Financial statements for the 3rd QTR of 2023 SALIK
Document31 pages, a scan, read by AshumOpen DFM’s file
Page 1
SALIK COMPANY P.J.S.C.
CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED30 SEPTEMBER 2023 (UNAUDITED)
Page 2
SALIK COMPANY P.J.S.C.CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023
Page
| Directors' report | 1 |
|---|---|
| Report on review of condensed interim financial statements to the Board of Directors of Salik Company P.J.S.C. | 2 |
| Condensed interim statement of profit or loss and comprehensive income | 3 |
| Condensed interim statement of financial position | 4 |
| Condensed interim statement of cash flows | 5 - 6 |
| Condensed interim statement of changes in equity | 7 |
| Notes to the condensed interim financial statements | 8 - 29 |
Page 3
SALIK COMPANY P.J.S.C.DIRECTORS' REPORTFOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023
The Board of Directors (the "Board") present their report together with the reviewed condensed interim financial statements of Salik Company P.J.S.C. ("Salik" or the "Company") for the three-month and nine-month periods ended 30 September 2023.
Board of Directors
The directors of the Company are:
| Chairman: | His Excellency Mattar Al Tayer |
| Vice chairman: | Mr. Abdul Muhsen Ibrahim Kalbat |
| Members: | Eng. Maitha Bin Adai |
| Mr. Mohammed Al-Mudharreb| Mr. Ibrahim Al Haddad (CEO)
| Mr. Mohammed Abdulla Lengawi | Mr. Mohammad Alhawi
Principal activities
The principal activities of the Company are the operations and maintenance of the existing tollgates throughout Dubai, UAE and for design, construction (including all the civil, electrical, gantry design and manufacturing, system integration, testing and commissioning) of new toll gates, including without limitation, the required tolling equipment, infrastructure and any interface requirements in relation to the new toll gates, but excluding the construction, operation and maintenance of the relevant toll roads.
Financial performance
During the three-month and nine-month periods ended 30 September 2023, the Company reported revenue of AED 508.8 million and AED 1,545.6 million respectively (2022: AED 445.4 million and AED 1,390.3 million respectively for the three-month and nine-month periods ended 30 September 2022). Profit for the three-month and nine-month periods ended 30 September 2023 was AED 254.8 million and AED 802.7 million respectively (2022: AED 241.9 million and AED 1,038.7 million respectively for the three-month and nine-month periods ended 30 September 2022).
for the Board of Directors
His Excellency Mattar Al TayerChairmanBoard of DirectorsSalik Company P.J.S.C.
13 November 2023
1
Page 4
Report on review of condensed interim financial statements to the Board of Directors of Salik Company P.J.S.C.
Introduction
We have reviewed the accompanying condensed interim statement of profit or loss and comprehensive income of Salik Company P.J.S.C. (the 'Company' or 'Salik') for the three-month and nine-month periods ended 30 September 2023, the condensed interim statement of financial position as at 30 September 2023 and the related condensed interim statements of changes in equity and cash flows for the nine-month period then ended and other explanatory notes. Management is responsible for the preparation and presentation of these condensed interim financial statements in accordance with International Accounting Standard 34 'Interim Financial Reporting'. Our responsibility is to express a conclusion on these condensed interim financial statements based on our review.
Scope of review
We conducted our review in accordance with International Standard on Review Engagements 2410, 'Review of interim financial information performed by the independent auditor of the entity'. A review of interim financial statements consists of making inquiries, primarily of persons responsible for financial and accounting matters, and applying analytical and other review procedures. A review is substantially less in scope than an audit conducted in accordance with International Standards on Auditing and consequently does not enable us to obtain assurance that we would become aware of all significant matters that might be identified in an audit. Accordingly, we do not express an audit opinion.
Emphasis of matter
We draw attention to Note 2 to the condensed interim financial statements, which describes the fact that Salik Company P.J.S.C. was not incorporated as a standalone entity for the period up to 30 June 2022 and the assets and liabilities of the Salik Tolling Business were transferred from Roads and Transport Authority ("RTA") to the Company on 1 July 2022. Therefore, the condensed interim financial statements include the carve-out financial information of the Salik Tolling Business within RTA for the comparative period from 1 January 2022 to 30 June 2022 and the results of the operations of the Company for the period from 1 July 2022 to 30 September 2022. We also draw attention to Note 2 to the condensed interim financial statements, which details the basis of preparation and carve-out adjustments applied.
Our conclusion is not modified in respect of these matters.
Conclusion
Based on our review, nothing has come to our attention that causes us to believe that the accompanying condensed interim financial statements are not prepared, in all material respects, in accordance with International Accounting Standard 34 "Interim Financial Reporting".
PricewaterhouseCoopers Limited Partnership Dubai Branch13 November 2023
Wassim El AfchalRegistered Auditor Number 5454Dubai, United Arab Emirates
PricewaterhouseCoopers Limited Partnership Dubai Branch. License no. 102451
Emaar Square, Building 5, P O Box 11987, Dubai - United Arab EmiratesT: +971 (0)4 304 3100, F: +971 (0)4 346 9150, www.pwc.com/me
Jacques Fakhoury, Douglas O'Mahony, Wassim El Afchal, Murad Alnsour, Rami Sarhan and Virendra Dhirajlai Lodhia are registered as practicing auditors with the UAE Ministry of Economy
2
Page 5
SALIK COMPANY P.J.S.C.CONDENSED INTERIM STATEMENT OF PROFIT OR LOSS AND COMPREHENSIVE INCOME
| Three-month period ended | Nine-month period ended | ||||
|---|---|---|---|---|---|
| 30 September 2023 (unaudited) | 30 September 2022 (unaudited) | 30 September 2023 (unaudited) | 30 September 2022 (unaudited) | ||
| Notes | AED'000 | AED'000 | AED'000 | AED'000 | |
| Revenue | 6 | 508,809 | 445,430 | 1,545,603 | 1,390,333 |
| Finance income | 21 | 7,814 | 155 | 18,430 | 155 |
| Other income | 436 | - | 1,444 | - | |
| Cost of tags and recharge cards | 7 | (9,202) | (4,870) | (19,477) | (15,800) |
| Toll operation and maintenance expense | 8 | (20,994) | (21,127) | (62,117) | (68,719) |
| Employee benefit expense | 9 | (5,964) | (3,291) | (18,957) | (8,179) |
| Depreciation and amortisation expense | 10 | (20,874) | (20,415) | (61,951) | (23,732) |
| Service providers commissions | 12 | (11,785) | (9,059) | (31,916) | (24,338) |
| Concession fee expense | 15 | (110,769) | (96,623) | (338,153) | (96,623) |
| Software enhancement expense | 18 | (4,119) | - | (9,074) | (8,334) |
| Impairment loss on trade receivables | 20 | (8,291) | (9,612) | (23,125) | (22,140) |
| Directors' remuneration | 22 | (45) | - | (3,420) | - |
| Corporate allocation expense | 22 | - | - | - | (40,521) |
| Finance costs | 11 | (62,610) | (28,980) | (177,727) | (28,980) |
| Other expenses | 13 | (7,637) | (9,678) | (16,858) | (14,444) |
| Profit for the period | 254,769 | 241,930 | 802,702 | 1,038,678 | |
| Other comprehensive income | - | - | - | - | |
| Total comprehensive income for the period | 254,769 | 241,930 | 802,702 | 1,038,678 | |
| Basic and diluted earnings per share for profit attributable to the ordinary equity holders of the Company (AED) | 31 | 0.03 | 0.03 | 0.11 | 0.14 |
The accompanying notes 1 to 38 form an integral part of these condensed interim financial statements.
3
Page 6
SALIK COMPANY P.J.S.C.CONDENSED INTERIM STATEMENT OF FINANCIAL POSITION
| Notes | 30 September 2023 (unaudited) AED'000 | 31 December 2022 (audited) AED'000 | |
|---|---|---|---|
| ASSETS | |||
| Non-current assets | |||
| Property and equipment | 16 | 4,521 | 90 |
| Intangibles | 14 | 3,897,959 | 3,959,183 |
| Right-of-use asset | 17 | 7,459 | - |
| Other asset | 600 | 720 | |
| 3,910,539 | 3,959,993 | ||
| Current assets | |||
| Inventories | 19 | 9,577 | 11,536 |
| Trade and other receivables | 20 | 154,343 | 364,407 |
| Short term deposit with bank | 21 | 500,000 | - |
| Due from related parties | 22 | 153,801 | 144,308 |
| Cash and cash equivalents | 21 | 167,122 | 822,707 |
| 984,843 | 1,342,958 | ||
| Total assets | 4,895,382 | 5,302,951 | |
| LIABILITIES | |||
| Non-current liabilities | |||
| Long-term borrowings | 23 | 3,987,978 | 3,985,573 |
| Lease liability | 17 | 6,422 | - |
| Provision for employees' end-of-service benefits | 24 | 2,350 | 2,624 |
| Contract liabilities | 26 | 49,923 | 43,195 |
| 4,046,673 | 4,031,392 | ||
| Current liabilities | |||
| Trade and other payables | 25 | 62,394 | 59,815 |
| Lease liability | 17 | 1,404 | - |
| Due to a related party | 22 | 124,128 | 313,492 |
| Contract liabilities | 26 | 293,503 | 294,338 |
| 481,429 | 667,645 | ||
| Total liabilities | 4,528,102 | 4,699,037 | |
| EQUITY | |||
| Share capital | 27 | 75,000 | 75,000 |
| Statutory reserve | 29 | 37,500 | 37,500 |
| Retained earnings | 254,780 | 491,414 | |
| Total equity | 367,280 | 603,914 | |
| Total equity and liabilities | 4,895,382 | 5,302,951 |
To the best of our knowledge, the condensed interim financial statements are prepared, in all material respects, in accordance with IAS 34. The condensed interim financial statements were approved by the Board of Directors on 13 November 2023 and were signed on its behalf by:
Chief Executive Officer | Chairman of the Board of Directors
The accompanying notes 1 to 38 form an integral part of these condensed interim financial statements.
