Financial statements for the 1st QTR of 2024 EMPOWER
Document27 pages, text from the file; its scanned pages read by AshumOpen DFM’s file
Page 1
Emirates Central Cooling Systems Corporation P.J.S.CInterim condensed consolidated financial statementsFor the three-month period ended 31 March 2024
Page 2
Emirates Central Cooling Systems Corporation P.J.S.C
Interim condensed consolidated financial statementsFor the three-month period ended 31 March 2024PagesDirectors’ report 1 - 2
Review report on interim condensed consolidated financial statements 3
Interim condensed consolidated statement of financial position 4Interim condensed consolidated statement of comprehensive income 5Interim condensed consolidated statement of changes in equity 6Interim condensed consolidated statement of cash flows 7Notes to the interim condensed consolidated financial statements 8 - 25
Page 3
Emirates Central Cooling Systems Corporation P.J.S.C
1Directors’ reportfor the three-month period ended 31 March 2024Directors’ report
The Board of Directors present their report and interim condensed consolidated financial statements of Emirates Central Cooling Systems Corporation P.J.S.C (the “Company”) and its subsidiaries (together referred to as the “Group”) for the three-month period ended 31 March 2024.
Principal activities
The principal activities of the Group are the provision of district cooling services, operations and maintenance of central cooling plants and related distribution networks and manufacturing of pre-insulated pipes for district cooling services.
Financial performance
The Group achieved a turnover of AED 537,720 thousand, which represented a growth of 8.8% compared to the same period last year and achieved an operating profit of AED 229,414 thousand, which represented a growth of 14.2% compared to the same period last year. The net profit attributable to the owners of the Parent amounted to AED 163,361 thousand for the three-month period ended 31
March 2024.Share capital
The paid-up capital of the Company is AED 1,000,000 thousand consisting of 10,000,000 thousand shares of AED 0.10 each. There has been no change in the capital structure of the Company during the three-month period ended 31 March 2024.
Transfer to statutory reserve
The transfer of profit to the statutory reserve has been suspended as the reserve has reached 50% of the paid-up share capital in prior years.
Dividend
No interim dividend proposed for the three-month period ended 31 March 2024.
Research and Development
The Group is setting the Standard for the Industry by signing a Memorandum of Understanding (MoU) with the American Society of Heating, Refrigerating and Air-Conditioning Engineers (ASHRAE), in the conference held recently in Chicago, U.S., for the development of a unified and globally approved District Cooling Standard, which will be adopted by various countries with emerging district cooling infrastructure by 2025 and also to develop the third generation District Cooling Systems.
Outlook
The Global District Cooling Market Size valued at USD 28.36 billion in 2023 is predicted to reach USD 51.88 billion by the year 2031, growing at a CAGR of 7.94% during the forecast period 2024-2031.
In the coming years, due to growing environment consciousness it is expected that governments will tighten the rules to reduce greenhouse gas emissions and rapid environmental changes. This will expedite the growth of district cooling as it utilises less energy than conventional cooling systems.
Page 4
Emirates Central Cooling Systems Corporation P.J.S.C
Directors' reportfor the three-month period ended 31 March 2024 (continued)
Outlook (continued)
In its recent economic update, UAE Central Bank (CBUAE) has revised upward UAE's growth forecast to 4.2% for the year 2024 and rising it to 5.2% for the year 2025. CBUAE also forecasted non-oil economic growth at 4.7% in both 2024 and 2025.
Empower will seize the opportunities in UAE and explore other neighbouring countries to provide its energy efficient district cooling services.
Auditors
The interim condensed consolidated statements of the Group were reviewed by PricewaterhouseCoopers Limited Partnership Dubai Branch, who were re-appointed as external auditors of the Group for the year 2024 in the Annual General Assembly meeting held on 27 March 2024.
On behalf of the Board
H.E Saeed Mohammed Ahmad Al TayerChairman
06th May 2024
2
Page 5
PricewaterhouseCoopers Limited Partnership Dubai Branch, License no. 102451 Emaar Square, Building 5, P O Box 11987, Dubai - United Arab Emirates T: +971 (0)4 304 3100, F: +971 (0)4 346 9150, www.pwc.com/me 3
Review report on interim condensed consolidated financial statements to the board of directors of Emirates Central Cooling Systems
Corporation P.J.S.CIntroduction
We have reviewed the accompanying interim condensed consolidated statement of financial position of Emirates Central Cooling Systems Corporation P.J.S.C (“the Company”) and its subsidiaries (together, “the Group”) as at 31 March 2024 and the related interim condensed consolidated statements of comprehensive income, changes in equity and cash flows for the three-month period then ended and other explanatory notes. Management is responsible for the preparation and presentation of these interim condensed consolidated financial statements in accordance with International Accounting Standard (IAS) 34, ‘Interim Financial Reporting’. Our responsibility is to express a conclusion on these interim condensed consolidated financial statements based on our review.
Scope of review
We conducted our review in accordance with International Standard on Review Engagements 2410, ‘Review of interim financial information performed by the independent auditor of the entity’. A review of interim financial information consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.
Conclusion
Based on our review, nothing has come to our attention that causes us to believe that the accompanying interim condensed consolidated financial statements are not prepared, in all material respects, in accordance with International Accounting Standard 34, ‘Interim Financial Reporting’.
