ASHUMGulf news and Dubai stocks, live

Financial statements for the 2n QTR of 2024 SALIK

Salik Company PJSC Half-year results 28 pages Arabic record

Document28 pages, text from the file; its scanned pages read by AshumOpen DFM’s file

Page 1

SALIK COMPANY P.J.S.C.CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED30 JUNE 2024 (UNAUDITED)

Page 2

SALIK COMPANY P.J.S.C.CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024PageDirectors’ report 1

Report on review of condensed interim financial statements to the Board of Directors of Salik Company P.J.S.C. 2

Condensed interim statement of profit or loss and comprehensive income 3

Condensed interim statement of financial position 4Condensed interim statement of cash flows 5Condensed interim statement of changes in equity 6Notes to the condensed interim financial statements 7 - 26

Page 3

SALIK COMPANY P.J.S.C.DIRECTORS’ REPORTFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024

The Board of Directors (the “Board”) present their report together with the reviewed condensed interim financial statements of Salik Company P.J.S.C. (“Salik” or the “Company”) for the three-month and six-month periods ended 30 June 2024.

Board of Directors

The Board of Directors of the Company comprises:

Chairman:His Excellency Mattar Al Tayer
Vice chairman:Mr. Abdul Muhsen Ibrahim Kalbat
Members:His Excellency Mohammed Abdulla Lengawi

| His Excellency Mohammad Alhawi| Mr. Ibrahim Al Haddad (CEO)| Mr. Mohammed Al-Mudharreb| Eng. Maitha Bin Adai

Principal activities

The principal activities of the Company are the operations and maintenance of the existing tollgates throughout Dubai, UAE and for design, construction (including all the civil, electrical, gantry design and manufacturing, system integration, testing and commissioning) of new toll gates, including without limitation, the required tolling equipment, infrastructure and any interface requirements in relation to the new toll gates, but excluding the construction, operation and maintenance of the relevant toll roads.

Financial Performance

During the three-month and six-month periods ended 30 June 2024, the Company reported revenue of AED 532.7 million and AED 1,094.8 million respectively (2023: AED 516.7 million and AED 1,036.8 million respectively for the three-month and six-month periods ended 30 June 2023) and profit after tax for the three-month and six-month periods of AED 267.5 million and AED 544.8 million respectively (2023: AED 272.7 million and AED 547.9 million respectively for the three-month and six-month periods ended 30 June 2023).

Dividends

On 13ᵗʰ August 2024, the Board of Directors approved to distribute a dividend of AED 544,765 thousand to the shareholders (7.263 fils per share), reflecting 100% of the Company’s distributable net profit for the first half of 2024 as per the Company’s dividend policy.

Statement of disclosure

To the best of our knowledge, the condensed interim financial statements are prepared, in all material respects, in accordance with IAS 34.

for the Board of Directors

His Excellency Mattar Al TayerChairmanBoard of DirectorsSalik Company P.J.S.C.13ᵗʰ August 2024

Page 4

PricewaterhouseCoopers Limited Partnership Dubai Branch, License no. 102451 Emaar Square, Building 5, P O Box 11987, Dubai - United Arab Emirates T: +971 (0)4 304 3100, F: +971 (0)4 346 9150, www.pwc.com/me 2

Report on review of condensed interim financial statements to theBoard of Directors of Salik Company P.J.S.C.Introduction

We have reviewed the accompanying condensed interim statement of profit or loss and comprehensive income of Salik Company P.J.S.C. (the ‘Company’ or ‘Salik’) for the three-month and six-month periods ended 30 June 2024, the condensed interim statement of financial position as at 30 June 2024 and the related condensed interim statements of changes in equity and cash flows for the six-month period then ended and other explanatory notes. Management is responsible for the preparation and presentation of these condensed interim financial statements in accordance with International Accounting Standard 34 ‘Interim Financial Reporting’. Our responsibility is to express a conclusion on these condensed interim financial statements based on our review.

Scope of review

We conducted our review in accordance with International Standard on Review Engagements 2410, 'Review of interim financial information performed by the independent auditor of the entity'. A review of interim financial statements consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.

Conclusion

Based on our review, nothing has come to our attention that causes us to believe that the accompanying condensed interim financial statements are not prepared, in all material respects, in accordance with International Accounting Standard 34 “Interim Financial Reporting”.

PricewaterhouseCoopers Limited Partnership Dubai Branch13 August 2024Wassim El AfchalRegistered Auditor Number 5454Dubai, United Arab Emirates

Page 5

SALIK COMPANY P.J.S.C.3CONDENSED INTERIM STATEMENT OF PROFIT OR LOSS AND COMPREHENSIVEINCOME

Three-month period ended Six-month period ended 30 June

202430 June202330 June202430 June2023

(unaudited)(unaudited)(unaudited)(unaudited)

NotesAED'000AED'000AED'000AED'000

Revenue6532,737516,6681,094,7921,036,794

Other income5471,0081,7441,008

Finance income2014,9676,62329,18910,616

Cost of tags and recharge cards7(7,516)(3,158)(14,608)(10,275)

Toll operation and maintenance expense8(20,208)(20,492)(41,196)(41,123)

Employee benefit expense9(7,318)(5,973)(14,491)(12,993)

Depreciation and amortisation expense10(21,043)(20,662)(42,061)(41,077)

Service providers commission12(7,814)(9,736)(18,450)(20,131)

Concession fee expense15(104,106)(113,822)(226,883)(227,384)

Software enhancement expense(2,650)(3,063)(4,998)(4,955)

Impairment loss on trade receivables19(12,035)(7,467)(21,904)(14,834)

Directors’ remuneration-(3,145)-(3,375)

Finance costs11(61,487)(59,211)(126,875)(115,117)

Other expenses13(10,181)(4,918)(15,648)(9,221)

Profit before tax293,893272,652598,611547,933

Income tax expense26(26,421)-(53,846)-

Profit for the period267,472272,652544,765547,933

Other comprehensive income - - - -

Total comprehensive income for the period267,472272,652544,765547,933

Basic and diluted earnings per share for profit attributable to the ordinary equity holders of

the Company (AED)290.040.040.070.07

The accompanying notes 1 to 35 form an integral part of these condensed interim financial statements.