4
Page 7
SALIK COMPANY P.J.S.C.CONDENSED INTERIM STATEMENT OF CASH FLOWS
| Nine-month period ended 30 September 2023 (unaudited) AED'000 | Nine-month period ended 30 September 2022 (unaudited) AED'000 | ||
|---|---|---|---|
| Notes | |||
| Cash flows from operating activities | |||
| Profit for the period | 802,702 | 1,038,678 | |
| Adjustments for: | |||
| Depreciation of property and equipment | 10 | 91 | 3,324 |
| Depreciation of right-of-use asset | 10 | 636 | - |
| Adjustment for property and equipment | 80 | - | |
| Amortisation of intangibles | 10 | 61,224 | 20,408 |
| Provision for employees' end-of-service benefits | 24 | 530 | 927 |
| Adjustment for employees' end-of-service benefits | 24 | (804) | - |
| Finance income | 21 | (18,430) | (155) |
| Interest on lease liability | 11 | 183 | - |
| Other finance costs | 177,544 | 28,980 | |
| Impairment loss on trade receivables | 20 | 23,125 | 22,140 |
| Operating cash flows before changes in working capital | 1,046,881 | 1,114,302 | |
| Changes in working capital: | |||
| Trade and other receivables excluding impact of impairment loss | 186,939 | (183,810) | |
| Due from related parties | (9,493) | (141,410) | |
| Inventories | 1,959 | 10,171 | |
| Trade and other payables | 2,579 | 36,194 | |
| Due to a related party | (189,364) | 298,618 | |
| Other asset | 120 | - | |
| Contract liabilities | 5,893 | 8,663 | |
| Net cash flows generated from operating activities | 1,045,514 | 1,142,728 | |
| Cash flows from investing activities | |||
| Increase in fixed deposits with original maturity of more than 3 months | 21 | (500,000) | - |
| Payment for purchase of property and equipment | 16 | (4,602) | (3,158) |
| Interest income on deposits | 18,430 | 155 | |
| Payment for upfront concession fee | - | (4,000,000) | |
| Net cash used in investing activities | (486,172) | (4,003,003) | |
| Cash flows from financing activities | |||
| Dividend paid | 30 | (1,039,336) | - |
| Finance charge on lease liability paid | 17 | (183) | - |
| Other finance costs paid | (175,139) | (28,138) | |
| Principal element of lease payment | (269) | - | |
| Net distribution to Parent | 22 | - | (826,711) |
| Proceeds from borrowings – net of transaction cost | - | 3,983,170 | |
| Proceeds from issuance of share capital | - | 75,000 | |
| Capital contribution received | - | 146,480 | |
| Net cash (used in) / generated from financing activities | (1,214,927) | 3,349,801 | |
| (Decrease) / increase in cash and cash equivalents | (655,585) | 489,526 | |
| Cash and cash equivalents at the beginning of the period | 822,707 | - | |
| Cash and cash equivalents at the end of the period | 21 | 167,122 | 489,526 |
The accompanying notes 1 to 38 form an integral part of these condensed interim financial statements.
5
Page 8
SALIK COMPANY P.J.S.C.CONDENSED INTERIM STATEMENT OF CASH FLOWS (continued)SUPPLEMENTAL NON-CASH INFORMATION
| Nine-month period ended 30 September 2023 (unaudited) AED'000 | Nine-month period ended 30 September 2022 (unaudited) AED'000 | |
|---|---|---|
| Right-of-use asset | 8,095 | - |
| Lease liability | 8,095 | - |
| Property and equipment not transferred to the Company | - | 107,178 |
| End of service benefit liability of employees not transferred to the Company | - | 741 |
(This space has been left intentionally blank)
The accompanying notes 1 to 38 form an integral part of these condensed interim financial statements.
6
Page 9
SALIK COMPANY P.J.S.C.CONDENSED INTERIM STATEMENT OF CHANGES IN EQUITY
| Share capital AED'000 | Reorganisation reserve AED'000 | Statutory reserve AED'000 | Net parent investment AED'000 | Retained earnings AED'000 | Total equity AED'000 | |
|---|---|---|---|---|---|---|
| At 1 January 2022 | - | - | - | (10,080) | - | (10,080) |
| Issuance of share capital (Note 27) | 75,000 | - | - | - | - | 75,000 |
| Capital contribution received (Note 28) | - | 146,480 | - | - | - | 146,480 |
| Total comprehensive income for the period | - | - | - | 796,748 | 241,930 | 1,038,678 |
| Net distribution to parent (Note 22) | - | - | - | (826,711) | - | (826,711) |
| Property and equipment not transferred to the Company (Note 16) | - | - | - | (107,178) | - | (107,178) |
| End of service benefit liability of employees not transferred to the Company (Note 24) | - | - | - | 741 | - | 741 |
| Transfer during the period (Note 28) | - | (146,480) | - | 146,480 | - | - |
| At 30 September 2022 (unaudited) | 75,000 | - | - | - | 241,930 | 316,930 |
| At 1 January 2023 | 75,000 | - | 37,500 | - | 491,414 | 603,914 |
| Total comprehensive income for the period | - | - | - | - | 802,702 | 802,702 |
| Transactions with owners in their capacity as owners | ||||||
| Dividends declared and paid (Note 30) | - | - | - | - | (1,039,336) | (1,039,336) |
| At 30 September 2023 (unaudited) | 75,000 | - | 37,500 | - | 254,780 | 367,280 |
The accompanying notes 1 to 38 form an integral part of these condensed interim financial statements.
7
Page 10
SALIK COMPANY P.J.S.C.
NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTSFOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023
1 DESCRIPTION OF BUSINESS AND PRINCIPAL ACTIVITIES
Salik Company P.J.S.C. (‘Salik' or the 'Company’) is a Public Joint Stock Company incorporated on 30 June 2022 in the Emirate of Dubai, United Arab Emirates (UAE) under law no. 12 of 2022 issued by His Highness Sheikh Mohammed Bin Rashid Al Maktoum, the Ruler of Dubai, and started its operations on 1 July 2022.
The Company changed its corporate office on 18" September 2023. The Company’s new registered address is Suite No.400, 4" floor, Festival Tower, Dubai Festival City, PO Box 36003, Dubai, UAE.
The Government of Dubai owns Salik Company P.J.S.C. represented by the Department of Finance ("DoF" or the "Parent"). The Company is ultimately owned and controlled by the Government of Dubai (“ultimate controlling party"). On 29 September 2022, DoF sold 24.9% shares of the Company through an Initial Public Offering ("IPO") on the Dubai Financial Market ("DFM") stock exchange.
The principal activities of the Company are the operations and maintenance of the existing tollgates throughout Dubai, UAE and for design, construction (including all the civil, electrical, gantry design and manufacturing, system integration, testing and commissioning) of new toll gates, including without limitation, the required tolling equipment, infrastructure and any interface requirements in relation to the new toll gates, but excluding the construction, operation and maintenance of the relevant toll roads.
These condensed interim financial statements have been reviewed, not audited. The comparative information for the condensed interim statement of financial position is based on the audited Salik Company P.J.S.C. financial statements as at 31 December 2022. The comparative information for the condensed interim statements of profit or loss and comprehensive income, changes in equity and cash flows, and related explanatory notes is based on the unaudited condensed interim financial statements for the three-month and nine-month periods ended 30 September 2022.
2 BASIS OF PREPARATION
These condensed interim financial statements for the three-month and nine-month periods ended 30 September 2023 have been prepared in accordance with International Accounting Standard (IAS): 34 'Interim Financial Reporting' and applicable requirements of the United Arab Emirates laws. The condensed interim financial statements do not include all information and disclosures required in the annual financial statements and should be read in conjunction with the Company's financial statement for the year ended 31 December 2022.
The condensed interim financial statements are presented at historical cost basis. Historical cost is generally based on the fair value of the consideration given in exchange for assets, unless otherwise disclosed.
Financial results and cash flows for the period I January 2022 to 30 September 2022
The transfer of the Roads and Transport Authority (RTA) - Salik Tolling Business to Salik Company P.J.S.C. represents a transfer of business under common control, whereby the condensed interim financial statements of the Company are presented as a continuation of RTA - Salik Tolling Business. The financial information presented in these condensed interim financial statements for the comparative period includes the financial results of Salik before the incorporation date of the Company as if the Company had historically operated as a standalone entity. Therefore, the transfer represents the predecessor method of accounting and retrospective presentation is used. As Salik was not a standalone legal entity, the comparative period presented from 1 January 2022 to 30 September 2022 includes the actual operations of Salik for the three-month period from 1 July 2022 to 30 September 2022 and the carved-out
information for the period from 1 January 2022 to 30 June 2022, as if these had always been a part of the Company. The assets and liabilities were transferred from RTA to the Company on 1 July 2022, at their predecessor carrying values and fair value measurement
was not required.