PricewaterhouseCoopers Limited Partnership Dubai Branch6 May 2024Murad AlnsourRegistered Auditor Number 1301Dubai, United Arab Emirates
Page 6
Emirates Central Cooling Systems Corporation P.J.S.C
Interim condensed consolidated statement of financial position
| As at | |||
|---|---|---|---|
| 31 March | 31 December | ||
| 2024 | 2023 | ||
| AED'000 | AED'000 | ||
| Note | Unaudited | Audited | |
| ASSETS | |||
| Non-current assets | |||
| Property, plant and equipment | 6 | 7,005,473 | 6,934,815 |
| Right-of-use assets | 3,120 | 3,994 | |
| Investment properties | 85,645 | 85,645 | |
| Intangible assets | 7 | 336,943 | 339,982 |
| Financial assets at amortised cost | 8 | 1,319,790 | 1,324,786 |
| Financial assets at fair value through other comprehensive income | 9 | 54,881 | 54,153 |
| Investment in a joint venture | 307 | 307 | |
| Deferred tax assets | 17,102 | 17,454 | |
| 8,823,261 | 8,761,136 | ||
| Current assets | |||
| Inventories | 49,300 | 43,730 | |
| Trade and other receivables | 11 | 267,933 | 319,094 |
| Due from related parties | 13 | 26,788 | 8,821 |
| Financial assets at amortised cost | 8 | 19,319 | 19,105 |
| Financial assets at fair value through profit or loss | 10 | 20,141 | 10,000 |
| Term deposits | 21,200 | 27,500 | |
| Cash and cash equivalents | 14 | 1,493,552 | 538,780 |
| 1,898,233 | 967,030 | ||
| Total assets | 10,721,494 | 9,728,166 | |
| EQUITY AND LIABILITIES | |||
| EQUITY | |||
| Equity attributable to equity holders of the Company | |||
| Share capital | 1,000,000 | 1,000,000 | |
| Statutory reserve | 500,000 | 500,000 | |
| Other reserves | 15,172 | 14,510 | |
| Contributed capital | 82,190 | 82,190 | |
| Retained earnings | 1,288,239 | 1,547,518 | |
| 2,885,601 | 3,144,218 | ||
| Non-controlling interests | 166,407 | 166,783 | |
| Total equity | 3,052,008 | 3,311,001 | |
| LIABILITIES | |||
| Non-current liabilities | |||
| Bank borrowings | 15 | 5,193,125 | 4,492,438 |
| Government grant | 304,863 | 305,558 | |
| Provision for employees' end of service benefits | 56,523 | 54,666 | |
| Retentions payable | 16 | 18,134 | 18,036 |
| Lease liabilities | 564 | 584 | |
| 5,573,209 | 4,871,282 | ||
| Current liabilities | |||
| Trade and other payables | 16 | 1,639,110 | 1,403,263 |
| Current tax liabilities | 27 | 16,008 | - |
| Due to related parties | 13 | 435,326 | 135,953 |
| Government grant | 3,170 | 3,170 | |
| Lease liabilities | 2,663 | 3,497 | |
| 2,096,277 | 1,545,883 | ||
| Total liabilities | 7,669,486 | 6,417,165 | |
| Total equity and liabilities | 10,721,494 | 9,728,166 |
To the best of our knowledge, the interim condensed consolidated financial statements are prepared, in all material respects, in accordance with IAS 34. The interim condensed consolidated financial statements were approved by the Board of Directors on 06th May 2024 and were signed on its behalf by:
Chief Executive Officer | Chairman
The notes on pages 8 to 25 form an integral part of these interim condensed consolidated financial statements | 4
Page 7
Emirates Central Cooling Systems Corporation P.J.S.C
The notes on pages 8 to 25 form an integral part of these interim condensed consolidated financial statements 5
Interim condensed consolidated statement of comprehensive income Three-month period ended 31
March
20242023
NoteAED’000AED’000
UnauditedUnaudited
Revenue17537,720494,274
Interest income on financial asset at amortised cost814,7064,515
Cost of sales19(266,670)(244,398)
Gross profit285,756254,391
General and administrative expenses20(58,829)(54,737)
Provision for expected credit loss462-
Other income2,0251,198
Operating profit229,414200,852
Finance income7,63817,530
Finance costs(55,254)(51,023)
Finance costs – net(47,616)(33,493)
Profit for the period before tax181,798167,359
Income tax expense27(16,294)-
Net profit for the period after tax165,504167,359
Profit attributable to:
Equity holders of the Company163,361167,261
Non-controlling interests2,14398
165,504167,359
Basic and diluted earnings per share for profit attributable to the equity holders of the Company
(AED)240.01630.0167
Profit for the period165,504167,359
Other comprehensive income
Items that will not be reclassified to profit or loss Changes in fair value of financial assets at fair value
through other comprehensive income9728658
Remeasurement of post-employment benefit
Obligations-112
Income tax relating to these items(66)-
Other comprehensive income for the period662770
Total comprehensive income for the period166,166168,129
Total comprehensive income for the periodattributable to:
Equity holders of the Company164,023168,031
Non-controlling interests2,14398
166,166168,129
Page 8
Emirates Central Cooling Systems Corporation P.J.S.C
The notes on pages 8 to 26 form an integral part of these interim condensed consolidated financial statements 6
Interim condensed consolidated statement of changes in equity Attributable to equity holders of the Company
SharecapitalStatutoryreserveOtherreservesRetainedearningsContributedcapitalTotalequityNon-controllinginterests Total
NoteAED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000
At 1 January20241,000,000500,00014,5101,547,51882,1903,144,218166,7833,311,001
Total comprehensive income for the period
Profit for the period---163,361-163,3612,143165,504
Other comprehensive incomeOther comprehensive income for
the period--662--662-662
Total comprehensive income for
the period--662163,361-164,0232,143166,166
Transaction with owners intheir capacity as owners:
Acquisition of minority interest---2,360-2,360(2,519)(159)
Dividends declared12---(425,000)-(425,000)-(425,000)
At 31 March 2024 (unaudited)1,000,000500,00015,1721,288,23982,1902,885,601166,4073,052,008