Page 6

SALIK COMPANY P.J.S.C.CONDENSED INTERIM STATEMENT OF FINANCIAL POSITION

Notes30 June 202431 December 2023
(unaudited)(audited)
AED’000AED’000
ASSETS
Non-current assets
Property and equipment166,6734,289
Intangibles143,839,7053,877,551
Right-of-use assets178,6017,078
Other asset480560
3,855,4593,889,478
Current assets
Inventories1815,7765,566
Trade and other receivables19179,850173,483
Contract asset157,871-
Short-term deposit with bank20600,000750,000
Due from related parties21142,336139,078
Cash and cash equivalents20452,299266,180
1,398,1321,334,307
Total assets5,253,5915,223,785
LIABILITIES
Non-current liabilities
Long-term borrowings223,990,3823,988,779
Lease liabilities176,8796,047
Provision for employees' end-of-service benefits232,9932,519
Contract liabilities2558,93253,350
4,059,1864,050,695
Current liabilities
Due to a related party21108,979138,693
Lease liabilities172,1811,889
Trade and other payables2474,31070,252
Provision for taxation2653,846-
Contract liabilities25297,812299,709
537,128510,543
Total liabilities4,596,3144,561,238
EQUITY
Share capital2775,00075,000
Statutory reserve2837,50037,500
Retained earnings544,777550,047
Total equity657,277662,547
Total equity and liabilities5,253,5915,223,785

To the best of our knowledge, the condensed interim financial statements are prepared, in all material respects, in accordance with IAS 34. The condensed interim financial statements were approved by the Board of Directors on 13ᵗʰ August 2024 and were signed on its behalf by:

Chief Executive Officer | Chairman of the Board of Directors

The accompanying notes 1 to 35 form an integral part of these condensed interim financial statements.

4

Page 7

SALIK COMPANY P.J.S.C.5CONDENSED INTERIM STATEMENT OF CASH FLOWSSix-month period ended30 June 2024 30 June 2023

(unaudited)(unaudited)

NotesAED'000AED'000

Cash flows from operating activities

Profit before tax for the period598,611547,933

Adjustments for:

Depreciation of property and equipment104898

Depreciation of right-of-use assets10756253

Amortisation of intangibles1040,81640,816

Provision for employees’ end-of-service benefits23522123

Finance charge on lease liabilities1120373

Other finance costs126,672115,044

Finance income20(29,189)(10,616)

Adjustment for property and equipment-80

Impairment loss on trade receivables1921,90414,834

Operating cash flows before changes in working capital and

payment of employees’ end of service benefits760,784708,548

Changes in working capital:

Trade and other receivables excluding impact of impairment loss(27,245)190,899

Due from related parties(3,258)(30,802)

Inventories(10,210)4,646

Trade and other payables4,058(824)

Due to a related party(29,714)(194,363)

Other asset8080

Contract asset(7,871)-

Contract liabilities3,6854,146

Cash generated from operations690,309682,330

Payment of employees’ end of service benefits23(48)-

Net cash generated from operating activities690,261682,330

Cash flows from investing activities

Payment for purchase of property and equipment16(2,873)(104)

Purchase of intangible assets14(2,970)-

Movement in fixed deposits150,000-

Interest income on deposits28,16310,616

Net cash generated from investing activities172,32010,512

Cash flows from financing activities

Dividend paid(550,035)(491,408)

Finance charge on lease liabilities paid(203)(73)

Other finance costs paid(125,069)(113,441)

Principal element of lease payment(1,155)(367)

Net cash used in financing activities(676,462)(605,289)

Net increase in cash and cash equivalents186,11987,553

Cash and cash equivalents at the beginning of the period266,180822,707

Cash and cash equivalents at the end of the period20452,299910,260

The accompanying notes 1 to 35 form an integral part of these condensed interim financial statements.

Page 8

SALIK COMPANY P.J.S.C.6CONDENSED INTERIM STATEMENT OF CHANGES IN EQUITYSharecapitalStatutoryreserveRetainedearningsTotalequity

AED'000AED'000AED'000AED'000

At 1 January202375,00037,500491,414603,914

Total comprehensive income for the period--547,933547,933

Transaction with owners in their capacity as owners:

Dividend declared and paid (Note32)--(491,408)(491,408)

At 30 June 2023 (unaudited)75,00037,500547,939660,439

At 1 January202475,00037,500550,047662,547

Total comprehensive income for the period--544,765544,765

Transaction with owners in their capacity as owners:

Dividend declared and paid (Note32)--(550,035)(550,035)

At 30 June 2024 (unaudited)75,00037,500544,777657,277

The accompanying notes 1 to 35 form an integral part of these condensed interim financial statements.

Page 9

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 202471 DESCRIPTION OF BUSINESS AND PRINCIPAL ACTIVITIES

Salik Company P.J.S.C. ('Salik' or the 'Company') is a Public Joint Stock Company incorporated on 30 June 2022 in the Emirate of Dubai, United Arab Emirates (UAE) under law no. 12 of 2022 issued by His Highness Sheikh Mohammed Bin Rashid Al Maktoum, the Ruler of Dubai, and started its operations on 1 July 2022. The Company is listed on the Dubai Financial Market on 29th September 2022.

The registered address of the Company is Suite No.400, 4th floor, Festival Tower, Dubai Festival City, PO Box 36003, Dubai, United Arab Emirates.

The Company is owned by the Dubai Investment Fund (“DIF” or the “Parent”) which holds 75.1% of the Company’s shares which is ultimately owned and controlled by the Government of Dubai (“ultimate controlling party”). The remaining shares of 24.9% are publicly traded on the Dubai Financial Market ("DFM") stock exchange.

The principal activities of the Company are the operations and maintenance of the existing tollgates throughout Dubai, UAE and for design, construction (including all the civil, electrical, gantry design and manufacturing, system integration, testing and commissioning) of new toll gates, including without limitation, the required tolling equipment, infrastructure and any interface requirements in relation to the new toll gates, but excluding the construction, operation and maintenance of the relevant toll roads.