Consistent with the Company's audited financial statements for the year ended 31 December 2022, the financial results and cash flows for the period 1 January 2022 to 30 June 2022 included in the comparative nine-month period ended 30 September 2022 represent historical operations of the RTA - Salik Tolling Business and have been prepared from the accounting records of RTA wherein revenues, expenses, assets, and liabilities of the Salik tolling business were separately maintained in the RTA books except for corporate shared overheads. Throughout 1 January 2022 to 30 June 2022, the Company functioned as part of the Traffic and Roads Agency ("TRA") which is one of the four agencies forming part of RTA. Accordingly, both RTA and TRA have historically performed certain corporate overhead functions for Salik. These include, but are not limited to, executive oversight, legal, finance, human resources, and financial reporting. The costs of such services have been allocated to the Company based on the most relevant allocation method to the service provided. Management believes such allocations are reasonable; however, they may not be indicative of the actual expense that would have been incurred had the Company been operating as a separate entity apart from RTA.
Page 11
SALIK COMPANY P.J.S.C.
NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
2 BASIS OF PREPARATION (continued)
Financial results and cash flows for the period I January 2022 to 30 September 2022 (continued)
The cost allocated for these functions is included in corporate allocation expense in the condensed interim statement of profit or loss and comprehensive income for the comparative period presented. A complete discussion of the Company's relationship with RTA, together with the cost allocations, is included in Note 22 to the condensed interim financial statements. Because Salik was not a standalone legal entity during 1 January 2022 to 30 June 2022, Parent's net investment is shown which represents the cumulative net investment by RTA in the Company through that date. The impact of transactions between the Company and RTA that were not
historically settled in cash are also included in the Net parent investment.
The condensed interim financial statements are presented in UAE Dirhams ("AED"), which is also the Company's functional currency.
All values have been rounded to the nearest thousand ("000"), unless otherwise disclosed.
3 NEW STANDARDS, INTERPRETATIONS AND AMENDMENTS TO EXISTING STANDARDS
New standards, interpretations and amendments to existing standards as adopted by the Company
The following are new standards, amendments and interpretations of IFRS that have been adopted by the Company. The application of these revised IFRSs, except where stated, have not had any material impact on the amounts reported for the current and prior periods.
- Amendments to IFRS 4: amendments regarding the expiry date of the deferral approach.
3 Amendments to IFRS 17: amendments to address concerns and implementation challenges that were identified after IFRS 17 was published.
- Amendments to IAS 1: amendments regarding the disclosure of accounting policies.
- Amendments to IAS 8: amendments regarding the definition of accounting estimates.
- Amendments to IAS 12: amendments regarding deferred tax on leases decommissioning obligations
- Amendments to IAS 12: amendments to provide temporary exception to the requirements regarding deferred tax assets and liabilities related to pillar two income taxes.
New standards, interpretations and amendments issued but not yet effective
The following are new standards, amendments, and interpretations of IFRS that have been issued but not yet effective.
- IFRS 51: General Requirements for Disclosure of Sustainability-related Financial Information.
- IFRS S2: Climate-related Disclosures.
- Amendments to IAS 1: amendments regarding the classification of liabilities
- Amendments to IAS 1: amendments regarding the classification of debt with covenants
- Amendments to IAS 1: amendment to defer the effective date of the January 2020 amendments.
- Amendments to IFRS 7: amendments regarding supplier finance arrangements.
- Amendments to IAS 7: amendments regarding supplier finance arrangements.
- Amendments to IFRS 16: amendments to clarify how a seller-lessee subsequently measures sale and leaseback transactions.
The Company has not early adopted any standards, interpretation or amendment that has been issued but is not yet effective. The Company does not expect the adoption of the above new standards and amendments to have a material impact on the future financial statements of the Company.
4 SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
The accounting policies applied in the preparation of these condensed interim financial statements are consistent with those applied by the Company in its recent annual audited financial statements for the year ended 31 December 2022. unless otherwise stated. except for the adoption of new and amended standards as mentioned in Note 3.
4.1 Leases
The Company's lease represents the lease of office space. Rental contract is made for a fixed period of five years. Contract contain both lease and non-lease components. The Company allocates the consideration in the contract to the lease and non-lease components based on their relative stand-alone prices. Lease terms are negotiated on an individual basis and contain a wide range of different terms and conditions. The lease agreements do not impose any covenants other than the security interests in the leased assets that are held by the lessor, but leased assets may not be used as security for borrowing purposes. Assets and liabilities arising from a lease are initially measured on a present value basis.
Page 12
SALIK COMPANY P.J.S.C.
NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
4 SUMMARY OF SIGNIFICANT ACCOUNTING POLICIES
4.1 Leases (continued)
Lease liabilities include the net present value of the following lease payments:
fixed payments, including in-substance fixed payments;
variable lease payments that depend on an index or a rate, initially measured using the index or rate as at the commencement date; amounts expected to be payable under a residual value guarantee;
the exercise price under a purchase option that the Company is reasonably certain to exercise,
lease payments in an optional renewal period if the Company is reasonably certain to exercise an extension option, and
penalties for early termination of a lease unless the Company is reasonably certain not to terminate early.
Lease payments to be made under reasonably certain extension options are also included in the measurement of the liability. The lease payments are discounted using the interest rate implicit in the lease. If that rate cannot be readily determined, which is generally the case for leases in the Company, the lessee’s incremental borrowing rate is used, being the rate that the individual lessee would have to pay to borrow the funds necessary to obtain an asset of similar value to the right-of-use asset in a similar economic environment with similar terms, security and conditions.
To determine the incremental borrowing rate, the Company:
٠ where possible, uses recent third-party financing received by the individual lessee as a starting point, adjusted to reflect changes in financing conditions since third party financing was received, and
e makes adjustments specific to the lease, e.g. term, country, currency and security.
If a readily observable amortising loan rate is available to the individual lessee (through recent financing or market data) which has a similar payment profile to the lease, then the Company entities use that rate as a starting point to determine the incremental borrowing rate. Lease payments are allocated between principal and finance cost. The finance cost is charged to condensed interim statement of profit or loss and comprehensive income over the lease period so as to produce a constant periodic rate of interest on the remaining balance of the liability for each period.
Right-of-use assets are measured at cost comprising the following:
the amount of the initial measurement of the lease liability;
any lease payments made at or before the commencement date less any lease incentives received;
any initial direct costs, and,
restoration costs.
Right-of-use assets are generally depreciated over the shorter of the asset's useful life and the lease term, on a straight-line basis. If the Company is reasonably certain to exercise a purchase option, the right-of-use asset is depreciated over the underlying asset's useful life.
The Company does not revalue right-of-use assets held by the Company.
Payments associated with short-term leases and all leases of low-value assets are recognised on a straight-line basis as an expense in condensed interim statement of profit or loss and comprehensive income. Short-term leases are leases with a lease term of 12 months or less without a purchase option.
5 CRITICAL ACCOUNTING ESTIMATES AND JUDGEMENTS
The preparation of the condensed interim financial statements requires management to make judgements, estimates and assumptions that affect the application of accounting policies and the reported amounts of assets and liabilities, income and expense. Actual results may differ from these estimates.
The significant judgements made by management in applying the Company's accounting policies and the key sources of estimation uncertainty were the same as those that were applied in the preparation of the financial statements of the Company as at and for the year ended 31 December 2022.
10
Page 13
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
6 REVENUE
Set out below is the disaggregation of the Company's revenue:
| Three-month period ended 30 September 2023 (unaudited) AED'000 | Three-month period ended 30 September 2022 (unaudited) AED'000 | Nine-month period ended 30 September 2023 (unaudited) AED'000 | Nine-month period ended 30 September 2022 (unaudited) AED'000 | |
|---|---|---|---|---|
| Tolling revenue | ||||
| - Toll usage fees | 443,078 | 386,492 | 1,352,613 | 1,207,832 |
| - Tag activation fees* | 9,281 | 7,689 | 24,402 | 23,820 |
| Total tolling revenue | 452,359 | 394,181 | 1,377,015 | 1,231,652 |
| Fines | 54,417 | 49,031 | 162,541 | 153,485 |
| Inactive balance write-off (Note 26) | 1,433 | 1,411 | 4,273 | 4,274 |
| Miscellaneous | 600 | 807 | 1,774 | 922 |
| 508,809 | 445,430 | 1,545,603 | 1,390,333 |
*Tag activation fees is recognised on a straight-line basis over the estimated customer life of 5 years.
7 COST OF TAGS AND RECHARGE CARDS
| Three-month period ended 30 September 2023 (unaudited) AED'000 | Three-month period ended 30 September 2022 (unaudited) AED'000 | Nine-month period ended 30 September 2023 (unaudited) AED'000 | Nine-month period ended 30 September 2022 (unaudited) AED'000 | |
|---|---|---|---|---|
| Inventories expensed - Salik tags | 9,145 | 4,557 | 19,314 | 15,374 |
| Inventories expensed - Salik recharge cards | 57 | 313 | 163 | 426 |
| 9,202 | 4,870 | 19,477 | 15,800 |
8 TOLL OPERATION AND MAINTENANCE EXPENSE
| Three-month period ended 30 September 2023 (unaudited) AED'000 | Three-month period ended 30 September 2022 (unaudited) AED'000 | Nine-month period ended 30 September 2023 (unaudited) AED'000 | Nine-month period ended 30 September 2022 (unaudited) AED'000 | |
|---|---|---|---|---|
| Operating expenses | 15,637 | 15,635 | 45,804 | 47,867 |
| Maintenance expenses | 5,357 | 5,492 | 16,313 | 20,852 |
| 20,994 | 21,127 | 62,117 | 68,719 |
The operations and maintenance of the tolling system is outsourced to a third-party service provider. Operating expenses comprise of account management charges, customer service charges, processing of violations charges, and charges relating to general requirements to operate the tolling business. Maintenance expense comprises back-office software support, maintaining and replacing equipment, and mobile application maintenance expenses. Operating and maintenance expenses are recorded in the period in which the services are provided.