At 1 January20231,000,000500,0005,8361,444,59182,1903,032,6172,1253,034,742
Total comprehensive income for the period
Profit for the period---167,261-167,26198167,359
Other comprehensive incomeOther comprehensive loss for
the period--770--770-770
Total comprehensive income for
the period--770167,261-168,03198168,129
Transaction with owners inTheir capacity as owners:
Dividends declared12---(425,000)-(425,000)-(425,000)
At 31 March 2023 (unaudited)1,000,000500,0006,6061,186,85282,1902,775,6482,2232,777,871
Page 9
Emirates Central Cooling Systems Corporation P.J.S.C
The notes on pages 8 to 25 form an integral part of these interim condensed consolidated financial statements 7
Interim condensed consolidated statement of cash flows Three-month period ended 31
March
20242023
NoteAED’000UnauditedAED’000UnauditedCash flows from operating activities
Profit before tax181,798167,359
Adjustments for:
Depreciation of property, plant and equipment681,78885,359
Depreciation of right-of-use asset874796
Amortisation of intangible assets73,0393,039
Settlement of financial assets819,4885,616
Provision for employees’ end of service benefits2,1122,012
Interest income earned on financial assets at amortised
cost8(14,706)(4,515)
Impairment of trade receivables(462)-
Loss on disposal of property, plant and equipment33-
Finance income(7,638)(17,530)
Finance costs55,25451,023
Government grant income(695)(695)
Operating cash flows before changes in working capital and payment of employees’ end of service
benefits320,885292,464
Changes in working capital:
Inventories(5,570)2,208
Trade and other receivables46,37230,074
Due from related parties(17,967)28,398
Trade and other payables105,41350,519
Due to related parties net of dividends declared(40,627)(98,476)
Cash generated from operations408,506305,187
Payment of employees’ end of service benefits(255)(598)
Net cash generated from operating activities408,251304,589
Cash flows from investing activities
Acquisition of minority interest in a subsidiary(159)-
Additions to property, plant and equipment(87,858)(103,011)
Investment in financial assets at fair value through profit
or loss(10,141)-
Additions to investment properties-(5,315)
Short-term deposits (more than 3 months)
invested/(withdrawn)6,300(3,600)
Finance income received7,63817,530
Net cash used in investing activities(84,220)(94,396)
Cash flows from financing activities
Proceeds from bank borrowings15700,000-
Lease payments(909)(826)
Interest paid(68,350)(50,263)
Net cash generated from/(used in) financing activities630,741(51,089)
Net increase in cash and cash equivalents954,772159,104
Cash and cash equivalents, beginning of the period538,7801,473,908
Cash and cash equivalents, end of the period1,493,5521,633,012
Page 10
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024
81 Establishment and operations
Emirates Central Cooling Systems Corporation P.J.S.C (“EMPOWER” or “the Company”) was established on 23 November 2003 in accordance with Article 3 of Law No. (10) “Emirates Central Cooling System Corporation Incorporation Law for the year 2003” (“the Decree”). The Company was established as a joint venture between Dubai Electricity and Water Authority (“DEWA”), which is ultimately owned by the Government of Dubai, and the Dubai Development Authority (later transferred to TECOM Investments FZ- LLC (“TECOM”)). EMPOWER began commercial operations on 15 February 2004, and its principal activities are the provision of district cooling services and management, operation and maintenance of central cooling plants and related distribution networks.
In 2009, DEWA increased its shareholding in the Company to 70% and reduced TECOM’s interest to 30%, as formalised through Decree No.3 of 2010 issued by the Ruler of Dubai. On 9 May 2022, TECOM transferred its interest of 30% to Emirates Power Investment LLC, an entity under common control through the Decree No. 19 of 2022 issued by the Ruler of Dubai.
On 14 October 2022, the legal status of the Company was amended to a Public Joint Stock Company through
Decree No. (22) of 2022 issued by the Ruler of Dubai. EMPOWER was listed on the Dubai Financial
Market, on 15 November 2022, by listing 20% of its share capital.
The Company’s primary office is located at Al Hudaiba Awards Building, P.O. Box 8081, Dubai, United Arab Emirates.
These interim condensed consolidated financial statements relate to the Company and its subsidiaries (collectively referred to as “the Group”). The Company has the following principal subsidiaries:
Subsidiary Principal activity Beneficial and legal holding
20242023
Empower Logstor LLC(“ELIPS”)*Manufacturing of pre-insulated
pipes, mainly for district cooling.100.0%97.0%
Palm District Cooling LLC
Establishing and operating district cooling projects and provide air-conditioning, ventilator and
refrigeration services.99.9%99.9%
Palm Utilities LLC
Establishing and operating district cooling projects and provide air-conditioning, ventilator and
refrigeration services.99.5%99.5%
Empower FM LLCInstallations of equipment,
installations and supplies for air conditioning, ventilation and
purification systems, as well as
their repairs and maintenance.100.0%100.0%
Empower Engineering &Consultancy LLCConsultancy services for Project
Development100.0%100.0%
Empower SNOW LLC
Establishing and operating district cooling projects and provide air-conditioning, ventilator and
refrigeration services.100.0%100.0%
Dxb CoolCo FZCO
Establishing and operating district cooling projects and provide air-conditioning, ventilator and
refrigeration services.85.0%85.0%
*In January 2024, EMPOWER acquired 3% minority shareholding, in ELIPS, from Logstor Holding.