These condensed interim financial statements for the three-month and six-month periods ended 30 June 2024 have been reviewed, not audited. The comparative information for the condensed interim statement of financial position and related explanatory notes is based on the audited financial statements as at 31 December 2023. The comparative information for the condensed interim statements of profit or loss and comprehensive income, changes in equity and cash flows, and related explanatory notes is based on the unaudited condensed interim financial statements for the three-month and six-month periods ended 30 June 2023.

2 BASIS OF PREPARATION

These condensed interim financial statements have been prepared in accordance with International Accounting Standard (IAS): 34 'Interim Financial Reporting' and applicable requirements of the United Arab Emirates laws.

The condensed interim financial statements do not include all information and disclosures required in the annual financial statements and should be read in conjunction with the Company’s financial statement for the year ended 31 December 2023.

The condensed interim financial statements are presented at historical cost basis. Historical cost is generally based on the fair value of the consideration given in exchange for assets, unless otherwise disclosed.

The condensed interim financial statements are presented in UAE Dirhams ("AED"), which is also the Company's functional currency. All values have been rounded to the nearest thousand ("000"), unless otherwise disclosed.

3 NEW STANDARDS, INTERPRETATIONS AND AMENDMENTS TO EXISTING STANDARDS

New standards, interpretations and amendments to existing standards as adopted by the Company A number of amended standards became applicable for the current reporting period. The Company did not have to change its accounting policies or make retrospective adjustments as a result of adopting these amended standards. The amended standards did not have a material impact on the condensed interim financial statements.

New standards, interpretations and amendments issued but not yet effective

Certain amendments to accounting standards have been published that are not mandatory for the six-month period ended 30 June 2024 and have not been early adopted by the Company. These amendments are not expected to have a material impact on the Company in the current or future reporting periods and on foreseeable future transactions.

Page 10

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)84 SUMMARY OF MATERIAL ACCOUNTING POLICIES

The material accounting policies applied in the preparation of these condensed interim financial statements are consistent with those applied by the Company in its recent annual audited financial statements for the year ended 31 December 2023 except for the policies set out below and the adoption of new and amended standards as mentioned in Note 3.

Income taxes

Income taxes have been provided for in the condensed interim financial statements in accordance with legislation enacted or substantively enacted at the reporting date in the United Arab Emirates where the Company operates and generates taxable income. The income tax charge comprises current tax and is recognised in profit or loss for the period.

Taxable profits or losses are based on estimates if the condensed interim financial statements are authorized prior to filing relevant tax returns. Taxes other than on income are recorded within operating expenses.

Deferred income tax is provided using the balance sheet liability method for tax loss carry forwards and temporary differences arising between the tax bases of assets and liabilities and their carrying amounts for financial reporting purposes. In accordance with the initial recognition exemption, deferred taxes are not recorded for temporary differences on initial recognition of an asset or a liability in a transaction other than a business combination if the transaction, when initially recorded, affects neither accounting nor taxable profit and at the time of the transaction, does not give rise to equal taxable and deductible temporary differences. Deferred tax balances are measured at tax rates enacted or substantively enacted at the end of the reporting period, which are expected to apply to the period when the temporary differences will reverse or the tax loss carry forwards will be utilised.

Deferred tax assets for deductible temporary differences and tax loss carry forwards are recorded only to the extent that it is probable that the temporary difference will reverse in the future and there is sufficient future taxable profit available against which the deductions can be utilised.

Revenue recognition - toll gate construction

Salik has the exclusive rights for the construction of new toll gates for and on behalf of Roads and Transport Authority (“RTA”) (Note 15). The Company has concluded that for such arrangements it is creating an asset controlled by the customer and has an enforceable right to payment for work completed. Therefore, it meets the criteria to recognise revenue over time.

The Company is reimbursed for all costs and expenses associated with toll gate construction at a consideration equal to cost plus a 10% mark-up. The Company has determined it acts as an agent under IFRS 15 ‘Revenue from Contracts with Customers’ as toll gate construction service is provided using third parties without taking control. Accordingly, revenue is recognised on a net basis (which is equivalent to the 10% markup) as and when the construction progresses.

When the services rendered by the Company exceeds the payment from the customer, a contract asset is recognised.

If the payment exceeds the services rendered, a contract liability is recognised.

5 CRITICAL ACCOUNTING ESTIMATES AND JUDGEMENTS

The preparation of the condensed interim financial statements requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, income and expense. Actual results may differ from these estimates.

The significant judgements made by management in applying the Company’s accounting policies and the key sources of estimation uncertainty were the same as those that were applied in the preparation of the financial statements of the Company as at and for the year ended 31 December 2023.

Page 11

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)96 REVENUE

Set out below is the disaggregation of the Company’s revenue:

Three-month period ended Six-month period ended 30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Tolling revenue

- Toll usage fees462,691455,289953,801909,535

- Tag activation fees*9,9726,51919,74815,121

472,663461,808973,549924,656

Fines57,18852,778116,095108,124

Inactive balance write-off (Note25)1,5761,4563,0462,840

Toll gate construction** (Note15)585-716-

Miscellaneous7256261,3861,174

532,737516,6681,094,7921,036,794

*Tag activation fees are recognised on a straight-line basis over the estimated customer life of 5 years.

**Represents a 10% mark-up that Salik is entitled to in relation to construction work carried out during the period for new toll gates.

7 COST OF TAGS AND RECHARGE CARDSThree-month period ended Six-month period ended30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Salik tags7,4833,10714,52510,169

Salik recharge cards335183106

7,5163,15814,60810,275

8 TOLL OPERATION AND MAINTENANCE EXPENSE

Three-month period ended Six-month period ended 30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Operating expenses15,00215,07930,42530,167

Maintenance expenses5,2065,41310,77110,956

20,20820,49241,19641,123

The operations and maintenance of the tolling system is outsourced to a third-party service provider. Operating expenses comprise of account management charges, customer service charges, processing of violations charges, and charges relating to general requirements to operate the tolling business. Maintenance expense comprises back-office software support, maintaining and replacing equipment, and mobile application maintenance expenses. Operating and maintenance expenses are recorded in the period in which the services are provided.