11
Page 14
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
9 EMPLOYEE BENEFITS EXPENSE
| Three-month period ended | Three-month period ended | Nine-month period ended | Nine-month period ended | |
|---|---|---|---|---|
| 30 September | 30 September | 30 September | 30 September | |
| 2023 | 2022 | 2023 | 2022 | |
| (unaudited) | (unaudited) | (unaudited) | (unaudited) | |
| AED'000 | AED'000 | AED'000 | AED'000 | |
| Salaries and wages | 4,960 | 2,217 | 15,678 | 6,618 |
| End of service benefits | 407 | 784 | 530 | 927 |
| Bonus expense | - | - | 518 | - |
| Other benefits and allowances | 597 | 290 | 2,231 | 634 |
| 5,964 | 3,291 | 18,957 | 8,179 |
10 DEPRECIATION AND AMORTISATION EXPENSE
| Three-month period ended | Three-month period ended | Nine-month period ended | Nine-month period ended | |
|---|---|---|---|---|
| 30 September | 30 September | 30 September | 30 September | |
| 2023 | 2022 | 2023 | 2022 | |
| (unaudited) | (unaudited) | (unaudited) | (unaudited) | |
| AED'000 | AED'000 | AED'000 | AED'000 | |
| Depreciation of property and equipment (Note 16) | 83 | 7 | 91 | 3,324 |
| Depreciation of right-of-use asset (Note 17) | 383 | - | 636 | - |
| Amortisation of intangibles (Note 14) | 20,408 | 20,408 | 61,224 | 20,408 |
| 20,874 | 20,415 | 61,951 | 23,732 |
11 FINANCE COSTS
| Three-month period ended | Three-month period ended | Nine-month period ended | Nine-month period ended | |
|---|---|---|---|---|
| 30 September | 30 September | 30 September | 30 September | |
| 2023 | 2022 | 2023 | 2022 | |
| (unaudited) | (unaudited) | (unaudited) | (unaudited) | |
| AED'000 | AED'000 | AED'000 | AED'000 | |
| Finance cost on borrowings | 62,460 | 28,940 | 177,424 | 28,940 |
| Finance charge on lease liability | 110 | - | 183 | - |
| Other finance costs | 40 | 40 | 120 | 40 |
| 62,610 | 28,980 | 177,727 | 28,980 |
12
Page 15
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
12 SERVICE PROVIDERS COMMISSIONS
| Three-month period ended | Three-month period ended | Nine-month period ended | Nine-month period ended | |
|---|---|---|---|---|
| 30 September | 30 September | 30 September | 30 September | |
| 2023 | 2022 | 2023 | 2022 | |
| (unaudited) | (unaudited) | (unaudited) | (unaudited) | |
| AED'000 | AED'000 | AED'000 | AED'000 | |
| Service provider expense | ||||
| - Bank commissions | 5,729 | 3,146 | 13,353 | 6,624 |
| - Other Emirates commissions | 2,973 | 2,763 | 9,004 | 8,118 |
| Commission on card sales | 1,998 | 2,230 | 5,181 | 6,705 |
| Commission on tag sales | 1,085 | 920 | 4,378 | 2,891 |
| 11,785 | 9,059 | 31,916 | 24,338 |
13 OTHER EXPENSES
| Three-month period ended | Three-month period ended | Nine-month period ended | Nine-month period ended | |
|---|---|---|---|---|
| 30 September | 30 September | 30 September | 30 September | |
| 2023 | 2022 | 2023 | 2022 | |
| (unaudited) | (unaudited) | (unaudited) | (unaudited) | |
| AED'000 | AED'000 | AED'000 | AED'000 | |
| Professional fees | 2,333 | 4,380 | 5,843 | 6,787 |
| Transition service expense (Note 22) | 1,408 | 1,696 | 4,556 | 1,696 |
| Utilities | 385 | 384 | 1,151 | 733 |
| Travel and accommodation | 344 | - | 417 | - |
| Wireless communication for Salik RFID tags | 6 | - | 531 | 52 |
| Marketing and advertisement | 72 | - | 517 | - |
| Entertainment | 11 | - | 37 | - |
| Other expenses | 3,078 | 3,218 | 3,806 | 5,176 |
| 7,637 | 9,678 | 16,858 | 14,444 |
13
Page 16
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
14 INTANGIBLES
This represents the Company's right under the service concession agreement (Note 15), that is, an upfront concession fee of AED 4,000 million (31 December 2022: AED 4,000 million) to RTA under the service concession agreement between RTA and the Company.
For the nine-month period ended 30 September 2023| AED'000Cost |At 1 January 2023 and 30 September 2023 | 4,000,000Accumulated amortisation |
| At 1 January 2023 | 40,817 |
|---|---|
| Charge for the period (Note 10) | 61,224 |
| At 30 September 2023 | 102,041 |
Net carrying amount |At 30 September 2023 | 3,897,959
For the year ended 31 December 2022 | AED'000
Cost |
| At 1 January 2022 | - |
|---|---|
| Additions (Note 15) | 4,000,000 |
| At 31 December 2022 | 4,000,000 |
Accumulated amortisation |
| At 1 January 2022 | - |
|---|---|
| Charge for the year | 40,817 |
| At 31 December 2022 | 40,817 |
Net carrying amount |At 31 December 2022 | 3,959,183
For the period 1 January 2022 to 30 September 2022 | AED'000
Cost |
| At 1 January 2022 | - |
|---|---|
| Additions (Note 15) | 4,000,000 |
| At 30 September 2022 | 4,000,000 |
Accumulated amortisation |
| At 1 January 2022 | - |
|---|---|
| Charge for the period | 20,408 |
| At 30 September 2022 | 20,408 |
Net carrying amount |At 30 September 2022 | 3,979,592
14
Page 17
SALIK COMPANY P.J.S.C.
NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
15 SERVICE CONCESSION ARRANGEMENT
Salik Company P.J.S.C. entered into a concession agreement with RTA effective 1 July 2022 to undertake the Dubai tolling operations for which Salik ("Operator") made an upfront concession payment of AED 4,000 million plus VAT of AED 200 million to RTA ("Grantor") for acquiring the right to operate Salik's existing gates and any future gates.
Additionally, a variable concession fee of 25% of toll usage fee earned excluding tag activation fees, violations revenue. inactive balance write-off or any other miscellaneous revenue is payable to RTA for each quarter period. The agreement term is 49 years ("the concession period") unless terminated or extended as per the terms of the concession agreement. As per the terms of the concession agreement, there are no decommissioning obligations at the end of the contractual period and therefore, no liability has been recorded as of 30
September 2023.
Variable concession fee for three-month and nine-month periods ended 30 September 2023 amounts to AED 110.8 million and AED 338.2 million respectively (2022: AED 96.6 million for the three-month and nine-month periods ended 30 September 2022), which has been recorded as an expense in the condensed interim statement of profit or loss and comprehensive income.
Key elements of concession agreement
Tolling Operations, Tolling Systems, Tolling Assets: The Company has the absolute and exclusive responsibility for the Dubai tolling operations and the operation, maintenance, development and/or upgrade of the tolling system. All costs and expenses incurred in this relation are at expense of the Company. Ownership over tolling assets vests with RTA.
Revisions to toll fee: The Company has exclusive right to charge. collect and keep for its account toll fees and other road user charges from vehicles utilizing the toll roads. The Company has a right to increase the toll fees to account for increase in operational cost or to consider the impact of inflation. Such increase in toll fees has to be approved by Dubai Executive Council. In case the revision in toll rate is not approved by the Dubai Executive Council, the Company will be compensated for such non approval by reduction in the variable concession fee charged by RTA, only if the proposed increase was on account of increased inflation rates.
New toll gates: The Company has exclusive right to undertake any tolling works with respect to the new toll gates and all costs and expenses incurred for the construction of toll gates will be reimbursed by RTA on a cost plus 10% basis. For obtaining the right to charge users, the Company shall pay to RTA a fee determined based on valuation of the new toll gate. In case of difference in valuation done by RTA and that done by Salik by more than 5%, an earnout mechanism will apply, whereby during the period of 5 years following the completion and commissioning of the new toll gate, the Company shall be liable to pay earn-out payments only if there is a positive traffic delta compared to forecasts.
Replacement of Tolling Assets: The Company shall be reimbursed by RTA on a cost plus 5% basis for replacement of each tolling asset upon the end of its useful life.
Termination: The Company may terminate the agreement if RTA is in breach of its obligations and if a change in law were to make it illegal or impossible for the Company to perform substantially all its obligations under the agreement. RTA may terminate the agreement
by giving notice to the Company. if an insolvency event occurs, if the Company commits a prohibited act or if certain type of breaches of the agreement occur. Further, RTA also has an option to voluntarily terminate the agreement by giving notice of voluntary termination
to the Company. Compensation amounts will have to be paid by either of the parties upon occurrence of certain events, that is, it will have to be paid by RTA in case of exercise of voluntary termination or breach by RTA of its obligations and will have to be paid by the Company if it commits a prohibited act.