Page 11
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
1 Establishment and operations (continued)
These interim condensed consolidated financial statements for the three-month period ended 31 March 2024 were authorised for issue in accordance with a resolution of the Board of Directors
on¢ gh Mad . 0
These interim condensed consolidated financial statements have been reviewed, not audited. The comparative information for the interim condensed consolidated statement of financial position is based on the audited financial statements as at 31 December 2023. The comparative information for the interim condensed consolidated statements of comprehensive income, changes in equity and cash flows, and other explanatory notes, for the three-month period ended 31 March 2024 is based on the unaudited interim condensed consolidated financial statements.
2 Basis of preparation
These interim condensed consolidated financial statements for the three-month ended 31 March 2024 has been prepared in accordance with International Accounting Standard 34 ‘Interim financial reporting’, (“IAS 34”).
The interim report does not include all the notes of the type normally included in an annual financial report. Accordingly, these interim condensed consolidated financial statements should be read in conjunction with the annual consolidated financial statements for the year ended 31 December 2023.
Although as of 31 March 2024, the Group’s current liabilities exceeded its current assets by AED 198,044 thousand, management’s cash flow projections covering a twelve-month period indicate that the Group will at all stages in that period be able to meet its liabilities as they fall due. Current liabilities as at 31 March 2024, includes the dividend payable approved in March (Note 12) amounting to AED 425,000 thousand which was subsequently paid in April 2024. It also includes deferred revenue amounting to AED 383,084 thousand (Note 16) which have no cash impact and will be recognised as revenue, and refundable customer security deposits amounting to AED 465,265 thousand (Note 16) which are only repayable on disconnection of service by a customer in the ordinary course of business.
Further, the Group has undrawn loan facilities amounting to AED 300,000 thousand which are readily available to meet any additional capital needs that might arise, although management does not expect these will need to be utilised for working capital purposes.
3 Material accounting policies
The accounting policies applied in the preparation of these interim condensed consolidated financial statements are consistent with those applied by the Group in its recent annual audited consolidated financial statements for the year ended 31 December 2023 except for the adoption of new and amended standards as set out below.
(a New and amended standards adopted by the Group
A number of amended standards became applicable for the current reporting period. The Group did not have to change its accounting policies or make retrospective adjustments as a result of adopting these amended standards.
Page 12
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
103 Material accounting policies (continued)
(b) Impact of standards issued but not yet applied by the Group
The new and amended standards that are issued, but not yet effective, up to the date of issuance of the Group’s interim condensed consolidated financial statements are disclosed below:
Effective date
Amendments to IAS 21 The Effects of Changes in Foreign Exchange Rates relating to lack of exchangeability 1 January 2025
IFRS 18 Presentation and Disclosures in Financial Statements 1 January 2027 IFRS 10 and IAS 28 – Sale or Contribution of Assets between an investor and its Associate or Joint Venture
Effective date deferredindefinitely
Sale or contribution of assets between an investor and its associate or joint venture – Amendments to IFRS 10 and IAS 28
Effective date deferredindefinitely
Management is currently assessing the impact of aforementioned new accounting standards, amendments and interpretations.
4 Use of estimates and judgments
The preparation of interim condensed consolidated financial statements requires management to make judgments, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets, liabilities, income and expenses. Actual results may differ from these estimates.
The significant judgments made by management in applying the Group’s accounting policies and the key sources of estimation uncertainty were the same as those that were applied in the preparation of the consolidated financial statements of the Group as at and for the year ended 31 December 2023.
5 Financial risk management
5.1 Financial risk factors
The Group’s activities and borrowings exposes it to a variety of financial risks: market risk (including foreign exchange risk, price risk and cash flow interest rate risk), credit risk and liquidity risk.
These interim condensed consolidated financial statements does not include all financial risk management information and disclosures required in the annual financial statements. As such, they should be read in conjunction with the Group’s consolidated financial statements as at 31 December 2023. There have been no changes in any financial risk management policies since year-end.
5.2 Liquidity risk
During the three-month period ended 31 March 2024, the Group drew down AED 700 million of bank loan which is disclosed in Note 15. There has been no other material change in the contractual undiscounted cash outflows for financial liabilities during this period.
5.3 Fair value estimation
Financial instruments comprise financial assets and financial liabilities. Financial assets consist of cash and bank balances, trade and other receivables (excluding prepayments) and due from related parties.
Financial liabilities consist of trade and other payables (excluding deferred revenue), bank borrowings and due to related parties. The fair values of financial instruments approximate their carrying values.