Page 12

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)109 EMPLOYEE BENEFITS EXPENSE

Three-month period ended Six-month period ended 30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Salaries and wages6,6015,24812,87111,527

End of service benefits435261957510

Bonus---518

Other benefits and allowances282464663438

7,3185,97314,49112,993

10 DEPRECIATION AND AMORTISATION EXPENSE

Three-month period ended Six-month period ended 30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Depreciation of property and

equipment (Note16)256-4898

Depreciation of right-of-use assets

(Note17)378253756253

Amortisation of intangibles (Note14)20,40920,40940,81640,816

21,04320,66242,06141,077

11 FINANCE COSTS

Three-month period ended Six-month period ended 30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Finance cost on borrowings61,34859,098126,592114,964

Finance charge on lease liabilities

(Note17)997320373

Other finance costs40408080

61,48759,211126,875115,117

Page 13

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)1112 SERVICE PROVIDERS COMMISSION

Three-month period ended Six-month period ended 30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Service provider commission

- Banks and other providers3,9503,8348,1187,624

- Other Emirates commission9992,7104,1306,031

Commission on card sales1,5422,0243,4964,273

Commission on tag sales1,3231,1682,7062,203

7,8149,73618,45020,131

13 OTHER EXPENSES

Three-month period ended Six-month period ended 30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Professional fees5,1031,3707,1373,502

Transitional service expense (Note21)1,2172,3542,4833,148

Wireless communication for Salik

RFID tags569525750525

Insurance542-1,085-

Marketing and advertisement436192842447

Rent and service charge405383814767

Repairs and maintenance3526935469

Travel and accommodation219-26577

Corporate social responsibility200-200-

Other expenses1,138251,718686

10,1814,91815,6489,221

Page 14

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)1214 INTANGIBLES

Six-month period ended 30 June 2024 Toll operation

rights(Note 15) SoftwareWork inprogress Total

AED ‘000AED ‘000AED ‘000AED ‘000

Cost

At 1 January20244,000,000--4,000,000

Additions*--2,9702,970

Transfers-2,970(2,970)-

At 30 June20244,000,0002,970-4,002,970

Accumulated amortisation

At 1 January2024122,449--122,449

Charge for the period (Note10)40,816--40,816

At 30 June2024163,265--163,265

Net carrying amount

At 30 June20243,836,7352,970-3,839,705

*Additions to software is associated with major modifications to existing fully amortised toll operations software, for the parking management business.

Year ended 31 December 2023Toll operationrights(Note 15)AED'000Cost

At 1 January and 31 December20234,000,000

Accumulated amortisation

At 1 January202340,817

Charge for the year 81,632

At 31 December2023122,449

Net carrying amount

At 31 December20233,877,551

Six-month period ended 30 June 2023 Toll operation

rights(Note 15)AED'000Cost

At 1 January and 30 June20234,000,000

Accumulated amortisation

At 1 January202340,817

Charge for the period (Note10)40,816

At 30 June202381,633

Net carrying amount

At 30 June20233,918,367

Page 15

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)1315 SERVICE CONCESSION ARRANGEMENT

Salik Company P.J.S.C. entered into a concession agreement with RTA effective 1 July 2022 to undertake the Dubai tolling operations for which Salik ("Operator") made an upfront concession payment of AED 4,000 million plus VAT of AED 200 million to RTA ("Grantor") for existing toll gates and an amount to be agreed upon as and when new toll gates are constructed.

Additionally, a variable concession fee of 22.5% (2023: 25%) of toll usage fee earned excluding tag activation fees, violations revenue, inactive balance write-off or any other miscellaneous revenue is payable to RTA for each quarter period. The agreement term is 49 years ("the concession period") unless terminated or extended as per the terms of the concession agreement. As per the terms of the concession agreement, there are no decommissioning obligations at the end of the contractual period and therefore, no liability has been recorded as of 30 June 2024 and 31 December 2023.

The variable concession fee for the three-month and six-month periods ended 30 June 2024 amounts to AED 104.1 million and AED 226.9 million respectively (2023: AED 113.8 million and AED 227.4 million respectively for the three-month and six-month periods ended 30 June 2023), which has been recorded as an expense in the condensed interim statement of profit or loss and comprehensive income.

KKey elements of concession agreement

• Tolling Operations, Tolling Systems, Tolling Assets: The Company have the absolute responsibility for the Dubai tolling operations and the operation, maintenance, development and/or upgrade of the tolling system.

All costs and expenses incurred in this relation are at expense of the Company. Ownership over tolling assets vests with RTA.

• Revisions to toll fee: The Company has exclusive right to charge, collect and keep for its account toll fees and other road user charges from vehicles utilizing the toll roads. The Company has a right to increase the toll fees to account for increase in operational cost or to consider the impact of inflation. Such increase in toll fees has to be approved by Dubai Executive Council. In case the revision in toll rate is not approved by the Dubai Executive Council, the Company will be compensated for such non approval by reduction in the variable concession fee charged by RTA only if the proposed increase was on account of increased inflation rates. Effective from 1st April 2024, RTA reduced the variable concession fee from 25% to 22.5% of toll usage revenue.

• New toll gates: The Company has exclusive right to undertake any tolling works (construction) with respect to the new toll gates and all costs and expenses incurred for the tolling works will be reimbursed by RTA on a cost plus 10% basis. For obtaining the right to charge users, the Company shall pay to RTA a fee determined based on the valuation of the new toll gate. In case of a difference in the valuation performed by RTA and that performed by Salik by more than 5%, an earnout mechanism will apply, whereby during the period of 5 years following the completion and commissioning of the new toll gate, the Company shall be liable to pay earn-out payments only if there is a positive traffic delta.

On 19th January 2024, RTA formally assigned Salik to install two new toll gates to optimise traffic flow and reduce congestion on key routes within Dubai. The addition of two gates will increase the total number of gates in Dubai from eight to ten, with the new gates expected to be operational by November 2024.

During the three-month and six-month periods ended 30 June 2024, the Company recorded revenue of AED 0.6 million and AED 0.7 million respectively (2023: Nil) from toll gate construction. As on 30 June 2024, the unbilled portion associated with toll gate construction amounts to AED 7.9 million which is shown as contract assets in the condensed interim statement of financial position.