Transfer of Assets and Rights: On end of the agreement, Operator shall, without consideration, transfer to Grantor all rights, title and interest of assets, intellectual property rights used in Dubai tolling operations.
15
Page 18
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
16 PROPERTY AND EQUIPMENT
For the nine-month period ended 30 September 2023
| Office equipment and furniture | Motor vehicle | Leasehold improvements | Total | |
|---|---|---|---|---|
| AED'000 | AED'000 | AED'000 | AED'000 | |
| Cost | ||||
| At 1 January 2023 | 150 | - | - | 150 |
| Additions | 1,685 | 362 | 2,555 | 4,602 |
| Adjustment | (128) | - | - | (128) |
| At 30 September 2023 | 1,707 | 362 | 2,555 | 4,624 |
| Accumulated depreciation | ||||
| At 1 January 2023 | 60 | - | - | 60 |
| Depreciation charge for the period (Note 10) | 41 | 8 | 42 | 91 |
| Adjustment | (48) | - | - | (48) |
| At 30 September 2023 | 53 | 8 | 42 | 103 |
| Net carrying amount | ||||
| At 30 September 2023 | 1,654 | 354 | 2,513 | 4,521 |
(This space has been left intentionally blank)
16
Page 19
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
16 PROPERTY AND EQUIPMENT (continued)
For the year ended 31 December 2022
| Buildings | Infrastructure assets | Tolling equipment | Office equipment & furniture | Capital work in progress | Total | |
|---|---|---|---|---|---|---|
| AED'000 | AED'000 | AED'000 | AED'000 | AED'000 | AED'000 | |
| Cost | ||||||
| At 1 January 2022 | 2,438 | 128,718 | 49,438 | 1,657 | 27,680 | 209,931 |
| Additions | - | - | 106 | - | 3,052 | 3,158 |
| Transfer* | - | - | 2,259 | - | (2,259) | - |
| Transfer from related party | - | - | - | 150 | - | 150 |
| Retirements** | - | - | (4,758) | (1,069) | - | (5,827) |
| Property and equipment not transferred to Salik*** | (2,438) | (128,718) | (47,045) | (588) | (28,473) | (207,262) |
| At 31 December 2022 | - | - | - | 150 | - | 150 |
| Accumulated depreciation | ||||||
| At 1 January 2022 | 1,153 | 51,142 | 48,646 | 1,653 | - | 102,594 |
| Depreciation charge for the year | 52 | 2,573 | 691 | 15 | - | 3,331 |
| Transfer from related party | - | - | - | 46 | - | 46 |
| Retirements | - | - | (4,758) | (1,069) | - | (5,827) |
| Property and equipment not transferred to Salik*** | (1,205) | (53,715) | (44,579) | (585) | - | (100,084) |
| At 31 December 2022 | - | - | - | 60 | - | 60 |
| Net carrying amount | ||||||
| At 31 December 2022 | - | - | - | 90 | - | 90 |
*This includes transfer of Information technology (IT) assets of AED 2.3 million from CWIP to Tolling Equipment during the year.
**Retirements relate to certain fully depreciated Information technology (IT) assets under tolling equipment category and telecommunication assets under office equipment & furniture category.
***The property and equipment i.e. building, infrastructure assets and tolling equipment used by the Company in its operations till 30 June 2022, that is, until the date of its incorporation, but are legally owned by RTA and are not transferred to Salik Company P.J.S.C. on formation of the legal entity. However, as part of the service concession agreement (Note 15) entered into between by the Company and RTA these assets will be used by Salik to provide operation, maintenance, and management of Tolling business in Dubai.
17
Page 20
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
16 PROPERTY AND EQUIPMENT (continued)
For the period 1 January 2022 to 30 September 2022
| Buildings | Infrastructure assets | Tolling equipment | Office equipment & furniture | Capital work in progress | Total | |
|---|---|---|---|---|---|---|
| AED'000 | AED'000 | AED'000 | AED'000 | AED'000 | AED'000 | |
| Cost | ||||||
| At 1 January 2022 | 2,438 | 128,718 | 49,438 | 1,657 | 27,680 | 209,931 |
| Additions | - | - | 106 | - | 3,052 | 3,158 |
| Transfer* | - | - | 2,259 | - | (2,259) | - |
| Transfer from related party | - | - | - | 150 | - | 150 |
| Retirements** | - | - | (4,758) | (1,069) | - | (5,827) |
| Property and equipment not transferred to Salik*** | (2,438) | (128,718) | (47,045) | (588) | (28,473) | (207,262) |
| At 30 September 2022 | - | - | - | 150 | - | 150 |
| -------------------- | -------------------- | -------------------- | -------------------- | -------------------- | -------------------- | |
| Accumulated depreciation | ||||||
| At 1 January 2022 | 1,153 | 51,142 | 48,646 | 1,653 | - | 102,594 |
| Depreciation charge for the period (Note 10) | 52 | 2,573 | 691 | 8 | - | 3,324 |
| Retirements | - | - | (4,758) | (1,069) | - | (5,827) |
| Transfer from related party | - | - | - | 46 | - | 46 |
| Property and equipment not transferred to Salik*** | (1,205) | (53,715) | (44,579) | (585) | - | (100,084) |
| -------------------- | -------------------- | -------------------- | -------------------- | -------------------- | -------------------- | |
| At 30 September 2022 | - | - | - | 53 | - | 53 |
| -------------------- | -------------------- | -------------------- | -------------------- | -------------------- | -------------------- | |
| Net carrying amount | ||||||
| At 30 September 2022 | - | - | - | 97 | - | 97 |
| ==================== | ==================== | ==================== | ==================== | ==================== | ==================== |
*This represents transfer of Information technology (IT) assets from CWIP to Tolling Equipment during the period.
**Retirements relate to certain fully depreciated Information technology (IT) assets under Tolling Equipment category and Telecommunication assets under Office & Furniture category.
***The property and equipment i.e. building, infrastructure assets and tolling equipment used by the Company till 30 June 2022 in its operations but are legally owned by RTA and are not transferred to Salik Company P.J.S.C. on formation of the legal entity. However, as part of the service concession agreement (refer Note 15) entered into between by the Company and RTA these assets will be used by Salik to provide operation, maintenance, and management of Tolling business in Dubai.
18
Page 21
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
17 LEASES
i. Right-of-use asset
| Office space| AED'000Cost |
| At 1 January 2023 | - |
|---|---|
| Additions | 8,095 |
| ----------At 30 September 2023 | 8,095| ==========Accumulated depreciation |
| At 1 January 2023 | - |
|---|---|
| Charge for the period (Note 10) | 636 |
| ----------At 30 September 2023 | 636| ==========Net book value |At 30 September 2023 | 7,459| ==========
ii. Lease liability
| AED'000
| At 1 January 2023 | - |
|---|---|
| Lease additions | 8,095 |
| Finance charge for the period (Note 11) | 183 |
| Lease repayments | (452) |
| ----------As at 30 September 2023 | 7,826| ==========Lease liability is bifurcated into: |
| Current | 1,404 |
|---|---|
| Non-current | 6,422 |
| ----------| 7,826| ==========
iii. Amounts recognised in profit or loss
| Three-month period ended | Three-month period ended | Nine-month period ended | Nine-month period ended | |
|---|---|---|---|---|
| 30 September 2023 | 30 September 2022 | 30 September 2023 | 30 September 2022 | |
| (unaudited) | (unaudited) | (unaudited) | (unaudited) | |
| AED'000 | AED'000 | AED'000 | AED'000 | |
| Finance charge on lease liability (Note 11) | 110 | - | 183 | - |
| Depreciation of right-of-use asset (Note 10) | 383 | - | 636 | - |
| ---------- | ---------- | ---------- | ---------- |
19
Page 22
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
17 LEASES (continued)
iv. Contractual undiscounted cash flows
The contractual undiscounted cash flows associated with the lease are as follows:
| 30 September 2023 | 31 December 2022 | |
|---|---|---|
| (unaudited) | (audited) | |
| AED'000 | AED'000 | |
| Not later than 1 year | 1,811 | - |
| Between 1 to 5 years | 7,156 | - |
| 8,967 | - | |
| ========== | ========== |
18 SOFTWARE ENHANCEMENT EXPENSE
The expenditure incurred towards enhancements of the software did not meet capitalisation criteria and have been expensed in the period in which the expense was incurred. Expenses incurred related to software enhancement were AED 4.1 million and AED 9.1 million for the three-month and nine-month periods ended 30 September 2023 respectively (2022: AED Nil and AED 8.3 million for the three-month and nine-month period ended 30 September 2022 respectively).
19 INVENTORIES
| 30 September 2023 | 31 December 2022 | |
|---|---|---|
| (unaudited) | (audited) | |
| AED'000 | AED'000 | |
| Salik tags | 9,552 | 5,188 |
| Salik recharge scratch cards | 25 | 6,348 |
| 9,577 | 11,536 | |
| ========== | ========== |
All inventories are in the form of finished goods. The cost of inventories recognised as expense during the period is included in 'Cost of tags and recharge cards' on the condensed interim statement of profit or loss and comprehensive income. None of the inventories are carried at net realisable value being lower than cost for all periods presented. There are no obsolete or slow-moving inventories. There has been no write-off of inventory in the periods presented.