Page 13
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued) 11
6 Property, plant and equipmentLandPlant,equipmentandmachinery BuildingFurnitureand fixturesLeaseholdimprovementsComputerequipment VehiclesCapitalwork-in-progress Total
AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000
Cost
At 1 January2024432,3649,162,26370,70920,69212,45544,94011,992249,83210,005,247
Additions---292-252441151,494152,479
Transfers-36,000-----(36,000)-
Disposals------(49)-(49)
At 31 March2024432,3649,198,26370,70920,98412,45545,19212,384365,32610,157,677
Accumulated depreciation
At 1 January2024-2,943,45634,54518,22211,77938,5416,79517,0943,070,432
Charge for the year-80,03368929677318375-81,788
Disposals------(16)-(16)
At 31 March2024-3,023,48935,23418,51811,85638,8597,15417,0943,152,204
Net book amount at 31
March2024432,3646,174,77435,4752,4665996,3335,230348,2327,005,473
Page 14
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
12
6 Property, plant and equipment (continued) Land
Plant,equipmentandmachinery BuildingFurnitureand fixturesLeaseholdimprovementsComputerequipment VehiclesCapitalwork-in-progress Total
AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000AED’000
Cost
At 1 January2023432,3648,780,42770,70918,35011,89042,4218,566393,3689,758,095
Additions---514-26819398,78799,762
Reversal of accrual-(7,498)------(7,498)
Transfers-30-222-1,144-(1,396)-
At 31 March 2023
(unaudited)432,3648,772,95970,70919,08611,89043,8338,759490,7599,850,359
Accumulated depreciation
At 1 January2023-2,645,55931,76016,83810,87936,1875,83917,0942,764,156
Charge for the year-83,56468928192551182-85,359
At 31 March 2023
(unaudited)-2,729,12332,44917,11910,97136,7386,02117,0942,849,515
Net book amount at 31
March 2023 (unaudited)432,3646,043,83638,2601,9679197,0952,738473,6657,000,844
* During 2022, the Group returned 11 plots of land to a related party, which were granted in previous years for the purpose of constructing the district cooling plants. Accordingly, the carrying amount of AED 59,382 thousand was reversed from property, plant and equipment and the corresponding deferred government grant. District cooling assets with a net book value of AED 306,911 thousand are developed on some of these plots of land.
Management signed a Master Land Agreement and Exclusivity and Framework Agreement with the related party granting the Group unlimited access over 8 plots. The Master Land Agreement refers to a separate lease agreement which is yet to be executed between the Group and the related party over these plots on fair and reasonable terms, for a nominal value. The term of such lease agreements will be for a period no shorter than the term remaining under the master development agreement or the period as agreed in the relevant lease agreements and that EMPOWER will continue to have uninterrupted and unencumbered use of the plots until the relevant lease agreements are entered into.
Page 15
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued) 13
6 Property, plant and equipment (continued) Three-month period ended 31
March
20242023
AED’000AED’000
UnauditedUnaudited
Depreciation expense has been charged to:
Cost of sales (Note19)80,03383,564
General and administrative expenses (Note20)1,7551,795
81,78885,359
7 Intangible assets31 March 31 December
20242023
AED’000AED’000
Unaudited Audited
At 1 January339,982352,139
Amortisation during the period/year(3,039)(12,157)
At 31 March / December336,943339,982
Intangible assets of the Group represent rights to charge users that have been acquired and recognised at fair value as of the acquisition date. These assets have a useful life of 30 years.
8 Financial assets at amortised cost31 March 31 December
20242023
AED’000AED’000
Unaudited Audited
At 1 January1,343,891305,157
Additions during the period/year-1,050,000
Interest earned during the period/year14,70638,711
Settlement during the period/year(19,488)(49,977)
At 31 March / December1,339,1091,343,891
Less: current portion(19,319)(19,105)
Non-current portion1,319,7901,324,786
The balance of financial assets at amortised cost as above represents receivable of:
a) AED 299,877 thousand from Nakheel PJSC, an entity under common control, in relation to acquisition of Empower Snow LLC (formerly Snow LLC) during 2021, and
b) AED 1,039,232 thousand from Dubai Aviation City Corporation, an entity under common control, in relation to acquisition of DXB CoolCo FZCO during the year 2023.
Page 16
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
14
9 Financial assets at fair value through other comprehensive income (FVTOCI) 31 March 31 December
20242023
AED’000AED’000
Unaudited Audited
At the beginning of the period/year54,15352,911
Gain during the period/year7281,242
At the end of the period/year54,88154,153
During the period, the following amounts were recognised in profit or loss and other comprehensive income:
31 March31 March
20242023
AED’000AED’000
UnauditedUnaudited
Gain recognised in other comprehensive income728658
Interest income from equity investments held at FVTOCI recognised
in profit or loss826826
The Group had invested in Tier 1 Capital Certificates (“Bonds”), which have been issued at their par value. These Bonds are perpetual instruments and are listed. The bonds carry a non-cumulative interest of 6% per annum, payable semi-annually at the discretion of the issuer.
10 Financial assets at fair value through profit or loss31 March 31 December2024AED’000Unaudited2023AED’000Audited
Investment in National Bonds20,14110,000
During the period ended 31 March 2024, the Group reinvested the matured amount AED 10,000 thousand with interest of AED 141 thousand and also made an additional investment of AED 10,000 thousand into the National Bonds Corporation.
11 Trade and other receivables 31 March 31 December
20242023
AED’000UnauditedAED’000Audited
Trade receivables180,658226,508
Accrued revenues43,34749,488
224,005275,996
Less: Provision for expected credit losses(74,235)(74,697)
149,770201,299
Other financial assets at amortised cost
Other receivables16,73314,333
Other assets
Advance to contractors / suppliers84,66489,915
Prepayments16,76613,547
101,430103,462
267,933319,094
Other receivables includes a deposit of AED 4,490 thousand (2023: AED 4,490 thousand) receivable from DEWA (Note 13).