• Replacement of end-of-life tolling assets: The Company shall be reimbursed by RTA on a cost plus 5% basis for replacement of each tolling asset upon the end of its useful life.

Page 16

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)1415 SERVICE CONCESSION ARRANGEMENT (continued)Key elements of concession agreement (continued)

• Termination: The Company may terminate the agreement if RTA is in breach of its obligations and if a change in law were to make it illegal or impossible for the Company to perform substantially all its obligations under the agreement. RTA may terminate the agreement by giving notice to the Company, if an insolvency event occurs, if the Company commits a prohibited act or if certain type of breaches of the agreement occur. Further, RTA also has an option to voluntarily terminate the agreement by giving notice of voluntary termination to the Company. Compensation amounts will have to be paid by either of the parties upon occurrence of certain events, that is, it will have to be paid by RTA in case of exercise of voluntary termination or breach by RTA of its obligations and will have to be paid by the Company if it commits a prohibited act.

• Transfer of Assets and Rights: At the end of the agreement, the Operator shall, without consideration, transfer to the Grantor all rights, title and interest of assets, intellectual property rights used in Dubai tolling operations.

16 PROPERTY AND EQUIPMENTOfficefurniture andequipmentMotorvehiclesLeaseholdimprovements TotalAED ‘000 AED ‘000 AED '000 AED '000Six-month period ended 30 June 2024Cost

At 1 January20241,7073622,5554,624

Additions2,873--2,873

At 30 June20244,5803622,5557,497

Accumulated depreciation

At 1 January202413826171335

Depreciation charge for the period (Note10)19836255489

At 30 June202433662426824

Net carrying amount

At 30 June20244,2443002,1296,673

Year ended 31 December 2023Officefurniture andequipmentMotorvehiclesLeaseholdimprovements Total

AED ‘000 AED ‘000 AED '000 AED '000 Cost

At 1 January2023150--150

Additions1,6853622,5554,602

Adjustment(128)--(128)

At 31 December20231,7073622,5554,624

Accumulated depreciation

At 1 January202360--60

Depreciation charge for the year12626171323

Adjustment(48)--(48)

At 31 December202313826171335

Net carrying amount

At 31 December20231,5693362,3844,289

Page 17

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)1516 PROPERTY AND EQUIPMENT (continued)

Six-month period ended 30 June 2023 Office furniture and

equipmentAED'000Cost

At 1 January2023150

Additions 104Adjustment (128)

At 30 June2023126

Accumulated depreciation

At 1 January202360

Depreciation charge for the period (Note10)8

Adjustment (48)

At 30 June202320

Net carrying amount

At 30 June2023106

17 LEASES

(i) Right-of-use assets

Six-month period ended 30 June 2024 Office space

AED '000CostAt 1 January 8,096Additions 2,279

At 30 June202410,375

Accumulated depreciation

At 1 January20241,018

Charge for the period (Note10)756

At 30 June20241,774

Net book value

At 30 June20248,601

Year ended 31 December 2023Office spaceAED '000Cost

At 1 January2023-

Additions 8,096

At 31 December20238,096

Accumulated depreciation

At 1 January2023-

Charge for the year 1,018

At 31 December20231,018

Net book value

At 31 December20237,078

Page 18

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)1617 LEASES (continued)

(i) Right-of-use assets (continued)

Six-month period ended 30 June 2023Office spaceAED '000CostAt 1 January -Additions 8,096

At 30 June20238,096

Accumulated depreciation

At 1 January2023-

Charge for the period (Note10)253

At 30 June2023253

Net book value

At 30 June20237,843

(ii) Lease liabilities

30 June 2024 31 December 2023 30 June 2023 (unaudited) (audited) (unaudited)

AED'000AED'000AED'000

At beginning of the period / year / period7,936--

Lease additions during the period / year / period2,2798,0968,096

Finance charge for the period / year / period20329373

Lease repayments during the period / year / period(1,358)(453)(441)

At end of the period / year / period9,0607,9367,728

Lease liabilities is bifurcated into:

30 June 2024 31 December 2023 30 June 2023 (unaudited) (audited) (unaudited)

AED'000AED'000AED'000

Current2,1811,889906

Non-current6,8796,0476,822

9,0607,9367,728

(iii) Amounts recognised in profit or loss Three-month period ended Six-month period ended 30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Finance charge on lease liabilities

(Note11)997320373

Depreciation of right-of-use assets

(Note10)378253756253

Page 19

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)1717 LEASES (continued)

(iv) Contractual undiscounted cash flows

The contractual undiscounted cash flows associated with the lease are as follows:

30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

Not later than 1 year2,6352,264

Between 1 to 5 years7,4436,703

10,0788,967

18 INVENTORIES30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

Salik tags15,5485,461

Salik recharge scratch cards228105

15,7765,566

All inventories are in the form of finished goods. The cost of inventories recognised as expense during the period is disclosed as 'Cost of tags and recharge cards' on the condensed interim statement of profit or loss and comprehensive income. None of the inventories are carried at net realisable value being lower than cost for all periods presented.

There are no obsolete or slow-moving inventories. There has been no write-off of inventory in the periods presented.

19 TRADE AND OTHER RECEIVABLES30 June 2024 31 December 2023 30 June 2023(unaudited) (audited) (unaudited)

AED'000AED'000AED'000

Trade receivables (including fines receivable)306,440301,192300,864

Less: loss allowance on fines receivable(182,335)(177,827)(177,456)

124,105123,365123,408

VAT receivable9,34217,24616,857

Accrued interest13,74712,7212,103

Advance to supplier31,48619,48415,989

Prepayments and other assets1,170667317

179,850173,483158,674

Break up of trade receivables is as follows:

Fines290,272284,066282,476

Taxi9,01410,1547,026

Banks3,0332,6474,823

Other Emirates353353353

Telecom52945,331

Gas stations--855

Others3,7163,878-

306,440301,192300,864

Page 20

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)1819 TRADE AND OTHER RECEIVABLES (continued)

Trade and other receivables are measured at amortised cost using the effective interest method.

Trade and other receivables from Other Emirates, taxi, gas stations, telecom, banks and others are not secured, non-interest bearing and are generally on terms of 30 to 90 days. The allowance for expected credit losses or impairment incurred for trade and other receivables from other Emirates, taxi, gas stations, telecom, banks and others is considered to be not material.