20 TRADE AND OTHER RECEIVABLES
| 30 September 2023 | 31 December 2022 | 30 September 2022 | |
|---|---|---|---|
| (unaudited) | (audited) | (unaudited) | |
| AED'000 | AED'000 | AED'000 | |
| Trade receivables (including fines) | 301,213 | 313,410 | 313,438 |
| Less: loss allowance on fines | (177,442) | (183,074) | (188,214) |
| 123,771 | 130,336 | 125,224 | |
| VAT receivable | 17,109 | 211,249 | 204,534 |
| Advance to supplier | 12,063 | 20,808 | 23,713 |
| Prepayments and other assets | 1,400 | 2,014 | 295 |
| ---------- | ---------- | ---------- | |
| 154,343 | 364,407 | 353,766 | |
| ========== | ========== | ========== |
20
Page 23
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
20 TRADE AND OTHER RECEIVABLES (continued)
| 30 September 2023 | 31 December 2022 | 30 September 2022 | |
|---|---|---|---|
| (unaudited) | (audited) | (unaudited) | |
| AED'000 | AED'000 | AED'000 | |
| Break up of trade receivables is as follows: | |||
| Fines | 283,832 | 286,182 | 293,456 |
| Taxi | 8,901 | 7,543 | 9,482 |
| Banks | 2,540 | 1,962 | 2,466 |
| Other Emirates | 353 | 353 | 278 |
| Telecom | 87 | 4,592 | 5,709 |
| Gas stations | - | 12,778 | 1,805 |
| Others | 5,500 | - | 242 |
| 301,213 | 313,410 | 313,438 | |
| ========== | ========== | ========== |
Trade and other receivables are measured at amortised cost using the effective interest method.
Trade and other receivables from other Emirates, taxi, gas stations, telecom, banks and others are unsecured, non-interest bearing and are generally on terms of 30 to 90 days. The allowance for expected credit losses or impairment incurred for trade and other receivables from other Emirates, taxi, gas stations, telecom, banks and other is considered to be not material.
Receivables from fines are unsecured, non-interest bearing and customers are generally required to pay the violation 12 months from the issuance date. The movement of loss allowance on receivable relating to fines were as follows:
| 30 September 2023 | 31 December 2022 | 30 September 2022 | |
|---|---|---|---|
| (unaudited) | (audited) | (unaudited) | |
| AED'000 | AED'000 | AED'000 | |
| Balance at the beginning of the period / year / period | 183,074 | 196,680 | 196,680 |
| Provision for expected credit losses | 23,125 | 26,614 | 22,140 |
| Write offs during the period / year / period | (28,757) | (40,220) | (30,606) |
| Balance at the end of the period / year / period | 177,442 | 183,074 | 188,214 |
| ========== | ========== | ========== |
The provision for expected credit losses for the period has been included as "Impairment loss on trade receivables" in the condensed interim statement of profit or loss and other comprehensive income. The Company fully writes off a trade receivable arising from a violation when there is no realistic prospect of recovery, which is estimated by management to be at the end of the average customer useful life, which is five years.
Set out below is the ageing analysis of the Company's trade receivables from violations using a provision matrix:
| 30 September 2023 (unaudited) | Expected credit loss % | Gross carrying amount AED'000 | Loss allowance AED'000 |
|---|---|---|---|
| Current | 39% | 118,333 | 45,942 |
| 1 - 90 days | 58% - 64% | 11,576 | 6,997 |
| 91 - 180 days | 65% - 68% | 10,690 | 7,026 |
| 180 - 365 days | 70% - 79% | 21,711 | 16,072 |
| 365+ days | 84% | 121,522 | 101,405 |
| 283,832 | 177,442 | ||
| ========== | ========== |
21
Page 24
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
20 TRADE AND OTHER RECEIVABLES (continued)
| 31 December 2022 (audited) | Expected credit loss % | Gross carrying amount AED'000 | Loss allowance AED'000 |
|---|---|---|---|
| Current | 39% | 111,887 | 43,895 |
| 1 - 90 days | 58% - 63% | 12,536 | 7,616 |
| 91 - 180 days | 64% - 68% | 10,451 | 6,904 |
| 180 - 365 days | 70% - 79% | 22,691 | 16,962 |
| 365+ days | 83% | 128,617 | 107,697 |
| 286,182 | 183,074 | ||
| ========== | ========== |
| 30 September 2022 (unaudited) | Expected credit loss % | Gross carrying amount AED'000 | Loss allowance AED'000 |
|---|---|---|---|
| Current | 39% | 116,170 | 45,185 |
| 1 - 90 days | 54% - 60% | 11,728 | 6,715 |
| 91 - 180 days | 62% - 64% | 11,420 | 7,169 |
| 180 - 365 days | 67% - 77% | 23,333 | 16,815 |
| 365+ days | 86% | 130,805 | 112,330 |
| 293,456 | 188,214 | ||
| ========== | ========== |
21 CASH AND CASH EQUIVALENTS AND SHORT TERM DEPOSIT WITH BANK
| 30 September 2023 | 31 December 2022 | |
|---|---|---|
| (unaudited) | (audited) | |
| AED'000 | AED'000 | |
| Cash and cash equivalents | ||
| Current account | 167,122 | 321,758 |
| Short-term deposits with original maturity of 3 months or less | - | 500,949 |
| Cash and cash equivalents | 167,122 | 822,707 |
| ========== | ========== | |
| Short term deposit with bank | ||
| Fixed deposit with original maturity of 3 to 12 months | 500,000 | - |
| ---------- | ---------- |
Bank balance represents amounts held in current accounts and Wakala deposit maintained with Emirates NBD operating in the UAE. The deposits have a maturity period of 181 days (2022: 88 days) and earn expected profits of 5.3% (2022: 5.15%). Interest income earned from short-term deposits was AED 18,430 thousand and AED 7,814 thousand for the nine-month and three-month periods ended 30 September 2023 respectively (2022: AED 155 thousand for the nine-month and three-month periods ended 30 September 2022). Further, subsequent to period end, the Company has entered into a sweeping arrangement with newly opened Islamic Mudarabah Call Account whereby daily available balance in the current account will be transferred to Call account and the Company will be earning interest on the daily available bank balance.
22 RELATED PARTY BALANCES AND TRANSACTIONS
Related parties comprise the Parent, ultimate controlling party, the shareholders, key management personnel, subsidiaries, joint venture, directors and businesses which are controlled directly or indirectly by the ultimate controlling party, or directors or over which they exercise significant management influence. The Company has availed the exemption as per para 25 of IAS 24 Related Party Disclosure and consider the entities controlled by Government of Dubai as non-related except for RTA, Dubai Taxi Corporation (“DTC”), Dubai E-Government, Dubai Digital Authority, Emirates NBD Bank PJSC (“ENBD”) and Emirates National Oil Company (“ENOC”).
The Company, in the normal course of business, receives services from and provides services to related parties. These transactions comprise the purchase and sale of goods and services in the normal course of business at mutually agreed terms.
22
Page 25
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
22 RELATED PARTY BALANCES AND TRANSACTIONS (continued)
Additionally, the Company entered into a Service Concession Agreement with RTA (Note 15), Transitional Services agreement with RTA and debt agreement with ENBD (Note 23).
The following table summarizes related party balances for the relevant financial period.
| 30 September 2023 (unaudited) AED'000 | 31 December 2022 (audited) AED'000 | |
|---|---|---|
| Due from related parties | ||
| Entities under common control of the Government of Dubai | ||
| Dubai E-Government | 75,923 | 66,408 |
| Roads and Transport Authority* | 64,507 | 72,240 |
| Dubai Taxi Corporation | 10,996 | 5,660 |
| Emirates National Oil Company | 2,375 | - |
| 153,801 | 144,308 | |
| Due to a related party | ||
| Entities under common control of the Government of Dubai | ||
| Roads and Transport Authority* | 124,128 | 313,492 |
*With respect to the balance due to and due from Roads and Transport Authority, the Company does not have an enforceable right to offset and therefore these have been presented separately.
| 30 September 2023 (unaudited) AED'000 | 31 December 2022 (audited) AED'000 | |
| Loan from a related party | ||
| Entities under common control of the Government of Dubai | ||
| Emirates NBD PJSC | 3,987,978 | 3,985,573 |
The Company obtained a financing facility with a related party, as has been disclosed in Note 23.
Bank balances as disclosed in Note 21 are held with a related party bank.
Transactions with related parties
Commission expense
Transactions with ENBD, other than finance cost on borrowings as explained in Note 23, relates to commission paid for collection services provided by ENBD and amounts to AED 0.6 million and AED 1.9 million for three-month and nine-month periods ended 30 September 2023 respectively (2022: AED 0.6 million and AED 1.7 million for the three-month and nine-month periods ended 30 September 2022 respectively). Transactions, gross of commission earned, with ENOC relate to the sale of Salik tag and recharge cards and amount to AED 27.6 million and AED 101.6 million for three-month and nine-month periods ended 30 September 2023 respectively (2022: AED 33.0 million and AED 90.5 million for the three-month and nine-month periods ended 30 September 2022 respectively).