Page 17
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
1512 Dividends
A final dividend of AED 425,000 thousand (AED 0.0425 per share) in respect of the year ended 31
December 2023 was declared and approved in Annual General Assembly Meeting held on 27 March 2024. The dividend payable amounting to AED 425,000 thousand comprises AED 340,000 thousand in due to related parties (Note 13) and AED 85,000 thousand in trade and other payables (Note 16) and was subsequently paid on 23 April 2024 (2023: a final dividend of AED 425,000 thousand (AED 0.0425 per share), in respect of the year ended 31 December 2022, was declared and approved in Annual General Assembly Meeting held on 29 March 2023 and was subsequently paid on 25 April 2023).
13 Transactions and balances with related parties
Related parties include the shareholders, key management personnel, subsidiaries, joint venture, directors and businesses which are controlled directly or indirectly by the shareholders or directors or over which they exercise significant management influence. The Group has availed the exemption as per para 25 of IAS 24 Related Party Disclosure and consider the entities (other than disclosed below) controlled by Government of Dubai as non-related.
(a) Related party transactions
During the period, the Group entered into the following significant transactions with related parties:
Three-month period ended 31March
20242023
AED’000AED’000
UnauditedUnaudited
Services rendered to entities under common control of shareholders
Dubai Properties Group LLC27,69028,186
Tecom Investments FZ LLC11,39312,064
Jumeirah Group LLC8,6798,527
Meraas Holding LLC6,1246,857
Global Village Dubai LLC129134
54,01555,768
Dividend to shareholders
Dubai Electricity and Water Authority PJSC (DEWA)238,000238,000
Emirates Power Investment LLC102,000102,000
340,000340,000
Services received from shareholder
Dubai Electricity and Water Authority PJSC (DEWA)154,846120,153
Services rendered to entities under common control of Ultimate parent
Dubai Airports Corporation44,177-
Services received from entities under common control of Ultimate Parent
Finance cost from Emirates NBD PJSC66,84757,678
Key management remuneration
Board of directors’ remuneration (Note20)1,4501,875
Compensation of key management personnel
Short term benefits1,2161,284
End of service benefits130130
1,3461,414
Page 18
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued) 16
13 Transactions and balances with related parties (continued) (b) Balances with related parties
31 March202431 December2023AED’000UnauditedAED’000AuditedDue from related partiesShareholders
Emirates Power Investment LLC-2
Dubai Electricity and Water Authority PJSC-4
-6
Entities under common control of shareholders
Tecom Investments FZ LLC3,7273,762
Jumeirah Group LLC1,8862,311
Meraas Holding LLC447602
Others3265
6,0926,740
Entity under common control of Ultimate Parent
Dubai Airports Corporation20,6962,075
26,7888,821
Due to related partiesShareholders
Dubai Electricity and Water Authority PJSC (DEWA)316,436113,854
Emirates Power Investment LLC102,000-
418,436113,854
Entities under common control of shareholders
Dubai Properties Group LLC16,45417,955
Dubai Holding LLC-3,708
16,45421,663
Others436436
435,326135,953
Amounts included in bank borrowings, financial assets at amortised cost, cash and cash equivalents and trade and other receivables
Shareholder
Dubai Electricity and Water Authority PJSC4,4904,490
Entities under common control of shareholder
Emirates NBD PJSC5,308,3404,498,463
Dubai Islamic Bank705,7641,255,245
Emirates Islamic Bank22540,220
Dubai Aviation City Corporation1,039,232-
Nakheel PJSC299,877301,003
Page 19
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued) 17
14 Cash and cash equivalents 31 March202431 December2023AED’000UnauditedAED’000Audited
Cash on hand1,091-
Cash at bank254,161168,980
Short term bank deposits – less than 3 months1,238,300369,800
1,493,552538,780
Bank balances are held with branches of local and international banks. Short-term bank deposits bear an effective interest rate of 3.75% to 5.45% per annum (2023: 5.5% to 5.75%).
Term deposits are presented as cash equivalents only if they have a maturity of three-month or less from the date of original maturity or are readily convertible to known amounts of cash which are subject to insignificant risk of changes in value.
The Group earned finance income AED 7,638 thousand during the period (2023: AED 17,530 thousand). The decrease is mainly due to reduction in average deposit places and deposit rates during the period.
15 Bank borrowings 31 March202431 December2023AED’000UnauditedAED’000Audited
Term loan5,200,0004,500,000
Unamortised loan cost(6,875)(7,562)
Non-current balance5,193,1254,492,438
During the period ended 31 March 2024, the Group drew down AED 700,000 thousand from its loan facilities. The undrawn term loan facilities is AED 300,000 thousand as at 31 March 2024 (31 December 2023:
AED 1,000,000 thousand) at a floating rate linked to EIBOR plus margin.
16 Trade and other payables 31 March202431 December2023AED’000UnauditedAED’000Audited
Refundable customers’ security deposits465,265456,361
Deferred revenue383,084341,792
Project cost accruals268,667240,489
Project payables92,03775,796
Retentions payable88,84487,731
Dividend payable85,000-
Other liabilities*264,347219,130
1,657,2441,421,299
Less: Non-current portion
Retentions payable(18,134)(18,036)
Current portion1,639,1101,403,263
* Other liabilities mainly include accrued expenses for water, electricity and staff liabilities.