Receivables from fines are not secured, non-interest bearing, and customers are generally required to pay the violation within 12 months from the issuance date. The movement of loss allowance on receivable relating to fines were as follows:

30 June 2024 31 December 2023 30 June 2023(unaudited) (audited) (unaudited)

AED'000AED'000AED'000

Balance at the beginning of the period / year / period177,827183,074183,074

Provision for expected credit losses21,90434,41214,834

Write offs during the period / year / period(17,396)(39,659)(20,452)

Balance at the end of the period / year / period182,335177,827177,456

The provision for expected credit losses for the period has been included as "Impairment loss on trade receivables" in the condensed interim statement of profit or loss and other comprehensive income. The Company fully writes off a trade receivable arising from a violation when there is no realistic prospect of recovery, which is estimated by management to be at the end of the average customer useful life, which is five years.

Set out below is the ageing analysis of the Company's trade receivables from violations using a provision matrix:

30 June 2024 (unaudited)Expected creditlossGross carryingamountLossallowance

%AED'000AED'000

Current40%126,12050,894

1-90 days60%-65%13,9068,741

91-180 days67%-69%13,3779,081

180 - 365 days71%-78%20,03414,984

365+ days84%116,83598,635

290,272182,335

31 December 2023 (audited)Expected creditloss%Gross carryingamountAED'000LossallowanceAED'000

Current40%121,81448,378

1-90 days59%-64%12,3407,625

91-180 days66%-68%10,5457,048

180 - 365 days71%-77%21,41415,915

365+ days84%117,95398,861

284,066177,827

Page 21

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)19

19 TRADE AND OTHER RECEIVABLES (continued) 30 June 2023 (unaudited)

Expected creditloss%Gross carryingamountAED'000LossallowanceAED'000

Current39%114,99644,492

1-90 days58%-64%11,9687,217

91-180 days65%-68%12,3938,154

180 - 365 days70%-79%19,69214,598

365+ days84%123,427102,995

282,476177,456

20 CASH AND CASH EQUIVALENTS AND SHORT-TERM DEPOSIT WITH BANK30 June 2024 31 December 2023(unaudited) (audited)Cash and cash equivalents AED'000 AED'000

Islamic Mudarabah call account152,299266,180

Fixed deposits with original maturity less than 3 months300,000-

452,299266,180

Short term deposit with bank

Fixed deposits with original maturity of 3 to 12 months600,000750,000

Cash in bank represents amounts held in current account, call account and Wakala deposits maintained with Emirates NBD Bank PJSC operating in the UAE. The fixed deposits as on 30 June 2024 and 31 December 2023 earn expected profits of 4.9% to 5.1% (2023: 5.3%). During the three-month and six-month periods ended 30 June 2024, the Company earned a profit of AED 15.0 million and AED 29.2 million respectively (2023: AED 6.6 million and AED 10.6 million respectively for three-month and six-month periods ended 30 June 2023) on these Wakala deposits and Mudarabah call account.

21 RELATED PARTY BALANCES AND TRANSACTIONS

Related parties comprise the Parent, ultimate controlling party, the shareholders, key management personnel, subsidiaries, joint venture, directors and businesses which are controlled directly or indirectly by the ultimate controlling party, or directors or over which they exercise significant management influence. The Company has availed the exemption under para 25 of IAS 24 Related Party Disclosure and consider the entities controlled by Government of Dubai as non-related except for RTA, Dubai Taxi Company PJSC (“DTC”), Dubai E-Government, Dubai Digital Authority, Emirates NBD Bank PJSC (“ENBD”) and Emirates National Oil Company (“ENOC”).

The Company, in the normal course of business, receives services from and provides services to related parties. These transactions comprise the purchase and sale of goods and services in the normal course of business at mutually agreed terms. Additionally, the Company entered into a Service Concession Agreement with RTA (Note 15), Transitional Services agreement with RTA and debt agreement with Emirates NBD Bank PJSC (Note 22).

Page 22

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)2021 RELATED PARTY BALANCES AND TRANSACTIONS (continued)

The following table summarizes related party balances for the relevant financial period.

30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

Due from related partiesEntities under common control of the Government of Dubai

Dubai E-Government76,42879,567

Roads and Transport Authority*54,85347,563

Dubai Taxi Company PJSC11,05511,948

142,336139,078

Due to related partiesEntities under common control of the Government of Dubai

Roads and Transport Authority*108,979138,693

*With respect to the balance due to and due from Roads and Transport Authority, the Company does not have an enforceable right to offset and therefore these have been presented separately.

30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

Loan from a related partyEntities under common control of the Government of Dubai

Emirates NBD Bank PJSC3,990,3823,988,779

The Company obtained a financing facility with ENBD, related party, as has been disclosed in Note 22. Bank balances as disclosed in Note 20 are also held with ENBD.

30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

Contract asset7,871-

It represents unbilled portion of revenue to Roads and Transport Authority, associated with toll gate construction, as detailed in Note 15.

Transactions with related partiesCommission expense

Transactions with ENBD, other than finance cost on borrowings as explained in Note 22, relates to commission paid for collection services provided by ENBD and amounts to AED 0.6 million and AED 1.3 million respectively for the three-month and six-month periods ended 30 June 2024 (2023: AED 0.7 million and AED 1.3 million respectively for the three-month and six-month periods ended 30 June 2023). Transactions, gross of commission earned, with ENOC relate to the sale of Salik tag and recharge cards and amounts to AED 24.5 million and AED 56.2 million respectively for three-month and six-month periods ended 30 June 2024 (2023: AED 37 million and AED 74 million respectively for the three-month and six-month periods ended 30 June 2023).

Tolling fees collected by Dubai Taxi Company PJSC

Dubai Taxi Company PJSC (“DTC”) is ultimately controlled by the Government of Dubai. Tolling fees collected by DTC represent toll fee collection by the taxis operated by DTC within the Emirate of Dubai and are based on trips under toll gates where there is a passenger in the taxi vehicle. Tolling fees collected by DTC are AED 16.3 million and AED 34.0 million respectively for the three-month and six-month periods ended 30 June 2024 (2023: AED 16.9 million and AED 34.5 million respectively for the three-month and six-month periods ended 30 June 2023).