Tolling fees collected by Dubai Taxi Corporation
Dubai Taxi Corporation ("DTC") is a subsidiary of RTA which is ultimately controlled by the Government of Dubai. Tolling fees collected by DTC represents toll fee collection by the taxis operated by DTC within the Emirate of Dubai and are based on trips under tollgates where there is a passenger in the taxi vehicle. Tolling fees collected by DTC are AED 16.4 million and AED 50.9 million for three-month and nine-month periods ended 30 September 2023 respectively (2022: AED 14.5 million and AED 46.4 million for the three-month and nine-month periods ended 30 September 2022 respectively). Historically, collections made by DTC were settled directly with the Government of Dubai's Department of Finance. Accordingly, the total effect of the settlement of the tolling fee portion of these transactions until the date of formation of the Company, that is 30 June 2022, is reflected in the condensed interim statement of cash flows as a financing activity as part of movement in net parent investment. Effective from 1 July 2022, the amounts are collected by RTA on behalf of the Company and will be transferred to the Company in accordance with the terms of agreement with the Company.
23
Page 26
SALIK COMPANY P.J.S.C.
NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
22 RELATED PARTY BALANCES AND TRANSACTIONS (continued)
Corporate costs allocation
The Company had been allocated expenses of AED Nil for the three-month and nine-month periods ended 30 September 2023 (2022:
AED Nil and AED 40.5 million for the three-month and nine-month periods ended 30 September 2022 respectively) from RTA. These costs are derived from multiple levels of the organisation including shared RTA corporate expenses and shared agency expenses. The allocated corporate costs include, but are not limited to, executive oversight, legal. finance, human resources, audit. strategic planning, and IT governance and are allocated to the Company to represent the cost of providing these services. Further, RTA's Director compensation is included in these amounts. The amounts allocated to the Company are intended to represent the costs of providing these services, and management believes the allocation methods are reasonable. However. the actual cost of obtaining these individual services, if the Company were a stand-alone company, could be materially different.
The cost of the services provided by RTA and TRA were determined by the most relevant allocation method, primarily relative percentage of headcount or revenue. These costs are recorded as corporate allocation expenses in the condensed interim statement of profit or loss and comprehensive income. Effective from 1 July 2022, the Company entered into a transitional services agreement with RTA for assistance with such back-office functions, as have been detailed below. Accordingly. corporate costs were allocated to the Company until 30 June 2022 and that no such costs have been allocated following the transitional services agreement.
Transitional Service Agreement
The Company entered into a Transitional Services Agreement (‘TSA’) with RTA, effective from 1 July 2022, wherein RTA providing services to Salik for performance of the tolling operations and back-office functions such as financial services. information technology (IT), human resources, administration, marketing and communication in accordance with the tolling Concession Agreement. During the three-month and nine-month periods ended 30 September 2023, an amount of AED 1.4 million and AED 4.6 million respectively (AED 1.7 million for the three-month and nine-month periods ended 30 September 2022) has been charged by RTA for such transitional services and these have been included as ‘Transition service expense” under “Other expenses’.
Service concession arrangement
As part of formation of Salik Company P.J.S.C., the Company entered into a Service Concession Agreement with RTA, pursuant to which RTA grants some of its mandates and powers under Dubai Law No. 17 of 2005 regarding the operation, maintenance and management of Salik i.e. Dubai's automatic road toll collection system. Refer Note 14 and 15 for the financial impact associated with the Concession Agreement.
Cash pooling
Until 30 June 2022, the Company utilised the RTA's centralised processes and systems for cash management. As a result, substantially all cash received related to the tolling business was deposited and comingled with RTA's general corporate funds. The Company did not have legal right to deposit or withdraw funds autonomously. Substantially all cash received by the Company was deposited in and commingled with RTA's general corporate funds and is not specifically allocated to the Company. Effective from 1 July 2022, the Company has its own bank account and ceased to use the centralized cash pooling process and systems of RTA. Accordingly, all the transactions are settled directly with the bank account of the Company from this date.
The total net effect of the settlement of these transactions until 30 June 2022 is reflected in the statement of cash flows as a financing activity and in the condensed interim statement of changes in equity as net distributions to parent.
Period from 1 Year ended Period from 1January 2023 to. 31 December January 2022 to
30 September 2022 30 September
20232022
(unaudited) (audited) (unaudited)
AED'000AED'000AED'000
Cash pooling and general activities-(415,936)(415,936)
Receivables from RTA-(451,296)(451,296)
Corporate allocations-40,52140.521
Net decrease in parent company investment-(826.711)(826,711)
24
Page 27
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
22 RELATED PARTY BALANCES AND TRANSACTIONS (continued)
Key management and directors' remuneration
| Three-month period ended 30 September 2023 (unaudited) AED'000 | Three-month period ended 30 September 2022 (unaudited) AED'000 | Nine-month period ended 30 September 2023 (unaudited) AED'000 | Nine-month period ended 30 September 2022 (unaudited) AED'000 | |
|---|---|---|---|---|
| Key management | ||||
| Salaries and other benefits | 1,477 | - | 5,221 | - |
| End of service benefits | 244 | - | 732 | - |
| 1,721 | - | 5,953 | - | |
| Directors' remuneration | 45 | - | 3,420 | - |
23 BORROWINGS
| 30 September 2023 (unaudited) AED'000 | 31 December 2022 (audited) AED'000 | |
|---|---|---|
| Term loan from Emirates NBD | 4,000,000 | 4,000,000 |
| Unamortised loan cost | (12,022) | (14,427) |
| Total borrowing (non-current) | 3,987,978 | 3,985,573 |
On 30 June 2022, the Company and Emirates NBD Bank entered into an agreement to underwrite a 5 year, AED 4,200 million unsecured Islamic Mudarabah credit facility (the "Facility"). The Facility is bifurcated further into a term facility commitment of AED 4,000 million and a revolving facility commitment of AED 200 million. On 19 May 2023, the Company agreed with the bank for a partial reduction of Facility B, that is, revolving Murabaha facility commitment, to reduce the commitment to AED 50 million instead of the original commitment of AED 200 million. The purpose of the overall borrowing facility is firstly, towards making an upfront payment as per requirements under the Concession Agreement; and secondly, for general corporate purposes including fees and expenses in relation to the Facilities.
Borrowings under the term facility carries variable interest at 3-month EIBOR plus a margin at a rate per annum of 0.82%. The upfront fee under the Facility is 0.4% flat and commitment fee on revolving credit facility is 0.25% per annum, calculated on daily undrawn and available commitments, and payable quarterly in arrears. Transaction costs incurred in relation to the term facility have been deducted from the financial liability amount and considered in the computation of the effective interest rate. The upfront fee allocated to the revolving facility has been capitalised and is amortized on a straight-line basis over the term of the agreement and the same have been disclosed as 'Other asset' in the condensed interim statement of financial position.
Principal amounts outstanding under the term facility will be due and payable in full on final maturity which is 5 years from the date of the facility agreement.
The Facility contains customary representations and warranties, subject to limitations and exceptions and customary covenants restricting the Company's ability to declare dividends or make distributions in the event of outstanding default or a default that may occur as a result of such dividend distribution. The Company is also required to comply with financial covenant, leverage (Net Debt to EBITDA): 5x or lower tested semi-annually with testing commencing from June 2023. The Company complied with the financial covenant throughout the reporting period.
25
Page 28
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
23 BORROWINGS (continued)
As at 30 September 2023, the Company has access to the following borrowing facilities:
| 30 September 2023 (unaudited) AED'000 | 31 December 2022 (audited) AED'000 | |
|---|---|---|
| Total available facilities | 4,050,000 | 4,200,000 |
| Facility utilised | (4,000,000) | (4,000,000) |
| Available financing facility | 50,000 | 200,000 |
24 PROVISION FOR EMPLOYEES' END-OF-SERVICE BENEFITS
| 30 September 2023 (unaudited) AED'000 | 31 December 2022 (audited) AED'000 | |
|---|---|---|
| Balance at the beginning of the period / year | 2,624 | 2,377 |
| Charge for the period / year | 530 | 988 |
| Liability of employees not transferred to the Company | - | (741) |
| Adjustment | (804) | - |
| Balance at the end of the period / year | 2,350 | 2,624 |
25 TRADE AND OTHER PAYABLES
| 30 September 2023 (unaudited) AED'000 | 31 December 2022 (audited) AED'000 | |
|---|---|---|
| Trade payables - Operation and Maintenance service provider | 47,105 | 38,727 |
| Fine refund payables | 2,868 | 2,871 |
| Employee benefits | 1,326 | 1,629 |
| Commission accruals and other payables | 11,095 | 16,588 |
| 62,394 | 59,815 |
Trade and other payables are short-term in nature and are non-interest bearing. These are measured at amortised cost using the effective interest method.
26 CONTRACT LIABILITIES
As at 30 September 2023, current contract liabilities of AED 293.5 million (31 December 2022: AED 294.3 million), and non-current contract liabilities of AED 49.9 million (31 December 2022: AED 43.2 million), either relate to account balances paid in advance by the customer or arise from tag sale activation fees. The Company expects to recognise these unsatisfied performance obligations as revenue over a period of up to 5 years. At the end of 5 years any inactive customer account balances will be released and recognised as revenue.