Page 20
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued) 18
16 Trade and other payables (continued)
Movement in deferred revenue is as follows:
31 March202431 March2023
AED’000AED’000
UnauditedUnaudited
At the beginning of the period341,792290,225
Billed during the period326,348284,777
Less: Income recognised during the period(285,056)(273,679)
At the end of the period383,084301,323
17 RevenueThree-month period ended 31March
20242023
AED’000AED’000
UnauditedUnaudited
District cooling services537,123487,329
Pre-insulated pipe5976,945
537,720494,274
18 Operating segments
The Group has determined that the Board of Directors, are the chief operating decision-makers (“CODM”) per the requirements of IFRS 8 Operating Segments.
Management monitors the operating results of its business units separately for the purpose of making decisions about resource allocation and performance assessment. Segment performance is evaluated based on operating profit or loss and is measured consistently with operating profit or loss in the consolidated financial statements.
The Board of Directors are also provided with multiple levels of information which comprise of revenue, gross profit and net profit, aggregated for higher level components by stream. The financial accounting system of the Group is currently configured in this manner and this information is readily available. However, for decision making purposes, the Board of Directors relies mainly on the revenue and net profit information that contains lower-level components. Hence, the segment information provided is primarily to the net profit level of the Group.
For the Board of Directors, the Group is currently organised into two major operating and reportable segments as follows:
• The ‘Chilled water’ segment constructs, owns, assembles, installs, operates and maintains cooling and conditioning systems. In addition, the segment distributes and sells chilled water for use in district cooling technologies.
• The ‘Pre-insulated pipe business' segment is involved in manufacture, assemble and selling activities relating to the expansion of the Group’s chilled water business.
Page 21
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
1918 Operating segments (continued)
Three-month period ended 31 March 2024 (unaudited) Three-month period ended 31 March 2023 (unaudited) Chilled
waterPre-insulatedpipe Elimination TotalChilledwaterPre-insulatedpipe Elimination Total
AED’000AED’000
Revenues
External revenue537,123597-537,720487,3296,945-494,274
Inter-segment revenue-6,608(6,608)--8,840(8,840)-
Interest earned on financial asset
at amortised cost14,706--14,7064,515--4,515
Total revenues551,8297,205(6,608)552,426491,84415,785(8,840)498,789
Cost of sales(266,038)(4,390)3,758(266,670)(238,526)(10,348)4,476(244,398)
Gross profit285,7912,815(2,850)285,756253,3185,437(4,364)254,391
General and administrative
expenses(57,877)(952)-(58,829)(52,217)(2,520)-(54,737)
Net impairment losses on
financial assets462--462
Other income9551,070-2,0251,14355-1,198
Operating profit229,3312,933(2,850)229,414202,2442,972(4,364)200,852
Finance income7,231407-7,63817,247283-17,530
Finance costs(55,254)--(55,254)(51,023)--(51,023)
Income taxes(16,294)--(16,294)----
Net profit for the period165,0143,340(2,850)165,504168,4683,255(4,364)167,359
Inter-segment transaction are eliminated on consolidation
Page 22
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
2018 Operating segments (continued)
Segment results include an amount of depreciation and amortisation allocated to the operating segments as follows:
Three-month period ended 31 March 2024 (unaudited)
Three-month period ended 31 March 2023 (unaudited)
ChilledwaterPre-insulatedpipe TotalChilledwaterPre-insulatedpipe Total
AED’000AED’000
Depreciation on property, plant and equipment
(Note6)81,17561381,78884,74661385,359
Depreciation on right-of-use asset874-874796-796
Total Depreciation82,04961382,66285,54261386,155
Segment assets and liabilities are as follows:
Three-month period ended 31 March 2024 (unaudited) 31 December 2023 (audited) Chilled
waterPre-insulatedpipe TotalChilledwaterPre-insulatedpipe Total
AED’000AED’000
Segment assets10,613,905107,34810,721,2539,626,555101,3049,727,859
Investment in joint venture307-307307-307
Total assets10,614,212107,34810,721,5609,626,862101,3049,728,166
Segment liabilities
Total liabilities7,651,09018,3967,669,4866,403,83213,3336,417,165
Page 23
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
2118 Operating segments (continued)
The table below illustrates the capital expenditures added during the period:
Three-month period ended 31 March 2024 (unaudited)
Three-month period ended 31 March 2023 (unaudited)
Chilled waterPre-insulatedpipe Total Chilled waterPre-insulatedpipe TotalAED’000 AED’000Property, plant and equipment 152,466 13 152,479 99,755 7 99,762Geographic information
The following table presents certain revenue and non-current assets information relating to the Group based on geographical location of the operating units:
Revenue Non-current assets31 March 2024(unaudited)31 March 2023(unaudited)31 March 2024(unaudited)31 December 2023(audited)United Arab Emirates 537,720 494,274 8,823,261 8,761,136
Page 24
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
2219 Cost of salesThree-month period ended 31March
20242023
AED’000AED’000
UnauditedUnaudited
Utilities cost155,903123,805
Depreciation on property, plant and equipment (Note6)80,03383,564
Staff costs (Note21)10,5299,753
Amortisation of intangible asset (Note7)3,0393,039
Materials2885,180
Depreciation on right-of-use asset2045
Others16,85819,012
266,670244,398
20 General and administrative expenses Three-month period ended 31
March
20242023
AED’000AED’000
UnauditedUnaudited
Staff costs (Note21)44,10141,426
Depreciation on property, plant and equipment (Note6)1,7551,795
Directors remuneration1,4501,875
Communication expenses1,2791,275
Business travel1,276241
Consultancy1,245516
Advertising and marketing expenses886425
Depreciation on right-of-use asset854751
Rent64195
Others5,9196,238
58,82954,737
21 Staff costsThree-month period ended 31March
20242023
AED’000AED’000
UnauditedUnaudited
Salaries35,00832,507
Staff benefits17,51016,660
End of service benefits2,1122,012
54,63051,179
Staff costs have been charged to:
Cost of sales (Note19)10,5299,753
General and administrative expenses (Note20)44,10141,426
54,63051,179
Page 25
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
2322 Guarantees
At 31 March 2024, the Group had outstanding bank guarantees and letters of credits amounting to AED 4,487 thousand (31 December 2023: AED 3,842 thousand), which were issued by the Group’s bankers in the normal course of business.