Page 23

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)2121 RELATED PARTY BALANCES AND TRANSACTIONS (continued)Transactions with related parties (continued)Service concession arrangement

As part of formation of Salik Company P.J.S.C., the Company entered into a Service Concession Agreement with RTA, pursuant to which RTA grants some of its mandates and powers under Dubai Law No. 17 of 2005 regarding the operation, maintenance and management of Salik i.e. Dubai's automatic road toll collection system.

Refer Note 14 and Note 15 for the financial impact associated with the Concession Agreement.

Transitional service agreement

The Company entered into a transitional services agreement (“TSA”) with RTA, effective from 1 July 2022, wherein RTA provides services to Salik for performance of the tolling operations and back-office functions such as financial services, information technology (IT), human resources, administration, marketing and communication in accordance with the tolling Concession Agreement. During the three-month and six-month periods ended 30 June 2024, an amount of AED 1.2 million and AED 2.5 million respectively (2023: AED 2.4 million and AED 3.1 million respectively for the three-month and six-month periods ended 30 June 2023) has been charged by RTA for such transitional services and these have been included as ‘Transition service expense’ under ‘Other expenses’.

Key management remunerationThree-month period ended Six-month period ended30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Salaries and other benefits1,8841,4773,7523,744

End of service benefits175128459297

2,0591,6054,2114,041

Directors’ remuneration-3,145-3,375

22 BORROWINGS30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

Term loan from Emirates NBD Bank PJSC4,000,0004,000,000

Unamortised loan cost(9,618)(11,221)

Total borrowing3,990,3823,988,779

On 30 June 2022, the Company and Emirates NBD Bank PJSC entered into an agreement to underwrite a 5-year, AED 4,200 million unsecured Islamic Mudarabah credit facility (the "Facility"). The Facility is bifurcated further into a term facility commitment of AED 4,000 million and a revolving facility commitment of AED 200 million. On 19 May 2023, the Company agreed with the bank for a partial reduction of Facility B, that is, revolving Murabaha facility commitment, to reduce the commitment to AED 50 million instead of the original commitment of AED 200 million.

The purpose of the overall borrowing facility is firstly, towards making an upfront payment under the requirements of the Concession Agreement; and secondly, for general corporate purposes including fees and expenses in relation to the Facilities.

Borrowings under the term facility carries variable interest at 3-month EIBOR plus a margin at a rate per annum of 0.82%. The upfront fee under the Facility is 0.4% flat and the commitment fee on the revolving credit facility is 0.25% per annum, calculated on daily undrawn and available commitments, and payable quarterly in arrears. Transaction costs incurred in relation to the term facility have been deducted from the financial liability amount and considered in the computation of the effective interest rate. The upfront fee allocated to the revolving facility has been capitalised and is amortized on a straight-line basis over the term of the agreement and is disclosed as an 'Other asset' in the condensed interim statement of financial position.

Page 24

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)2222 BORROWINGS (continued)

Principal amounts outstanding under the term facility will be due and payable in full on final maturity which is 5 years from the date of the facility agreement.

The Facility contains customary representations and warranties, subject to limitations and exceptions and customary covenants restricting the Company's ability to declare dividends or make distributions in the event of outstanding default or a default that may occur as a result of such dividend distribution. The Company is also required to comply with a financial covenant, leverage (Net Debt to EBITDA): 5x or lower tested semi-annually with testing commencing from June 2023. The Company complied with the financial covenant throughout the six-month period ended 30 June 2024 and year ended 31 December 2023.

As at 30 June 2024, the Company has access to the following borrowing facilities:

30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

Total available facilities4,050,0004,050,000

Facility utilised(4,000,000)(4,000,000)

Available financing facility50,00050,000

23 PROVISION FOR EMPLOYEES' END-OF-SERVICE BENEFITS30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

Balance at the beginning of the period / year2,5192,624

Charge for the period / year522699

Payment during the period / year(48)-

Adjustment-(804)

Balance at the end of the period / year2,9932,519

24 TRADE AND OTHER PAYABLES30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

Trade payables - Operation and maintenance service provider56,47439,638

Advance from customers1,3695,350

Fine refund payables2,8962,888

Employee benefits1,8381,400

Commission accruals and other payables11,73320,976

74,31070,252

Trade and other payables are short-term in nature and are non-interest bearing. These are measured at amortised cost using the effective interest method.

25 CONTRACT LIABILITIES

As of 30 June 2024, current contract liabilities of AED 297.8 million (31 December 2023: AED 299.7 million), and non-current contract liabilities of AED 58.9 million (31 December 2023: AED 53.4 million), either relate to account balances paid in advance by the customer or arise from tag sale activation fees. The Company expects to recognise these unsatisfied performance obligations as revenue over a period of up to 5 years. At the end of 5 years any inactive customer account balances will be released and recognised as revenue.

Page 25

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)2325 CONTRACT LIABILITIES (continued)

As of 30 June 2024, contract liabilities of AED 84.3 million (31 December 2023: AED 76.6 million), arising from tag activation fees will be recognized as revenue as follows:

30 June 2024 31 December 2023(unaudited) (audited)

AED'000AED'000

- 0 to 12 months25,34023,236

- 13 to 24 months22,83720,543

- 25 – 36 months18,66617,149

- 37 – 48 months12,82311,562

- 49 – 60 months4,6064,096

84,27276,586

Movements in contract liabilities is as follows:

30 June 2024 31 December 2023 30 June 2023 (unaudited) (audited) (unaudited)

AED'000AED'000AED'000

Balance at the beginning of the period / year / period353,059337,533337,533

Add: Recharges during the period / year / period952,8461,859,152909,728

Add: Tag activation fees received27,43445,73221,914

Less: Revenue recognised – toll usage(953,801)(1,845,477)(909,535)

Less: Revenue recognised – tag activation fee(19,748)(38,200)(15,121)

Less: Inactive balance write-off(3,046)(5,681)(2,840)

Balance at the end of the period / year / period356,744353,059341,679

26 INCOME TAX

On 9 December 2022 UAE Federal Decree-Law no 47 of 2022 was published setting in place a general corporate income tax for the first time. The profit threshold of AED 375,000 at which the 9% tax will apply for the Company’s financial year commencing on 1 January 2024. The Company is required to file its first annual tax return and pay the declared income tax, pertaining to the financial year ending 31 December 2024, before 30 September 2025.

