, Safety, and Environment

IDCXS International Digital Customer Experience Standard IMS Integrated Management System

IoT Internet of thingsIPP Independent Power ProducerI-RECs Renewable Energy Certificates

ISO International Organization for Standardization KM kilometres

KV kilovoltMBR Mohammed bin RashidMD Managing Director

MENA Middle East and North Africa MFO Medium Fuel Oil

Page 194

About DEWA PJSC | Financials | Sustainability | Corporate Governence DEWA PJSC Integrated Report 2022 194MIG Million Imperial GallonsMIGD million imperial gallons per dayMMBTU Metric Million British Thermal UnitsMRV Monitoring, Reporting and VerificationMSF Multi-Stage FlashingMW MegawattsMWh Megawatts HoursNOx Nitrogen oxidePOD People of DeterminationPPM Parts Per MillionPV Photovoltaic Solar Power

QHSE Quality, Health, Safety and Environment R&D Research and Development

RO Reverse OsmosisSAIFI System Average Interruption Frequency IndexSDGs The Sustainable Development GoalsSF6 Sulphur HexafluorideSO2 Sulphur DioxideSWRO Sea Water Reverse Osmosis

T&D Transmission and Distribution TDS Total Dissolved Solids

UNGC United Nations Global CompactUNSDGs United Nations Sustainable Development Goals

Page 195

We would like to thank you for taking the time to go through DEWA Integrated Report 2022, and we hope this report met your expectations.

H.E Matar Humaid Al Tayer H.E Saeed Mohammad Al Tayer Chairman of the Board MD & CEO of DEWA

Mr. Saeed Mohammed Al SharedAudit Committee ChairmanMr. Hilal Khalfan Bin DhaherESG, Nomination andRemuneration CommitteeChairmanEng. Waleed Bin SalmanEVP – Business Development &Excellence