23 CommitmentsCapital commitments
As at 31 March 2024, the Group has project commitments of AED 720,973 thousand (31 December 2023: AED 687,341 thousand) for projects-in-progress. These commitments represent the value of contracts issued as of 31 March 2024, net of invoices recorded and accruals made as of that date.
24 Earning per share31 March 2024 31 March 2023
UnauditedUnaudited
Profit attributable to the ordinary equity holders of the
Company163,361,000167,261,000
Weighted average number of ordinary shares used as a
denominator in calculating basic earnings per share10,000,000,00010,000,000,000
Basic and diluted earnings per share0.01630.0167
25 Fair value measurement
The Group measures fair values using the following fair value hierarchy that reflects the significance of the inputs used in making the measurements:
Level 1: inputs that are quoted market price (unadjusted) in an active market for identical instruments.
Level 2: inputs other than quoted prices included within Level 1 that are observable either directly (i.e., as prices) or indirectly (i.e., derived from prices). This category includes instruments valued using: quoted market prices in active markets for similar instruments; quoted market prices for identical or similar instruments in markets that are considered less than active; or other valuation techniques where all significant inputs are directly or indirectly observable from market data.
Level 3: inputs that are unobservable. This category includes all instruments where the valuation technique includes inputs not based on observable data and the unobservable inputs have a significant effect on the instrument’s valuation. This category includes instruments that are valued based on quoted prices for similar instruments where significant unobservable adjustments or assumptions are required to reflect differences between the instruments.
Page 26
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
2425 Fair value measurement (continued)
The table below analyses financial instruments, measured at fair value at the end of the reporting period, by the level in the fair value hierarchy into which the fair value measurement is categorised:
31 March 2024 Level 1 Level 2 Level 3 TotalAED’000UnauditedAED’000UnauditedAED’000UnauditedAED’000UnauditedFinancial assets at fair value through
other comprehensive income54,881--54,881
Financial assets at fair value through
profit or loss-20,141-20,141
54,88120,141-75,022
31 December 2023 Level 1 Level 2 Level 3 Total AED’000
AuditedAED’000AuditedAED’000AuditedAED’000AuditedFinancial assets at fair value through
other comprehensive income54,153--54,153
Financial assets at fair value through
profit or loss-10,000-10,000
54,15310,000-64,153
There were no transfers between Level 1, Level 2 and Level 3 fair value measurements.
Specific valuation techniques used to value financial instruments include:
• the use of quoted market prices or dealer quotes for similar instruments; and
• for other financial instruments - discounted cash flow analysis. All of the resulting fair value estimates are included in level 2.
26 Seasonality of operations
The Group’s financial results for any period are not necessarily indicative of results to be expected for the full year. Interim period revenues and earnings are typically sensitive to the weather conditions.
Page 27
Emirates Central Cooling Systems Corporation P.J.S.C
Notes to the interim condensed consolidated financial statements for the three-month period ended 31 March 2024 (continued)
2527 Income tax expense
(a) Components of income tax expense
Income tax expenses recorded in profit or loss comprises the following:
Three-month period ended 31March
20242023
AED’000AED’000
UnauditedUnaudited
Current tax16,008-
Deferred tax286-
Income tax expense for the period16,294-
Income tax expense is recognised during the three-month period ended 31 March 2024 on a best estimate of the weighted average annual income tax rate expected for the full financial year. Amounts accrued for income tax expense may have to be adjusted if the estimate of the annual income tax rate changes. As of 31 March 2024, the Group has current tax liabilities of AED 16,008 thousand (2023:
Nil).
(b) Reconciliation between the tax expense and profit or loss multiplied by applicable tax rate The income tax rate applicable to the Group’s income is 9% (2023: 0%). A reconciliation between the expected and the actual tax charge is provided below:
31 March31 March
20242023
AED’000AED’000
UnauditedUnaudited
Profit before tax181,798-
Profit before tax at statutory rate of9%16,362-
Income which is exempt from taxation(354)-
Income tax expense16,008-
The effective tax rate as of 31 March 2024 is 8.8% (2023: Nil).
(c) Deferred taxes analysed by type of temporary difference
Differences between IFRS Accounting Standards and statutory taxation regulations in the United Arab Emirates give rise to temporary differences between the carrying amount of assets and liabilities for financial reporting purposes and their tax bases. The tax effect of the movements in these temporary differences was not material to the interim condensed consolidated financial statements.
Further, AED 66 thousand of deferred tax relates to changes in fair value of financial assets at fair value through other comprehensive income which has been recognised in other comprehensive income in interim condensed consolidated statement of comprehensive income.