26
Page 29
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
26 CONTRACT LIABILITIES (continued)
As at 30 September 2023, contract liabilities of AED 78.04 million, arising from tag activation fees will be recognized as revenue as follows:
| AED'000Year ended |
| 2023 | 8,134 |
| 2024 | 26,616 |
| 2025 | 21,850 |
| 2026 | 14,760 |
| 2027 | 6,677 |
| Total | 78,037 |
Movements in contract liabilities is as follows:
| 30 September 2023 (unaudited) AED'000 | 31 December 2022 (audited) AED'000 | 30 September 2022 (unaudited) AED'000 | |
|---|---|---|---|
| Balance at the beginning of the period / year / period | 337,533 | 313,346 | 313,345 |
| Add: Recharges during the period / year / period | 1,353,621 | 1,673,173 | 1,214,845 |
| Add: Tag activation fees collected during the period / year / period | 33,560 | 40,413 | 29,745 |
| Less: Revenue recognised during the period / year / period - toll usage fees | (1,352,613) | (1,651,575) | (1,207,832) |
| Less: Revenue recognised during the period / year / period - tag sales | (24,402) | (32,182) | (23,820) |
| Less: Inactive balance write-off during the period / year / period | (4,273) | (5,642) | (4,274) |
| Balance at the end of the period / year / period | 343,426 | 337,533 | 322,009 |
27 SHARE CAPITAL
The share capital of the Company comprised of 7,500,000,000 (31 December 2022: 7,500,000,000) shares of AED 0.01 each. All shares are authorised, issued and fully paid up.
28 REORGANISATION RESERVE
The reorganisation reserve is related to the capital reorganisation wherein the Salik Tolling Business was transferred from RTA to Salik Company P.J.S.C. during the year ended 31 December 2022. It represents the difference between the capital contributed by the Parent (DoF) and the net parent investment resulting from the transfer of tolling business of RTA to Salik Company P.J.S.C. as of 1 July 2022.
The movement in Net parent investment includes the impact of property and equipment not transferred to the Company (Note 16), the net distribution to the Parent (Note 22) and the total comprehensive income for the period 1 January 2022 to 30 June 2022, that is until the date the Company was legally set up and commenced its operations independently.
At the date of incorporation of the Company i.e., 30 June 2022, the Parent has contributed an amount of AED 205 million in the Company comprising of share capital of AED 75 million (Note 27) and remaining AED 130 million of capital contribution to the business. Further, additional capital contribution of AED 16.5 million was made by DoF following the incorporation of the Company. The total capital contribution of AED 146.5 million is not intended to be recalled by the Parent. Accordingly, the resulting Net parent investment of AED 146.5 million is offset by the capital contributed by the Parent and included in the reorganisation reserve.
Net parent investment in the comparative period represents the cumulative net investment by RTA in the Company from the inception of business until the date the business was transferred to the Company.
27
Page 30
SALIK COMPANY P.J.S.C.NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
29 STATUTORY RESERVE
In accordance with the UAE Federal Decree Law No. (32) of 2021, 5% of net profit of the Company is to be allocated every year to a statutory reserve. This statutory reserve, as per the Memorandum of Association, is subject to a maximum of 50%, of the Company's issued share capital. This reserve is not available for distribution except as stipulated by the law. During the nine-month period ended 30 September 2023, the Company has allocated AED Nil (2022: AED 37.5 million) from net profit to statutory reserve as the Company has reached the maximum limit for the reserve.
30 DIVIDEND
Dividends of AED 1,039,336 thousand were declared and paid during the nine-month period ended 30 September 2023 (2022: Nil) with details as follows:
(a) On 10th August 2023, the Board of Directors approved to distribute a dividend of AED 547.928 thousand (AED 0.073057 per share) to the shareholders, representing 100% of the Company's distributable net profit for the first half of 2023, which was subsequently paid on 6 September 2023.
(b) Dividend of AED 491,408 thousand (AED 0.065521 per share) in respect of the year ended 31 December 2022 was declared and approved in Annual General Assembly Meeting held on 6th April 2023, which was subsequently paid on 26 April 2023.
31 EARNINGS PER SHARE
The following table reflects the income and share data used in the basic and diluted EPS calculations:
| Three-month period ended 30 September 2023 (unaudited) AED'000 | Three-month period ended 30 September 2022 (unaudited) AED'000 | Nine-month period ended 30 September 2023 (unaudited) AED'000 | Nine-month period ended 30 September 2022 (unaudited) AED'000 | |
|---|---|---|---|---|
| Profit attributable to ordinary equity holders of the Company (AED '000) | 254,769 | 241,930 | 802,702 | 1,038,678 |
| Weighted average number of ordinary shares for basic and diluted EPS (number) | 7,500,000,000 | 7,500,000,000 | 7,500,000,000 | 7,500,000,000 |
| Basic and diluted earnings per share for profit attributable to the ordinary equity holders of the Company (AED) | 0.03 | 0.03 | 0.11 | 0.14 |
Basic earnings per share is calculated by dividing the profit or loss attributable to ordinary equity holders of the Company by the number of ordinary shares outstanding. Diluted earnings per share is determined by adjusting the profit or loss attributable to ordinary equity holders of the Company and the number of shares on formation for the effects of all dilutive potential ordinary shares. There were no instruments or any other items which could cause a dilutive effect on the earnings per share calculation.
32 FINANCIAL RISK MANAGEMENT OBJECTIVES AND POLICIES
32.1 Financial risk factors
The Company's activities and borrowings expose it to a variety of financial risks: market risk (including foreign exchange risk, price risk and cash flow interest rate risk), credit risk and liquidity risk.
These condensed interim financial statements do not include all financial risk management information and disclosures required in the annual financial statements. As such, they should be read in conjunction with the Company's financial statements for the year ended 31 December 2022. There has been no change in any financial risk management policies since year end.
28
Page 31
SALIK COMPANY P.J.S.C.
NOTES TO THE CONDENSED INTERIM FINANCIAL STATEMENTS
FOR THE THREE-MONTH AND NINE-MONTH PERIODS ENDED 30 SEPTEMBER 2023 (continued)
32. FINANCIAL RISK MANAGEMENT OBJECTIVES AND POLICIES (continued)
32.2 Capital risk management
The Company's objectives when managing capital are to safeguard the Company's ability to continue as a going concern in order to provide returns for the shareholders and benefits for other stakeholders and to maintain an optimal capital structure to reduce the cost of capital.
There has been no material change in the capital risk management policies of the Company during this period.
33 FAIR VALUES OF FINANCIAL INSTRUMENTS
Financial instruments comprise financial assets and financial liabilities. The Company's financial assets consist of trade and other receivables, due from related parties and cash and cash equivalents. The Company's financial liabilities consist of borrowings, lease liability, trade and other payables and due to a related party. The fair values of the financial assets and liabilities are included at the amount at which the instrument could be exchanged in a current transaction between willing parties, other than in a forced or liquidation sale. The fair values of the above financial assets and liabilities approximate their carrying amounts.
34 OFFSETTING FINANCIAL ASSETS AND FINANCIAL LIABILITIES
As at 30 September 2023 and 31 December 2022, the Company had outstanding trade receivable balances with gas stations related to the purchases of Salik tag and recharge cards in the amounts of AED 2.5 million and AED 12.8 million, respectively. These financial assets are offset by the commission payable by the Company to the gas stations in the amounts of AED 125 thousand and AED 672 thousand respectively. The net amount is reported in the condensed interim statement of financial position. The Company has an enforceable legal right to offset the recognised amounts and there is an intention to settle on a net basis.
35 DEFERRED TAX
On 9 December 2022, the UAE Ministry of Finance released Federal Decree-Law No. 47 of 2022 on the Taxation of Corporations and Businesses (Corporate Tax Law or the Law) to enact a Federal corporate tax (CT) regime in the UAE. The CT regime is effective from 1 June 2023 and accordingly, it has an income tax related impact on the financial statements for accounting periods beginning on or after 1 June 2023.
The Cabinet of Ministers Decision No. 116 of 2022 specifies the threshold of income over which the 9% tax rate would apply and accordingly, the Law is now considered to be substantively enacted from the perspective of IAS 12 - Income Taxes. A rate of 9% will apply to taxable income exceeding AED 375,000 and a rate of 0% will apply to taxable income not exceeding AED 375,000 and a rate
of 0% on qualifying income of free zone entities.
Current taxes will only be payable for financial years beginning on or after 1 June 2023 so the Company will be subject to current tax for the first time during the year ending 31 December 2024. However, as mentioned above, enactment of the legislation requires the Company to record deferred taxes using the enacted rate of 9%. Based on the assessment performed by the management, an immaterial deferred tax impact has been noted as of and for the three-month and nine-month periods ended 30 September 2023. As certain other cabinet decisions are pending as on the date of these condensed interim financial statements, the Company will continue to assess the impact of these pending cabinet decision on deferred taxes as and when finalized and published.
36 SUBSEQUENT EVENTS
There are no material events subsequent to 30 September 2023 and up until the authorisation of the condensed interim financial statements for issue, that have not been disclosed elsewhere in the financial statements.
37. IMPACT OF SEASONALITY ON THE BUSINESS
The Company is subject to moderate seasonal fluctuations, interim period revenue and earnings are typically sensitive to the traffic activity that tends to slow down during the summer months. As a result of moderate seasonal fluctuations, results for any quarter are not necessarily indicative of the results that may be achieved for any other quarter or for the full fiscal year.
38 APPROVAL OF THE CONDENSED INTERIM FINANCIAL STATEMENTS
The condensed interim financial statements were approved by the Board of Directors of Salik Company P.J.S.C. on 13 November 2023 and signed on its behalf by His Excellency Mattar Al Tayer, Chairman of the Board of Directors and Ibrahim Sultan Al Haddad, Chief Executive Officer.
29