While current taxes are not payable on profits generated before the Company’s financial year commencing on 1

January 2024, the existence of an enacted tax law results in the need to immediately record deferred taxes on assets and liabilities where the carrying amount differs from the tax base. Based on the assessment performed by the management, an immaterial deferred tax impact has been noted as of and for the six-month period ended 30 June 2024 and for the year ended 31 December 2023. As certain other cabinet decisions are pending as on the date of these financial statements, the Company will continue to assess the impact of these pending cabinet decisions on deferred taxes as and when finalized and published.

(i) Components of income tax expense

Income tax expense comprise the following:

Three-month period ended Six-month period ended 30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Current tax26,421-53,846-

Page 26

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)2426 INCOME TAX (continued)

(ii) Reconciliation between tax expense and profit or loss multiplied by applicable tax rate The income tax rate applicable to the Company’s income is 9%. A reconciliation between the expected and actual taxation charge is as follows:

30 June 2024(unaudited)AED'000Profit before tax 598,611

- Tax charge of 0% on profit up to AED375,000-

- Tax charge of 9% on profit beyond AED375,00053,846

Income tax expense 53,84627 SHARE CAPITAL

The share capital of the Company comprised of AED 7,500,000,000 (31 December 2023: 7,500,000,000) shares of AED 0.01 each. All shares are authorised, issued and fully paid up.

28 STATUTORY RESERVE

In accordance with the UAE Federal Decree Law No. (32) of 2021, 5% of net profit of the Company is to be allocated every year to a statutory reserve. This statutory reserve, as per the Articles of Association, is subject to a maximum of 50%, of the Company’s issued share capital. This reserve is not available for distribution except as stipulated by the law. There was no allocation from net profit to statutory reserve during the period ended 30 June 2024 and year ended 31 December 2023 as the Company has reached the maximum limit for the reserve.

29 EARNINGS PER SHARE

The following table reflects the income and share data used in the basic and diluted EPS calculations:

Three-month period endedThree-month period ended

30 June 2024 30 June 2023 30 June 2024 30 June 2023

(unaudited)(unaudited)(unaudited)(unaudited)

AED'000AED'000AED'000AED'000

Profit attributable to ordinary equity

holders of the Company (AED '000)267,472272,652544,765547,933

Weighted average number of ordinaryshares for basic and diluted EPS

(number)7,500,000,0007,500,000,0007,500,000,0007,500,000,000

Basic and diluted earnings per share forprofit attributable to the ordinaryequity holders of the Company

(AED)0.040.040.070.07

Basic earnings per share is calculated by dividing the profit or loss attributable to ordinary equity holders of the Company by the number of ordinary shares outstanding. Diluted earnings per share is determined by adjusting the profit or loss attributable to ordinary equity holders of the Company and the number of shares on formation for the effects of all dilutive potential ordinary shares. There were no instruments or any other items which could cause a dilutive effect on the earnings per share calculation.

Page 27

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)2530 FINANCIAL RISK MANAGEMENT OBJECTIVES AND POLICIES

30.1 Financial risk factors

The Company’s activities and borrowings expose it to a variety of financial risks: market risk (including foreign exchange risk, price risk and cash flow interest rate risk), credit risk and liquidity risk.

These condensed interim financial statements do not include all financial risk management information and disclosures required in the annual financial statements. As such, they should be read in conjunction with the Company’s financial statements for the year ended 31 December 2023. There has been no change in any financial risk management policies since year end.

30.2 Capital risk management

The Company's objectives when managing capital are to safeguard the Company's ability to continue as a going concern in order to provide returns for the shareholders and benefits for other stakeholders and to maintain an optimal capital structure to reduce the cost of capital.

There has been no material change in the capital risk management policies of the Company during this period.

31 FAIR VALUES OF FINANCIAL INSTRUMENTS

Financial instruments comprise financial assets and financial liabilities. The Company's financial assets consist of trade and other receivables (excluding VAT receivable and advance to supplier), contract assets, due from related parties, short-term deposit with bank and cash and cash equivalents. The Company's financial liabilities consist of borrowings, lease liabilities, trade and other payables (excluding advance from customers) and due to a related party.

The fair values of the financial assets and liabilities are included at the amount at which the instrument could be exchanged in a current transaction between willing parties, other than in a forced or liquidation sale. The fair values of the above financial assets and liabilities approximate their carrying amounts.

32 DIVIDENDSFor the six-month period ended 30 June 2024:

A dividend of AED 550,035 thousand (7.3338 fils per share) was declared and approved in the Annual General Assembly Meeting held on 2nd April 2024, which was subsequently paid on 19th April 2024.

For the six-month period ended 30 June 2023:

A dividend of AED 491,408 thousand (6.5521 fils per share) was declared and approved in Annual General Assembly Meeting held on 6th April 2023, which was subsequently paid on 26 April 2023.

33 SUBSEQUENT EVENTS

On 13th August 2024, the Board of Directors approved to distribute AED 544,765 thousand dividend to the shareholders (7.263 fils per share).

34 IMPACT OF SEASONALITY ON THE BUSINESS

The Company is subject to moderate seasonal fluctuations, interim period revenue and earnings are typically sensitive to the traffic activity that tends to slow down during the summer months. As a result of moderate seasonal fluctuations, results for any quarter are not necessarily indicative of the results that may be achieved for any other quarter or for the full fiscal year.

Page 28

SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND SIX-MONTH PERIODS ENDED 30 JUNE 2024(continued)2635 APPROVAL OF THE CONDENSED INTERIM FINANCIAL STATEMENTS

The condensed interim financial statements were approved by the Board of Directors of Salik Company P.J.S.C. on 13th August 2024 and signed on its behalf by His Excellency Mattar Al Tayer, Chairman of the Board of Directors and Ibrahim Sultan Al Haddad, Chief Executive Officer.